CN107642069A - 袋内注砼建坝,围水吹沙造岛 - Google Patents
袋内注砼建坝,围水吹沙造岛 Download PDFInfo
- Publication number
- CN107642069A CN107642069A CN201710849066.1A CN201710849066A CN107642069A CN 107642069 A CN107642069 A CN 107642069A CN 201710849066 A CN201710849066 A CN 201710849066A CN 107642069 A CN107642069 A CN 107642069A
- Authority
- CN
- China
- Prior art keywords
- dam
- island
- bag
- concrete
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/11—Hard structures, e.g. dams, dykes or breakwaters
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本发明公开一种袋内注砼建坝,围水吹沙造岛的水上基建工程技术方法。其特征是在浅滩、暗礁、群礁、小岛的水域,由篦杆、横限筋定型的连续袋体内注砼建坝,向坝内吹沙造岛。本发明与现有技术相比:具有吹沙填土无流失,重复性劳动数量少、效率高、进度快、成本低,施工过程对周边水域影响轻、污染少,所建岛岸易于实现建岛目的和功能,建岛后便于岛内环境的去盐碱化改良,易于形成功能性和易居性的生态环境。
Description
一、技术领域:
本发明公开一种袋内注砼建坝,围水吹沙造岛,属于水上基建工程。
二、背景技术:
为满足改善环境、发展经济、加强国防等需求,常在湖海浅滩、暗礁、群礁小岛等水域填土造岛。吹沙堆土即是重要方法之一,但存在着:吹沙过程砂堆冲摊面积大、边沿不分明、造岛时再次挖沙筑坝、二次吹沙等麻烦和不足。
三、发明内容
本发明的目的是针对以上问题和不足,提供一种节省沙土资源、吹沙量少,能在较深水体区域建造深水砼岸岛屿的袋内注砼建坝,围水吹沙造岛的水上基建工程技术方法。
本发明的目的是通过以下技术方案实现的:
一种袋内注砼建坝,围水吹沙造岛,包括砼袋立片、砼袋底片、篦杆、横限筋、浮筒、坝墙、基墩、水面和水床,其特征是浮筒在设定区位水中吊挂由篦杆和横限筋相对固定两片柔性砼袋立片间距与形态,下边连接相对两片砼袋立片为一体的游离柔性底片,注砼后下部向两侧摊淤形成基墩、上部连续形成坝墙,构成设定形态的人工岛轮廓,由环外水床向环内吹沙或填土至高出水面,形成人工岛。
所述的浮筒,其特征是一种柔性气袋,打卷储运,现场充气后布设。
所述的砼袋立片、砼袋底片、篦杆和横限筋,其特征是于工厂制作后组装、打卷包装、储运,现场展开应用。
所述的袋内注砼建坝,围水吹沙造岛的水上基建工程技术方法,其特征是事前对设定坝墙走向的水床进行勘探和清障,使坝墙修筑于相对平坦的水床之上。
所述的基墩,其特征是下面水床为流沙或淤泥结构时,于建坝前或建坝后进行封固加强。
所述的坝墙,其特征是外侧面具规整度要求时,在外侧面砼袋立片的篦杆间设置横向篦杆或采用刚性模板。
所述的坝墙,其特征是所处位置水体过深,或基础牢固度差时,于纵坝的内侧等距离或不等距离的修筑连接为一体的横坝加强,或在纵坝的两侧修筑相对或相错的横坝加强。
所述的坝墙,其特征是在袋内设置钢筋笼网加强坝墙坚固度。
所述的基墩和坝墙,其特征是定型后设置贯穿坝墙的基墩,深达水床下岩层的钢质或混凝土定位锚桩。
所述的袋内注砼建坝,围水吹沙造岛的水上基建工程技术方法,其特征是在建坝挡期、或建岛成型后,依照功能和环境条件,修筑防浪、泊船等功能性设施。
本发明的袋内注砼建坝,围水吹沙造岛的水上基建工程技术方法与现有技术相比,具有以下特点和优点:
1、其筑坝和造岛过程,所填沙土无流失,资源利用充分,没有或较少无效劳动和重复劳动、效率高、进度快、成本低,对周边环境破坏性影响小、污染轻。
2、造岛和成岛的岸基水深选择范围大,可依据造岛目的和功能在更大范围内选择岸基水深和精确走向,更合适码头区域建设需求和避风港湾的泊船需求。
3、砼袋立片下边连接游离柔性砼袋底片,注砼后以自身压力随水床形态向下向两侧摊铺,可与水床随形附贴,对坝墙形成稳定性支撑。
4、由于连续混凝土坝墙的阻隔,及人造岛高于周边水体和人造岛体的垂直渗透能力强,在外来雨水及其淡水的累积储积,易于形成坝内大于坝外半封闭的水体压力差,冲刷和冲淡岛上土壤中的海水,使之去盐碱化,形成易居的生态环境。
四、附图说明:
图1为袋内注砼建坝,围水吹沙造岛的坝体断面示意图。
图2为袋内注砼建坝,围水吹沙造岛的坝墙水平示意图。
图中:1砼袋立片、2砼袋底片、3篦杆、4横限筋、5浮筒、6坝墙、7基墩、8纵坝、9横坝、10水面、11水床。
五、具体实施方式:
下面结合说明书附图对本发明作进一步详细说明:
如图1所示,在规划并清障处置的人造岛岸基治线、分段布设充气的浮筒5,将由砼袋立片1、砼袋底片2、篦杆3和横限筋4组装好的坝墙模袋卷展开并挂联于浮筒5,由一端注砼并依序向前推进,混凝土以自身重力作用在游离柔性砼袋底片2内向下向两侧挤压摊铺,随形附贴于水床11之上形成基墩7,在由篦杆3和横限筋4锁固的相对两片砼袋立片1之间形成坝墙6,坝墙6上沿高出于水面10。
如图2所示,在因水床11基础薄弱,或所筑坝墙6具有特殊功能要求处,在纵坝8的一侧或两侧,等距或不等距、相对或相错设置横坝9强化其牢固和稳定性。
除说明书所述的技术特征外,均为本专业技术人员的己知技术。
Claims (10)
1.一种袋内注砼建坝,围水吹沙造岛,包括砼袋立片、砼袋底片、篦杆、横限筋、浮筒、坝墙、基墩、水面和水床,其特征是浮筒在设定区位水中吊挂由篦杆和横限筋相对固定两片柔性砼袋立片间距与形态,下边连接相对两片砼袋立片为一体的游离柔性底片,注砼后下部向两侧摊淤形成基墩、上部连续形成坝墙,构成设定形态的人工岛轮廓,由环外水床向环内吹沙或填土至高出水面,形成人工岛。
2.根据权利要求1所述的浮筒,其特征是一种柔性气袋,打卷储运,现场充气后布设。
3.根据权利要求1所述的砼袋立片、砼袋底片、篦杆和横限筋,其特征是于工厂制作后组装、打卷包装、储运,现场展开应用。
4.根据权利要求1所述的袋内注砼建坝,围水吹沙造岛的水上基建工程技术方法,其特征是事前对设定坝墙走向的水床进行勘探和清障,使坝墙修筑于相对平坦的水床之上。
5.根据权利要求1所述的基墩,其特征是下面水床为流沙或淤泥结构时,于建坝前或建坝后进行封固加强。
6.根据权利要求1所述的坝墙,其特征是外侧面具规整度要求时,在外侧面砼袋立片的篦杆间设置横向篦杆或采用刚性模板。
7.根据权利要求1所述的坝墙,其特征是所处位置水体过深,或基础牢固度差时,于纵坝的内侧等距离或不等距离的修筑连接为一体的横坝加强,或在纵坝的两侧修筑相对或相错的横坝加强。
8.根据权利要求1所述的坝墙,其特征是在袋内设置钢筋笼网加强坝墙坚固度。
9.根据权利要求1所述的基墩和坝墙,其特征是定型后设置贯穿坝墙的基墩,深达水床下岩层的钢质或混凝土定位锚桩。
10.根据权利要求1所述的袋内注砼建坝,围水吹沙造岛的水上基建工程技术方法,其特征是在建坝挡期、或建岛成型后,依照功能和环境条件,修筑防浪、泊船等功能性设施。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710849066.1A CN107642069A (zh) | 2017-09-20 | 2017-09-20 | 袋内注砼建坝,围水吹沙造岛 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710849066.1A CN107642069A (zh) | 2017-09-20 | 2017-09-20 | 袋内注砼建坝,围水吹沙造岛 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107642069A true CN107642069A (zh) | 2018-01-30 |
Family
ID=61113811
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710849066.1A Pending CN107642069A (zh) | 2017-09-20 | 2017-09-20 | 袋内注砼建坝,围水吹沙造岛 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107642069A (zh) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW517129B (en) * | 1998-07-07 | 2003-01-11 | Jung-Yung Ke | A bank construction method |
CN2583198Y (zh) * | 2002-12-16 | 2003-10-29 | 中国人民解放军理工大学 | 箱式子堤装置 |
CN102345300A (zh) * | 2011-07-12 | 2012-02-08 | 中交四航工程研究院有限公司 | 海岸及人工岛地下结构建造方法 |
CN203668885U (zh) * | 2013-12-24 | 2014-06-25 | 上海市水利工程设计研究院有限公司 | 一种新型吹填模袋 |
-
2017
- 2017-09-20 CN CN201710849066.1A patent/CN107642069A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW517129B (en) * | 1998-07-07 | 2003-01-11 | Jung-Yung Ke | A bank construction method |
CN2583198Y (zh) * | 2002-12-16 | 2003-10-29 | 中国人民解放军理工大学 | 箱式子堤装置 |
CN102345300A (zh) * | 2011-07-12 | 2012-02-08 | 中交四航工程研究院有限公司 | 海岸及人工岛地下结构建造方法 |
CN203668885U (zh) * | 2013-12-24 | 2014-06-25 | 上海市水利工程设计研究院有限公司 | 一种新型吹填模袋 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103410156B (zh) | 一种可回收直立式钢管前撑围护结构及其应用方法 | |
CN106640091B (zh) | 一种浅埋隧道分段施工方法 | |
CN105040595B (zh) | 缓坡河床基岩上的桥梁主墩承台基坑支护结构及其施工方法 | |
CN105133627A (zh) | 单壁钢板桩围堰流水状态下施工工法 | |
CN111502725B (zh) | 一种海底掘进隧道的人工岛式中间井结构 | |
CN104631476A (zh) | 一种滨海超深厚软土地基浮置式钢板桩围堰及其施工方法 | |
CN204780764U (zh) | 环境友好型生态带肋壁板式挡墙护岸 | |
CN103243678B (zh) | 防波堤 | |
CN202323865U (zh) | 一种新型护岸组合结构 | |
CN103410158A (zh) | 一种可回收直立式门架自稳围护结构及其应用方法 | |
CN202530464U (zh) | 降水井辅助钢板桩施工道路排水的基坑支护结构 | |
CN2581502Y (zh) | 筒型基础水上打桩平台装置 | |
CN108239963A (zh) | 一种高桩承台式生态驳岸结构及其施工方法 | |
CN202170512U (zh) | 一种沉井和钢管桩的水中组合基础 | |
CN104612128A (zh) | 适用于水下淤泥环境的真空预压加固施工方法 | |
CN107642069A (zh) | 袋内注砼建坝,围水吹沙造岛 | |
CN106906829A (zh) | 一种地铁明挖基坑水平土体加固方法 | |
CN102587316A (zh) | 沉箱式高桩海堤及其施工方法 | |
CN216041278U (zh) | 一种新型桩基防冲刷结构 | |
CN201671103U (zh) | 水中墩承台钻孔桩一体化施工成型平台 | |
CN111485579B (zh) | 一种悬浮隧道与深水悬索桥之间的桥隧过渡转换结构 | |
CN104895008B (zh) | 环境友好型生态带肋壁板式挡墙护岸的施工方法 | |
CN208219559U (zh) | 结构物出水口临时封堵装置 | |
CN209798657U (zh) | 可移动式沉箱防波堤结构 | |
CN104452649A (zh) | 一种深海区海堤砂被铺设设备 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180130 |
|
RJ01 | Rejection of invention patent application after publication |