CN107630510A - High-rise building Core Walls Structure shear wall construction form frame system is revealed all the details platform stop layers construction method - Google Patents

High-rise building Core Walls Structure shear wall construction form frame system is revealed all the details platform stop layers construction method Download PDF

Info

Publication number
CN107630510A
CN107630510A CN201710898514.7A CN201710898514A CN107630510A CN 107630510 A CN107630510 A CN 107630510A CN 201710898514 A CN201710898514 A CN 201710898514A CN 107630510 A CN107630510 A CN 107630510A
Authority
CN
China
Prior art keywords
drag
line
details
platform
shear wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710898514.7A
Other languages
Chinese (zh)
Other versions
CN107630510B (en
Inventor
李厚波
杨鼎
侯凯旗
杨晓宇
龚煌森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201710898514.7A priority Critical patent/CN107630510B/en
Publication of CN107630510A publication Critical patent/CN107630510A/en
Application granted granted Critical
Publication of CN107630510B publication Critical patent/CN107630510B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The present invention provides a kind of high-rise building Core Walls Structure shear wall construction form frame system and revealed all the details platform stop layers construction method, including:The Desired Height that platform needs to stop of revealing all the details is determined first;Then first suspension centre and the second suspension centre are set on Core Walls Structure shear wall, hung again by platform device for lifting of revealing all the details and rise platform of the revealing all the details platform that makes to reveal all the details and be higher than Desired Height, the platform that will reveal all the details separates with Core Walls Structure shear wall construction form frame system, first suspension centre, the second suspension centre and platform of revealing all the details are connected by the first drag-line, the second drag-line and the 3rd drag-line respectively, platform of revealing all the details is declined until the 3rd complete stress of drag-line by platform device for lifting of revealing all the details, and the first drag-line, the second drag-line and the 3rd the drag-line platform that makes to reveal all the details are located at Desired Height;Dismounting, which is revealed all the details, platform device for lifting and hangs a liter drag-line.The present invention platform that will can reveal all the details is attached in agent structure, realizes stop layers, ingenious in design, simple, convenient, quick, cost is low, suitable for large-scale promotion application.

