CN106379488B - 快速进行海上浮托安装平台的方法 - Google Patents
快速进行海上浮托安装平台的方法 Download PDFInfo
- Publication number
- CN106379488B CN106379488B CN201610831755.5A CN201610831755A CN106379488B CN 106379488 B CN106379488 B CN 106379488B CN 201610831755 A CN201610831755 A CN 201610831755A CN 106379488 B CN106379488 B CN 106379488B
- Authority
- CN
- China
- Prior art keywords
- land
- platform
- lift pump
- chunk
- guiding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B75/00—Building or assembling floating offshore structures, e.g. semi-submersible platforms, SPAR platforms or wind turbine platforms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Farming Of Fish And Shellfish (AREA)
- Structures Of Non-Positive Displacement Pumps (AREA)
Abstract
一种快速进行海上浮托安装平台的方法,采用以下安装步骤:一:在陆地上预制好平台组块;二:在陆地上将导向安装在不影响浮拖进船的平台组块结构外侧,然后,再将扬水泵护管穿入导向的内部,再将扬水泵护管进行固定,使导向、扬水泵护管与平台组块在陆地上预制构成一体化模块;三:将在陆地上已经构成一体化模块的导向、扬水泵护管与平台组块通过驳船运输到海上,拖航至导管架预定位置,再进行整体浮托安装。本发明在不影响海洋平台组块浮拖进船的前提下,在组块陆地建造期间,即可将其安装到位,解决了海上安装的风险及效率较低的问题;不仅大大提高了安装效率,而且,还降低了施工风险,节约了生产成本。
Description
技术领域
本发明涉及海上平台,尤其涉及一种快速进行海上浮托安装平台的方法。属于海洋石油工程领域。
背景技术
采用“浮托法”安装海洋平台组块,首先,要将海洋平台组块滑移固定到驳船,然后,再利用拖轮将驳船拖行至导管架前,并向前移动。当驳船完全进入导管架后,通过锚链和系泊缆来调整驳船的水平位置,使得上部组块桩腿对接单元的插尖与桩腿接收器对准,然后,再通过调整驳船压载增大吃水,将上部组块的重量逐步转移到导管架的基础之上。当重量完全转移到导管架上后,继续给驳船加压载,使组块与驳船分离,从而,使得驳船顺势退出导管架。
从上述过程中可以看出,采用“浮托法”安装海洋平台组块时,驳船要进入两导管架之间,为了使导管架之间驳船进船不受影响,凡是在导管架内侧对组块浮托进船有干涉的设备安装等作业,都只能待组块安装就位后,再在海上再进行施工。
目前,现有的安装均是将扬水泵护管(柴油消防泵及海水提升泵等)及导向喇叭口设置在导管架内侧,由于这种设置会影响到其驳船进船,因此,也只能在组块就位后,择机进行海上安装。在海上安装时,除工序繁琐外,还需搭设脚手架,进行舷外作业,这样一来,不仅浪费人力、物力,而且,受海上恶劣的天气因素影响,安全风险较大,并且,施工效率较低。
发明内容
本发明的主要目的在于克服现有技术存在的上述缺点,而提供一种快速进行海上浮托安装平台的方法,其在不影响海洋平台组块浮拖进船的前提下,在组块陆地建造期间,即可将其安装到位,解决了海上安装的风险及效率较低的问题;不仅大大提高了安装效率,而且,还降低了施工风险,节约了生产成本。
本发明的目的是由以下技术方案实现的:
一种快速进行海上浮托安装平台的方法,其特征在于:采用以下安装步骤:
第一步:在陆地上预制好平台组块;
第二步:在陆地上将导向安装在不影响浮拖进船的平台组块结构外侧,然后,再将扬水泵护管穿入导向的内部,再将扬水泵护管进行固定,使导向、扬水泵护管与平台组块在陆地上预制构成一体化模块;
第三步:将在陆地上已经构成一体化模块的导向、扬水泵护管与平台组块通过驳船运输到海上,拖航至导管架预定位置,再进行整体浮托安装。
所述导向为喇叭口形状;并通过斜撑安装在不影响浮拖进船的平台组块结构外侧。
所述扬水泵护管是由数根泵护管连接组成。
本发明的有益效果:本发明由于采用上述技术方案,其在不影响海洋平台组块浮拖进船的前提下,在组块陆地建造期间,即可将其安装到位,解决了海上安装的风险及效率较低的问题;不仅大大提高了安装效率,而且,还降低了施工风险,节约了生产成本。
附图说明
图1为本发明结构使用状态示意图。
图2为本发明结构主视示意图。
图3为本发明结构侧视示意图。
图中主要标号说明:
1.导向、2.扬水泵护管、3.斜撑。
具体实施方式
如图1—图3所示,本发明采用以下安装步骤:
第一步:在陆地上预制好平台组块;
第二步:在陆地上采用焊接方式将导向1安装在不影响浮拖进船的平台组块结构外侧,然后,再利用吊车将采用焊接方式连接组装后的扬水泵护管2,吊装穿入导向1的内部,直至扬水泵护管2达到设定标高,再将扬水泵护管2进行固定,使导向1、扬水泵护管2与平台组块在陆地上预制构成一体化模块;就位固定后,吊车脱扣驶离,整个扬水泵护管2就此安装完成;
第三步:将在陆地上已经构成一体化模块的导向1、扬水泵护管2与平台组块用驳船运输到海上,拖航至导管架预定位置,再进行整体浮托安装。
上述导向1为喇叭口形状;并通过斜撑3安装在不影响浮拖进船的平台组块结构外侧。
上述扬水泵护管2是由数根泵护管采用焊接方式连接组成。
以上所述,仅是本发明的较佳实施例而已,并非对本发明作任何形式上的限制,凡是依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本发明技术方案的范围内。
Claims (1)
1.一种快速进行海上浮托安装平台的方法,其特征在于:采用以下安装步骤:
第一步:在陆地上预制好平台组块;
第二步:在陆地上将导向安装在不影响浮拖进船的平台组块结构外侧,然后,再将扬水泵护管穿入导向的内部,再将扬水泵护管进行固定,使导向、扬水泵护管与平台组块在陆地上预制构成一体化模块;
第三步:将在陆地上已经构成一体化模块的导向、扬水泵护管与平台组块通过驳船运输到海上,拖航至导管架预定位置,再进行整体浮托安装;
所述导向为喇叭口形状;并通过斜撑安装在不影响浮拖进船的平台组块结构外侧;所述扬水泵护管是由数根泵护管连接组成。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610831755.5A CN106379488B (zh) | 2016-09-19 | 2016-09-19 | 快速进行海上浮托安装平台的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610831755.5A CN106379488B (zh) | 2016-09-19 | 2016-09-19 | 快速进行海上浮托安装平台的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106379488A CN106379488A (zh) | 2017-02-08 |
CN106379488B true CN106379488B (zh) | 2018-01-16 |
Family
ID=57936776
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610831755.5A Active CN106379488B (zh) | 2016-09-19 | 2016-09-19 | 快速进行海上浮托安装平台的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106379488B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109505293A (zh) * | 2018-10-16 | 2019-03-22 | 中海福陆重工有限公司 | 一种隔水套管平台的搭建方法 |
CN114156784B (zh) * | 2021-11-03 | 2024-03-22 | 海洋石油工程股份有限公司 | 一种电缆护管的后安装方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101362008A (zh) * | 2007-08-06 | 2009-02-11 | 中国海洋石油总公司 | 海上平台的消防泵护管的浮袋安装法 |
CN102587342A (zh) * | 2012-03-02 | 2012-07-18 | 中国水电顾问集团华东勘测设计研究院 | 海上升压站的浮托式安装方法 |
EP2527242A1 (en) * | 2011-05-25 | 2012-11-28 | Leenars, Cees Eugen Jochem | Installation method of an offshore upended float-over platform |
CN203806103U (zh) * | 2014-03-20 | 2014-09-03 | 中国海洋石油总公司 | 超大型组块的海上浮托安装装置 |
CN104594319A (zh) * | 2014-12-29 | 2015-05-06 | 中国海洋石油总公司 | 较深水海洋平台泵护管的整体提升安装方法 |
CN104743058A (zh) * | 2015-03-24 | 2015-07-01 | 中国海洋石油总公司 | 张力腿平台上部组块浮托安装的方法 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB0016932D0 (en) * | 2000-07-10 | 2000-08-30 | Saipem Uk Limited | Installation and removal of decks on and from offshore structures |
US20070224000A1 (en) * | 2006-03-21 | 2007-09-27 | Mills Trevor R | Deep draft semi-submersible offshore floating structure |
-
2016
- 2016-09-19 CN CN201610831755.5A patent/CN106379488B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101362008A (zh) * | 2007-08-06 | 2009-02-11 | 中国海洋石油总公司 | 海上平台的消防泵护管的浮袋安装法 |
EP2527242A1 (en) * | 2011-05-25 | 2012-11-28 | Leenars, Cees Eugen Jochem | Installation method of an offshore upended float-over platform |
CN102587342A (zh) * | 2012-03-02 | 2012-07-18 | 中国水电顾问集团华东勘测设计研究院 | 海上升压站的浮托式安装方法 |
CN203806103U (zh) * | 2014-03-20 | 2014-09-03 | 中国海洋石油总公司 | 超大型组块的海上浮托安装装置 |
CN104594319A (zh) * | 2014-12-29 | 2015-05-06 | 中国海洋石油总公司 | 较深水海洋平台泵护管的整体提升安装方法 |
CN104743058A (zh) * | 2015-03-24 | 2015-07-01 | 中国海洋石油总公司 | 张力腿平台上部组块浮托安装的方法 |
Non-Patent Citations (4)
Title |
---|
一体化建造工艺在海洋平台建造中的优势分析与应用建议;宋青武等;《石油工程建设》;20160831;第42卷(第4期);第30-33页 * |
浮托平台总图布置设计;张佃臣;《辽宁化工》;20160731;第45卷(第7期);第972-973页 * |
海上油田大型平台一体化工程实践与展望;尤学刚等;《石油规划设计》;20130731;第24卷(第4期);第9-12页 * |
海洋平台组块浮托安装总体设计方法;李达等;《海洋工程》;20110831;第29卷(第3期);第13-22页 * |
Also Published As
Publication number | Publication date |
---|---|
CN106379488A (zh) | 2017-02-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2514913B1 (en) | Method of demobilizing a self-elevating mobile platform | |
EP2917097B1 (en) | Floatable transportation and installation structure for transportation and installation of a floating wind turbine, a floating wind turbine and method for transportation and installation of the same | |
CN108626078B (zh) | 一种海上风机Spar型浮式基础驳船助运扶装工艺 | |
CN101881148B (zh) | 一种导管架立管安装方法及其专用立管组件 | |
CN111661273B (zh) | 一种深远海半潜式风机的安装施工方法 | |
US20110214596A1 (en) | Vertically installed spar and construction methods | |
CN110155262B (zh) | 一种具有自安装功能的干树半潜式平台 | |
CN103395476A (zh) | 一种潜没浮筒在超深水中的安装方法 | |
CN103123017A (zh) | 浅海长距离海底管道无张力敷设施工工艺 | |
CN102677694A (zh) | 一种海上风电潜式基础结构及其整机安装施工方法 | |
CN104590497A (zh) | Fpso船 | |
CN106379488B (zh) | 快速进行海上浮托安装平台的方法 | |
CN103786841A (zh) | 海上浮式平台的保护设施 | |
GB2378472A (en) | Method of constructing a floating offshore structure | |
US9340942B2 (en) | Method for installing a device for recovering hydrocarbons | |
KR20090125358A (ko) | 진자형 가두리 양식 시설물 | |
CN103921900A (zh) | 母子双浮体海上风力发电机组整体运输安装一体船及方法 | |
CN103119222A (zh) | 用于安装一个或多个浸没柱/桩的可再用的打破表面的可浸没模板 | |
CN202610780U (zh) | 一种可移动自安装平台 | |
CN209852529U (zh) | 一种海上移动平台原油外输大抓力锚加双缆系泊系统 | |
AU2011101650A4 (en) | Self installing tension leg platform and subsea storage tank | |
EP3243734B1 (en) | Assembly of a vessel and a floating module | |
CN203905053U (zh) | 海下隧道桥 | |
CN104790368B (zh) | 一种可自浮拖航的海上建筑结构及其施工方法 | |
CN103963931A (zh) | 大型构件半潜式水上出运安装系统及施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100010 Beijing, Chaoyangmen, North Street, No. 25, No. Co-patentee after: Tianjin Branch of China Sea Prtroleum (China) Co., Ltd. Patentee after: China Offshore Oil Group Co., Ltd. Address before: 100010 Beijing, Chaoyangmen, North Street, No. 25, No. Co-patentee before: Tianjin Branch of China Sea Prtroleum (China) Co., Ltd. Patentee before: China National Offshore Oil Corporation |
|
CP01 | Change in the name or title of a patent holder |