CN107642016B - It is a kind of to reinforce anti-fracture road-bridge roadway slab - Google Patents

It is a kind of to reinforce anti-fracture road-bridge roadway slab Download PDF

Info

Publication number
CN107642016B
CN107642016B CN201710802586.7A CN201710802586A CN107642016B CN 107642016 B CN107642016 B CN 107642016B CN 201710802586 A CN201710802586 A CN 201710802586A CN 107642016 B CN107642016 B CN 107642016B
Authority
CN
China
Prior art keywords
block
road deck
plate
road
concave block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710802586.7A
Other languages
Chinese (zh)
Other versions
CN107642016A (en
Inventor
郭啸晨
杨国宁
章小春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guo Xiaochen
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710802586.7A priority Critical patent/CN107642016B/en
Publication of CN107642016A publication Critical patent/CN107642016A/en
Application granted granted Critical
Publication of CN107642016B publication Critical patent/CN107642016B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

Anti-fracture road-bridge roadway slab is reinforced the invention discloses a kind of, including the first road deck and the second road deck, the top of first road deck and the second road deck is mounted on the second steel plate, the first concave block is run through in the two sides of second plate, second concave block and the first plate, the two sides bottom end of first steel plate is connected with the first road deck and the second road deck, the screw runs through the first steel plate and the second plate, the bearing is fixed on the front of the first fixed block by bull stick, the left end of the bearing is equipped with strut, the top left hand of the strut is equipped with convex block, the outer wall of the convex block is connected with third concave block.The novel road-bridge roadway slab, pass through the cooperation of the first concave block and the second concave block, strut is rotated clockwise by bearing and is fastened with third concave block, the extension spring on strut surface is installed to the second plate end, the probability caused danger is reduced, is effectively reduced since the traffic accident that fracture generates occurs for road deck.

