CN107679683A - Software development progress method for early warning and device - Google Patents

Software development progress method for early warning and device Download PDF

Info

Publication number
CN107679683A
CN107679683A CN201611239455.4A CN201611239455A CN107679683A CN 107679683 A CN107679683 A CN 107679683A CN 201611239455 A CN201611239455 A CN 201611239455A CN 107679683 A CN107679683 A CN 107679683A
Authority
CN
China
Prior art keywords
story
delivery
warning
default
progress
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611239455.4A
Other languages
Chinese (zh)
Other versions
CN107679683B (en
Inventor
邓智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ping An Technology Shenzhen Co Ltd
Original Assignee
Ping An Technology Shenzhen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ping An Technology Shenzhen Co Ltd filed Critical Ping An Technology Shenzhen Co Ltd
Priority to CN201611239455.4A priority Critical patent/CN107679683B/en
Priority to PCT/CN2017/099729 priority patent/WO2018120891A1/en
Publication of CN107679683A publication Critical patent/CN107679683A/en
Application granted granted Critical
Publication of CN107679683B publication Critical patent/CN107679683B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063116Schedule adjustment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Data Mining & Analysis (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Debugging And Monitoring (AREA)

Abstract

The present invention relates to a kind of software development progress method for early warning and device, this method to include:Obtain and preset the construction cycle corresponding to the total points of Story and the current version corresponding to current version;The Story points of default monitoring cycle planted agent delivery are obtained according to the default construction cycle and the total points of the Story;The Story points of actual handing in the default monitoring cycle are obtained, count to obtain actual handing over rate according to the Story of actual handing over points and the Story that should be delivered;Default delivery rate threshold value is read from database, the actual handing over rate is compared with the delivery rate threshold value, warning information corresponding with delivery of version progress is generated according to comparison result;The warning information corresponding with delivery of version progress is sent to terminal.Improve software development efficiency.

Description

Software development progress method for early warning and device
Technical field
The present invention relates to field of computer technology, more particularly to a kind of software development progress method for early warning and device.
Background technology
Software development, refer to the process of be required to build the software section in software systems or system according to user. In various software development methodologies, agile development is (i.e. using the requirement evolution of user as core, using iteration, incremental method The method for carrying out software development) due to its iteratively faster, the characteristic quickly delivered, gradually welcome by developer.
It during whole agile development, can be related to developing, test, the process such as defect repair, the place of one of link Reason just influences whether the development progress of whole version not in time.There is no associated monitoring mechanism in release development process generally, When version development progress blocks, manager tends not to enough timely learn bottom is by which link or process processing Caused by not in time, cause timely to enter the arrangement in terms of administrative staff or work and adjustment to solve to cause obstruction Problem, influence software development efficiency.
The content of the invention
Based on this, it is necessary to provide a kind of software development progress method for early warning and device for improving software development efficiency.
A kind of software development progress method for early warning, the described method comprises the following steps:
Obtain and preset the construction cycle corresponding to the total points of Story and the current version corresponding to current version;
According to the default construction cycle and the Story, always points obtain the Story that default monitoring cycle planted agent delivers Points;
The Story points of actual handing in the default monitoring cycle are obtained, are counted according to the Story of the actual handing over Count to obtain actual handing over rate with the Story that should be delivered;
Default delivery rate threshold value is read from database, the actual handing over rate and the delivery rate threshold value are compared It is right, warning information corresponding with delivery of version progress is generated according to comparison result;
The warning information corresponding with delivery of version progress is sent to terminal.
In one of the embodiments, the step of Story corresponding to the acquisition current version always counts, including:
Obtain and multiple demands corresponding to current version and Story corresponding with each demand are counted;
Count to obtain Story corresponding with the current version according to Story corresponding to each demand and always count.
In one of the embodiments, it is described that warning information corresponding with delivery of version progress is generated according to comparison result Step, including:
When the actual handing over rate is more than or equal to the delivery rate threshold value, it is determined that go out corresponding with delivery of version progress The first warning grade, generate corresponding with first warning grade early warning and mark;
When actual handing over rate is less than the delivery rate threshold value and is more than or equal to the delivery rate threshold value and default deliver is During several product, it is determined that go out the second warning grade corresponding with delivery of version progress, generation and second warning grade pair The early warning mark answered;
When actual handing over rate is less than the product of the delivery rate threshold value and default delivery coefficient, it is determined that go out and version is handed over The 3rd warning grade corresponding to progress is paid, generates early warning mark corresponding with the 3rd warning grade.
In one of the embodiments, methods described also includes:
Call the interface of defective system to obtain defect information and corresponding defect rank, and handle the defect information Actual timeliness;
Default timeliness corresponding with the defect rank is searched, the actual timeliness and the default timeliness are compared It is right, generate warning information corresponding with defect processing progress;
The warning information corresponding with defect processing progress is sent to the terminal.
In one of the embodiments, the default timeliness includes defect repair timeliness and/or defect checking timeliness.
A kind of software development progress prior-warning device, described device include:
Acquisition module, opened for obtaining to preset corresponding to the total points of Story corresponding to current version and the current version Send out the cycle;
Story points determining modules, for always points to obtain default prison according to the default construction cycle and the Story Control the Story points that cycle planted agent delivers;
Delivery rate determining module, for obtaining the Story points of actual handing in the default monitoring cycle, according to described The Story points of actual handing over and the Story that should be delivered count to obtain actual handing over rate;
Warning information generation module, for reading default delivery rate threshold value from database, by the actual handing over rate It is compared with the delivery rate threshold value, warning information corresponding with delivery of version progress is generated according to comparison result;
Sending module, for the warning information corresponding with delivery of version progress to be sent to terminal.
In one of the embodiments, be additionally operable to obtain will be more corresponding to current version for Story points determining module Individual demand and Story corresponding with each demand count;Count to obtain according to Story corresponding to each demand and institute Story corresponding to current version is stated always to count.
In one of the embodiments, the warning information generation module is additionally operable to when the actual handing over rate is more than or waited When the delivery rate threshold value, it is determined that go out the first warning grade corresponding with delivery of version progress, generate and described first is pre- Early warning mark corresponding to alert grade;When actual handing over rate is less than the delivery rate threshold value and is more than or equal to the delivery rate threshold value During with the product of default delivery coefficient, it is determined that go out the second warning grade corresponding with delivery of version progress, generation and described the Early warning corresponding to two warning grades marks;When actual handing over rate is less than the delivery rate threshold value and the default product for delivering coefficient When, it is determined that go out the 3rd warning grade corresponding with delivery of version progress, generate early warning corresponding with the 3rd warning grade Mark.
In one of the embodiments, the acquisition module be additionally operable to call defective system interface obtain defect information and Corresponding defect rank, and the actual timeliness of the processing defect information;
Described device also includes:
Searching modul, for searching default timeliness corresponding with the defect rank;
The warning information generation module is additionally operable to the actual timeliness being compared with the default timeliness, generation with Warning information corresponding to defect processing progress;
The sending module is additionally operable to send the warning information corresponding with defect processing progress to the terminal.
In one of the embodiments, the default timeliness includes defect repair timeliness and/or defect checking timeliness.
Above-mentioned software development progress method for early warning and device, always count and work as by obtaining Story corresponding to current version The construction cycle is preset corresponding to preceding version;According to default construction cycle and Story, always points obtain default monitoring cycle planted agent friendship The Story points paid;Obtain the Story points of actual handing in the default monitoring cycle, according to the Story of actual handing over points and The Story that should be delivered counts to obtain actual handing over rate;Default delivery rate threshold value is read from database, by actual handing over rate with Delivery rate threshold value is compared, and warning information corresponding with delivery of version progress is generated according to comparison result;Will be with delivery of version Warning information corresponding to progress is sent to terminal.By Story dimensions develop the monitoring of delivery rate, and generation and version Warning information corresponding to delivery progress, and then when exploitation delivery process is blocked, can timely inform that early warning handles people Member.So, early warning treatment people knows the reason for blocking in time, it becomes possible to is arranged and is adjusted in time, solved Cause the problem of obstruction.And then improve software development efficiency.
Brief description of the drawings
Fig. 1 is the application environment schematic diagram of software development progress method for early warning in one embodiment;
Fig. 2 is the cut-away view of server in one embodiment;
Fig. 3 is the schematic flow sheet of software development progress method for early warning in one embodiment;
Fig. 4 is the schematic flow sheet of warning information generation method in another embodiment;
Fig. 5 is the schematic flow sheet of defect processing progress method for early warning in one embodiment;
Fig. 6 is the structural representation of software development progress prior-warning device in one embodiment;
Fig. 7 is the structural representation of software development progress prior-warning device in another embodiment.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, it is right below in conjunction with drawings and Examples The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
Fig. 1 is the applied environment figure of software development progress method for early warning in one embodiment.As shown in figure 1, server 110 Communicated by network with terminal 120.Server 110 obtains Story corresponding to current version always points and current version pair The default construction cycle answered, according to default construction cycle and Story, always points obtain the Story that default monitoring cycle planted agent delivers Points.Further, server 110 obtains the Story points of actual handing in the default monitoring cycle, according to actual handing over The Story that Story counts and should delivered counts to obtain actual handing over rate.Server 110 reads default delivery from database Rate threshold value, actual handing over rate is compared with delivery rate threshold value, generated according to comparison result corresponding with delivery of version progress Warning information.Server 110 sends warning information corresponding with delivery of version progress to terminal 120.
It is appreciated that terminal 120 includes but is not limited to various personal computers, smart mobile phone, tablet personal computer, notebook electricity Brain, portable wearable device etc., it is numerous to list herein.
Fig. 2 shows the internal structure schematic diagram of the server 110 in one embodiment, and the server includes passing through system Processor, non-volatile memory medium, built-in storage and the network interface of bus connection.Wherein, the server is non-volatile Storage medium is stored with operating system, database and a kind of software development progress prior-warning device, and database is used for data storage, such as Default delivery rate threshold value etc..The software development progress prior-warning device is used to realize a kind of software development progress method for early warning.At this Manage device to be used to provide calculating and control ability, support the operation of whole server.Built-in storage in server is non-volatile The operation of software development progress prior-warning device in storage medium provides environment, can be stored in the built-in storage computer-readable Instruction, when the computer-readable instruction is by the computing device, may be such that a kind of software development progress of the computing device Method for early warning.Network interface is used to carry out network service with terminal.It will be understood by those skilled in the art that the knot shown in Fig. 2 The block diagram of structure, the only part-structure related to application scheme, do not form what application scheme was applied thereon The restriction of server, specific server can be included than more or less parts shown in figure, or some parts of combination, Or arranged with different parts.
As shown in figure 3, in one embodiment, there is provided a kind of software development progress method for early warning, now in this way should For being illustrated exemplified by server, this method specifically includes following steps:
Step 302, obtain and preset the construction cycle corresponding to the total points of Story corresponding to current version and current version.
It is appreciated that in agile development, the exploitation of whole version can be divided into several demands, each demand can wrap Include at least one story (i.e. Story).Wherein, Story is the function point of minimum particle size.One software version equivalent to by Multiple Story compositions.
Server can obtain Story corresponding to current version (version currently developed) always points and current version The default construction cycle.
Wherein, the corresponding points of a Story.Always points are Story total quantitys to Story.
Specifically, Ke Yishi, server is directly from interconnected system (the hereinafter referred to as association system for being stored with edition protection information System) obtain current version in (such as electronic billboard system) corresponding to Story always count.
Can also be that server obtains multiple demands corresponding to current version and Story corresponding with each demand points, Specifically, server can be obtained from the interconnected system for being stored with edition protection information multiple demands corresponding to current version and Story corresponding with each demand points, or obtain multiple demands corresponding to the current version of itself storage and with each demand Corresponding Story points.This is not construed as limiting.
Further, server can the Story according to corresponding to each demand count to obtain Story corresponding with current version Total points.Specifically, server can obtain Story points progress read group total corresponding to each demand corresponding with current version Story always count.For example edition protection is included into 5 Story, 3 need respectively into 18 demands, 2 demands therein Ask includes 3 Story respectively, and 10 demands include 2 Story and 3 demands respectively includes 1 Story respectively.Then with this Story corresponding to version always counts=2*5+3*3+10*2+3*1=42.
It is appreciated that edition protection information be by edition protection into demand information and Story point informations or version Total points of corresponding Story etc..Electronic billboard system, refer to the system for managing version information and version development process information.Can To understand, the function of electronic billboard system is not limited to above-mentioned function.
In other embodiments, server itself can also storage version division information, server can be from its data The edition protection information of storage is obtained in storehouse.
Wherein, the construction cycle is preset, refers to the cycle that the developer pre-set carries out version exploitation.It is appreciated that version After the completion of this exploitation, delivery of version to test organization can be subjected to version test operation.
Step 304, according to default construction cycle and Story, always points obtain the Story that default monitoring cycle planted agent delivers Points.
The default monitoring cycle is pre-set in the present embodiment, in server.The default monitoring cycle can be with day, week Deng for unit.For example it can be one day, can also be 2 days or 1 week etc..In the default monitoring cycle, refer to the detection of carry out progress, life Into the cycle of warning information.
Server can always points obtain the Story that default monitoring cycle planted agent delivers according to default construction cycle and Story Points.Specifically, server can calculate the ratio in default version monitoring cycle and default construction cycle, then according to the ratio The Story that default monitoring cycle planted agent delivery is obtained with the product that Story always counts counts.It is appreciated that in the present embodiment " delivery " refers to be delivered to test from exploitation, and not completes to reach the standard grade to production after entirely developing test process.
Step 306, the Story points of actual handing in the default monitoring cycle are obtained, are counted according to the Story of actual handing over Count to obtain actual handing over rate with the Story that should be delivered.
Server can obtain the Story points of actual handing in the default monitoring cycle.Specifically, server can be from itself The Story points of the actual handing over are obtained in database, the interface of interconnected system can also be called, obtained from interconnected system pre- If monitor the Story points of actual handing in the cycle.This is not limited.
Further, the ratio that the Story that server is counted and should delivered according to the Story of actual handing over counts, obtains reality Border delivery rate.
Step 308, default delivery rate threshold value is read from database, actual handing over rate and delivery rate threshold value are compared It is right, warning information corresponding with delivery of version progress is generated according to comparison result.
Specifically, the delivery rate threshold value pre-set is stored in database.Server reads default from database Delivery rate threshold value.And actual handing over rate is compared with default delivery rate threshold value, handed over according to comparison result generation with version Pay warning information corresponding to progress.
Wherein, warning information includes early warning mark or early warning item (for example deliver this item to exploitation and carry out early warning) Deng.Actual handing over rate and default delivery rate threshold value, and the comparison situation between both can also be included.Further, early warning Mark is the mark that can be identified for that out early warning intensity or warning grade, can include color mark or pictorial symbolization, by difference Early warning intensity or warning grade make a distinction mark.
In one embodiment, as shown in figure 4, generating warning information corresponding with delivery of version progress according to comparison result The step of (abbreviation warning information generation step), specifically include following steps:
Step 402, when actual handing over rate is more than or equal to delivery rate threshold value, it is determined that go out corresponding with delivery of version progress The first warning grade, generate corresponding with the first warning grade early warning and mark.
In the present embodiment, when server judges that actual handing over rate is more than or equal to delivery rate threshold value, it is determined that with version It is the first warning grade corresponding to this delivery progress, and then generates early warning mark corresponding with the first warning grade.
It is appreciated that when actual handing over rate is more than or equal to delivery rate threshold value, then illustrate that progress is not blocked, is belonged to Progress normal condition.The first warning grade then determined is zero level early warning.The corresponding early warning mark of generation, then it is mark progress Normal mark.For example can identify whether progress blocks according to traffic lights, then early warning mark corresponding to first warning grade It is designated as green light mark.
Step 404, when actual handing over rate is less than delivery rate threshold value and is more than or equal to delivery rate threshold value and default deliver is During several product, it is determined that go out the second warning grade corresponding with delivery of version progress, generation is corresponding with the second warning grade Early warning marks.
Delivery coefficient is pre-set in the present embodiment, in server, wherein delivering coefficient as the positive number less than 1.Work as clothes Business device judges that actual handing over rate is less than delivery rate threshold value and more than or equal to delivery rate threshold value and the default product for delivering coefficient When, it is determined that corresponding with delivery of version progress is the second warning grade, and then generates early warning corresponding with the second warning grade Mark.
It is appreciated that when actual handing over rate is less than delivery rate threshold value and is more than or equal to delivery rate threshold value and default deliver is During several product, then illustrate that some obstructions occurs in progress, belong to progress little obstruction state.Second early warning then determined etc. Level is intermediate early warning.The corresponding early warning mark of generation, then it is the mark of mark progress little obstruction.Similarly, such as according to red Green light identifies whether progress blocks, then early warning corresponding to second warning grade marks labeled as amber light.
Step 406, when actual handing over rate be less than delivery rate threshold value and it is default deliver coefficient product when, it is determined that go out and version 3rd warning grade corresponding to this delivery progress, generate early warning mark corresponding with the 3rd warning grade.
It is appreciated that when actual handing over rate is less than the product of delivery rate threshold value and default delivery coefficient, then illustrate progress There is Severe blockage, belong to progress Severe blockage state.The second warning grade then determined is advanced early warning.Pair of generation Answer early warning to mark, be then the mark of mark progress Severe blockage.Identify whether progress hinders Plug, then early warning corresponding to the 3rd warning grade mark labeled as red light.
It is appreciated that the embodiment of the present invention is not construed as limiting the order of step 402,404 and 406, it is only used for distinguishing difference Comparison result generates different early warning informations.
It is explained in conjunction with the example of step 302.For example the construction cycle is 7 days, the version monitoring cycle is every My god, then the Story points=42/7=6 that should be delivered (i.e. daily) in the version monitoring cycle, default delivery rate threshold value is 1, in advance If it is 0.8 to deliver coefficient, it is assumed that the Story points of daily actual handing over are 4, then actual handing over rate=4/6=0.67<1*0.8 Early warning corresponding to then determining marks labeled as progress Severe blockage, such as red light, it is assumed that the Story of daily actual handing over, which counts, is 7, then actual handing over rate=7/6>1, then illustrate that progress is not blocked, early warning mark can be green light, it is assumed that daily actual handing over Story points are 5, then actual handing over rate=5/6, then the actual handing over rate 5/6 is more than 1*0.8 and is less than 1, then it is slight to belong to progress Blocked state, early warning mark can be amber light.
Step 310, warning information corresponding with delivery of version progress is sent to terminal.
Further, server can send warning information corresponding with delivery of version progress to terminal.Specifically, server Directly warning information can be sent to terminal.The interface of mailing system can also be called, will be corresponding with delivery of version progress Warning information is sent in the form of mail to terminal.The interface of immediate communication platform or SMS platform is may call upon, will be with version Warning information corresponding to this delivery progress is sent in the form of instant communication message or short message to terminal.This is not construed as limiting.
It is appreciated that terminal here refers to terminal used in early warning treatment people.
In the present embodiment, server is pre- corresponding to the total points of Story corresponding to current version and current version by obtaining If the construction cycle;The Story points of default monitoring cycle planted agent delivery are obtained according to default construction cycle and the total points of Story; Obtain the Story points of actual handing in the default monitoring cycle, the Story that counts and should deliver according to the Story of actual handing over Points obtain actual handing over rate;Default delivery rate threshold value is read from database, actual handing over rate and delivery rate threshold value are entered Row is compared, and warning information corresponding with delivery of version progress is generated according to comparison result;Will be corresponding with delivery of version progress pre- Alert information is sent to terminal.By Story dimensions develop the monitoring of delivery rate, and generate corresponding with delivery of version progress Warning information, and then develop delivery process block when, can timely inform early warning treatment people.So, Early warning treatment people knows the reason for blocking in time, it becomes possible to is arranged and is adjusted in time, solves to cause being somebody's turn to do for obstruction Problem.And then improve software development efficiency.
As shown in figure 5, in one embodiment, the step of this method also includes defect processing progress early warning, specifically include Following steps:
Step 502, call the interface of defective system to obtain defect information and corresponding defect rank, and handle described lack Fall into the actual timeliness of information.
In the present embodiment, server can call the interface of defective system, and defect information and each is obtained from defective system The defects of corresponding to defect information grade.
Further, server can also obtain the actual timeliness for handling the defect information from defective system.Wherein, processing lacks Falling into the timeliness (including actual timeliness and default timeliness) of information includes defect repair timeliness and/or defect checking timeliness.
Step 504, default timeliness corresponding with defect rank is searched, actual timeliness is compared with default timeliness, it is raw Into warning information corresponding with defect processing progress.
Specifically, the corresponding relation between defect rank and default timeliness is pre-set in server.It is corresponding according to this Relation, search default timeliness corresponding with defect rank.Similarly, as described above, when default timeliness includes defect repair Effect and/or defect checking timeliness.Actual timeliness can be compared with default timeliness for server, be generated according to comparison result corresponding Warning grade, corresponding with defect processing progress warning information is generated according to warning grade.
Wherein, the corresponding one or more default timeliness of a defect rank.
In one embodiment, the corresponding default timeliness of defect rank, server is by actual timeliness and the lookup To default timeliness be compared, corresponding warning grade is determined according to comparison result.
Specifically, when effect is less than or equal to the default timeliness when practical, it is determined that corresponding warning grade is pre- to be not required to Alert grade (such as zero level), then generate early warning mark corresponding with the warning grade, such as green light.Effect, which is more than, when practical is somebody's turn to do During default timeliness, it is determined that actual timeliness exceeds the duration of default timeliness, according to beyond duration come warning grade corresponding to determining. Further, multiple segmentation durations are preset, multiple piecewise intervals, different segment identifiers are formed as waypoint by multiple segmentation durations Between correspond to different warning grades, the piecewise interval according to residing for beyond duration determines corresponding warning grade.It is appreciated that Here the number for being segmented duration point is not limited, and then the division series to warning grade does not also limit.
Further, when being less than or equal to the first segmentation duration beyond duration, then primary early warning is corresponded to;When beyond when grow up When being segmented duration in first and being segmented duration less than or equal to second, then intermediate early warning is corresponded to;It is segmented when being more than second beyond duration During duration, then advanced early warning is corresponded to.Such as beyond when it is a length of be more than 0 and be less than or equal to 4H when, then correspond to primary early warning;Beyond when It is a length of when being more than 8 and being less than or equal to 8H, then correspond to intermediate early warning;It is more than 8H beyond duration, then corresponds to advanced early warning.
In another embodiment, a defect rank corresponds to multiple default timeliness.Server can be by multiple default timeliness Multiple reference intervals are formed as waypoint, different reference intervals corresponds to different warning grades, according to residing for actual timeliness Reference interval determine corresponding warning grade.It is appreciated that the number for presetting timeliness is not limited here, and then to pre- The division series of alert grade does not also limit.
Further, by default timeliness according to descending order be represented sequentially as the first default timeliness and second it is default when Effect.When then effect is less than or equal to the first default timeliness when practical, then the grade (such as zero level) for being not required to early warning is corresponded to;When practical When effect is more than the first default timeliness and timeliness is preset less than or equal to second, then intermediate early warning is corresponded to;Effect is more than second when practical During default timeliness, then advanced early warning is corresponded to.Such as first default timeliness be 4H, second to preset timeliness be 8H, and actual timeliness is 7H, then actual timeliness 7H, which is more than the first default timeliness 4H and is less than second, presets timeliness 8H, so during corresponding warning grade is Level early warning.
The corresponding relation between warning grade and warning information is pre-set in server.According to the corresponding relation, look into Look for the warning information of defect processing progress corresponding with the warning grade determined.Wherein, warning information marks including early warning.Enter One step, early warning mark include color mark or pictorial symbolization etc..Here the specific manifestation form of early warning mark is not construed as limiting, only It can be identified for that and distinguish different warning grades.
Step 506, warning information corresponding with defect processing progress is sent to terminal.
Server can send warning information corresponding with defect processing progress to terminal.Specifically, server can be straight Connect and send warning information corresponding with defect processing progress to terminal.The interface of mailing system can also be called, will be with defect Warning information corresponding to processing progress is sent in the form of mail to terminal.It may call upon immediate communication platform or SMS platform Interface, warning information corresponding with defect processing progress is sent to terminal in the form of instant communication message or short message.It is right This is not construed as limiting.
It is appreciated that terminal here refers to terminal used in early warning treatment people.
In one embodiment, test execution rate threshold value has also been preset in server.Server can also obtain actual Test execution rate.Wherein, actual test implementation rate is to be delivered according to the points for the Story for actually accomplishing test with exploitation What the ratio of Story points was worth to.
Actual test implementation rate is compared server with default test execution rate threshold value, is generated and surveyed according to comparison result Try the warning information of processing progress.Specifically, test coefficient has been preset in server, wherein test coefficient is the positive number less than 1. Server forms using the product and test execution rate threshold value of test system and test execution rate threshold value as waypoint Multiple control sections, different control sections correspond to different warning grades, the control being located at according to actual test implementation rate Corresponding warning grade is determined in section.Search warning information corresponding with the warning grade determined.This is determined pre- Alert information is the warning information of test processes progress.
, can will corresponding with delivery of version progress warning information and defect processing it is appreciated that in one embodiment Warning information corresponding to progress and warning information corresponding with test processes progress merge, and send together to terminal.Its In, it can be that template is merged according to default warning information, the warning information of this 3 type is merged, generate a system One warning information, send to terminal.
As shown in fig. 6, in one embodiment, there is provided a kind of software development progress prior-warning device 600.The device includes Acquisition module 602, Story points determining module 604, delivery rate determining module 606, warning information generation module 608 and hair Module 610 is sent, wherein:
Acquisition module 602, preset for obtaining corresponding to the total points of Story corresponding to current version and the current version Construction cycle.
Story points determining modules 604, it is pre- for being obtained according to the default construction cycle and the total points of the Story If monitor the Story points that cycle planted agent delivers.
Delivery rate determining module 606, for obtaining the Story points of actual handing in the default monitoring cycle, according to The Story points of the actual handing over and the Story that should be delivered count to obtain actual handing over rate.
Warning information generation module 608, for reading default delivery rate threshold value from database, by the actual handing over Rate is compared with the delivery rate threshold value, and warning information corresponding with delivery of version progress is generated according to comparison result.
Sending module 610, for the warning information corresponding with delivery of version progress to be sent to terminal.
In one embodiment, Story points determining module 604 is additionally operable to obtain multiple demands corresponding to current version Corresponding Story counts with each demand;According to Story corresponding to each demand count to obtain with it is described current Story always counts corresponding to version.
In one embodiment, warning information generation module 608 is additionally operable to when the actual handing over rate is more than or equal to institute When stating delivery rate threshold value, it is determined that go out the first warning grade corresponding with delivery of version progress, generation and first early warning etc. Early warning mark corresponding to level;When actual handing over rate is less than the delivery rate threshold value and more than or equal to the delivery rate threshold value and in advance If deliver the product of coefficient, it is determined that go out the second warning grade corresponding with delivery of version progress, generate and described second is pre- Early warning mark corresponding to alert grade;When actual handing over rate is less than the product of the delivery rate threshold value and default delivery coefficient, then The 3rd warning grade corresponding with delivery of version progress is determined, generates early warning mark corresponding with the 3rd warning grade.
In one embodiment, acquisition module 602 is additionally operable to call the interface of defective system to obtain defect information and correspondingly The defects of grade, and the actual timeliness of the processing defect information.As shown in fig. 7, in the present embodiment, the device also includes:
Searching modul 607, for searching default timeliness corresponding with the defect rank.
In the present embodiment, warning information generation module 608 is additionally operable to carry out the actual timeliness and the default timeliness Compare, generate warning information corresponding with defect processing progress;
Sending module 610 is additionally operable to send the warning information corresponding with defect processing progress to the terminal.
In one embodiment, presetting timeliness includes defect repair timeliness and/or defect checking timeliness.
One of ordinary skill in the art will appreciate that realize all or part of flow in above-described embodiment method, being can be with The hardware of correlation is instructed to complete by computer program, the computer program can be stored in a computer-readable storage and be situated between In matter, the program is upon execution, it may include such as the flow of the embodiment of above-mentioned each method.Wherein, foregoing storage medium can be The non-volatile memory mediums such as magnetic disc, CD, read-only memory (Read-Only Memory, ROM), or random storage note Recall body (Random Access Memory, RAM) etc..
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, the scope that this specification is recorded all is considered to be.
Embodiment described above only expresses the several embodiments of the present invention, and its description is more specific and detailed, but simultaneously Can not therefore it be construed as limiting the scope of the patent.It should be pointed out that come for one of ordinary skill in the art Say, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention Scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (10)

1. a kind of software development progress method for early warning, the described method comprises the following steps:
Obtain and preset the construction cycle corresponding to the total points of Story and the current version corresponding to current version;
The Story points of default monitoring cycle planted agent delivery are obtained according to the default construction cycle and the total points of the Story;
The Story points of actual handing in the default monitoring cycle are obtained, according to the Story of actual handing over points and institute The Story that stating to deliver counts to obtain actual handing over rate;
Default delivery rate threshold value is read from database, the actual handing over rate is compared with the delivery rate threshold value, Warning information corresponding with delivery of version progress is generated according to comparison result;
The warning information corresponding with delivery of version progress is sent to terminal.
2. according to the method for claim 1, it is characterised in that what Story corresponding to the acquisition current version always counted Step, including:
Obtain and multiple demands corresponding to current version and Story corresponding with each demand are counted;
Count to obtain Story corresponding with the current version according to Story corresponding to each demand and always count.
3. according to the method for claim 1, it is characterised in that described according to comparison result generation and delivery of version progress pair The step of warning information answered, including:
When the actual handing over rate is more than or equal to the delivery rate threshold value, it is determined that go out corresponding with delivery of version progress One warning grade, generate early warning mark corresponding with first warning grade;
When actual handing over rate is less than the delivery rate threshold value and more than or equal to the delivery rate threshold value and default delivery coefficient During product, it is determined that go out the second warning grade corresponding with delivery of version progress, generation is corresponding with second warning grade Early warning marks;
When actual handing over rate is less than the product of the delivery rate threshold value and default delivery coefficient, it is determined that go out and enter with delivery of version 3rd warning grade corresponding to degree, generate early warning mark corresponding with the 3rd warning grade.
4. according to the method described in any one of claims 1 to 3, it is characterised in that methods described also includes:
The interface of defective system is called to obtain defect information and corresponding defect rank, and the reality of the processing defect information Timeliness;
Default timeliness corresponding with the defect rank is searched, the actual timeliness is compared with the default timeliness, it is raw Into warning information corresponding with defect processing progress;
The warning information corresponding with defect processing progress is sent to the terminal.
5. according to the method for claim 4, it is characterised in that the default timeliness includes defect repair timeliness and/or lacked Fall into checking timeliness.
6. a kind of software development progress prior-warning device, it is characterised in that described device includes:
Acquisition module, it is all for obtaining default exploitation corresponding to the total points of Story corresponding to current version and the current version Phase;
Story points determining modules, it is all for obtaining default monitoring according to the default construction cycle and the total points of the Story The Story points that phase planted agent delivers;
Delivery rate determining module, for obtaining the Story points of actual handing in the default monitoring cycle, according to the reality The Story points of delivery and the Story that should be delivered count to obtain actual handing over rate;
Warning information generation module, for reading default delivery rate threshold value from database, by the actual handing over rate and institute State delivery rate threshold value to be compared, warning information corresponding with delivery of version progress is generated according to comparison result;
Sending module, for the warning information corresponding with delivery of version progress to be sent to terminal.
7. device according to claim 6, it is characterised in that the Story points determining module is additionally operable to acquisition ought Multiple demands corresponding to preceding version and Story corresponding with each demand count;According to corresponding to each demand Story, which counts to obtain Story corresponding with the current version, always to count.
8. device according to claim 6, it is characterised in that the warning information generation module is additionally operable to work as the reality When delivery rate is more than or equal to the delivery rate threshold value, it is determined that go out the first warning grade corresponding with delivery of version progress, it is raw Marked into early warning corresponding with first warning grade;When actual handing over rate is less than the delivery rate threshold value and is more than or equal to When the delivery rate threshold value and the product of default delivery coefficient, it is determined that go out second early warning corresponding with delivery of version progress etc. Level, generate early warning mark corresponding with second warning grade;When actual handing over rate is less than the delivery rate threshold value and presets When delivering the product of coefficient, it is determined that go out the 3rd warning grade corresponding with delivery of version progress, generation and the 3rd early warning Early warning corresponding to grade marks.
9. the device according to claim 6 to 8, it is characterised in that the acquisition module is additionally operable to call defective system Interface obtains defect information and corresponding defect rank, and the actual timeliness of the processing defect information;
Described device also includes:
Searching modul, for searching default timeliness corresponding with the defect rank;
The warning information generation module is additionally operable to the actual timeliness being compared with the default timeliness, generation and defect Warning information corresponding to processing progress;
The sending module is additionally operable to send the warning information corresponding with defect processing progress to the terminal.
10. device according to claim 9, it is characterised in that the default timeliness includes defect repair timeliness and/or lacked Fall into checking timeliness.
CN201611239455.4A 2016-12-28 2016-12-28 Software development progress early warning method and device Active CN107679683B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201611239455.4A CN107679683B (en) 2016-12-28 2016-12-28 Software development progress early warning method and device
PCT/CN2017/099729 WO2018120891A1 (en) 2016-12-28 2017-08-30 Software development progress early warning method, device, server, and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611239455.4A CN107679683B (en) 2016-12-28 2016-12-28 Software development progress early warning method and device

Publications (2)

Publication Number Publication Date
CN107679683A true CN107679683A (en) 2018-02-09
CN107679683B CN107679683B (en) 2020-03-24

Family

ID=61133144

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611239455.4A Active CN107679683B (en) 2016-12-28 2016-12-28 Software development progress early warning method and device

Country Status (2)

Country Link
CN (1) CN107679683B (en)
WO (1) WO2018120891A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108737504A (en) * 2018-04-25 2018-11-02 安徽沃屹智能装备有限公司 A kind of software programmers' intelligent management system
CN108845943A (en) * 2018-06-25 2018-11-20 郑州云海信息技术有限公司 A kind of method and system that judgement software test stage is completed

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111210099A (en) * 2018-11-21 2020-05-29 鸿富锦精密电子(成都)有限公司 Product aging information monitoring method and device and computer readable storage medium
CN110443480B (en) * 2019-07-26 2023-10-27 中铁四局集团第一工程有限公司 Construction progress monitoring and early warning method and system
CN113405608B (en) * 2021-07-07 2022-11-18 淮南泰隆机械制造有限公司 Iron wire galvanizing film monitoring system and working method thereof
CN115118571A (en) * 2022-06-28 2022-09-27 中国平安财产保险股份有限公司 Service monitoring method, platform, computer equipment and storage medium
CN115794045B (en) * 2023-02-07 2023-05-12 山东信息职业技术学院 Software development application data processing method based on big data

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102360465A (en) * 2011-09-30 2012-02-22 镇江睿泰信息科技有限公司 Software project schedule management method and system thereof
CN103092762A (en) * 2013-02-19 2013-05-08 南京大学 Real-time software defect detection method applicable to rapid software development model
US8458663B2 (en) * 2008-02-14 2013-06-04 International Business Machines Corporation Static code analysis
CN105117348A (en) * 2015-09-28 2015-12-02 佛山市朗达信息科技有限公司 Method for monitoring test execution progress of software

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9654414B2 (en) * 2014-09-18 2017-05-16 International Business Machines Corporation Scheduling cost efficient datacenter load distribution

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8458663B2 (en) * 2008-02-14 2013-06-04 International Business Machines Corporation Static code analysis
CN102360465A (en) * 2011-09-30 2012-02-22 镇江睿泰信息科技有限公司 Software project schedule management method and system thereof
CN103092762A (en) * 2013-02-19 2013-05-08 南京大学 Real-time software defect detection method applicable to rapid software development model
CN105117348A (en) * 2015-09-28 2015-12-02 佛山市朗达信息科技有限公司 Method for monitoring test execution progress of software

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
龙爱强: "银行软件项目管理系统设计与实现", 《万方》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108737504A (en) * 2018-04-25 2018-11-02 安徽沃屹智能装备有限公司 A kind of software programmers' intelligent management system
CN108845943A (en) * 2018-06-25 2018-11-20 郑州云海信息技术有限公司 A kind of method and system that judgement software test stage is completed

Also Published As

Publication number Publication date
CN107679683B (en) 2020-03-24
WO2018120891A1 (en) 2018-07-05

Similar Documents

Publication Publication Date Title
CN107679683A (en) Software development progress method for early warning and device
Liu et al. Optimal restoration schedules of transportation network considering resilience
CN107908631A (en) Data processing method, device, storage medium and computer equipment
CN110442498B (en) Abnormal data node positioning method and device, storage medium and computer equipment
JP2017188113A (en) Providing per-application resource usage information
CN108257227A (en) A kind of Quick Response Code settlement method, terminal and system
CN107580073A (en) Realize the method and device of targeted customer&#39;s message push
JP2009022042A (en) Automated fraud management in transaction-based networks
CN110213068A (en) A kind of monitoring method and relevant device of message-oriented middleware
CN104965999B (en) The analysis joining method of a kind of short-and-medium genetic fragment order-checking and equipment
CN110162445A (en) The host health assessment method and device of Intrusion Detection based on host log and performance indicator
CN104133688A (en) Medical service inspection and investigation system and method
CN109543891A (en) Method for building up, equipment and the computer readable storage medium of capacity prediction model
CN113434575B (en) Data attribution processing method, device and storage medium based on data warehouse
CN112396547B (en) Course recommendation method, device, equipment and medium based on unsupervised learning
WO2021249306A1 (en) Crowd overdensity prediction method and device
CN109766323A (en) The full link monitoring method, apparatus of loan transaction, computer equipment and storage medium
CN109947870A (en) The prediction meanss and method of specific type personnel calculate equipment and storage medium
CN110443624A (en) Shou Dan trade company checking method and node apparatus based on block chain
Gitinavard et al. A mixed expert evaluation system and dynamic interval-valued hesitant fuzzy selection approach
CN109710689A (en) Enterprise&#39;s monitoring and managing method, system, device, equipment and readable storage medium storing program for executing
CN110609871A (en) Product research and development management method and system based on block chain
CN106899436A (en) A kind of cloud platform failure predication diagnostic system
CN113312529A (en) Data visualization method and device, computer equipment and storage medium
CN106331060A (en) Control execution method and system based on WIFI

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant