CN103921900A - 母子双浮体海上风力发电机组整体运输安装一体船及方法 - Google Patents

母子双浮体海上风力发电机组整体运输安装一体船及方法 Download PDF

Info

Publication number
CN103921900A
CN103921900A CN201410044743.9A CN201410044743A CN103921900A CN 103921900 A CN103921900 A CN 103921900A CN 201410044743 A CN201410044743 A CN 201410044743A CN 103921900 A CN103921900 A CN 103921900A
Authority
CN
China
Prior art keywords
ship
buoyancy aid
floating body
offshore wind
blower fan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410044743.9A
Other languages
English (en)
Other versions
CN103921900B (zh
Inventor
刘德进
曲俐俐
冯甲鑫
陆连洲
张学俊
杨瑞亮
徐善忠
李振国
冯海暴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority to CN201410044743.9A priority Critical patent/CN103921900B/zh
Publication of CN103921900A publication Critical patent/CN103921900A/zh
Application granted granted Critical
Publication of CN103921900B publication Critical patent/CN103921900B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/727Offshore wind turbines

Abstract

本发明涉及一种母子双浮体海上风力发电机组整体运输安装一体船,包括母船浮体,子船浮体,母船浮体上固定连接母船固定架,子浮体上固定设置提升装置,固定架上设置上固锁紧装置。所述提升装置上部连接承重平台,承重平台上安装旋转精调抱紧装置。旋转精调抱紧装置包括锁紧千斤顶和旋转千斤顶。所述提升装置为提升千斤顶。子船浮体和母船浮体通过锁紧装置组合和分离。采用这样的结构后,本发明的风机安装稳定性好,施工方便,运输安全,安装速度快,对周围环境影响小,安全、工程施工成本低。

Description

母子双浮体海上风力发电机组整体运输安装一体船及方法
技术领域
本发明涉及一种海上风力发电机组拉索千斤顶提升安装装置及施工方法。
背景技术
一般海上风力发电机多采用平台式安装方式,船舶就位后将安装船顶升脱离水面,再进行风机的安装,施工条件比较复杂,强风、急流、波浪等建设条件更加复杂,导致风机的安装造价较大,且在平台式支撑装置下,动载可能会引起“穿刺”现象,形成事故,且受水深的影响条件较多。
发明内容
本发明要解决的技术问题是提供一种海上风力发电机组拉索千斤顶提升安装装置及施工方法。
为解决上述技术问题,本发明的母子双浮体海上风力发电机组整体运输安装一体船,其特征在于:包括母船浮体,子船浮体,母船浮体上固定连接母船固定架,子浮体上固定设置提升装置,固定架上设置上固锁紧装置。
所述提升装置上部连接承重平台,承重平台上安装旋转精调抱紧装置。
旋转精调抱紧装置包括锁紧千斤顶和旋转千斤顶。
所述提升装置为提升千斤顶。
子船浮体和母船浮体通过锁紧装置组合和分离。
一种使用上述海上风力发电机组拉索千斤顶提升安装装置的施工方法,包括下列步骤,风机在岸边组装完毕,子浮体进行预压载使其座在主船体上,然后装载风机,采用抱箍装置进行锁定,风机装船依靠上抱紧装置和下抱紧装置进行固定,通过船组拖航,使用拖轮拖航到施工区域,风机安装包括首先通过提升装置将风机提升至一定高度,然后主船体加压载水下沉使子浮体和主船体脱离成自由漂浮状态,移船使得下抱紧装置抱住桩基后中心线对正塔筒中心,液压顶升装置下落到一定高度停,旋转装置工作进行精确定位后,液压顶升装置继续下落,下旋转抱紧装置通过旋转风机塔筒将螺栓孔对正,安装完成,此时已经实现了塔筒和风机基础的轴线准确对正,松开抱紧装置,完成风机组的整体安装。
采用这样的结构后,本发明的风机安装稳定性好,施工方便,运输安全,安装速度快,对周围环境影响小,安全、工程施工成本低。
附图说明
下面结合附图和具体实施方式对本发明作进一步详细的说明。
图1是本发明母子双浮体海上风力发电机组整体运输安装一体船左视图。
图2是本发明母子双浮体海上风力发电机组整体运输安装一体船俯视图。
图3是本发明母子双浮体海上风力发电机组整体运输安装一体船主视图。
具体实施方式
如图1至图3所示,本发明的母子双浮体海上风力发电机组整体运输安装一体船,包括母船浮体1,子船浮体2,母船浮体1上固定连接母船固定架3,子浮体2上固定设置提升装置4,固定架3上设置上固锁紧装置5,上固锁紧装置5通过塔筒12,提升装置4上部连接承重平台6,承重平台6上安装旋转精调抱紧装置7,旋转精调抱紧装7包括锁紧千斤顶8和旋转千斤顶9,提升装置4为提升千斤顶,子船浮体2和母船浮体1通过锁紧装置10组合和分离,左右两边的子浮体通过连接梁固定连接。
施工方法,包括下列步骤,风机在岸边组装完毕,母子双浮体海上风力发电机组整体运输安装一体船靠泊,风机在岸边组装完毕,风电安装船靠岸系泊,子浮体进行预压载使其座在主船体上,然后装载风机,采用抱箍装置进行锁定,船舶调平;风机装船依靠上抱紧装置和下抱紧装置进行固定,安装一体船离开码头,通过船组拖航,使用拖轮拖航到施工区域,系泊初定位,绞锚移位。使用液压顶升装置将风机提升一定高度,绞缆进行粗定位。风机安装包括首先通过提升装置将风机提升至一定高度,绞缆进行粗定位。然后主船体加压载水下沉使子浮体和主船体脱离成自由漂浮状态,移船使得下抱紧装置抱住桩基后中心线对正塔筒中心,液压顶升装置下落到一定高度停,旋转装置工作进行精确定位后,液压顶升装置继续下落,下旋转抱紧装置通过旋转风机塔筒将螺栓孔对正,安装完成,此时已经实现了塔筒和风机基础的轴线准确对正,松开抱紧装置,完成风机组的整体安装。在安装的整个过程中,子船浮体处于母船浮体的保护下,受浪、流等自然条件的影响极小,实现了风机安装的效率和精度等。本发明的风机安装船稳定性好,施工方便,风机装船、运输、安装速度快,对周围环境影响小,安全、工程施工成本低。
以上所述,仅是对本发明的较佳实施例而已,并非对本发明做其他形式的限制,任何熟悉本专业的技术人员可能利用上述揭示的技术内容加以变更或改型为同等变化的等效实施例。凡是未脱离本发明方案内容,依据本发明的技术实质对以上实施例所做的任何简单修改、等同变化与改型,均落在本发明的保护范围内。

Claims (6)

1.一种母子双浮体海上风力发电机组整体运输安装一体船,其特征在于:包括母船浮体,子船浮体,母船浮体上固定连接母船固定架,子浮体上固定设置提升装置,固定架上设置上固锁紧装置。
2.按照权利要求1所述的母子双浮体海上风力发电机组整体运输安装一体船,其特征在于:所述提升装置上部连接承重平台,承重平台上安装旋转精调抱紧装置。
3.按照权利要求2所述的母子双浮体海上风力发电机组整体运输安装一体船,其特征在于:旋转精调抱紧装置包括锁紧千斤顶和旋转千斤顶。
4.按照权利要求1所述的母子双浮体海上风力发电机组整体运输安装一体船,其特征在于:所述提升装置为提升千斤顶。
5.按照权利要求1所述的母子双浮体海上风力发电机组整体运输安装一体船,其特征在于:子船浮体和母船浮体通过锁紧装置组合和分离。
6.一种使用上述海上风力发电机组拉索千斤顶提升安装装置的施工方法,其特征在于:包括下列步骤,风机在岸边组装完毕,子浮体进行预压载使其座在主船体上,然后装载风机,采用抱箍装置进行锁定,风机装船依靠上抱紧装置和下抱紧装置进行固定,通过船组拖航,使用拖轮拖航到施工区域,风机安装包括首先通过提升装置将风机提升至一定高度,然后主船体加压载水下沉使子浮体和主船体脱离成自由漂浮状态,移船使得下抱紧装置抱住桩基后中心线对正塔筒中心,液压顶升装置下落到一定高度停,旋转装置工作进行精确定位后,液压顶升装置继续下落,下旋转抱紧装置通过旋转风机塔筒将螺栓孔对正,安装完成,此时已经实现了塔筒和风机基础的轴线准确对正,松开抱紧装置,完成风机组的整体安装。
CN201410044743.9A 2014-01-31 2014-01-31 母子双浮体海上风力发电机组整体运输安装一体船的施工方法 Active CN103921900B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410044743.9A CN103921900B (zh) 2014-01-31 2014-01-31 母子双浮体海上风力发电机组整体运输安装一体船的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410044743.9A CN103921900B (zh) 2014-01-31 2014-01-31 母子双浮体海上风力发电机组整体运输安装一体船的施工方法

Publications (2)

Publication Number Publication Date
CN103921900A true CN103921900A (zh) 2014-07-16
CN103921900B CN103921900B (zh) 2017-10-10

Family

ID=51140354

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410044743.9A Active CN103921900B (zh) 2014-01-31 2014-01-31 母子双浮体海上风力发电机组整体运输安装一体船的施工方法

Country Status (1)

Country Link
CN (1) CN103921900B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106894953A (zh) * 2017-02-28 2017-06-27 天津大学 一种海上四筒基础式风电整机安装船及其一步式施工方法
CN106965906A (zh) * 2017-02-28 2017-07-21 天津大学 一种海上三筒基础式风电整机安装船及其一步式施工方法
CN109185071A (zh) * 2018-09-27 2019-01-11 天津大学 一种海上风电深水一步式安装装置及方法
CN109911127A (zh) * 2019-03-08 2019-06-21 武汉理工大学 一种母子式安装船及其在海上风机安装的应用
CN111156137A (zh) * 2018-11-08 2020-05-15 江苏金风科技有限公司 海上风力发电机组运维方法、装置及系统

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101973501A (zh) * 2010-10-20 2011-02-16 三一电气有限责任公司 风机整体安装旋转抱举机构
CN102079477A (zh) * 2009-11-27 2011-06-01 三一电气有限责任公司 一种风机抱举装置及移动式水上作业平台
DE102010009466A1 (de) * 2010-02-26 2011-09-01 Ed. Züblin Aktiengesellschaft Vorrichtung zum Transport und Installieren von eine Flachgründung umfassende Anordnung einer Offshore-Windenergieanlage sowie Verfahren zum Transport und zur Installation einer solchen Anordnung mit Flachgründung
KR20130054056A (ko) * 2011-11-16 2013-05-24 현대중공업 주식회사 4래그 풍력발전용 상부구조물의 시공방법
CN103121627A (zh) * 2011-11-21 2013-05-29 江苏道达海上风电工程科技有限公司 用于风电安装船的一步式起重系统及装设其的风电安装船
CN103332269A (zh) * 2013-05-22 2013-10-02 江苏道达海上风电工程科技有限公司 背负式海上风电整机运输安装船
CN203844964U (zh) * 2014-01-31 2014-09-24 中交一航局第二工程有限公司 母子双浮体海上风力发电机组整体运输安装一体船

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102079477A (zh) * 2009-11-27 2011-06-01 三一电气有限责任公司 一种风机抱举装置及移动式水上作业平台
DE102010009466A1 (de) * 2010-02-26 2011-09-01 Ed. Züblin Aktiengesellschaft Vorrichtung zum Transport und Installieren von eine Flachgründung umfassende Anordnung einer Offshore-Windenergieanlage sowie Verfahren zum Transport und zur Installation einer solchen Anordnung mit Flachgründung
CN101973501A (zh) * 2010-10-20 2011-02-16 三一电气有限责任公司 风机整体安装旋转抱举机构
KR20130054056A (ko) * 2011-11-16 2013-05-24 현대중공업 주식회사 4래그 풍력발전용 상부구조물의 시공방법
CN103121627A (zh) * 2011-11-21 2013-05-29 江苏道达海上风电工程科技有限公司 用于风电安装船的一步式起重系统及装设其的风电安装船
CN103332269A (zh) * 2013-05-22 2013-10-02 江苏道达海上风电工程科技有限公司 背负式海上风电整机运输安装船
CN203844964U (zh) * 2014-01-31 2014-09-24 中交一航局第二工程有限公司 母子双浮体海上风力发电机组整体运输安装一体船

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106894953A (zh) * 2017-02-28 2017-06-27 天津大学 一种海上四筒基础式风电整机安装船及其一步式施工方法
CN106965906A (zh) * 2017-02-28 2017-07-21 天津大学 一种海上三筒基础式风电整机安装船及其一步式施工方法
CN106965906B (zh) * 2017-02-28 2018-11-20 天津大学 一种海上三筒基础式风电整机安装船及其一步式施工方法
CN109185071A (zh) * 2018-09-27 2019-01-11 天津大学 一种海上风电深水一步式安装装置及方法
CN109185071B (zh) * 2018-09-27 2023-06-06 天津大学 一种海上风电深水一步式安装装置及方法
CN111156137A (zh) * 2018-11-08 2020-05-15 江苏金风科技有限公司 海上风力发电机组运维方法、装置及系统
CN111156137B (zh) * 2018-11-08 2021-03-30 江苏金风科技有限公司 海上风力发电机组运维方法、装置及系统
CN109911127A (zh) * 2019-03-08 2019-06-21 武汉理工大学 一种母子式安装船及其在海上风机安装的应用

Also Published As

Publication number Publication date
CN103921900B (zh) 2017-10-10

Similar Documents

Publication Publication Date Title
EP3430259B1 (en) A floating wind turbine and a method for the installation of such floating wind turbine
US8689721B2 (en) Vertically installed spar and construction methods
EP2917097B1 (en) Floatable transportation and installation structure for transportation and installation of a floating wind turbine, a floating wind turbine and method for transportation and installation of the same
CN103228909B (zh) 用于安装海上塔的方法
DK2997257T3 (en) PROCEDURE FOR OPERATING A WINDOW ENERGY INSTALLATION AND A WINDOW ENERGY INSTALLATION
EP2789847B1 (en) Floating type wind turbine generation apparatus and installation method thereof
US20100316450A1 (en) Method for installing an offshore wind turbine and a barge system
JP2016520167A (ja) オフショア設備における、タービンタワーおよびサブステーションまたは類似の要素のための潜水可能なアクティブ支持構造
CN103921900A (zh) 母子双浮体海上风力发电机组整体运输安装一体船及方法
CN108626078B (zh) 一种海上风机Spar型浮式基础驳船助运扶装工艺
KR102632315B1 (ko) 부이 및 그 부이를 위한 설치 방법
WO2014187977A1 (en) Deep-draft floating foundation for wind turbine with clustered hull and compartmented ballast section and self-erecting pivoting installation process thereof
JP2004001750A (ja) 特殊作業船及び洋上構造物の施工方法
CN203844964U (zh) 母子双浮体海上风力发电机组整体运输安装一体船
JP2020172872A (ja) セミサブ浮体、及びセミサブ浮体を用いた風車の洋上設置方法
CN103661827A (zh) 海上潮间带区域的风机总成安装系统及其施工方法
CN102337746B (zh) 水上风力发电塔架基础和结构的安装施工方法
CN102556292A (zh) 一种可自航的、能坐底作业的海上风电工程作业船
CN103803024A (zh) 半浮式海上风力发电机组整体运输安装一体船及施工方法
WO2010120186A1 (en) Floating windmill and method of installation, intervention or decommissioning
CN103807116A (zh) 海上风力发电机组拉索千斤顶提升安装装置及施工方法
CN103863524A (zh) 半潜式海上风力发电机组整体运输安装一体船及运输安装方法
CN203822557U (zh) 海上风力发电机组拉索千斤顶提升安装装置
CN203819473U (zh) 半潜式海上风力发电机组整体运输安装一体船
KR102062204B1 (ko) 해상풍력타워의 일괄 설치 및 운반 방법

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant