CN103863524A - 半潜式海上风力发电机组整体运输安装一体船及运输安装方法 - Google Patents
半潜式海上风力发电机组整体运输安装一体船及运输安装方法 Download PDFInfo
- Publication number
- CN103863524A CN103863524A CN201410092421.1A CN201410092421A CN103863524A CN 103863524 A CN103863524 A CN 103863524A CN 201410092421 A CN201410092421 A CN 201410092421A CN 103863524 A CN103863524 A CN 103863524A
- Authority
- CN
- China
- Prior art keywords
- offshore wind
- installation
- integrated ship
- integral
- transportation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/727—Offshore wind turbines
Landscapes
- Wind Motors (AREA)
Abstract
本发明公开了一种半潜式海上风力发电机组整体运输安装一体船以及使用该船的海上风力发电机组整体运输安装方法,该一体船包括上层平台和下浮体,所述的上层平台和下浮体之间通过可伸缩的顶升装置相连接;所述的上层平台上安装有提升装置和固定装置,所述的固定装置上安装有抱箍锁紧装置和精调抱紧装置。本发明所公开的半潜式海上风力发电机组整体运输安装一体船,安装定位准确,稳定性好,施工方便,风机装船、运输、安装速度快,对周围环境影响小,工程造价低。本发明所公开的海上风力发电机组整体运输安装方法,可以避免“穿刺”现象,受波浪和水深的影响不大,安装效率高。
Description
技术领域
本发明属于海上风机安装施工领域,特别涉及该领域中的一种半潜式海上风力发电机组整体运输安装一体船及运输安装方法。
背景技术
一般海上风力发电机多采用平台式安装方式,船舶就位后将安装船顶升脱离水面,再进行风机的安装,施工条件比较复杂,强风、急流、波浪等建设条件更加复杂,导致风机的安装造价较大,且在平台式支撑装置下,动载可能会引起“穿刺”现象,形成事故,且受水深的影响较多。
发明内容
本发明所要解决的技术问题就是提供一种半潜式海上风力发电机组整体运输安装一体船及运输安装方法。
本发明采用如下技术方案:
一种半潜式海上风力发电机组整体运输安装一体船,包括上层平台和下浮体,所述的上层平台和下浮体之间通过可伸缩的顶升装置相连接;所述的上层平台上安装有提升装置和固定装置,所述的固定装置上安装有抱箍锁紧装置和精调抱紧装置。
进一步的,在所述的顶升装置上刻划有水位线。
进一步的,所述的一体船还设置与风机基础相配合的卡箍装置。
进一步的,所述的抱箍锁紧装置由上抱箍和下抱箍组成。
进一步的,所述的上层平台上安装有连接横梁。
进一步的,所述的上层平台上还安装有旋转对中装置。
进一步的,所述的一体船还设置有锚泊系统。
一种海上风力发电机组整体运输安装方法,使用上述的一体船,包括如下步骤:
(1)风力发电机组在岸边组装完毕后,一体船靠泊;
(2)一体船利用提升装置把风力发电机组装入固定装置内后,用上抱箍和下抱箍锁紧,再将一体船调平,最后由拖轮拖航到施工区域;
(3)顶升装置将上层平台顶升至一定高度,下浮体压载下潜至所需深度,锚泊系统固定一体船;
(4)将卡箍装置与风机基础对接,并用提升装置把风力发电机组慢慢装至风机基础,安装完成。
本发明的有益效果是:
本发明所公开的半潜式海上风力发电机组整体运输安装一体船,安装定位准确,稳定性好,施工方便,风机装船、运输、安装速度快,对周围环境影响小,工程造价低。
本发明所公开的海上风力发电机组整体运输安装方法,可以避免“穿刺”现象,受波浪和水深的影响不大,安装效率高。
附图说明
图1是本发明实施例1所公开的一体船的左视图;
图2是本发明实施例1所公开的一体船的俯视图;
图3是本发明实施例1所公开的一体船的主视图;
图4是本发明实施例1所公开的一体船的停泊及拖航状态示意图;
图5是本发明实施例1所公开的一体船的锚泊状态示意图。
具体实施方式
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图和实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。
实施例1,如图1—5所示,本实施例公开了一种半潜式海上风力发电机组整体运输安装一体船,包括上层平台1和下浮体2,所述的上层平台1和下浮体2之间通过可伸缩的顶升装置3相连接,上层平台1可以落在下浮体2上,也可以通过顶升装置3脱离下浮体2抬升到一定高度;所述的上层平台1上安装有提升装置和固定装置4,所述的固定装置4上安装有抱箍锁紧装置5和对风机塔筒9在固定装置之内的位置进行精调的精调抱紧装置6。
在所述的顶升装置上刻划有水位线。
所述的一体船还设置与风机基础7相配合的卡箍装置8。
所述的抱箍锁紧装置由上抱箍和下抱箍组成。
所述的上层平台上安装有连接横梁10。
所述的上层平台上还安装有与提升装置配合使用以便将风机准确安装至风机基础的旋转对中装置。
所述的一体船还设置有锚泊系统。
本实施例所公开的半潜式海上风力发电机组整体运输安装一体船,安装定位准确,稳定性好,施工方便,风机装船、运输、安装速度快,对周围环境影响小,工程造价低。
本实施例还公开了一种海上风力发电机组整体运输安装方法,使用上述的一体船,包括如下步骤:
(1)风力发电机组在岸边组装完毕后,一体船靠泊;
(2)一体船利用提升装置把风力发电机组装入固定装置内后,用上抱箍和下抱箍锁紧,再将一体船调平,最后由拖轮拖航到施工区域;
(3)顶升装置将上层平台顶升至一定高度,下浮体压载下潜至所需深度,锚泊系统固定一体船;
(4)将卡箍装置与风机基础对接,并用提升装置把风力发电机组慢慢装至风机基础,安装完成。
本实施例所公开的海上风力发电机组整体运输安装方法,在控制系统的控制下工作,可以实现精确就位和安装,能够避免“穿刺”现象,受波浪和水深的影响不大,安装效率高。
Claims (8)
