CN107618620A - 一种浮托式平台的安装工艺 - Google Patents

一种浮托式平台的安装工艺 Download PDF

Info

Publication number
CN107618620A
CN107618620A CN201710663320.9A CN201710663320A CN107618620A CN 107618620 A CN107618620 A CN 107618620A CN 201710663320 A CN201710663320 A CN 201710663320A CN 107618620 A CN107618620 A CN 107618620A
Authority
CN
China
Prior art keywords
spud leg
platform body
platform
water tank
floating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710663320.9A
Other languages
English (en)
Inventor
周宏勤
周神青
廖鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU HUAXICUN OFFSHORE ENGINEERING SERVICE Co Ltd
Original Assignee
Hengtong Huaxi Offshore Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hengtong Huaxi Offshore Engineering Co Ltd filed Critical Hengtong Huaxi Offshore Engineering Co Ltd
Priority to CN201710663320.9A priority Critical patent/CN107618620A/zh
Publication of CN107618620A publication Critical patent/CN107618620A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Cleaning Or Clearing Of The Surface Of Open Water (AREA)

Abstract

本发明涉及一种浮托式平台的安装工艺,包含有以下步骤:步骤1、船体(101)装载平台本体(1)航行至目标海域,平台本体(1)的边缘上竖向插置的桩腿(2)锁紧在平台本体(1)上;步骤2、解锁桩腿(2),桩腿(2)位于平台本体(1)下方的一端上固定有水箱(3);桩腿(2)在重力作用下下沉至海底海泥层内;步骤3、水箱(3)内注水增加自身,使得桩腿(2)进一步插入海泥中;步骤4、船体(101)下沉,使得船体(101)与平台本体(1)分离,船体(101)驶离平台本体(1);步骤5、上浮,施工完成后,水箱(3)排出其内部的压载水;水箱(3)带着桩腿(2)上浮。本发明涉及一种浮托式平台的安装工艺,作业效率高且节约成本。

