CN107642092A - A kind of pile foundation post grouting construction method and post jacking device - Google Patents

A kind of pile foundation post grouting construction method and post jacking device Download PDF

Info

Publication number
CN107642092A
CN107642092A CN201710859668.5A CN201710859668A CN107642092A CN 107642092 A CN107642092 A CN 107642092A CN 201710859668 A CN201710859668 A CN 201710859668A CN 107642092 A CN107642092 A CN 107642092A
Authority
CN
China
Prior art keywords
pile foundation
shower nozzle
steel pipe
post
mud jacking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710859668.5A
Other languages
Chinese (zh)
Inventor
李松岷
李永利
李金元
孙福贺
赵亚斌
贺坚
闫定军
常福青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Second Construction Co Ltd of China Construction First Group Co Ltd
Original Assignee
China Construction First Group Corp Ltd
Second Construction Co Ltd of China Construction First Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, Second Construction Co Ltd of China Construction First Group Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201710859668.5A priority Critical patent/CN107642092A/en
Publication of CN107642092A publication Critical patent/CN107642092A/en
Pending legal-status Critical Current

Links

Abstract

A kind of method that pile foundation post grouting construction is carried out the invention discloses pile foundation post jacking device and using the device, the pile foundation post jacking device includes mud jacking shower nozzle, the mud jacking shower nozzle is fixedly welded on the lower end of pile foundation sounding steel pipe, the mud jacking shower nozzle includes body and the duckbilled positioned at body end, and No. 8 iron wires of a circle are welded with the crossover position of body and duckbilled;Slurry outlet is provided with the side wall of the body, drawing pin is packed with slurry outlet, is enclosed with balata belt and adhesive waterproof tape on the outside of body, balata belt and adhesive waterproof tape cause the head of a nail of drawing pin to be close to the outer wall of body.The present invention is simple in construction, cheap and only starches excellent effect.