Description

It is a kind of to reinforce anti-fracture road-bridge roadway slab
Technical field
The present invention relates to road deck technical fields, specially a kind of to reinforce anti-fracture road-bridge roadway slab.
Background technique
Mechanization road surface operating equipment is a kind of quick shakedown in place in the inconvenient vehicle driving such as muddy road, sand ground If the equipment of road deck, allow the vehicle to travel on the road deck of laying, so the quality of road deck directly determines vehicle The traffic capacity, existing road deck is generally hinge arrangement, and the rotational freedom between each connection unit is big, this just leads Causing vehicle, connection unit can sink in motion, and mask is distributed uneven ballast over the ground, vehicle pass-through effect be influenced, existing In technology, such as application No. is 201620186486.7 patent of invention, including one group of successively hinged sub- road deck, every road Ge Zi Panel includes one group of basic road surface unit mutually spliced, basic road surface unit by seven pieces or ten pieces above-mentioned road surface blocks by pin thread with Female groove is spliced to form rectangle, and the basic road surface unit for forming rectangle is mutually clamped by hexagonal and trapezoidal road surface block, then Sub- road deck is constituted by several basic road surface cell interconnections, finally hingedly constitutes road deck by several sub- road decks again, the patent Although anti-skidding, the speed of vehicle pass-through is improved, the connection between road deck is simultaneously unstable, if the vehicle flow of traveling It is bigger, it is easy to break the junction of road deck during traveling, be likely to result in when being easy to happen dangerous serious tight The traffic accident of weight.
Summary of the invention
Anti-fracture road-bridge roadway slab is reinforced the purpose of the present invention is to provide a kind of, reduces the probability caused danger, It is effectively reduced since the traffic accident that fracture generates occurs for road deck.
To achieve the above object, the invention provides the following technical scheme: a kind of reinforce anti-fracture road-bridge roadway slab, including The inside of first road deck and the second road deck, first road deck and the second road deck is mounted on bushing, and described first Third concave block is installed on the right side of the bottom end of road deck, the first fixed block is installed on the left of the bottom end of second road deck, it is described The top of first road deck and the second road deck is mounted on the second steel plate, is equipped at the right end center of first road deck First concave block, is equipped with the second concave block at the left end center of second road deck, first concave block and the second concave block it is interior Portion is equipped with the first plate, and the inside top of first concave block and the second concave block is equipped with the second plate, second plate Two sides run through the first concave block, the second concave block and the first plate, second plate top is equipped with the first steel plate, described first The two sides bottom end of steel plate is connected with the first road deck and the second road deck, is equipped with spiral shell at the top center of first steel plate Silk, the screw run through the first steel plate and the second plate, and the bottom end of second plate is mounted on extension spring, the stretching The bottom end of spring is equipped with strut, and the positive bottom of first fixed block is equipped with bearing, installs at the center of the bearing There is bull stick, the bearing is fixed on the front of the first fixed block by bull stick, and the left end of the bearing is equipped with strut, the branch The top left hand of bar is equipped with convex block, and the outer wall of the convex block is connected with third concave block, first road deck and the second road surface The second fixed block is mounted at the bottom center of plate, the bottom end of second fixed block is equipped with block, and described second is fixed Compressed spring is installed, the compressed spring runs through block, and the compressed spring bottom end is equipped with connection at the inside center of block Block, the bottom end of the link block are equipped with third fixed block, and the bottom end of the third fixed block is equipped with the first rubber pad, described The top of first concave block and the second concave block and the second plate junction are equipped with the second rubber pad, the connection of the bearing and bull stick Place is equipped with gasket.
Compared with prior art, the beneficial effects of the present invention are: the novel road-bridge roadway slab, passes through the first concave block and second The cooperation of concave block, when needing road deck to work, the first road deck and the alignment of the second road deck, by by the first plate insertion the Second plate is inserted by one concave block and the second concave block from the opening of the second concave block and the first concave block, through the first concave block, second recessed Block and the first plate will by screw by the first steel plate and the second sheet-steel cover on the surface of the first road deck and the second road deck First steel plate and the second plate are fixed, and strut is rotated clockwise by bearing and fastened with third concave block, by strut surface Extension spring is installed to the second plate end, and by fixed more stable of the pulling force of extension spring, road deck is matched by device The stronger of connection is closed, when vehicle flow is bigger, the probability caused danger is reduced, is effectively reduced due to road deck The traffic accident that fracture generates occurs.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Fig. 2 is the second board plug structure schematic diagram of the invention;
Fig. 3 is compressed spring structural schematic diagram of the invention.
In figure: 1, the first road deck, the 2, second road deck, the 3, first plate, the 4, second plate, 5, screw, the 6, first steel Plate, the 7, second steel plate, the 8, first concave block, the 9, second concave block, the 10, first fixed block, 11, bearing, 12, bull stick, 13, strut, 14, Convex block, 15, third concave block, 16, extension spring, 17, bushing, 18, compressed spring, the 19, second fixed block, 20, third fixed block, 21, block, 22, link block, the 23, first rubber pad, 24, gasket, the 25, second rubber pad.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1-3 is please referred to, the present invention provides a kind of technical solution: a kind of to reinforce anti-fracture road-bridge roadway slab, including The inside of one road deck 1 and the second road deck 2, the first road deck 1 and the second road deck 2 is mounted on bushing 17, the first road surface The second fixed block 19 is mounted at the bottom center of plate 1 and the second road deck 2, the bottom end of the second fixed block 19 is equipped with block 21, block 21 prevents compressed spring 18 from falling off, and block 21 is that the rubber material with larger frictional force and elasticity is made, the Compressed spring 18 is installed, the coefficient of elasticity of compressed spring 18 is 20N/CM, compressed spring at the inside center of two fixed blocks 19 18 run through block 21, and 18 bottom end of compressed spring is equipped with link block 22, and link block 22 is used to connect compressed spring 18, prevents from compressing Spring 18 falls off, and the bottom end of link block 22 is equipped with third fixed block 20, and the bottom end of third fixed block 20 is equipped with the first rubber Pad 23, the first rubber pad 23 are that the rubber material with larger frictional force and elasticity is made, and the bottom end of the first road deck 1 is right Side is equipped with third concave block 15, and the first fixed block 10 is equipped on the left of the bottom end of the second road deck 2, and the first fixed block 10 is used to connect The top of joint bearing 11, the first road deck 1 and the second road deck 2 is mounted on the second steel plate 7, and the surface of the second steel plate 7 is furnished with Aperture, accelerates the leakage of rainy day rainwater by the cooperation of the second steel plate 7 and bushing 17, and the second steel plate 7 has protection first simultaneously The effect of road deck 1 and the second road deck 2 is equipped with the first concave block 8, the second road deck 2 at the right end center of first road deck 1 Left end center at the second concave block 9 is installed, the inside of the first concave block 8 and the second concave block 9 is equipped with the first plate 3, and first inserts Plate 3 is used to connect the first concave block 8 and the second concave block 9, and the inside top of the first concave block 8 and the second concave block 9 is equipped with the second plate 4, the first concave block 8, the second concave block 9 and the first plate 3 are run through in the two sides of the second plate 4, and the second plate 4, which passes through to run through, plays fixation The top of firmly the first road deck 1 and the second road deck 2, the first concave block 8 and the second concave block 9 is equipped with 4 junction of the second plate Second rubber pad 25,4 top of the second plate are equipped with the first steel plate 6, the two sides bottom end of the first steel plate 6 and the first road deck 1 and Second road deck 2 is connected, and screw 5 is equipped at the top center of the first steel plate 6, and screw 5 runs through the first steel plate 6 and the second plate 4, it allows the first steel plate 6 to be tightly connected with the second plate 2 by the installation of screw 5 and plays fixed effect, the bottom end of the second plate 4 It is mounted on extension spring 16, the bottom end of extension spring 16 is equipped with strut 13, by the connection of extension spring 16, passes through stretching Second plate 4 and strut 13 are inwardly bonded by the pulling force of spring 16, and the first road deck 1 and the second road deck 2 are by a series of Installation, keeps the connection of two road decks stronger, the positive bottom of the first fixed block 10 is equipped with bearing 11, the center of bearing 11 Place is equipped with bull stick 12, and bearing 11 is fixed on the front of the first fixed block 10 by bull stick 12, and bearing 11 passes through the company of bull stick 12 Connecing can rotate clockwise, and the left end of bearing 11 is equipped with strut 13, and strut 13 is by rotating the convex block 14 and third of end Concave block 15 fastens, and the junction of bearing 11 and bull stick 12 is equipped with gasket 24, and gasket 24 is with larger frictional force and elasticity Rubber material is made, and gasket 24 is used to reduce the abrasion of bearing 11 Yu bull stick 12, and the top left hand of strut 13 is equipped with convex The outer wall of block 14, convex block 14 is connected with third concave block 15.
First road deck 1 and the alignment of the second road deck 2, by the way that the first plate 3 is inserted into the first concave block 8 and the second concave block 9, Second plate 4 is inserted into from the opening of the second concave block 9 and the first concave block 8, runs through the first concave block 8, the second concave block 9 and the first plate 3, the first steel plate 6 and the second steel plate 7 are covered into the surface in the first road deck 1 and the second road deck 2, the surface cloth of the second steel plate 7 There is aperture, accelerate the leakage of rainy day rainwater by the cooperation of the second steel plate 7 and bushing 17, the second steel plate 7 has protection the simultaneously The effect of one road deck 1 and the second road deck 2, by screw 5 that first steel plate 6 and the second plate 4 is fixed, bearing 11 is by turning The connection of bar 12 can rotate clockwise, and the left end of bearing 11 is equipped with strut 13, and strut 13 is by rotating the convex block of end 14 fasten with third concave block 15, and the extension spring 16 on 13 surface of strut is installed to 4 end of the second plate, passes through extension spring 16 Pulling force the second plate 4 and strut 13 are inwardly bonded, fixed more stable of the pulling force of extension spring 16.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (1)