Description

High-rise building Core Walls Structure shear wall construction form frame system reveal all the details platform stop layers construction Method
Technical field
The present invention relates to technical field of building construction, more particularly to form frame system is revealed all the details platform construction technical field, specifically Refer to that a kind of high-rise building Core Walls Structure shear wall construction form frame system is revealed all the details platform stop layers construction method.
Background technology
High-rise building refers to more than 40 layers, highly more than 100 meters of building.China《Civil buildings design general rule》 GB50352-2005 is provided:When building height is more than 100m, no matter house and public building are high-rise building.
In construction of super highrise building, in order to form multiple scope of operations in vertical height, usual Core Walls Structure shear wall is first Row construction, and leading outer framed-tube structure 6-7 layers, and horizontal structure construction 4-5 layers in the leading Core Walls Structure of housing tube construction, so Just make between the horizontal structure scope of operation, to form more than 10 layers of the vertical discrepancy in elevation in the Core Walls Structure shear wall scope of operation and Core Walls Structure. According to《Construction high-rise working technical specification of security》JGJ80-2016, security protection should be set during cross-operation.Engineering is real In trampling, the form frame system of Core Walls Structure shear wall construction is generally depended on, lower hanging pocket bottom platform is set as horizontal protective.Reveal all the details platform Constantly lifted with form frame system.After the completion of Core Walls Structure shear wall construction, operation is removed to form frame system to reduce platform of revealing all the details Influence, while make horizontal protective continue to play operation, it is necessary to which the platform that will reveal all the details is attached in agent structure, realizes stop layers.
The platform stop layers construction party accordingly, it is desirable to provide a kind of high-rise building Core Walls Structure shear wall construction form frame system is revealed all the details Method, its platform that will can reveal all the details are attached in agent structure, realize stop layers, simple, convenient, quick, cost is low.
The content of the invention
In order to overcome it is above-mentioned in the prior art the shortcomings that, it is an object of the present invention to provide a kind of high-rise building core Heart cylinder shear wall construction form frame system is revealed all the details platform stop layers construction method, and its platform that will can reveal all the details is attached in agent structure, Stop layers are realized, suitable for large-scale promotion application.
Another object of the present invention is to provide a kind of high-rise building Core Walls Structure shear wall construction form frame system reveal all the details it is flat Platform stop layers construction method, its is ingenious in design, and simple, convenient, quick, cost is low, suitable for large-scale promotion application.
To achieve the above objectives, high-rise building Core Walls Structure shear wall construction form frame system of the invention is revealed all the details platform stop layers Construction method, it is characterized in, comprises the following steps:
(1) before or during Core Walls Structure shear wall construction, it is determined that hanging is under Core Walls Structure shear wall construction form frame system Platform of revealing all the details need the Desired Height stopped;
(2) the Core Walls Structure shear wall rises with the Core Walls Structure shear wall construction form frame system and constantly increased, in institute When stating Core Walls Structure shear wall and being higher than the Desired Height, in the different positions higher than the Desired Height of the Core Walls Structure shear wall Put and the first suspension centre and the second suspension centre are set respectively, the upper end of the first drag-line and the upper end of the second drag-line are connected described first respectively Suspension centre and second suspension centre;
(3) the platform device for lifting that will reveal all the details is arranged on the Core Walls Structure shear wall construction form frame system, will hang a liter drag-line Both ends connect platform device for lifting and the platform of revealing all the details of revealing all the details respectively;
(4) platform of revealing all the details rises with the Core Walls Structure shear wall construction form frame system and constantly risen, when the core When heart cylinder shear wall construction form frame system is higher than the Desired Height, is hung by the platform device for lifting of revealing all the details and revealed all the details described in rising Platform makes the platform of revealing all the details be higher than the Desired Height, by platform and the Core Walls Structure shear wall construction mould bases system of revealing all the details System separation, the lower end of the lower end of first drag-line, second drag-line is connected with the upper end of the 3rd drag-line, by described the Revealed all the details platform described in the lower end connection of three drag-lines;Or by the lower end of first drag-line, to La Lasuo one end and an institute The upper end for stating the 3rd drag-line is connected, by the lower end of second drag-line, described to described in the La Lasuo other end and another The upper end of 3rd drag-line is connected, by the lower end of this 3rd drag-line and the lower end of this another 3rd drag-line point Not Lian Jie described in reveal all the details platform;
(5) by the platform device for lifting of revealing all the details decline described in reveal all the details platform until the complete stress of the 3rd drag-line, And first drag-line, second drag-line and the 3rd drag-line make the platform of revealing all the details be located at the Desired Height or institute State the first drag-line, second drag-line, described to La Lasuo and the 3rd drag-line makes the platform of revealing all the details be located at the expectation Highly;
(6) revealed all the details described in removing and platform device for lifting and described hang a liter drag-line.
It is preferred that in the step (2), first suspension centre is by the 4th drag-line the one of the Core Walls Structure shear wall It is entwined in root coupling beam, the upper end of the first described drag-line is connected into the 4th drag-line, second suspension centre passes through the 5th Drag-line is entwined in another coupling beam of the Core Walls Structure shear wall, and the upper end of the second described drag-line is connected into institute State the 5th drag-line.
More preferably, in the step (2), is set between the 4th drag-line and the corner angle of the coupling beam One corner protector apparatus, the second corner protector apparatus is set between the 5th drag-line and the corner angle of another coupling beam.
More preferably, in the step (2), the 4th drag-line connects the upper of the first described drag-line by the first shackle End, the 5th drag-line connect the upper end of the second described drag-line by the second shackle.
It is preferred that in the step (4), by the 3rd shackle by the lower end of the first described drag-line, described second The lower end of drag-line is connected with the upper end of the 3rd described drag-line;By the 4th shackle by the lower end of the first described drag-line, institute The one end to La Lasuo stated is connected with the upper end of this 3rd drag-line, is drawn by the 5th shackle by described second The lower end of rope, the other end to La Lasuo are connected with the upper end of this another 3rd drag-line.
It is preferred that in the step (4), will be revealed all the details by the 6th shackle described in the lower end connection of the 3rd described drag-line Platform;, should by the 8th shackle by the 7th shackle by platform of being revealed all the details described in the lower end connection of this 3rd drag-line Revealed all the details described in the lower end connection of another 3rd drag-line platform.
It is preferred that in the step (2), first suspension centre is by the first built-in fitting in the Core Walls Structure shear wall It is pre-buried in one face wall to form, the upper end of the first described drag-line is connected into first built-in fitting, second suspension centre passes through It is pre-buried in wall described in another side of second built-in fitting in the Core Walls Structure shear wall to form, by the upper end of the second described drag-line Connect second built-in fitting.
More preferably, in the step (2), first built-in fitting is provided with the first perforation, the first described drag-line Upper end is located in first perforation, and second built-in fitting is provided with the second perforation, and the upper end of the second described drag-line is worn It is located in second perforation.
It is preferred that in the step (2), first suspension centre by the 4th drag-line the Core Walls Structure shear wall company It is entwined on beam, the upper end of the first described drag-line is connected into the 4th drag-line, second suspension centre is pre-buried by second Part is pre-buried in the wall of the Core Walls Structure shear wall to be formed, and the upper end connection described second of the second described drag-line is pre-buried Part.
It is preferred that in the step (2), first suspension centre is by the first built-in fitting in the Core Walls Structure shear wall It is pre-buried in wall to form, the upper end of the first described drag-line is connected into first built-in fitting, second suspension centre passes through the 5th Drag-line is entwined in the coupling beam of the Core Walls Structure shear wall, and the upper end connection the described 5th of the second described drag-line is drawn Rope.
Beneficial effects of the present invention essentially consist in:
1st, high-rise building Core Walls Structure shear wall construction form frame system of the invention platform stop layers construction method of revealing all the details includes: The Desired Height that platform needs to stop of revealing all the details is determined first;Then the first suspension centre and second is set to hang on Core Walls Structure shear wall Point, then hung by platform device for lifting of revealing all the details and to rise platform of the revealing all the details platform that makes to reveal all the details and be higher than Desired Height, will reveal all the details platform and core The form frame system separation of cylinder shear wall construction, the first suspension centre, second are connected by the first drag-line, the second drag-line and the 3rd drag-line respectively Suspension centre and platform of revealing all the details, decline platform of revealing all the details by platform device for lifting of revealing all the details up to the 3rd complete stress of drag-line, and first draws Rope, the second drag-line and the 3rd the drag-line platform that makes to reveal all the details are located at Desired Height;Dismounting, which is revealed all the details, platform device for lifting and hangs a liter drag-line, because This, its platform that will can reveal all the details is attached in agent structure, stop layers is realized, suitable for large-scale promotion application.
2nd, high-rise building Core Walls Structure shear wall construction form frame system of the invention platform stop layers construction method of revealing all the details includes: The Desired Height that platform needs to stop of revealing all the details is determined first;Then the first suspension centre and second is set to hang on Core Walls Structure shear wall Point, then hung by platform device for lifting of revealing all the details and to rise platform of the revealing all the details platform that makes to reveal all the details and be higher than Desired Height, will reveal all the details platform and core The form frame system separation of cylinder shear wall construction, the first suspension centre, second are connected by the first drag-line, the second drag-line and the 3rd drag-line respectively Suspension centre and platform of revealing all the details, decline platform of revealing all the details by platform device for lifting of revealing all the details up to the 3rd complete stress of drag-line, and first draws Rope, the second drag-line and the 3rd the drag-line platform that makes to reveal all the details are located at Desired Height;Dismounting, which is revealed all the details, platform device for lifting and hangs a liter drag-line, because This, its is ingenious in design, and simple, convenient, quick, cost is low, suitable for large-scale promotion application.
These and other objects, feature and the advantage of the present invention, by following detailed descriptions, drawings and claims obtain To fully demonstrate, and can be achieved by means, device and the combinations thereof specially pointed out in appended claims.
Brief description of the drawings
The high-rise building Core Walls Structure shear wall construction form frame system that Fig. 1 is the present invention is revealed all the details platform stop layers construction method The schematic front view of the attachment structure of first drag-line, the second drag-line and the 3rd drag-line in first specific embodiment.
Fig. 2 is the first drag-line, the second drag-line, the 3rd drag-line, the first suspension centre and in the first specific embodiment shown in Fig. 1 The main view schematic cross-sectional view of the attachment structure of two suspension centres.
Fig. 3 A are the close-up schematic views one of the structure shown in Fig. 2.
Fig. 3 B are the close-up schematic views two of the structure shown in Fig. 2.
The high-rise building Core Walls Structure shear wall construction form frame system that Fig. 4 is the present invention is revealed all the details platform stop layers construction method First drag-line, the second drag-line in second specific embodiment, to La Lasuo and the schematic front view of the attachment structure of the 3rd drag-line.
Fig. 5 is the first drag-line, the second drag-line in the second specific embodiment shown in Fig. 4, to La Lasuo, the 3rd drag-line, The main view schematic cross-sectional view of the attachment structure of one suspension centre and the second suspension centre.
Fig. 6 A are the schematic front view of the first built-in fitting of the structure shown in Fig. 5.
Fig. 6 B are the schematic front view of the second built-in fitting of the structure shown in Fig. 5.
(symbol description)
1 first suspension centre;2 second suspension centres;3 first drag-lines;4 second drag-lines;5 the 3rd drag-lines;6 the 4th drag-lines;7 the 5th draw Rope;8 coupling beams;9 first corner protector apparatus;10 second corner protector apparatus;11 first arc grooves;12 second arc grooves;13 first unload Button;14 second shackles;15 first built-in fittings;16 second built-in fittings;17 walls;18 first perforation;19 second perforation;20 first ears Plate;21 first panels;22 first anchors;23 bracing pieces;24 second otic placodes;25 second panels;26 second anchors;27 pairs of drawings Drag-line;28 the 3rd shackles;29 the 4th shackles;30 the 5th shackles;31 the 6th shackles;32 the 7th shackles;33 the 8th shackles.
Embodiment
In order to be more clearly understood that the technology contents of the present invention, described in detail especially exemplified by following examples.
Refer to shown in Fig. 1~Fig. 6 B, in the first specific embodiment and the second specific embodiment of the present invention, the present invention High-rise building Core Walls Structure shear wall construction form frame system platform stop layers construction method of revealing all the details comprise the following steps:
(1) before or during Core Walls Structure shear wall construction, it is determined that hanging is under Core Walls Structure shear wall construction form frame system Platform of revealing all the details need the Desired Height stopped;
