CN106379488B - 快速进行海上浮托安装平台的方法 - Google Patents

快速进行海上浮托安装平台的方法 Download PDF

Info

Publication number
CN106379488B
CN106379488B CN201610831755.5A CN201610831755A CN106379488B CN 106379488 B CN106379488 B CN 106379488B CN 201610831755 A CN201610831755 A CN 201610831755A CN 106379488 B CN106379488 B CN 106379488B
Authority
CN
China
Prior art keywords
land
platform
lift pump
chunk
guiding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610831755.5A
Other languages
English (en)
Other versions
CN106379488A (zh
Inventor
张重德
刘富有
周巍巍
赵庆凯
张吉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
CNOOC China Ltd Tianjin Branch
Original Assignee
China National Offshore Oil Corp CNOOC
CNOOC China Ltd Tianjin Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, CNOOC China Ltd Tianjin Branch filed Critical China National Offshore Oil Corp CNOOC
Priority to CN201610831755.5A priority Critical patent/CN106379488B/zh
Publication of CN106379488A publication Critical patent/CN106379488A/zh
Application granted granted Critical
Publication of CN106379488B publication Critical patent/CN106379488B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B75/00Building or assembling floating offshore structures, e.g. semi-submersible platforms, SPAR platforms or wind turbine platforms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Farming Of Fish And Shellfish (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

一种快速进行海上浮托安装平台的方法,采用以下安装步骤:一:在陆地上预制好平台组块;二:在陆地上将导向安装在不影响浮拖进船的平台组块结构外侧,然后,再将扬水泵护管穿入导向的内部,再将扬水泵护管进行固定,使导向、扬水泵护管与平台组块在陆地上预制构成一体化模块;三:将在陆地上已经构成一体化模块的导向、扬水泵护管与平台组块通过驳船运输到海上,拖航至导管架预定位置,再进行整体浮托安装。本发明在不影响海洋平台组块浮拖进船的前提下,在组块陆地建造期间,即可将其安装到位,解决了海上安装的风险及效率较低的问题;不仅大大提高了安装效率,而且,还降低了施工风险,节约了生产成本。

Description

快速进行海上浮托安装平台的方法
技术领域
本发明涉及海上平台,尤其涉及一种快速进行海上浮托安装平台的方法。属于海洋石油工程领域。
背景技术
采用“浮托法”安装海洋平台组块,首先,要将海洋平台组块滑移固定到驳船,然后,再利用拖轮将驳船拖行至导管架前,并向前移动。当驳船完全进入导管架后,通过锚链和系泊缆来调整驳船的水平位置,使得上部组块桩腿对接单元的插尖与桩腿接收器对准,然后,再通过调整驳船压载增大吃水,将上部组块的重量逐步转移到导管架的基础之上。当重量完全转移到导管架上后,继续给驳船加压载,使组块与驳船分离,从而,使得驳船顺势退出导管架。
从上述过程中可以看出,采用“浮托法”安装海洋平台组块时,驳船要进入两导管架之间,为了使导管架之间驳船进船不受影响,凡是在导管架内侧对组块浮托进船有干涉的设备安装等作业,都只能待组块安装就位后,再在海上再进行施工。
目前,现有的安装均是将扬水泵护管(柴油消防泵及海水提升泵等)及导向喇叭口设置在导管架内侧,由于这种设置会影响到其驳船进船,因此,也只能在组块就位后,择机进行海上安装。在海上安装时,除工序繁琐外,还需搭设脚手架,进行舷外作业,这样一来,不仅浪费人力、物力,而且,受海上恶劣的天气因素影响,安全风险较大,并且,施工效率较低。
发明内容
本发明的主要目的在于克服现有技术存在的上述缺点,而提供一种快速进行海上浮托安装平台的方法,其在不影响海洋平台组块浮拖进船的前提下,在组块陆地建造期间,即可将其安装到位,解决了海上安装的风险及效率较低的问题;不仅大大提高了安装效率,而且,还降低了施工风险,节约了生产成本。
本发明的目的是由以下技术方案实现的:
一种快速进行海上浮托安装平台的方法,其特征在于:采用以下安装步骤:
第一步:在陆地上预制好平台组块;
第二步:在陆地上将导向安装在不影响浮拖进船的平台组块结构外侧,然后,再将扬水泵护管穿入导向的内部,再将扬水泵护管进行固定,使导向、扬水泵护管与平台组块在陆地上预制构成一体化模块;
第三步:将在陆地上已经构成一体化模块的导向、扬水泵护管与平台组块通过驳船运输到海上,拖航至导管架预定位置,再进行整体浮托安装。
所述导向为喇叭口形状;并通过斜撑安装在不影响浮拖进船的平台组块结构外侧。
所述扬水泵护管是由数根泵护管连接组成。
本发明的有益效果:本发明由于采用上述技术方案,其在不影响海洋平台组块浮拖进船的前提下,在组块陆地建造期间,即可将其安装到位,解决了海上安装的风险及效率较低的问题;不仅大大提高了安装效率,而且,还降低了施工风险,节约了生产成本。
附图说明
图1为本发明结构使用状态示意图。
图2为本发明结构主视示意图。
图3为本发明结构侧视示意图。
图中主要标号说明:
1.导向、2.扬水泵护管、3.斜撑。
具体实施方式
如图1—图3所示,本发明采用以下安装步骤:
第一步:在陆地上预制好平台组块;
第二步:在陆地上采用焊接方式将导向1安装在不影响浮拖进船的平台组块结构外侧,然后,再利用吊车将采用焊接方式连接组装后的扬水泵护管2,吊装穿入导向1的内部,直至扬水泵护管2达到设定标高,再将扬水泵护管2进行固定,使导向1、扬水泵护管2与平台组块在陆地上预制构成一体化模块;就位固定后,吊车脱扣驶离,整个扬水泵护管2就此安装完成;
第三步:将在陆地上已经构成一体化模块的导向1、扬水泵护管2与平台组块用驳船运输到海上,拖航至导管架预定位置,再进行整体浮托安装。
上述导向1为喇叭口形状;并通过斜撑3安装在不影响浮拖进船的平台组块结构外侧。
上述扬水泵护管2是由数根泵护管采用焊接方式连接组成。
以上所述,仅是本发明的较佳实施例而已,并非对本发明作任何形式上的限制,凡是依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本发明技术方案的范围内。

Claims (1)

1.一种快速进行海上浮托安装平台的方法,其特征在于:采用以下安装步骤:
第一步:在陆地上预制好平台组块;
第二步:在陆地上将导向安装在不影响浮拖进船的平台组块结构外侧,然后,再将扬水泵护管穿入导向的内部,再将扬水泵护管进行固定,使导向、扬水泵护管与平台组块在陆地上预制构成一体化模块;
第三步:将在陆地上已经构成一体化模块的导向、扬水泵护管与平台组块通过驳船运输到海上,拖航至导管架预定位置,再进行整体浮托安装;
所述导向为喇叭口形状;并通过斜撑安装在不影响浮拖进船的平台组块结构外侧;所述扬水泵护管是由数根泵护管连接组成。
CN201610831755.5A 2016-09-19 2016-09-19 快速进行海上浮托安装平台的方法 Active CN106379488B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610831755.5A CN106379488B (zh) 2016-09-19 2016-09-19 快速进行海上浮托安装平台的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610831755.5A CN106379488B (zh) 2016-09-19 2016-09-19 快速进行海上浮托安装平台的方法

Publications (2)

Publication Number Publication Date
CN106379488A CN106379488A (zh) 2017-02-08
CN106379488B true CN106379488B (zh) 2018-01-16

Family

ID=57936776

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610831755.5A Active CN106379488B (zh) 2016-09-19 2016-09-19 快速进行海上浮托安装平台的方法

Country Status (1)

Country Link
CN (1) CN106379488B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505293A (zh) * 2018-10-16 2019-03-22 中海福陆重工有限公司 一种隔水套管平台的搭建方法
CN114156784B (zh) * 2021-11-03 2024-03-22 海洋石油工程股份有限公司 一种电缆护管的后安装方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101362008A (zh) * 2007-08-06 2009-02-11 中国海洋石油总公司 海上平台的消防泵护管的浮袋安装法
CN102587342A (zh) * 2012-03-02 2012-07-18 中国水电顾问集团华东勘测设计研究院 海上升压站的浮托式安装方法
EP2527242A1 (en) * 2011-05-25 2012-11-28 Leenars, Cees Eugen Jochem Installation method of an offshore upended float-over platform
CN203806103U (zh) * 2014-03-20 2014-09-03 中国海洋石油总公司 超大型组块的海上浮托安装装置
CN104594319A (zh) * 2014-12-29 2015-05-06 中国海洋石油总公司 较深水海洋平台泵护管的整体提升安装方法
CN104743058A (zh) * 2015-03-24 2015-07-01 中国海洋石油总公司 张力腿平台上部组块浮托安装的方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB0016932D0 (en) * 2000-07-10 2000-08-30 Saipem Uk Limited Installation and removal of decks on and from offshore structures
US20070224000A1 (en) * 2006-03-21 2007-09-27 Mills Trevor R Deep draft semi-submersible offshore floating structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101362008A (zh) * 2007-08-06 2009-02-11 中国海洋石油总公司 海上平台的消防泵护管的浮袋安装法
EP2527242A1 (en) * 2011-05-25 2012-11-28 Leenars, Cees Eugen Jochem Installation method of an offshore upended float-over platform
CN102587342A (zh) * 2012-03-02 2012-07-18 中国水电顾问集团华东勘测设计研究院 海上升压站的浮托式安装方法
CN203806103U (zh) * 2014-03-20 2014-09-03 中国海洋石油总公司 超大型组块的海上浮托安装装置
CN104594319A (zh) * 2014-12-29 2015-05-06 中国海洋石油总公司 较深水海洋平台泵护管的整体提升安装方法
CN104743058A (zh) * 2015-03-24 2015-07-01 中国海洋石油总公司 张力腿平台上部组块浮托安装的方法

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
一体化建造工艺在海洋平台建造中的优势分析与应用建议;宋青武等;《石油工程建设》;20160831;第42卷(第4期);第30-33页 *
浮托平台总图布置设计;张佃臣;《辽宁化工》;20160731;第45卷(第7期);第972-973页 *
海上油田大型平台一体化工程实践与展望;尤学刚等;《石油规划设计》;20130731;第24卷(第4期);第9-12页 *
海洋平台组块浮托安装总体设计方法;李达等;《海洋工程》;20110831;第29卷(第3期);第13-22页 *

Also Published As

Publication number Publication date
CN106379488A (zh) 2017-02-08

Similar Documents

Publication Publication Date Title
EP2514913B1 (en) Method of demobilizing a self-elevating mobile platform
EP2917097B1 (en) Floatable transportation and installation structure for transportation and installation of a floating wind turbine, a floating wind turbine and method for transportation and installation of the same
CN108626078B (zh) 一种海上风机Spar型浮式基础驳船助运扶装工艺
CN101881148B (zh) 一种导管架立管安装方法及其专用立管组件
CN111661273B (zh) 一种深远海半潜式风机的安装施工方法
US20110214596A1 (en) Vertically installed spar and construction methods
CN110155262B (zh) 一种具有自安装功能的干树半潜式平台
CN103395476A (zh) 一种潜没浮筒在超深水中的安装方法
CN103123017A (zh) 浅海长距离海底管道无张力敷设施工工艺
CN102677694A (zh) 一种海上风电潜式基础结构及其整机安装施工方法
CN104590497A (zh) Fpso船
CN106379488B (zh) 快速进行海上浮托安装平台的方法
CN103786841A (zh) 海上浮式平台的保护设施
GB2378472A (en) Method of constructing a floating offshore structure
US9340942B2 (en) Method for installing a device for recovering hydrocarbons
KR20090125358A (ko) 진자형 가두리 양식 시설물
CN103921900A (zh) 母子双浮体海上风力发电机组整体运输安装一体船及方法
CN103119222A (zh) 用于安装一个或多个浸没柱/桩的可再用的打破表面的可浸没模板
CN202610780U (zh) 一种可移动自安装平台
CN209852529U (zh) 一种海上移动平台原油外输大抓力锚加双缆系泊系统
AU2011101650A4 (en) Self installing tension leg platform and subsea storage tank
EP3243734B1 (en) Assembly of a vessel and a floating module
CN203905053U (zh) 海下隧道桥
CN104790368B (zh) 一种可自浮拖航的海上建筑结构及其施工方法
CN103963931A (zh) 大型构件半潜式水上出运安装系统及施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100010 Beijing, Chaoyangmen, North Street, No. 25, No.

Co-patentee after: Tianjin Branch of China Sea Prtroleum (China) Co., Ltd.

Patentee after: China Offshore Oil Group Co., Ltd.

Address before: 100010 Beijing, Chaoyangmen, North Street, No. 25, No.

Co-patentee before: Tianjin Branch of China Sea Prtroleum (China) Co., Ltd.

Patentee before: China National Offshore Oil Corporation

CP01 Change in the name or title of a patent holder