1. a kind of reinforce anti-fracture road-bridge roadway slab, including the first road deck (1) and the second road deck (2), it is characterised in that: The inside of first road deck (1) and the second road deck (2) is mounted on bushing (17), the bottom of first road deck (1) End right side is equipped with third concave block (15), is equipped with the first fixed block (10) on the left of the bottom end of second road deck (2), described The top of first road deck (1) and the second road deck (2) is mounted on the second steel plate (7), the right end of first road deck (1) It is equipped at center the first concave block (8), is equipped with the second concave block (9) at the left end center of second road deck (2), described The inside of one concave block (8) and the second concave block (9) is equipped with the first plate (3), first concave block (8) and the second concave block (9) Inside top is equipped with the second plate (4), the two sides of second plate (4) through the first concave block (8), the second concave block (9) and First plate (3), the second plate (4) top are equipped with the first steel plate (6), the two sides bottom end of first steel plate (6) with First road deck (1) is connected with the second road deck (2), is equipped with screw (5), institute at the top center of first steel plate (6) Screw (5) are stated through the first steel plate (6) and the second plate (4), the bottom end of second plate (4) is mounted on extension spring (16), the bottom end of the extension spring (16) is equipped with strut (13), and the positive bottom of first fixed block (10) is equipped with Bearing (11) is equipped with bull stick (12) at the center of the bearing (11), and the bearing (11) is fixed on the by bull stick (12) The left end in the front of one fixed block (10), the bearing (11) is equipped with strut (13), the top left hand peace of the strut (13) Equipped with convex block (14), the outer wall of the convex block (14) is connected with third concave block (15), first road deck (1) and the second road surface It is mounted at the bottom center of plate (2) the second fixed block (19), the bottom end of second fixed block (19) is equipped with block (21), it is equipped with compressed spring (18) at the inside center of second fixed block (19), the compressed spring (18) is through gear Block (21), compressed spring (18) bottom end are equipped with link block (22), and it is solid that the bottom end of the link block (22) is equipped with third Determine block (20), the bottom end of the third fixed block (20) is equipped with the first rubber pad (23), first concave block (8) and second recessed The top and the second plate (4) junction of block (9) are equipped with the second rubber pad (25), the company of the bearing (11) and bull stick (12) The place of connecing is equipped with gasket (24).
CN201710802586.7A 2017-09-07 2017-09-07 It is a kind of to reinforce anti-fracture road-bridge roadway slab Expired - Fee Related CN107642016B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710802586.7A CN107642016B (en) 2017-09-07 2017-09-07 It is a kind of to reinforce anti-fracture road-bridge roadway slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710802586.7A CN107642016B (en) 2017-09-07 2017-09-07 It is a kind of to reinforce anti-fracture road-bridge roadway slab