The Desired Height needs to predefine, so that what following steps (2) were mentioned reveals all the details the first of the construction of platform stop layers The setting of the suspension centre 2 of suspension centre 1 and second, in the first specific embodiment of the present invention, before Core Walls Structure shear wall construction, it is determined that Reveal all the details platform of the hanging under Core Walls Structure shear wall construction form frame system needs the Desired Height stopped.The Desired Height is really Surely can also be carried out during Core Walls Structure shear wall construction, as long as determining institute before the setting of the first suspension centre 1 and the second suspension centre 2 State Desired Height, that is to say, that determine that the expectation is high before the Core Walls Structure shear wall is higher than the Desired Height Degree, in the second specific embodiment of the present invention, during Core Walls Structure shear wall construction, it is determined that hanging shears in Core Walls Structure Platform of revealing all the details under wall construction form frame system needs the Desired Height stopped.
(2) the Core Walls Structure shear wall rises with the Core Walls Structure shear wall construction form frame system and constantly increased, in institute When stating Core Walls Structure shear wall and being higher than the Desired Height, in the different positions higher than the Desired Height of the Core Walls Structure shear wall Put and the first suspension centre 1 and the second suspension centre 2 are set respectively, the upper end of the upper end of the first drag-line 3 and the second drag-line 4 is connected respectively described First suspension centre 1 and second suspension centre 2;
First suspension centre 1 and second suspension centre 2 can have any suitable structure, refer to Fig. 1~Fig. 3 B institutes Show, in the first specific embodiment of the present invention, first suspension centre 1 is by the 4th drag-line 6 in the Core Walls Structure shear wall It is entwined in a piece coupling beam 8, the upper end of the first described drag-line 3 is connected into the 4th drag-line 6, second suspension centre 2 is logical Cross the 5th drag-line 7 to be entwined in another coupling beam 8 of the Core Walls Structure shear wall, by the second described drag-line 4 Upper end connects the 5th drag-line 7.
In order to protect coupling beam 8, destruction of the coupling beam 8 by the 4th drag-line 6 and the 5th drag-line 7 is prevented, refers to Fig. 3 A~figure Shown in 3B, in the first specific embodiment of the present invention, between the 4th drag-line 6 and the corner angle of this coupling beam 8 First corner protector apparatus 9 is set, sets the second corner protector to use between the 5th drag-line 7 and the corner angle of this another coupling beam 8 Tool 10.
The first corner protector apparatus 9 can have any suitable structure, it is preferred that the first corner protector apparatus 9 includes Connector (not shown) between multiple first arc grooves 11 and multiple first grooves, multiple first arc grooves 11 are mutual Parallel interval is set, and the corner angle of this coupling beam 8 are located in multiple first arc grooves 11 respectively, first arc It is connected between connected in star 11 by connector between first groove, the first arc groove 11 described in the pile warp of the 4th drag-line 6 Lateral surface.Refer to shown in Fig. 3 A, in the first specific embodiment of the present invention, first arc groove 11 has 3, Connector has 2 between first groove, and this coupling beam 8 has four corner angle, wherein both the above corner angle and following Outer corners are located in 3 first arc grooves 11 respectively, described 4th drag-line, 6 pile warp, 3 first arc grooves 11 lateral surface.First arc groove 11 can be semi-circular recesses, such as semicircle steel pipe, connector between first groove Can be connecting rod, such as reinforcing bar.Connector can be used and is welded to connect between first arc groove 11 and first groove.
The second corner protector apparatus 10 can have any suitable structure, it is preferred that the second corner protector apparatus 10 wraps Include connector (not shown) between multiple second arc grooves 12 and multiple second grooves, multiple phases of second arc groove 12 Mutual parallel interval is set, and the corner angle of this another coupling beam 8 are located in multiple second arc grooves 12 respectively, and described the It is connected between two arc grooves 12 by connector between second groove, the second arc described in the pile warp of the 5th drag-line 7 is recessed The lateral surface of groove 12.Refer to shown in Fig. 3 B, in the first specific embodiment of the present invention, second arc groove 12 has 3, connector has 2 between second groove, and this another coupling beam 8 has four corner angle, wherein both the above corner angle It is located at respectively in 3 second arc grooves 12 with lower outside corner angle, described 5th drag-line, 7 pile warp, 3 second arcs The lateral surface of connected in star 12.Second arc groove 12 can be semi-circular recesses, such as semicircle steel pipe, between second groove Connector can be connecting rod, such as reinforcing bar.Connector can use weldering between second arc groove 12 and second groove Connect in succession.
The upper end of the first described drag-line 3, which connects the 4th drag-line 6, can use any suitable structure, it is preferred that 4th drag-line 6 connects the upper end of the first described drag-line 3 by the first shackle 13.Refer to shown in Fig. 1~Fig. 3 A, at this In first specific embodiment of invention, the 4th drag-line 6 is set in first shackle 13, and the one of the 4th drag-line 6 End is worn after first shackle 13 with the other end by snapping connection, and the upper end of the first described drag-line 3 is set in described the In one shackle 13, the part of the upper end of the first described drag-line 3 wear after first shackle 13 with the first described drag-line 3 Upper end remainder by snapping connection.
The upper end of the second described drag-line 4, which connects the 5th drag-line 7, can use any suitable structure, it is preferred that 5th drag-line 7 connects the upper end of the second described drag-line 4 by the second shackle 14.Refer to Fig. 1~Fig. 2 and Fig. 3 B institutes Show, in the first specific embodiment of the present invention, the 5th drag-line 7 is set in second shackle 14, and the described 5th draws One end of rope 7 is worn after second shackle 14 with the other end by snapping connection, and the upper end of the second described drag-line 4 is set in In second shackle 14, the part of the upper end of the second described drag-line 4 is worn after second shackle 14 with described The remainder of the upper end of two drag-lines 4 is by snapping connection.
First suspension centre 1 and second suspension centre 2 can also have any other suitable structure, refer to Fig. 4~ Shown in Fig. 6 B, in the second specific embodiment of the present invention, first suspension centre 1 is by the first built-in fitting 15 in the Core Walls Structure It is pre-buried in one face wall 17 of shear wall to form, the upper end of the first described drag-line 3 is connected into first built-in fitting 15, it is described Second suspension centre 2 is formed by pre-buried in wall 17 described in another side of second built-in fitting 16 in the Core Walls Structure shear wall, by institute The upper end for the second drag-line 4 stated connects second built-in fitting 16.
The upper end of the first described drag-line 3 is connected into first built-in fitting 15 can use any suitable structure, please Referring to shown in Fig. 4~Fig. 6 B, in the second specific embodiment of the present invention, first built-in fitting 15 is provided with the first perforation 18, the upper end of the first described drag-line 3 is located in first perforation 18, and second built-in fitting 16 is provided with the second perforation 19, the upper end of the second described drag-line 4 is located in second perforation 19.
First built-in fitting 15 can have any suitable structure, refer to shown in Fig. 6 A, the second of the present invention In specific embodiment, first built-in fitting 15 include the first otic placode 20, the anchor 22 of first panel 21 and first, described first Otic placode 20 and first anchor 22 are separately positioned on opposite two sides of direction of the first panel 21, and described the One otic placode 20 is provided with first perforation 18, and the first panel 21 and first anchor 22 are embedded in described in the one side In wall 17.First otic placode 20 can be such as steel plate, and the first panel 21 can be such as steel plate, first anchor Fixed pole 22 can be such as reinforcing bar.In order to strengthen the anchoring of the first anchor 22, remote described the of the first anchor 22 Bracing piece 23 is stacked with the end of one panel 21.
Second built-in fitting 16 can have any suitable structure, refer to shown in Fig. 6 B, the second of the present invention In specific embodiment, second built-in fitting 16 include the second otic placode 24, the anchor 26 of second panel 25 and second, described second Otic placode 24 and second anchor 26 are separately positioned on opposite two sides of direction of the second panel 25, and described the Two otic placodes 24 are provided with second perforation 19, and the second panel 25 and second anchor 26 are embedded in the another side institute State in wall 17.Second otic placode 24 can be such as steel plate, and the second panel 25 can be such as steel plate, described second Anchor 26 can be such as reinforcing bar.In order to strengthen the anchoring of the second anchor 26, in the second anchor 26 away from described Also bracing piece 23 is stacked with the end of second panel 25.
First suspension centre 1 and second suspension centre 2 can also have any other suitable structure, for example, described One suspension centre 1 is entwined by the 4th drag-line 6 in the coupling beam 8 of the Core Walls Structure shear wall, by the upper of the first described drag-line 3 End connects the 4th drag-line 6, and second suspension centre 2 is by the second built-in fitting 16 in the wall 17 of the Core Walls Structure shear wall It is pre-buried to form, the upper end of the second described drag-line 4 is connected into second built-in fitting 16.
First suspension centre 1 and second suspension centre 2 can also have any other suitable structure, for example, described One suspension centre 1 forms by the way that the first built-in fitting 15 is pre-buried in the wall 17 of the Core Walls Structure shear wall, by the first described drag-line 3 Upper end connect first built-in fitting 15, second suspension centre 2 by the 5th drag-line 7 the Core Walls Structure shear wall coupling beam It is entwined on 8, the upper end of the second described drag-line 4 is connected into the 5th drag-line 7.
(3) the platform device for lifting that will reveal all the details is arranged on the Core Walls Structure shear wall construction form frame system, will hang a liter drag-line Both ends connect platform device for lifting and the platform of revealing all the details of revealing all the details respectively;
The platform device for lifting of revealing all the details can be any suitable device for lifting, in the first specific embodiment of the present invention In, the platform device for lifting of revealing all the details is bottle gouard moved by hands.
Liter drag-line that hangs can be any suitable drag-line, described to hang liter in the first specific embodiment of the present invention Drag-line is steel wire rope.
(4) platform of revealing all the details rises with the Core Walls Structure shear wall construction form frame system and constantly risen, when the core When heart cylinder shear wall construction form frame system is higher than the Desired Height, is hung by the platform device for lifting of revealing all the details and revealed all the details described in rising Platform makes the platform of revealing all the details be higher than the Desired Height, by platform and the Core Walls Structure shear wall construction mould bases system of revealing all the details System separation, the lower end of the lower end of first drag-line 3, second drag-line 4 is connected with the upper end of the 3rd drag-line 5, by institute State platform of being revealed all the details described in the lower end connection of the 3rd drag-line 5;Or by the lower end of first drag-line 3, one end to La Lasuo 27 It is connected with the upper end of the 3rd drag-line 5, by the lower end of second drag-line 4, the other end to La Lasuo 27 It is connected with the upper end of another 3rd drag-line 5, by the lower end of this 3rd drag-line 5 and this another described the The lower end of three drag-lines 5 connects the platform of revealing all the details respectively;
It is more convenient in order to operate, in the first specific embodiment of the present invention, it is located at the phase in the platform of revealing all the details When hoping height, then hanging platform of being revealed all the details described in liter by the platform device for lifting of revealing all the details makes the platform of revealing all the details be higher than the expectation Highly.Now, it is only necessary to a bit of height of platform such as 100mm height of being revealed all the details described in rising is hung by the platform device for lifting of revealing all the details .
The lower end of the lower end of first drag-line 3, second drag-line 4 is connected with the upper end of the 3rd drag-line 5 can be with Using any suitable structure, it is preferred that the lower end of the first described drag-line 3, described second are drawn by the 3rd shackle 28 The lower end of rope 4 is connected with the upper end of the 3rd described drag-line 5.Refer to shown in Fig. 1~Fig. 2, first in the present invention is specific In embodiment, the lower end of the first described drag-line 3 is set in the 3rd shackle 28, the lower end of the first described drag-line 3 A part wears remainder after the 3rd shackle 28 with the lower end of the first described drag-line 3 by snapping connection;It is described The lower end of the second drag-line 4 be set in the 3rd shackle 28, the part of the lower end of the second described drag-line 4 wears described Remainder after 3rd shackle 28 with the lower end of the second described drag-line 4 is by snapping connection;The 3rd described drag-line 5 it is upper End is set in the 3rd shackle 28, the part of the upper end of the 3rd described drag-line 5 wear after the 3rd shackle 28 with The remainder of the upper end of the 3rd described drag-line 5 is by snapping connection.
It is connected by the lower end of first drag-line 3, to La Lasuo 27 one end with the upper end of the 3rd drag-line 5 Any suitable structure can be used, it is preferred that by the 4th shackle 29 by the lower end of the first described drag-line 3, described pair One end of drag-line 27 is drawn to be connected with the upper end of this 3rd drag-line 5.Refer to shown in Fig. 4~Fig. 5, the present invention's In second specific embodiment, the lower end of the first described drag-line 3 is set in the 4th shackle 29, the first described drag-line 3 The remainder that wears after the 4th shackle 29 with the lower end of the first described drag-line 3 of a part of lower end connected by buckle Connect;Described one end to La Lasuo 27 is set in the 4th shackle 29, one of described one end to La Lasuo 27 The remainder after the 4th shackle 29 with described one end to La Lasuo 27 point is worn by snapping connection;A piece institute The upper end for stating the 3rd drag-line 5 is set in the 4th shackle 29, and a part for the upper end of this 3rd drag-line 5 is worn Remainder after 4th shackle 29 with the upper end of this 3rd drag-line 5 is by snapping connection.
By the lower end of second drag-line 4, described to the upper of La Lasuo 27 other end and another 3rd drag-line 5 End is connected and can use any suitable structure, it is preferred that by the 5th shackle 30 by the lower end of the second described drag-line 4, The described other end to La Lasuo 27 is connected with the upper end of this another 3rd drag-line 5.Refer to Fig. 4~Fig. 5 institutes Show, in the second specific embodiment of the present invention, the lower end of the second described drag-line 4 is set in the 5th shackle 30, institute A part for the lower end for the second drag-line 4 stated wears the residue with the lower end of the second described drag-line 4 after the 5th shackle 30 Part is by snapping connection;The described other end to La Lasuo 27 is set in the 5th shackle 30, described to drawing A part for the other end of rope 27 wears the remainder with the other end to La Lasuo 27 after the 5th shackle 30 By snapping connection;The upper end of this another 3rd drag-line 5 is set in the 5th shackle 30, this another described A part for the upper end of three drag-lines 5 wears the residue with the upper end of this another 3rd drag-line 5 after the 5th shackle 30 Part is by snapping connection.
Platform of being revealed all the details described in the lower end connection of 3rd drag-line 5 can be used into any suitable structure, it is preferred that logical The 6th shackle 31 is crossed by platform of being revealed all the details described in the lower end connection of the 3rd described drag-line 5.Refer to shown in Fig. 1~Fig. 2, in this hair In the first bright specific embodiment, the lower end of the 3rd drag-line 5 is set in the 6th shackle 31, under the 3rd drag-line 5 The part at end wears remainder after the 6th shackle 31 with the lower end of the 3rd drag-line 5 by snapping connection.
The lower end of the lower end of this 3rd drag-line 5 and this another 3rd drag-line 5 is connected respectively described Platform of revealing all the details can use any suitable structure, it is preferred that by the 7th shackle 32 by under this 3rd drag-line 5 Reveal all the details platform, will be revealed all the details by the 8th shackle 33 described in the lower end connection of this another 3rd drag-line 5 flat described in the connection of end Platform.Refer to shown in Fig. 4~Fig. 5, in the second specific embodiment of the present invention, the lower end set of this 3rd drag-line 5 Be located in the 7th shackle 32, the part of the lower end of this 3rd drag-line 5 wear after the 7th shackle 32 with this one By snapping connection, the lower end of this another 3rd drag-line 5 is set in the remainder of the lower end of 3rd drag-line 5 described in root In 8th shackle 33, the part of the lower end of this another 3rd drag-line 5 wears another with this after the 8th shackle 33 The remainder of the lower end of the 3rd drag-line 5 is by snapping connection described in root.
First drag-line 3, second drag-line 4, the 3rd drag-line 5, the 4th drag-line 6 and the 5th drag-line 7 can be any suitable drag-line, the present invention the first specific embodiment in, first drag-line 3, second drag-line 4, 3rd drag-line 5, the 4th drag-line 6 and the 5th drag-line 7 are steel wire rope.Described can be any to La Lasuo 27 Suitable drag-line, in the second specific embodiment of the present invention, described is steel wire rope to La Lasuo 27.
It should be noted that for a platform of revealing all the details, if first suspension centre 1, second suspension centre 2, described The structure or first suspension centre 1, second suspension centre that one drag-line 3, second drag-line 4 and the 3rd drag-line 5 are formed 2nd, first drag-line 3, second drag-line 4, the structure formed to La Lasuo 27 and the 3rd drag-line 5 can not be safe Platform of revealing all the details smoothly is hung, can consider to set multiple first suspension centres 1, second suspension centre 2, described as needed The structure or first suspension centre 1, second suspension centre that one drag-line 3, second drag-line 4 and the 3rd drag-line 5 are formed 2nd, first drag-line 3, second drag-line 4, the structure formed to La Lasuo 27 and the 3rd drag-line 5, with safety Smoothly hang platform of revealing all the details.
(5) by the platform device for lifting of revealing all the details decline described in reveal all the details platform until the 5 complete stress of the 3rd drag-line, And first drag-line 3, second drag-line 4 and the 3rd drag-line 5 make the platform of revealing all the details be located at the Desired Height or First drag-line 3 described in person, second drag-line 4, described it is located at the platform of revealing all the details to La Lasuo 27 and the 3rd drag-line 5 The Desired Height;
The platform of revealing all the details is located at the Desired Height, the design of Core Walls Structure shear wall and platform of revealing all the details can be passed through Drawing, the first suspension centre 1 and the position of the second suspension centre 2 and the hoisting point position for platform of revealing all the details are designed, so that it is determined that the first drag-line 3, The shape and structure that second drag-line 4 and the 3rd drag-line 5 (if in the presence of to La Lasuo 27 when also include to La Lasuo 27) are formed, Jin Erji Calculate their length, specification etc.;Or the of different length can also be changed by the way that step (4) and step (5) is repeated several times Three drag-lines 5;If there is to La Lasuo 27, can also change different length to La Lasuo 27;Difference even can also be changed The first drag-line 3 and the second drag-line 4 in the step of length (2) so that it is final, after the 5 complete stress of the 3rd drag-line, the pocket Bottom platform is located at the Desired Height.
Refer to shown in Fig. 1~Fig. 2, in the first specific embodiment of the present invention, a liter dress is hung by the platform of revealing all the details Put and reveal all the details platform until the 5 complete stress of the 3rd drag-line described in decline, and first drag-line 3, second drag-line 4 and institute Stating the 3rd drag-line 5 makes the platform of revealing all the details be located at the Desired Height.Refer to shown in Fig. 4~Fig. 5, in the second tool of the present invention In body embodiment, by the platform device for lifting of revealing all the details decline described in reveal all the details platform until the 5 complete stress of the 3rd drag-line, And first drag-line 3, second drag-line 4, described it is located at the platform of revealing all the details to La Lasuo 27 and the 3rd drag-line 5 The Desired Height.
(6) revealed all the details described in removing and platform device for lifting and described hang a liter drag-line.
The present invention is by above content and referring to the drawings to the present invention have been described in detail, on this basis, this Field those of ordinary skill can suitably be changed according to the common knowledge and conventional technical means of this area to the present invention, example Such as, " upper end of the upper end of the first drag-line 3 and the second drag-line 4 is connected into first suspension centre 1 and described respectively in step (2) Second suspension centre 2 " can be carried out in step (4);Step (3) before step (4) as long as carry out;It is described in step (4) The lower end of first drag-line 3 and the lower end of second drag-line 4 can first connect, and can be carried out in step (2);In step (4), The lower end of first drag-line 3, the lower end to La Lasuo 27 and second drag-line 4 can first connect, can be in step (2) Carry out;Etc..These, which are altered or varied, will all fall within the scope and spirit of the invention.
Therefore, the present invention proposes a kind of high-rise building Core Walls Structure shear wall construction form frame system platform stop layers of revealing all the details and applied Work method.In high-rise building core tube construction latter stage, by script hanging to the protection of revealing all the details on form frame system, hung with drag-line Onto shear wall body and/or coupling beam, process is simple, workable, and construction cost is low.The present invention is to solving similar projects skill Art problem, there is certain application value.
To sum up, high-rise building Core Walls Structure shear wall construction form frame system of the invention is revealed all the details platform stop layers construction method energy The platform that will enough reveal all the details is attached in agent structure, realizes stop layers, and ingenious in design, simple, convenient, quick, cost is low, is suitable to Large-scale promotion application.
As can be seen here, the purpose of the present invention is achieved completely and effectively.The function and structural principle of the present invention Shown and illustrated in embodiment, under without departing substantially from the principle, embodiment can make any modification.So this hair The bright all variant embodiments included based on claim spirit and right.