Description

一种浮托式平台的安装工艺
技术领域
本发明涉及一种浮托式平台的安装工艺。
背景技术
目前,随着新能源技术的不断引入,海上风电也得到了越来越广泛的应用;在海上作业过程中,海上浮动作业平台和施工船相互配合施工进行作业是最佳的作业方式,能够有效的提高作业效率;但是,常规的施工作业方式中缺乏相应的配套船只以及工艺流程,因此只能采用自带动力的浮动平台,这样一来极大的增加了其制造成本和施工成本;而且常规的平台在安装过程中需要单独对每根桩腿进行固定作业,从而导致施工效率降低,不利于缩短工期。
发明内容
本发明的目的在于克服上述不足,提供一种作业效率高且节约成本的浮托式平台的安装工艺。
本发明的目的是这样实现的:
一种浮托式平台的安装工艺,其特征在于:所述工艺包含有以下步骤:
步骤1、船体装载平台本体航行至目标海域,平台本体的边缘上竖向插置的桩腿锁紧在平台本体上;此时,桩腿沿其长度方向设置有多个锁紧孔,所述桩腿上套装有一锁紧套,所述锁紧套固定于平台本体上,且销轴穿过锁紧套插置于锁紧孔内;
步骤2、解锁桩腿(即将销轴拔出锁紧孔),桩腿位于平台本体下方的一端上固定有水箱;桩腿在重力作用下下沉至海底海泥层内;
步骤3、水箱内注水增加自身(该注水过程采用船用压载水技术,属于常规技术),使得桩腿进一步插入海泥中;
步骤4、船体下沉(落潮或通过压载方式),使得船体与平台本体分离,船体驶离平台本体;
步骤5、上浮,施工完成后,水箱排出其内部的压载水;从而使得水箱带着桩腿上浮。
本发明一种浮托式平台的安装工艺,步骤3中,当水箱内注水完成后,使用下压卷扬机下压桩腿,此时,下压卷扬机安装于平台本体上,所述桩腿的顶部两侧分别安装有下压动滑轮组,所述平台本体上位于桩腿两侧分别安装有下压定滑轮组,下压卷扬机上卷绕的下压钢丝绳经一下压定滑轮组后上升、分别经两个下压动滑轮组后下降缠绕于另一下压定滑轮组上。
本发明一种浮托式平台的安装工艺,下压卷扬机完成下压后,锁紧桩腿,平台本体的中空结构内同样注入压载水。
本发明一种浮托式平台的安装工艺,所述桩腿内沿其竖向设置有一高压气道,且与该桩腿相连的水箱与该高压气道相连通,排水时可通过高压气道输入高压气体进行排水。
与现有技术相比,本发明的有益效果是:
本发明采用水箱压载方式进行安装固定,从而多个桩腿之间可以同时进行固定安装作业,极大的提高了作业效率;而且相比于常规的自行式平台,本发明平台结构简单,船体采用现有普通作业船拖行即可;而且平台的安装固定过程简单方便,无需租借振动锤等额外的设备进行,进一步降低了施工成本。
附图说明
图1为本发明一种浮托式平台的安装工艺中状态示意图(侧视图)。
图2为本发明一种浮托式平台的安装工艺中状态示意图(侧视图)。
图3为本发明一种浮托式平台的安装工艺中状态示意图(俯视图)。
图4为本发明一种浮托式平台的安装工艺中状态示意图(安装有滑轮组后)。
图5为本发明一种浮托式平台的安装工艺的工艺步骤图(施工就绪)。
图6为本发明一种浮托式平台的安装工艺的工艺步骤图(施工中)。
图7为本发明一种浮托式平台的安装工艺的工艺步骤图(施工完毕)。
其中:
平台本体1、桩腿2、水箱3;
下压卷扬机4、下压定滑轮组5、下压动滑轮组6、下压钢丝绳7;
船体101。
具体实施方式
参见图1~7,本发明涉及的一种浮托式平台的安装工艺,所述工艺包含有以下步骤:
步骤1、船体101装载平台本体1航行至目标海域,平台本体1的边缘上竖向插置的桩腿2锁紧在平台本体1上(具体的讲,所述桩腿2沿其长度方向设置有多个锁紧孔,所述桩腿2上套装有一锁紧套,所述锁紧套固定于平台本体1上,且销轴穿过锁紧套插置于锁紧孔内);
步骤2、解锁桩腿2(即将销轴拔出锁紧孔),桩腿2位于平台本体1下方的一端上固定有水箱3;桩腿2在重力作用下下沉至海底海泥层内;
步骤3、水箱3内注水增加自身(该注水过程采用船用压载水技术,属于常规技术),使得桩腿2进一步插入海泥中;
步骤4、船体101下沉(落潮或通过压载方式),使得船体101与平台本体1分离,船体101驶离平台本体1;
步骤5、上浮,施工完成后,水箱3排出其内部的压载水;从而使得水箱3带着桩腿2上浮。
进一步的,所述桩腿2内沿其竖向设置有一高压气道,且与该桩腿2相连的水箱3与该高压气道相连通,排水时可通过高压气道输入高压气体进行排水;
进一步的,每个桩腿2上固定有一水箱3;或者多个桩腿2上固定有一水箱3;
进一步的,步骤3中,当水箱3内注水完成后,使用下压卷扬机4下压桩腿2,此时,下压卷扬机4安装于平台本体1上,所述桩腿2的顶部两侧分别安装有下压动滑轮组6,所述平台本体1上位于桩腿2两侧分别安装有下压定滑轮组5,下压卷扬机4上卷绕的下压钢丝绳7经一下压定滑轮组5后上升、分别经两个下压动滑轮组6后下降缠绕于另一下压定滑轮组5上;
优选的,下压卷扬机4完成下压后,锁紧桩腿2,平台本体1的中空结构内同样注入压载水;
另外:需要注意的是,上述具体实施方式仅为本专利的一个优化方案,本领域的技术人员根据上述构思所做的任何改动或改进,均在本专利的保护范围之内。

Claims (5)

1.一种浮托式平台的安装工艺,其特征在于:所述工艺包含有以下步骤:
步骤1、船体(101)装载平台本体(1)航行至目标海域,平台本体(1)的边缘上竖向插置的桩腿(2)锁紧在平台本体(1)上;
步骤2、解锁桩腿(2),桩腿(2)位于平台本体(1)下方的一端上固定有水箱(3);桩腿(2)在重力作用下下沉至海底海泥层内;
步骤3、水箱(3)内注水增加自身,使得桩腿(2)进一步插入海泥中;
步骤4、船体(101)下沉,使得船体(101)与平台本体(1)分离,船体(101)驶离平台本体(1);
步骤5、上浮,施工完成后,水箱(3)排出其内部的压载水;从而使得水箱(3)带着桩腿(2)上浮。
2.如权利要求1所述一种浮托式平台的安装工艺,其特征在于:所述桩腿(2)沿其长度方向设置有多个锁紧孔,所述桩腿(2)上套装有一锁紧套,所述锁紧套固定于平台本体(1)上,且销轴穿过锁紧套插置于锁紧孔内。
3.如权利要求1所述一种浮托式平台的安装工艺,其特征在于:步骤3中,当水箱(3)内注水完成后,使用下压卷扬机(4)下压桩腿(2),此时,下压卷扬机(4)安装于平台本体(1)上,所述桩腿(2)的顶部两侧分别安装有下压动滑轮组(6),所述平台本体(1)上位于桩腿(2)两侧分别安装有下压定滑轮组(5),下压卷扬机(4)上卷绕的下压钢丝绳(7)经一下压定滑轮组(5)后上升、分别经两个下压动滑轮组(6)后下降缠绕于另一下压定滑轮组(5)上。
4.如权利要求3所述一种浮托式平台的安装工艺,其特征在于:下压卷扬机(4)完成下压后,锁紧桩腿(2),平台本体(1)的中空结构内同样注入压载水。
5.如权利要求1所述一种浮托式平台的安装工艺,其特征在于:所述桩腿(2)内沿其竖向设置有一高压气道,且与该桩腿(2)相连的水箱(3)与该高压气道相连通,排水时可通过高压气道输入高压气体进行排水。
CN201710663320.9A 2017-08-05 2017-08-05 一种浮托式平台的安装工艺 Pending CN107618620A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710663320.9A CN107618620A (zh) 2017-08-05 2017-08-05 一种浮托式平台的安装工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710663320.9A CN107618620A (zh) 2017-08-05 2017-08-05 一种浮托式平台的安装工艺

Publications (1)

Publication Number Publication Date
CN107618620A true CN107618620A (zh) 2018-01-23

Family

ID=61088578

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710663320.9A Pending CN107618620A (zh) 2017-08-05 2017-08-05 一种浮托式平台的安装工艺

Country Status (1)

Country Link
CN (1) CN107618620A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109367717A (zh) * 2018-10-22 2019-02-22 苏州开端机电科技有限公司 一种半潜式浮动平台的防浪型升降控制装置
CN113895578A (zh) * 2021-10-22 2022-01-07 国网河南省电力公司新安县供电公司 一种便携式水上作业平台

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104554639A (zh) * 2014-12-19 2015-04-29 中远船务工程集团有限公司 大型近海风电设备安装装备
US20150139737A1 (en) * 2013-11-08 2015-05-21 Offshore Technology Development Pte Ltd Jackup Deployed Riser Protection Structure
CN105711766A (zh) * 2016-04-03 2016-06-29 大连理工大学 自升下潜式水下作业平台及其使用方法
CN105862696A (zh) * 2016-04-06 2016-08-17 大连理工大学 一种自升式多功能海洋平台及其工作方法
CN106741609A (zh) * 2016-12-16 2017-05-31 中国海洋石油总公司 大型海洋结构物的组块动力定位浮托安装工艺

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150139737A1 (en) * 2013-11-08 2015-05-21 Offshore Technology Development Pte Ltd Jackup Deployed Riser Protection Structure
CN104554639A (zh) * 2014-12-19 2015-04-29 中远船务工程集团有限公司 大型近海风电设备安装装备
CN105711766A (zh) * 2016-04-03 2016-06-29 大连理工大学 自升下潜式水下作业平台及其使用方法
CN105862696A (zh) * 2016-04-06 2016-08-17 大连理工大学 一种自升式多功能海洋平台及其工作方法
CN106741609A (zh) * 2016-12-16 2017-05-31 中国海洋石油总公司 大型海洋结构物的组块动力定位浮托安装工艺

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109367717A (zh) * 2018-10-22 2019-02-22 苏州开端机电科技有限公司 一种半潜式浮动平台的防浪型升降控制装置
CN113895578A (zh) * 2021-10-22 2022-01-07 国网河南省电力公司新安县供电公司 一种便携式水上作业平台

Similar Documents

Publication Publication Date Title
WO2021012860A1 (zh) 一种桩筒复合桁架式海上风机基础及其施工工艺
CN102677694B (zh) 一种海上风电潜式基础结构及其整机安装施工方法
US9499240B2 (en) Floating marine structure
CN206706811U (zh) 一种海上风机单桩基础
CN108626078B (zh) 一种海上风机Spar型浮式基础驳船助运扶装工艺
CN210562182U (zh) 海上桩基施工用稳桩器
CN113071605B (zh) 适用于漂浮式风机的锚固基础及其施工方法
CN208441122U (zh) 一种漂浮式光伏电站的水下桩基系泊系统
CN107618620A (zh) 一种浮托式平台的安装工艺
CN210797617U (zh) 一种桩筒复合桁架式海上风机基础
CN106368197A (zh) 带大型井口的沉垫式自安装平台
KR102192116B1 (ko) 스파형 풍력발전기 및 이의 설치 및 해체 방법
KR101338358B1 (ko) 해상 풍력발전기 설치선
CN205000333U (zh) 海上风机基础
CN207685810U (zh) 一种浮托式平台
CN102704502A (zh) 一种海上潜式箱型基础结构及其施工方法
CN105401564A (zh) 将潮流能发电装置固定于水底的施工方法和潮流发电装置
CN212335969U (zh) 一种迁移基盘式定位打桩一体化平台
KR101254973B1 (ko) 부유식 구조물
CN205276309U (zh) 一种浮式抗冰张力腿风机基础
CN107700450A (zh) 一种浮托式海上风电安装平台的安装工艺
CN110001878A (zh) 一种张力腿式海上风力发电系统
US20020067958A1 (en) Methods of installing offshore platforms
CN218894110U (zh) 一种单桩吸力桩基础
CN220469825U (zh) 一种水上钻探作业平台

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20181008

Address after: 214434 Xiangshan Road 29, Jiangyin City, Wuxi, Jiangsu (Huaxi financial building)

Applicant after: Jiangsu Huaxicun Offshore Engineering Service Co., Ltd.

Applicant after: Hengtong Huaxi Marine Engineering Co. Ltd.

Address before: 215600 room 308-247, international consumer goods centre, Beijing Road, Zhangjiagang Free Trade Zone, Suzhou, Jiangsu

Applicant before: Hengtong Huaxi Marine Engineering Co. Ltd.

TA01 Transfer of patent application right
CB02 Change of applicant information

Address after: 214434 Xiangshan Road 29, Jiangyin City, Wuxi, Jiangsu (Huaxi financial building)

Applicant after: Jiangsu Huaxicun Offshore Engineering Service Co., Ltd.

Applicant after: Hengtong Ocean Engineering Co., Ltd.

Address before: 214434 Xiangshan Road 29, Jiangyin City, Wuxi, Jiangsu (Huaxi financial building)

Applicant before: Jiangsu Huaxicun Offshore Engineering Service Co., Ltd.

Applicant before: Hengtong Huaxi Marine Engineering Co. Ltd.

CB02 Change of applicant information