Publications (2)

Publication Number Publication Date
CN107642016A CN107642016A (en) 2018-01-30
CN107642016B true CN107642016B (en) 2019-07-05

Family

ID=61111134

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710802586.7A Expired - Fee Related CN107642016B (en) 2017-09-07 2017-09-07 It is a kind of to reinforce anti-fracture road-bridge roadway slab

Country Status (1)

Country Link
CN (1) CN107642016B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111501473B (en) * 2020-04-27 2021-11-02 广东中帆建设有限公司 Prefabricated assembled town road drainage structures
CN112726317B (en) * 2020-12-29 2022-05-17 广东长海建设工程有限公司 Anti-impact wear-resistant fabricated concrete road and construction method thereof

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8353640B2 (en) * 2008-01-22 2013-01-15 Brock Usa, Llc Load supporting panel having impact absorbing structure
CN201291728Y (en) * 2008-11-01 2009-08-19 李晓秋 Break-proof steel spring plate for car
CN203113187U (en) * 2013-03-14 2013-08-07 刘少伟 Special quick road slab for expansion joint construction
CN105113352B (en) * 2015-08-11 2017-11-07 惠州大亚湾市政基础设施有限公司 A kind of scour and abrasion resistant concrete pre-installs road
CN106284017B (en) * 2016-09-30 2018-07-06 长安大学 One kind is used for Large Longitudinal Slope energy storage and energy release assembly road deck

Also Published As

Publication number Publication date
CN107642016A (en) 2018-01-30

Similar Documents

Publication Publication Date Title
CN107642016B (en) It is a kind of to reinforce anti-fracture road-bridge roadway slab
CN207115763U (en) Buried traffic lights
GB2151569A (en) Mudguards for road vehicles
CN207435842U (en) A kind of new road-bridge roadway slab
US7396091B2 (en) Caterpillar band chain for tracked vehicles
CN104631294B (en) Attachment means and milling machine thereof
CN209274642U (en) Transport trolley
CN110254542A (en) A kind of crawler shoe that replacement is convenient and firm
CN207985101U (en) Ship boat body locking system
CN206693114U (en) A kind of isolating and protecting unit and isolating and protecting guardrail
CN206983868U (en) A kind of vehicular platform rapid dismounting apparatus
CN208040316U (en) A kind of mobile scalable drilling machine platform in rubber conveyer top
KR200413409Y1 (en) Opening and closing structure for median strip guide rail in road
CN207246976U (en) A kind of buried traffic lights
CN102354938A (en) Transmission line walking device
CN207510547U (en) A kind of robot swinging arm that can adjust tensioner
CN208803495U (en) A kind of suspension reset town road manhole lid device
CN208789560U (en) A kind of novel self-unloading truck bucket-tipping device
CN202031310U (en) Detachable structural steel unloading platform
CN216305960U (en) Waterproof sealing device for tunnel
CN209617307U (en) A kind of portable type crawler belt equipment walking protective case
CN104716591B (en) A kind of high-voltage equipment box of rail vehicle
CN207958898U (en) A kind of road-surface building structure
CN114517485B (en) Highway roadbed slope reinforcing apparatus
CN218316953U (en) Glass fiber reinforced plastic double-wheel rim

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Guo Xiaochen

Inventor after: Yang Guoning

Inventor after: Zhang Xiaochun

Inventor before: Zhang Xiaochun

GR01 Patent grant
GR01 Patent grant
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190614

Address after: Room 501, Unit 1, Building 27, Dongfangyuan District, Qiaodong District, Zhangjiakou City, Hebei Province

Applicant after: Guo Xiaochen

Address before: 324099 No. 1, Fang Jin Yuan Street, Fu Shan Street, Kecheng District, Quzhou, Zhejiang, 367

Applicant before: QUZHOU WANPENG ENVIRONMENTAL CONSTRUCTION Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190705