Claims (10)

  1. The platform stop layers construction method 1. a kind of high-rise building Core Walls Structure shear wall construction form frame system is revealed all the details, it is characterised in that Comprise the following steps:
    (1) before or during Core Walls Structure shear wall construction, it is determined that pocket of the hanging under Core Walls Structure shear wall construction form frame system Bottom platform needs the Desired Height stopped;
    (2) the Core Walls Structure shear wall rises with the Core Walls Structure shear wall construction form frame system and constantly increased, in the core When heart cylinder shear wall is higher than the Desired Height, in the diverse location higher than the Desired Height point of the Core Walls Structure shear wall First suspension centre and the second suspension centre are not set, the upper end of the first drag-line and the upper end of the second drag-line are connected into first suspension centre respectively With second suspension centre;
    (3) the platform device for lifting that will reveal all the details is arranged on the Core Walls Structure shear wall construction form frame system, will hang the two of liter drag-line Hold revealed all the details described in connection respectively platform device for lifting and the platform of revealing all the details;
    (4) platform of revealing all the details rises with the Core Walls Structure shear wall construction form frame system and constantly risen, when the Core Walls Structure When shear wall construction form frame system is higher than the Desired Height, platform of being revealed all the details described in rising is hung by the platform device for lifting of revealing all the details The platform of revealing all the details is set to be higher than the Desired Height, by platform and the Core Walls Structure shear wall construction form frame system point of revealing all the details From, the lower end of the lower end of first drag-line, second drag-line is connected with the upper end of the 3rd drag-line, by the described 3rd draw Revealed all the details platform described in the lower end connection of rope;Or by the lower end of first drag-line, described to La Lasuo one end and one The upper end of three drag-lines is connected, by the lower end of second drag-line, described to the La Lasuo other end and another described 3rd The upper end of drag-line is connected, and the lower end of the lower end of this 3rd drag-line and this another 3rd drag-line is connected respectively Connect the platform of revealing all the details;
    (5) by the platform device for lifting of revealing all the details decline described in reveal all the details platform until the complete stress of the 3rd drag-line, and institute Stating the first drag-line, second drag-line and the 3rd drag-line makes the platform of revealing all the details be located at the Desired Height or described the It is one drag-line, second drag-line, described to La Lasuo and the 3rd drag-line makes the platform of revealing all the details be located at the Desired Height;
    (6) revealed all the details described in removing and platform device for lifting and described hang a liter drag-line.
  2. The platform stop layers construction party 2. high-rise building Core Walls Structure shear wall construction form frame system as claimed in claim 1 is revealed all the details Method, it is characterised in that in the step (2), first suspension centre is by the 4th drag-line the one of the Core Walls Structure shear wall It is entwined in root coupling beam, the upper end of the first described drag-line is connected into the 4th drag-line, second suspension centre passes through the 5th Drag-line is entwined in another coupling beam of the Core Walls Structure shear wall, and the upper end of the second described drag-line is connected into institute State the 5th drag-line.
  3. The platform stop layers construction party 3. high-rise building Core Walls Structure shear wall construction form frame system as claimed in claim 2 is revealed all the details Method, it is characterised in that in the step (2), is set between the 4th drag-line and the corner angle of the coupling beam One corner protector apparatus, the second corner protector apparatus is set between the 5th drag-line and the corner angle of another coupling beam.
  4. The platform stop layers construction party 4. high-rise building Core Walls Structure shear wall construction form frame system as claimed in claim 2 is revealed all the details Method, it is characterised in that in the step (2), the 4th drag-line connects the upper of the first described drag-line by the first shackle End, the 5th drag-line connect the upper end of the second described drag-line by the second shackle.
  5. The platform stop layers construction party 5. high-rise building Core Walls Structure shear wall construction form frame system as claimed in claim 1 is revealed all the details Method, it is characterised in that in the step (4), drawn the lower end of the first described drag-line, described second by the 3rd shackle The lower end of rope is connected with the upper end of the 3rd described drag-line;By the 4th shackle by the lower end of the first described drag-line, described One end to La Lasuo be connected with the upper end of this 3rd drag-line, by the 5th shackle by the second described drag-line Lower end, the other end to La Lasuo is connected with the upper end of this another 3rd drag-line.
  6. The platform stop layers construction party 6. high-rise building Core Walls Structure shear wall construction form frame system as claimed in claim 1 is revealed all the details Method, it is characterised in that in the step (4), will be revealed all the details by the 6th shackle described in the lower end connection of the 3rd described drag-line Platform;, should by the 8th shackle by the 7th shackle by platform of being revealed all the details described in the lower end connection of this 3rd drag-line Revealed all the details described in the lower end connection of another 3rd drag-line platform.
  7. The platform stop layers construction party 7. high-rise building Core Walls Structure shear wall construction form frame system as claimed in claim 1 is revealed all the details Method, it is characterised in that in the step (2), first suspension centre is by the first built-in fitting in the Core Walls Structure shear wall It is pre-buried in one face wall to form, the upper end of the first described drag-line is connected into first built-in fitting, second suspension centre passes through It is pre-buried in wall described in another side of second built-in fitting in the Core Walls Structure shear wall to form, by the upper end of the second described drag-line Connect second built-in fitting.
  8. The platform stop layers construction party 8. high-rise building Core Walls Structure shear wall construction form frame system as claimed in claim 7 is revealed all the details Method, it is characterised in that in the step (2), first built-in fitting is provided with the first perforation, the first described drag-line it is upper End is located in first perforation, and second built-in fitting is provided with the second perforation, and the upper end of the second described drag-line is worn In the described second perforation.
  9. The platform stop layers construction party 9. high-rise building Core Walls Structure shear wall construction form frame system as claimed in claim 1 is revealed all the details Method, it is characterised in that in the step (2), first suspension centre by the 4th drag-line the Core Walls Structure shear wall company It is entwined on beam, the upper end of the first described drag-line is connected into the 4th drag-line, second suspension centre is pre-buried by second Part is pre-buried in the wall of the Core Walls Structure shear wall to be formed, and the upper end connection described second of the second described drag-line is pre-buried Part.
  10. The platform stop layers construction party 10. high-rise building Core Walls Structure shear wall construction form frame system as claimed in claim 1 is revealed all the details Method, it is characterised in that in the step (2), first suspension centre is by the first built-in fitting in the Core Walls Structure shear wall It is pre-buried in wall to form, the upper end of the first described drag-line is connected into first built-in fitting, second suspension centre passes through the 5th Drag-line is entwined in the coupling beam of the Core Walls Structure shear wall, and the upper end connection the described 5th of the second described drag-line is drawn Rope.
CN201710898514.7A 2017-09-28 2017-09-28 Super high-rise building Core Walls Structure shear wall construction form frame system is revealed all the details platform stop layers construction method Active CN107630510B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710898514.7A CN107630510B (en) 2017-09-28 2017-09-28 Super high-rise building Core Walls Structure shear wall construction form frame system is revealed all the details platform stop layers construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710898514.7A CN107630510B (en) 2017-09-28 2017-09-28 Super high-rise building Core Walls Structure shear wall construction form frame system is revealed all the details platform stop layers construction method

Publications (2)

Publication Number Publication Date
CN107630510A true CN107630510A (en) 2018-01-26
CN107630510B CN107630510B (en) 2019-07-30

Family

ID=61102908

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710898514.7A Active CN107630510B (en) 2017-09-28 2017-09-28 Super high-rise building Core Walls Structure shear wall construction form frame system is revealed all the details platform stop layers construction method

Country Status (1)

Country Link
CN (1) CN107630510B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1088847A (en) * 1996-07-22 1998-04-07 Hitachi Ltd Elevator lift-way for intermediate vibration isolation building
CN101333869A (en) * 2008-07-03 2008-12-31 上海市第四建筑有限公司 Construction method for integrally hoisting steel platform and integrally traversing girders layer
CN101503908A (en) * 2009-03-03 2009-08-12 南通建工集团股份有限公司 Construction method for spacing suspension cable structural template support platform
CN203430066U (en) * 2013-07-04 2014-02-12 中国建筑第八工程局有限公司 Closed protective platform for core tube
CN204491837U (en) * 2015-03-17 2015-07-22 天津天一建设集团有限公司 Suspension type high-strength steel bar lifting module
CN204782031U (en) * 2015-06-11 2015-11-18 北京六建集团有限责任公司 Interior climbing tower hangs entrance to a cave from promoting safety protection platform
CN206233562U (en) * 2016-11-01 2017-06-09 中国建筑第八工程局有限公司 The safety device of revealing all the details of hydraulic pressure lift form frame system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1088847A (en) * 1996-07-22 1998-04-07 Hitachi Ltd Elevator lift-way for intermediate vibration isolation building
CN101333869A (en) * 2008-07-03 2008-12-31 上海市第四建筑有限公司 Construction method for integrally hoisting steel platform and integrally traversing girders layer
CN101503908A (en) * 2009-03-03 2009-08-12 南通建工集团股份有限公司 Construction method for spacing suspension cable structural template support platform
CN203430066U (en) * 2013-07-04 2014-02-12 中国建筑第八工程局有限公司 Closed protective platform for core tube
CN204491837U (en) * 2015-03-17 2015-07-22 天津天一建设集团有限公司 Suspension type high-strength steel bar lifting module
CN204782031U (en) * 2015-06-11 2015-11-18 北京六建集团有限责任公司 Interior climbing tower hangs entrance to a cave from promoting safety protection platform
CN206233562U (en) * 2016-11-01 2017-06-09 中国建筑第八工程局有限公司 The safety device of revealing all the details of hydraulic pressure lift form frame system

Also Published As

Publication number Publication date
CN107630510B (en) 2019-07-30

Similar Documents

Publication Publication Date Title
CN210193173U (en) Large-scale H shaped steel stand hoist and mount hoist that breaks off relations fast
CN103291066B (en) A kind of construction elevator wall-attached frame servicing unit reinforcement means
CN101712436B (en) Steel truss hoisting tool
CN105126272A (en) Safety belt suspension device
CN205222444U (en) A collection dress self -discharging case that is used for short steel pipe of handling scaffold
CN107630510B (en) Super high-rise building Core Walls Structure shear wall construction form frame system is revealed all the details platform stop layers construction method
CN106532557B (en) Across 10KV line construction platform tools devices
CN202658867U (en) Overhanging construction platform
CN203269337U (en) Clamp for high-altitude construction of long sleeve
CN202785255U (en) Turnover hoisting tool for reinforced concrete pipe joint
CN207079898U (en) Outer hanging basket structure
CN202988556U (en) Special lifting appliance for angle-steel type frame body
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN205527272U (en) Modulization hanging beam
CN203639016U (en) Balance beam for hoisting reinforcing steel bars by tower crane
CN208294090U (en) Plate installs crosshead
CN106836777B (en) A kind of foldable external wall construction operating platform of assembled and construction method
CN204079213U (en) Many lifting components hanger
CN104176629B (en) A kind of suspender of applicable I-steel
CN106049971A (en) Installation method of non-contact-point lifting appliance for towering noble metal tower mast
CN202081630U (en) Anti-leaning and anti-falling mechanism of attaching elevating scaffold for building construction
CN208981753U (en) Key slot type scaffold is fixedly connected device
CN205740047U (en) Self-locking girder steel hoisting device
CN205772768U (en) A kind of reinforcing bar handling support for building
CN103373664A (en) Self-tightening lifting appliance

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant