CN106741609A - 大型海洋结构物的组块动力定位浮托安装工艺 - Google Patents

大型海洋结构物的组块动力定位浮托安装工艺 Download PDF

Info

Publication number
CN106741609A
CN106741609A CN201611166518.8A CN201611166518A CN106741609A CN 106741609 A CN106741609 A CN 106741609A CN 201611166518 A CN201611166518 A CN 201611166518A CN 106741609 A CN106741609 A CN 106741609A
Authority
CN
China
Prior art keywords
ship
chunk
jacket
dynamic positioning
floating support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611166518.8A
Other languages
English (en)
Inventor
徐京阔
许南
王飚
王明伦
于文太
贺辰
秦立成
李立涛
李新超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Original Assignee
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, Offshore Oil Engineering Co Ltd filed Critical China National Offshore Oil Corp CNOOC
Priority to CN201611166518.8A priority Critical patent/CN106741609A/zh
Publication of CN106741609A publication Critical patent/CN106741609A/zh
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B75/00Building or assembling floating offshore structures, e.g. semi-submersible platforms, SPAR platforms or wind turbine platforms

Abstract

一种大型海洋结构物的组块动力定位浮托安装工艺,采用以下步骤:一:将组块运输至海上平台安装现场,然后,进行动力定位就位演练;二:船舶依靠自身动力定位系统逐步靠近导管架,通过位置参考系统为船舶进行定位,并由设置在船舶上的进船导向引导船舶顺利进入导管架的槽口;三:将船舶行进至导管架槽口内的最终对接位置,调整船舶上的压载的大小,将组块下放至导管架上;四:继续调整船舶的压载至退船吃水位置,然后,将船舶退出导管架,以完成组块动力定位浮托安装作业。本发明不仅能够在任何天气窗口及作业水深情况下对大型海洋结构物进行安装,而且,大大提高了恶劣海况条件下,对大型海洋结构物进行安装的效率。

Description

大型海洋结构物的组块动力定位浮托安装工艺
技术领域
本发明涉及大型海洋结构物的安装工艺,尤其涉及一种用于大型海洋结构物的组块动力定位浮托安装工艺。属于海洋石油工程领域。
背景技术
目前,对于大型海洋结构物的整体安装,通常采用锚系浮托安装的方式进行。但是,由于现有的锚系浮托安装大型海洋结构物,需要在海上预先布置锚系设备,并需要进行二次连接。因此,导致海上施工准备比较复杂、且对天气窗口要求高;同时,布锚时,受到水深限制。
发明内容
本发明的主要目的在于克服现有技术存在的上述缺点,而提供一种大型海洋结构物的组块动力定位浮托安装工艺,其不仅能够在任何天气窗口及作业水深情况下对大型海洋结构物进行安装,解决了对天气窗口要求高、作业时,水深受限的问题;而且,其施工准备比较简单,大大提高了恶劣海况条件下,对大型海洋结构物进行安装的效率。
本发明的目的是由以下技术方案实现的:
一种大型海洋结构物的组块动力定位浮托安装工艺,其特征在于:采用以下步骤:
第一步:通过船舶将组块运输至海上平台安装现场,然后,按照预先设置的方案进行动力定位就位演练;
第二步:船舶依靠自身动力定位系统逐步靠近导管架,通过位置参考系统为船舶进行定位,并由设置在船舶上的进船导向引导船舶顺利进入导管架的槽口;
第三步:将船舶行进至导管架槽口内的最终对接位置,调整船舶上的压载的大小,将组块下放至导管架上,以完成荷载转移;
第四步:继续调整船舶的压载至退船吃水位置,通过组块分离缓冲装置来缓冲组块和船舶分离过程中的碰撞力,然后,将船舶退出导管架,以完成组块动力定位浮托安装作业。
所述第二步中,导管架上设置有横荡橡胶护舷,通过横荡橡胶护舷来缓冲船舶与导管架之间的碰撞力。
所述第三步中,导管架上设置有组块桩腿耦合装置,通过组块桩腿耦合装置来缓冲下放过程中,组块与导管架之间的碰撞力。
本发明的有益效果:本发明由于采用上述技术方案,其不仅能够在任何天气窗口及作业水深情况下对大型海洋结构物进行安装,解决了对天气窗口要求高、作业时,水深受限的问题;而且,其施工准备比较简单,大大提高了恶劣海况条件下,对大型海洋结构物进行安装的效率。
附图说明
图1为本发明船舶进入导管架槽口示意图。
图2为本发明组块荷载转移示意图。
图3为本发明船舶退出导管架槽口示意图。
图中主要标号说明:
1.船舶、2.组块、3导管架、4.横荡橡胶护舷、5.组块桩腿耦合装置、6.组块分离缓冲装置、7.进船导向。
具体实施方式
如图1—图3所示,本发明采用以下步骤:
第一步:通过船舶1将组块2运输至海上平台安装现场,然后,按照预先设置的方案进行动力定位就位演练;
第二步:船舶1依靠自身动力定位系统逐步靠近导管架3,通过位置参考系统为船舶1进行定位,并由设置在船舶1尾部的进船导向7引导船舶1顺利进入导管架3的槽口;导管架2上设置有横荡橡胶护舷4,通过横荡橡胶护舷4来缓冲船舶1与导管架3之间的碰撞力;
第三步:将船舶1行进至导管架3槽口内的最终对接位置,调整船舶1上的压载的大小,将组块2下放至导管架3上,导管架2上设置有组块桩腿耦合装置5,通过组块桩腿耦合装置5来缓冲下放过程中,组块2与导管架3之间的碰撞力,以完成荷载转移;
第四步:继续调整船舶1的压载至退船吃水位置,通过组块分离缓冲装置6来缓冲组块2和船舶1分离过程中的碰撞力,然后,将船舶1退出导管架3,以完成组块动力定位浮托安装作业。
上述压载为压载块或水量。
上述组块桩腿耦合装置、组块分离缓冲装置、进船导向为现有技术,未作说明的技术为现有技术。故不再赘述。
以上所述,仅是本发明的较佳实施例而已,并非对本发明作任何形式上的限制,凡是依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本发明技术方案的范围内。

Claims (3)

1.一种大型海洋结构物的组块动力定位浮托安装工艺,其特征在于:采用以下步骤:
第一步:通过船舶将组块运输至海上平台安装现场,然后,按照预先设置的方案进行动力定位就位演练;
第二步:船舶依靠自身动力定位系统逐步靠近导管架,通过位置参考系统为船舶进行定位,并由设置在船舶上的进船导向引导船舶顺利进入导管架的槽口;
第三步:将船舶行进至导管架槽口内的最终对接位置,调整船舶上的压载的大小,将组块下放至导管架上,以完成荷载转移;
第四步:继续调整船舶的压载至退船吃水位置,通过组块分离缓冲装置来缓冲组块和船舶分离过程中的碰撞力,然后,将船舶退出导管架,以完成组块动力定位浮托安装作业。
2.根据权利要求1所述的大型海洋结构物的组块动力定位浮托安装工艺,其特征在于:所述第二步中,导管架上设置有横荡橡胶护舷,通过横荡橡胶护舷来缓冲船舶与导管架之间的碰撞力。
3.根据权利要求1所述的大型海洋结构物的组块动力定位浮托安装工艺,其特征在于:所述第三步中,导管架上设置有组块桩腿耦合装置,通过组块桩腿耦合装置来缓冲下放过程中,组块与导管架之间的碰撞力。
CN201611166518.8A 2016-12-16 2016-12-16 大型海洋结构物的组块动力定位浮托安装工艺 Pending CN106741609A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611166518.8A CN106741609A (zh) 2016-12-16 2016-12-16 大型海洋结构物的组块动力定位浮托安装工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611166518.8A CN106741609A (zh) 2016-12-16 2016-12-16 大型海洋结构物的组块动力定位浮托安装工艺

Publications (1)

Publication Number Publication Date
CN106741609A true CN106741609A (zh) 2017-05-31

Family

ID=58891849

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611166518.8A Pending CN106741609A (zh) 2016-12-16 2016-12-16 大型海洋结构物的组块动力定位浮托安装工艺

Country Status (1)

Country Link
CN (1) CN106741609A (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107618620A (zh) * 2017-08-05 2018-01-23 亨通华西海洋工程有限公司 一种浮托式平台的安装工艺
CN108639252A (zh) * 2018-05-21 2018-10-12 大连理工大学 一种大型海上风机的码头整体浮托装船方法
CN110552339A (zh) * 2019-08-15 2019-12-10 王静波 海岛型海上组合式机场及其施工方法
CN111504599A (zh) * 2020-04-23 2020-08-07 天津大学 基于t型驳和载荷快速转移的浮托安装试验模型及方法
CN111516826A (zh) * 2020-04-29 2020-08-11 上海交通大学 一种基于位置偏差的浮托安装进船控制方法及其系统
CN111994224A (zh) * 2020-08-17 2020-11-27 上海交通大学 在超浅水浮托安装作业下的动力定位驳船触底分析方法
CN113353202A (zh) * 2020-03-04 2021-09-07 中国电建集团华东勘测设计研究院有限公司 一种海上换流站的浮托式安装结构及方法
CN114715360A (zh) * 2021-01-05 2022-07-08 中国电建集团华东勘测设计研究院有限公司 一种依附于大型海上变电站的海底大数据中心及安装维护工艺

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EA002258B1 (ru) * 1998-11-06 2002-02-28 Эксонмобил Апстрим Рисерч Компани Система установки палубы на морском основании
CN201999177U (zh) * 2011-01-21 2011-10-05 中国海洋石油总公司 一种超大型浮托安装驳船
WO2011153677A1 (zh) * 2010-06-09 2011-12-15 中国海洋石油总公司 无条件稳性整装型深吃水浮式采油平台及其海上安装方法
CN203684192U (zh) * 2014-01-08 2014-07-02 中国海洋石油总公司 一种海上导管架生产平台
CN104002931A (zh) * 2014-05-08 2014-08-27 天津大学 U型海洋工程安装船及导管架上部模块安装方法
CN104743058A (zh) * 2015-03-24 2015-07-01 中国海洋石油总公司 张力腿平台上部组块浮托安装的方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EA002258B1 (ru) * 1998-11-06 2002-02-28 Эксонмобил Апстрим Рисерч Компани Система установки палубы на морском основании
WO2011153677A1 (zh) * 2010-06-09 2011-12-15 中国海洋石油总公司 无条件稳性整装型深吃水浮式采油平台及其海上安装方法
CN201999177U (zh) * 2011-01-21 2011-10-05 中国海洋石油总公司 一种超大型浮托安装驳船
CN203684192U (zh) * 2014-01-08 2014-07-02 中国海洋石油总公司 一种海上导管架生产平台
CN104002931A (zh) * 2014-05-08 2014-08-27 天津大学 U型海洋工程安装船及导管架上部模块安装方法
CN104743058A (zh) * 2015-03-24 2015-07-01 中国海洋石油总公司 张力腿平台上部组块浮托安装的方法

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107618620A (zh) * 2017-08-05 2018-01-23 亨通华西海洋工程有限公司 一种浮托式平台的安装工艺
CN108639252A (zh) * 2018-05-21 2018-10-12 大连理工大学 一种大型海上风机的码头整体浮托装船方法
CN108639252B (zh) * 2018-05-21 2019-08-09 大连理工大学 一种大型海上风机的码头整体浮托装船方法
CN110552339A (zh) * 2019-08-15 2019-12-10 王静波 海岛型海上组合式机场及其施工方法
CN113353202A (zh) * 2020-03-04 2021-09-07 中国电建集团华东勘测设计研究院有限公司 一种海上换流站的浮托式安装结构及方法
CN111504599A (zh) * 2020-04-23 2020-08-07 天津大学 基于t型驳和载荷快速转移的浮托安装试验模型及方法
CN111516826A (zh) * 2020-04-29 2020-08-11 上海交通大学 一种基于位置偏差的浮托安装进船控制方法及其系统
CN111516826B (zh) * 2020-04-29 2022-05-27 上海交通大学 一种基于位置偏差的浮托安装进船控制方法及其系统
CN111994224A (zh) * 2020-08-17 2020-11-27 上海交通大学 在超浅水浮托安装作业下的动力定位驳船触底分析方法
CN111994224B (zh) * 2020-08-17 2021-05-18 上海交通大学 在超浅水浮托安装作业下的动力定位驳船触底分析方法
CN114715360A (zh) * 2021-01-05 2022-07-08 中国电建集团华东勘测设计研究院有限公司 一种依附于大型海上变电站的海底大数据中心及安装维护工艺
CN114715360B (zh) * 2021-01-05 2023-02-24 中国电建集团华东勘测设计研究院有限公司 一种依附于大型海上变电站的海底大数据中心及安装维护工艺

Similar Documents

Publication Publication Date Title
CN106741609A (zh) 大型海洋结构物的组块动力定位浮托安装工艺
EP2450562B1 (en) A hydroelectric turbine recovery system and a method therefore
CN102312442A (zh) 栈桥钢管桩基础的施工方法
CN103395476B (zh) 一种潜没浮筒在超深水中的安装方法
CN102434129A (zh) 一种超深水海洋油气工程开发系统及其安装方法
WO2018068362A1 (zh) 一种深海采矿系统
WO2014126349A1 (ko) 잠수식 부교를 이용한 계류장치
CN104480865B (zh) 一种大型钢沉井精确定位方法
GB2463286B (en) Method and apparatus for at sea pipe abandonment and recovery
CN202391394U (zh) 一种超深水海洋油气工程开发系统
CN103422483A (zh) 浅水导管架浮托安装的方法
CN110382344A (zh) 用于与能漂浮的离岸设施连接的自主式的能漂浮的重力基件
CN103883273A (zh) 利用饱和潜水支持船上的双吊机安装立管的方法
CN104743058A (zh) 张力腿平台上部组块浮托安装的方法
CN105416511B (zh) 半潜插桩式海上平台定位系统
CN105003232A (zh) 一种超深海海洋油气干式生产系统及其安装撤离方法
US20200115014A1 (en) Launching method
CN113803525B (zh) 钢圆筒防护水下生产系统管汇的海床撑杆固定方法
US20080089745A1 (en) Method And Device For Connecting A Riser To A Target Structure
CN102434130A (zh) 一种超深海水下立管支撑浮筒的定位系统及其方法
CN103241348A (zh) 一种浮式平台减摇装置
CN105346677B (zh) 一种折叠式板锚及其使用方法
CN107013743A (zh) 深水油气平台钢制悬链线立管安装方法
CN106379488B (zh) 快速进行海上浮托安装平台的方法
CN202391395U (zh) 一种超深海水下立管支撑浮筒的定位系统

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Applicant after: China Offshore Oil Group Co., Ltd.

Applicant after: Offshore Oil Engineering Co., Ltd.

Address before: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Applicant before: China National Offshore Oil Corporation

Applicant before: Offshore Oil Engineering Co., Ltd.

WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170531