1.一种半潜式海上风力发电机组整体运输安装一体船,其特征在于:包括上层平台和下浮体,所述的上层平台和下浮体之间通过可伸缩的顶升装置相连接;所述的上层平台上安装有提升装置和固定装置,所述的固定装置上安装有抱箍锁紧装置和精调抱紧装置。
2.根据权利要求1所述的半潜式海上风力发电机组整体运输安装一体船,其特征在于:在所述的顶升装置上刻划有水位线。
3.根据权利要求2所述的半潜式海上风力发电机组整体运输安装一体船,其特征在于:所述的一体船还设置与风机基础相配合的卡箍装置。
4.根据权利要求3所述的半潜式海上风力发电机组整体运输安装一体船,其特征在于:所述的抱箍锁紧装置由上抱箍和下抱箍组成。
5.根据权利要求4所述的半潜式海上风力发电机组整体运输安装一体船,其特征在于:所述的上层平台上安装有连接横梁。
6.根据权利要求5所述的半潜式海上风力发电机组整体运输安装一体船,其特征在于:所述的上层平台上还安装有旋转对中装置。
7.根据权利要求6所述的半潜式海上风力发电机组整体运输安装一体船,其特征在于:所述的一体船还设置有锚泊系统。
8.一种海上风力发电机组整体运输安装方法,使用如权利要求7所述的一体船,其特征在于,包括如下步骤:
(1)风力发电机组在岸边组装完毕后,一体船靠泊;
(2)一体船利用提升装置把风力发电机组装入固定装置内后,用上抱箍和下抱箍锁紧,再将一体船调平,最后由拖轮拖航到施工区域;
(3)顶升装置将上层平台顶升至一定高度,下浮体压载下潜至所需深度,锚泊系统固定一体船;
(4)将卡箍装置与风机基础对接,并用提升装置把风力发电机组慢慢装至风机基础,安装完成。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410092421.1A CN103863524A (zh) | 2014-03-13 | 2014-03-13 | 半潜式海上风力发电机组整体运输安装一体船及运输安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410092421.1A CN103863524A (zh) | 2014-03-13 | 2014-03-13 | 半潜式海上风力发电机组整体运输安装一体船及运输安装方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103863524A true CN103863524A (zh) | 2014-06-18 |
Family
ID=50902666
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410092421.1A Pending CN103863524A (zh) | 2014-03-13 | 2014-03-13 | 半潜式海上风力发电机组整体运输安装一体船及运输安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103863524A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106014874A (zh) * | 2016-06-30 | 2016-10-12 | 海阳中集来福士海洋工程有限公司 | 海上风力发电机组的安装方法 |
CN111252660A (zh) * | 2020-01-16 | 2020-06-09 | 上海电气风电集团股份有限公司 | 海上风机整体运输的浮力装置及方法 |
CN114291222A (zh) * | 2021-12-17 | 2022-04-08 | 上海惠生海洋工程有限公司 | 海上风力发电平台、浮式基础及其运输方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10021163A1 (de) * | 2000-04-29 | 2001-11-08 | Aerodyn Eng Gmbh | Wasserfahrzeug zum Versorgen einer Offshore-Windenergieanlage |
CN1350499A (zh) * | 1998-12-23 | 2002-05-22 | 布伊坦戴克控股公司 | 工作船 |
EP2251254A1 (en) * | 2009-05-15 | 2010-11-17 | Cees Eugen Jochem Leenars | Installation vessel for offshore wind turbines |
CN102011714A (zh) * | 2010-10-08 | 2011-04-13 | 中交第一航务工程局有限公司 | 海上风力发电机组整体安装施工方法及其设备 |
DE102010026711A1 (de) * | 2010-03-30 | 2011-10-06 | Werner Möbius Engineering GmbH | Halbtaucher zum Transport und/oder Ausführen von Arbeiten auf See sowie Verfahren zur Positionierung offshore |
CN102712350A (zh) * | 2009-09-04 | 2012-10-03 | 伊特雷科公司 | 海上风轮机安装 |
CN102923261A (zh) * | 2012-10-29 | 2013-02-13 | 广东明阳风电产业集团有限公司 | 一种坐底式海上风机安装驳船 |
CN203819473U (zh) * | 2014-03-13 | 2014-09-10 | 中交一航局第二工程有限公司 | 半潜式海上风力发电机组整体运输安装一体船 |
-
2014
- 2014-03-13 CN CN201410092421.1A patent/CN103863524A/zh active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1350499A (zh) * | 1998-12-23 | 2002-05-22 | 布伊坦戴克控股公司 | 工作船 |
DE10021163A1 (de) * | 2000-04-29 | 2001-11-08 | Aerodyn Eng Gmbh | Wasserfahrzeug zum Versorgen einer Offshore-Windenergieanlage |
EP2251254A1 (en) * | 2009-05-15 | 2010-11-17 | Cees Eugen Jochem Leenars | Installation vessel for offshore wind turbines |
CN102712350A (zh) * | 2009-09-04 | 2012-10-03 | 伊特雷科公司 | 海上风轮机安装 |
DE102010026711A1 (de) * | 2010-03-30 | 2011-10-06 | Werner Möbius Engineering GmbH | Halbtaucher zum Transport und/oder Ausführen von Arbeiten auf See sowie Verfahren zur Positionierung offshore |
CN102011714A (zh) * | 2010-10-08 | 2011-04-13 | 中交第一航务工程局有限公司 | 海上风力发电机组整体安装施工方法及其设备 |
CN102923261A (zh) * | 2012-10-29 | 2013-02-13 | 广东明阳风电产业集团有限公司 | 一种坐底式海上风机安装驳船 |
CN203819473U (zh) * | 2014-03-13 | 2014-09-10 | 中交一航局第二工程有限公司 | 半潜式海上风力发电机组整体运输安装一体船 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106014874A (zh) * | 2016-06-30 | 2016-10-12 | 海阳中集来福士海洋工程有限公司 | 海上风力发电机组的安装方法 |
CN106014874B (zh) * | 2016-06-30 | 2019-10-22 | 海阳中集来福士海洋工程有限公司 | 海上风力发电机组的安装方法 |
CN111252660A (zh) * | 2020-01-16 | 2020-06-09 | 上海电气风电集团股份有限公司 | 海上风机整体运输的浮力装置及方法 |
CN114291222A (zh) * | 2021-12-17 | 2022-04-08 | 上海惠生海洋工程有限公司 | 海上风力发电平台、浮式基础及其运输方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11208987B2 (en) | Floating wind turbine and a method for the installation of such floating wind turbine | |
KR101713618B1 (ko) | 해안 풍력 터빈의 지지를 위한 워터-엔트랩먼트 플레이트 및 비대칭 무링 시스템을 가진 칼럼-안정화된 해안 플랫폼 | |
TWI682100B (zh) | 用於浮動式風力發電設備的繫綁浮筒 | |
Bagbanci et al. | Review of offshore floating wind turbines concepts | |
US8864419B2 (en) | Foundation support system for an offshore wind energy convertor, corresponding to an offshore wind power generating facility | |
WO2010021655A2 (en) | Deep offshore floating wind turbine and method of deep offshore floating wind turbine assembly, transportation, installation and operation | |
WO2013084632A1 (ja) | 浮体式風力発電装置および該浮体式風力発電装置の浮設方法 | |
CN111372843B (zh) | 浮标及浮标的安装方法 | |
CN108626078B (zh) | 一种海上风机Spar型浮式基础驳船助运扶装工艺 | |
JP2017516945A (ja) | 風力タービン用浮体式下部構造およびそれの設置方法 | |
KR101352096B1 (ko) | 트라이포드 석션파일 하부구조물 | |
CN103661827A (zh) | 海上潮间带区域的风机总成安装系统及其施工方法 | |
CN203844964U (zh) | 母子双浮体海上风力发电机组整体运输安装一体船 | |
CN103863524A (zh) | 半潜式海上风力发电机组整体运输安装一体船及运输安装方法 | |
CN103921900B (zh) | 母子双浮体海上风力发电机组整体运输安装一体船的施工方法 | |
CN203819473U (zh) | 半潜式海上风力发电机组整体运输安装一体船 | |
JP2017150303A (ja) | 洋上風車の架設のためのベース構造 | |
CN107792307B (zh) | 一种便于安装的浮式风电塔 | |
US20230113147A1 (en) | Floating offshore wind turbine substructure | |
JP2014227765A (ja) | 洋上風力発電施設の据付方法及び洋上風力発電施設用バージ | |
WO2022098246A1 (en) | Installing offshore floating wind turbines | |
CN103807116A (zh) | 海上风力发电机组拉索千斤顶提升安装装置及施工方法 | |
GB2481321A (en) | A submersible dynamic floatation tank mountable to a base of an offshore wind turbine assembly | |
CN203844963U (zh) | 半浮式海上风力发电机组整体运输安装一体船 | |
JP6334479B2 (ja) | 洋上風車の架設方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140618 |