Description

A kind of pile foundation post grouting construction method and post jacking device
Technical field
The present invention relates to the realm of building construction, relates in particular to a kind of pile foundation post grouting construction method and post jacking device A kind of pile foundation post grouting construction method and post jacking device.
Background technology
Pile foundation has high capacity, settles small, easy to make, flexible arrangement and fit as a kind of special deep foundation With condition it is extensive the advantages that, more and more important effect is played in field of civil engineering, but due to stake bottom in Practical Project Sediment, loosened soil cleaning be not clean, or stake week is produced one layer of mudcake using mud off, so as to reduce between stake and the soil body The reasons such as side friction, cause bearing capacity of pile foundation insufficient, have a negative impact to construction quality and safety.Pile foundation post-grouting technology This defect is compensate for well, and pile foundation post jacking refers to after pile reaches certain age, and plug is opened to pre-buried slip casting passage And the cement mortar jacked pile end of certain pressure, Pile side soil layer are played infiltration to Pile side soil body by slurries, filled out with grouting pump Fill, densification, splitting, the effect such as consolidation come strengthen an end, Pile side soil strength and stiffness, increase stake side shearing section resistance and Roughness, stake end bearing capacity, pile side friction, the effect for reducing sedimentation are improved so as to reach.
Need to use the devices such as grouting pump, Grouting Pipe, slurry casting machine, grouting stop-valve, existing market during pile foundation post jacking Not only expense is expensive for the slurry casting machine of upper purchase, grouting stop-valve etc., and sealing is poor, and in practice of construction, slurry casting machine occurs various Problem, especially severe is that soil and powder on pit bottom sand easily pour in Grouting Pipe, causes slurry casting machine to fail, so that slurry casting machine can not Normal work, success rate is extremely low, extends construction period to a certain extent and adds construction costs;During other post jacking Vertically arranged slip casting steel pipe 3-5 roots are usually required per pile, slip casting steel pipe dosage is larger, also increases construction costs.
In addition, can not effectively be permeated for the geological conditions of hypotonicity, in general cement mortar permeability deficiency, slurries, Either intensity deficiency.
The content of the invention
For overcome the deficiencies in the prior art, it is an object of the present invention to provide a kind of simple in construction, cheap and only slurry effect Excellent pile foundation post jacking device and the method using its progress pile foundation post grouting construction.
To reach above-mentioned purpose, present invention employs following technical scheme:
A kind of pile foundation post jacking device, it includes mud jacking shower nozzle, and the mud jacking shower nozzle is fixedly welded under pile foundation sounding steel pipe End, the mud jacking shower nozzle include body and the duckbilled positioned at body end, one are welded with the crossover position of body and duckbilled Enclose No. 8 iron wires;Slurry outlet is provided with the side wall of the body, drawing pin is packed with slurry outlet, rubber is enclosed with the outside of body Belt and adhesive waterproof tape, balata belt and adhesive waterproof tape cause the head of a nail of drawing pin to be close to the outer wall of body.
Further, the slurry outlet is arranged on tube wall in blossom type.
Further, the duckbilled is directly formed by the flat welding of end hammer of body.
A kind of pile foundation post grouting construction method, is comprised the steps of:
Step 1:Rotary digging drilling hole;
Step 2:Fabrication of reinforcing cage;
Step 3:Pile foundation sounding steel pipe is set on the inside of reinforcing cage stirrup, and in the lower end of pile foundation sounding steel pipe welding mud jacking spray Head;The pile foundation sounding steel pipe is uniformly arranged along around steel reinforcement cage, three sounding steel pipes of setting per pile, under every sounding steel pipe Weld a mud jacking shower nozzle in end;The mud jacking shower nozzle includes body and the duckbilled positioned at body end, in body and duckbilled Crossover position be welded with No. 8 iron wires of a circle;Slurry outlet is provided with the side wall of the body, drawing pin is packed with slurry outlet, Balata belt and adhesive waterproof tape are enclosed with the outside of body, balata belt and adhesive waterproof tape cause the head of a nail of drawing pin to be close to body Outer wall;
Step 4:Lift by crane placing of reinforcement cage;
Step 5:Connect post jacking equipment:Sounding steel pipe is connected by high-pressure hose and grouting pump, grouting pump are then connected to cement Starch agitator;The cement mortar is added with sodium ethoxide alkalescence permeation promoter and anilinomethyl by Portland cement mixing Triethoxysilane reinforcing agent;
Step 6:Pour into a mould pile foundation concrete;
Step 7:After pile foundation reaches certain age, by grouting pump by the cement mortar jacked pile end in cement mixer barrel;Slip casting Quality control uses grouting amount and grouting pressure dual control method, controlled with the quantity of the cement injected based on, supplemented by pumping end pressure control;
Step 8:Remove mud jacking equipment more than sounding steel pipe.
Further, the process of clear water splitting is also included before step 7, i.e., first pressure injection clear water opens squeezing unit Unidirectional grout structure.
Beneficial effects of the present invention:
(1)By the use of the sounding steel pipe of late detection pile foundation quality as Grouting Pipe, save in addition it is special set Grouting Pipe into Sheet and process, and because sounding steel pipe is together with pile foundation steel bar cage banding fixed, squeezing unit enters jointly with pile foundation steel bar cage Enter pore-forming, items safeguard measure co-ordination when transferring pile foundation steel bar cage so that madjack pipe when mud jacking shower nozzle enters stake substratum Interior cleanliness without any pollution, so as to reach the purpose that the work of pile foundation post jacking can be smoothed out.
(2)Wrap up in balata belt outside using drawing pin and adhesive waterproof tape forms unidirectional only slurry structure, eliminate special buy and stop The expense of valve is starched, unidirectional only slurry construction of the invention can bear deep layer high water head pressure and not be damaged, and prevent silt from pouring in pipe Block, and can makes slurries smoothly discharge without flowing back.
(3)The device of the present invention can increase the initial kinetic energy that cement mortar in post jacking work enters soil layer, be advantageous to press Slurry work is smoothed out.
(4)Apparatus of the present invention are simple in construction, are easy to processing on real-time at the construction field (site), remaining construction content can be put down with pile foundation Row operation, accelerating construction progress;And processing live can be drawn materials, and can carry out twice laid, and construction operation content uses It is accomplished manually, construction cost is greatlyd save compared with market is bought.
(5)Alkaline permeation promoter and silanes reinforcing agent are with the addition of in cement mortar used in the present invention, slurries can be significantly improved Permeability and intensity.
Brief description of the drawings
Fig. 1 is scheme of installation of the post jacking device of the present invention in pile foundation engineering.
Fig. 2 is schematic view of the mounting position of the post jacking device of the present invention on pile foundation steel bar cage.
Fig. 3 is the front view of mud jacking shower nozzle.
Fig. 4 is the side view of mud jacking shower nozzle.
Fig. 5 is the structural representation of the A-A sections in Fig. 3.
Fig. 6 is the structural representation of the B-B sections in Fig. 3.
In figure, 1- mud jacking shower nozzles;2- sounding steel pipes;3- bodys;4- duckbilleds;5-8 iron wires;6- slurry outlets;7- drawing pins;8- Balata belt;9- adhesive waterproof tapes;10- pile foundation concrete;11- steel reinforcement cages.
Embodiment
As shown in figures 1 to 6, a kind of pile foundation post jacking device, it includes mud jacking shower nozzle 1, and the mud jacking shower nozzle is fixedly welded on The lower end of pile foundation sounding steel pipe 2, the mud jacking shower nozzle 1 includes body 3 and the duckbilled 4 positioned at body end, in body 3 and duck The crossover position of mouth 4 is welded with No. 8 iron wires 5 of a circle;Slurry outlet 6 is provided with the side wall of the body 3, is clogged in slurry outlet 6 There is drawing pin 7, balata belt 8 and adhesive waterproof tape 9 are enclosed with the outside of body, balata belt 8 and adhesive waterproof tape 9 cause drawing pin 7 The head of a nail be close to the outer wall of body 3;The slurry outlet 6 is arranged in the side wall of body 3 in blossom type;The duckbilled 4 is directly by pipe The flat welding of end hammer of body 3 is formed.
Pile foundation post grouting construction is carried out using above-mentioned post jacking device to comprise the following steps:
Step 1:Rotary digging drilling hole;
Step 2:Fabrication of reinforcing cage;
Step 3:Pile foundation sounding steel pipe is set on the inside of reinforcing cage stirrup, and in the lower end of pile foundation sounding steel pipe welding mud jacking spray Head;The pile foundation sounding steel pipe is uniformly arranged along around steel reinforcement cage, three sounding steel pipes of setting per pile, under every sounding steel pipe Weld a mud jacking shower nozzle in end;
Step 4:Lift by crane placing of reinforcement cage;
Step 5:Connect post jacking equipment:Sounding steel pipe is connected by high-pressure hose and grouting pump, grouting pump are then connected to cement Starch agitator;The cement mortar is added with sodium ethoxide alkalescence permeation promoter and anilinomethyl by Portland cement mixing Triethoxysilane reinforcing agent;
Step 6:Pour into a mould pile foundation concrete;
Step 7:After pile foundation reaches certain age, by grouting pump by the cement mortar jacked pile end in cement mixer barrel;Slip casting Quality control uses grouting amount and grouting pressure dual control method, controlled with the quantity of the cement injected based on, supplemented by pumping end pressure control;
Step 8:Remove mud jacking equipment more than sounding steel pipe.

Claims (5)

  1. A kind of 1. pile foundation post grouting construction method, it is characterised in that comprise the steps of:
    Step 1:Rotary digging drilling hole;
    Step 2:Fabrication of reinforcing cage;
    Step 3:In steel reinforcement cage(11)Pile foundation sounding steel pipe is set on the inside of stirrup(2), and welded in the lower end of pile foundation sounding steel pipe Mud jacking shower nozzle(1);The pile foundation sounding steel pipe is uniformly arranged along around steel reinforcement cage, three sounding steel pipes of setting per pile, every Weld a mud jacking shower nozzle in sounding steel pipe lower end;The mud jacking shower nozzle(1)Including body(3)And positioned at body end Duckbilled(4), in body(3)With duckbilled(4)Crossover position be welded with No. 8 iron wires of a circle(5);The body(3)Side wall on It is provided with slurry outlet(6), slurry outlet(6)Inside it is packed with drawing pin(7), body outside is enclosed with balata belt(8)And marine glue Band(9), balata belt(8)And adhesive waterproof tape(9)So that drawing pin(7)The head of a nail be close to body(3)Outer wall;
    Step 4:Lift by crane placing of reinforcement cage;
    Step 5:Connect post jacking equipment:Sounding steel pipe is connected by high-pressure hose and grouting pump, grouting pump are then connected to cement Starch agitator;The cement mortar is added with sodium ethoxide alkalescence permeation promoter and anilinomethyl by Portland cement mixing Triethoxysilane reinforcing agent;
    Step 6:Pour into a mould pile foundation concrete;
    Step 7:After pile foundation reaches certain age, by grouting pump by the cement mortar jacked pile end in cement mixer barrel;Slip casting Quality control uses grouting amount and grouting pressure dual control method, controlled with the quantity of the cement injected based on, supplemented by pumping end pressure control;
    Step 8:Remove mud jacking equipment more than sounding steel pipe.
  2. 2. a kind of pile foundation post grouting construction method according to right wants 1, it is characterised in that also include before step 7 clear The process of water splitting, i.e., first pressure injection clear water open the unidirectional grout structure of squeezing unit.
  3. 3. a kind of pile foundation post jacking device, it includes mud jacking shower nozzle(1), the mud jacking shower nozzle is fixedly welded on pile foundation sounding steel pipe (2)Lower end, it is characterised in that:The mud jacking shower nozzle(1)Including body(3)And the duckbilled positioned at body end(4), in pipe Body(3)With duckbilled(4)Crossover position be welded with No. 8 iron wires of a circle(5);The body(3)Side wall on be provided with slurry outlet (6), slurry outlet(6)Inside it is packed with drawing pin(7), body outside is enclosed with balata belt(8)And adhesive waterproof tape(9), rubber peel Band(8)And adhesive waterproof tape(9)So that drawing pin(7)The head of a nail be close to body(3)Outer wall.
  4. A kind of 4. pile foundation post jacking device according to right wants 3, it is characterised in that the slurry outlet(6)In body(3)Side Arranged on wall in blossom type.
  5. A kind of 5. pile foundation post jacking device according to right wants 3, it is characterised in that:The duckbilled(4)Directly by body(3) End hammer it is flat welding formed.
CN201710859668.5A 2017-09-21 2017-09-21 A kind of pile foundation post grouting construction method and post jacking device Pending CN107642092A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710859668.5A CN107642092A (en) 2017-09-21 2017-09-21 A kind of pile foundation post grouting construction method and post jacking device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710859668.5A CN107642092A (en) 2017-09-21 2017-09-21 A kind of pile foundation post grouting construction method and post jacking device

Publications (1)

Publication Number Publication Date
CN107642092A true CN107642092A (en) 2018-01-30

Family

ID=61122585

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710859668.5A Pending CN107642092A (en) 2017-09-21 2017-09-21 A kind of pile foundation post grouting construction method and post jacking device

Country Status (1)

Country Link
CN (1) CN107642092A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759290A (en) * 2017-03-19 2017-05-31 马鞍山宏泰建材股份有限公司 A kind of grouting behind shaft or drift lining pile foundation and its grouting method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1078282A (en) * 1992-05-08 1993-11-10 东北金城建筑安装工程总公司地基基础工程处 Pile shoe pouring process and special reinforcing steel cage thereof
CN201232182Y (en) * 2008-08-01 2009-05-06 中铁十七局集团第二工程有限公司 Post-mud jacking apparatus for bottom and lateral of bored pile
CN105239563A (en) * 2015-10-27 2016-01-13 贵州开磷建设集团有限公司 Dry-method hole forming filling pile structure for post-grouting matched rotary drilling rig and construction method
CN105625303A (en) * 2014-11-28 2016-06-01 大连市市政设计研究院有限责任公司 Post-grouting technology for cast-in-situ bored pile
CN207392205U (en) * 2017-09-21 2018-05-22 中建一局集团第二建筑有限公司 A kind of pile foundation post jacking device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1078282A (en) * 1992-05-08 1993-11-10 东北金城建筑安装工程总公司地基基础工程处 Pile shoe pouring process and special reinforcing steel cage thereof
CN201232182Y (en) * 2008-08-01 2009-05-06 中铁十七局集团第二工程有限公司 Post-mud jacking apparatus for bottom and lateral of bored pile
CN105625303A (en) * 2014-11-28 2016-06-01 大连市市政设计研究院有限责任公司 Post-grouting technology for cast-in-situ bored pile
CN105239563A (en) * 2015-10-27 2016-01-13 贵州开磷建设集团有限公司 Dry-method hole forming filling pile structure for post-grouting matched rotary drilling rig and construction method
CN207392205U (en) * 2017-09-21 2018-05-22 中建一局集团第二建筑有限公司 A kind of pile foundation post jacking device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759290A (en) * 2017-03-19 2017-05-31 马鞍山宏泰建材股份有限公司 A kind of grouting behind shaft or drift lining pile foundation and its grouting method

Similar Documents

Publication Publication Date Title
CN204000956U (en) A kind of basement bottom plate rear pouring tape structure
CN109519150B (en) Dewatering well plugging device and method for large water yield
CN207727600U (en) Plugging dewatering well device
CN107513995A (en) A kind of bridge struction pile post grouting construction method
CN109736340B (en) Dewatering device and method for guaranteeing integrity of cushion layer by reserving dewatering well on foundation slab
CN208563315U (en) A kind of pile foundation grouting behind shaft or drift lining constructing device
CN110747847A (en) Double-pipe high-pressure jet grouting construction method for building impervious wall in soft foundation
CN107859028B (en) Double-hole double-liquid grouting method
CN207392205U (en) A kind of pile foundation post jacking device
CN107642092A (en) A kind of pile foundation post grouting construction method and post jacking device
CN108360542A (en) Waterproof between piles curtain combination stake side sleeve valve barrel grouting water stop construction method
CN103452115A (en) Casing pipe type bottom feeding post-pipe-plugging and post-grouting device and construction method
CN201292528Y (en) Grouting machine
CN110106884A (en) A kind of grouting construction method
CN207159994U (en) A kind of slip casting structure in slip casting around pile
CN204199324U (en) Connecting reinforcement cage i iron in construction of diaphragm wall
CN209816830U (en) A slip casting structure for interlock formula campshed construction cold joint
CN107882020A (en) A kind of Trees with Small Diameters pile construction method and cleaning grouting device
CN204825911U (en) Biliquid type high pressure jet machine
CN113832976A (en) Double-liquid grouting device for foundation pit engineering plugging and emergency rescue and construction method
CN112982372A (en) Inner drilling pipe insertion pipe compaction grouting reinforcement method based on pipe gallery bottom plate cavity
CN206859231U (en) A kind of grouting device of bored concrete pile
WO2021135156A1 (en) Construction apparatus for deep stirring by using curing material and construction method therefor
CN110359472A (en) A kind of base pit dewatering well plugging device and its application method
CN106837378A (en) Exempt from wall for grouting segmentation cleaning bottom of hole retrusive controlling grouting equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180130