CN107606306B - Road rain water pipeline construction method - Google Patents

Road rain water pipeline construction method Download PDF

Info

Publication number
CN107606306B
CN107606306B CN201710842035.3A CN201710842035A CN107606306B CN 107606306 B CN107606306 B CN 107606306B CN 201710842035 A CN201710842035 A CN 201710842035A CN 107606306 B CN107606306 B CN 107606306B
Authority
CN
China
Prior art keywords
postposition
pipeline
conduit
side pipe
preposition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710842035.3A
Other languages
Chinese (zh)
Other versions
CN107606306A (en
Inventor
沈伟良
金丹
应春仪
蒋建萍
方智超
王利锋
王祖俊
杨诚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yuanfeng Garden Construction Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710842035.3A priority Critical patent/CN107606306B/en
Publication of CN107606306A publication Critical patent/CN107606306A/en
Application granted granted Critical
Publication of CN107606306B publication Critical patent/CN107606306B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The invention discloses a kind of road rain water pipeline construction methods, including following implementation steps: measurement of the step 1. according to construction conduit slope and the landform of locality, before carrying out channel excavation;Step 2. carries out channel excavation according to the distribution of present situation pipeline and practical geological condition;Step 3. channel bottom making concrete foundation bed course;Step 4. carries out down tube and docking operation, and is sealed to interface tube using cement mortar;It is characterized by: above-mentioned steps 4 include that step is implemented as follows: postposition located space covers on downwards on mounted pipeline, realizes mounted pipeline and positions the positioning of pipelayer attachment, i.e., the positioning of preposition located space and mounted conduit axis;Pipeline to be installed is hung in into preposition located space, realizes the axis alignment of pipeline and mounted pipeline to be installed.Road rain water pipeline construction method of the present invention can be based on previous pipeline, provide positioning datum to the pipeline of rear installation, to realize quickly positioning, fast and easy docking improves operating efficiency.

Description

Road rain water pipeline construction method
Technical field
The present invention relates to road construction fields, and in particular to a kind of road rain water pipeline construction method.
Background technique
With the rapid development of the national economy, highway, the railway Grade Separation Project in all parts of the country built increases day by day.Road Draining design is the important link and element of municipal road construction, and Drainage Design is unreasonable, easily causes serious ponding.City City's rainwater-collecting pipeline construction, the construction quality for considering not only construction are also contemplated that construction speed, how to guarantee construction In the case where construction quality, construction speed is improved, is always that those skilled in the art need to solve one of direction, existing road In the storm sewer work progress of road, the operation of down tube and interface is as follows: cooperating artificial down tube using crane.When with crane down tube, Distance of the crane away from trough rim, tubing storage, traffic route etc. should be determined according to ambient conditions such as groove width depth, soil properties.Pine Soft ground also needs to be reinforced with lumps of wood place mat, to ensure to park balance.Centering is needed to dial after down tube straight, in crowbar underlay with wood Plate, can not straight cutting in concrete foundation, to complete under pipes whole between two inspection shafts, checking can interface after the gradient is errorless.It is above-mentioned Work progress the problem is that: in operating process, need multiple worker's lower grooves to assist crane lowering-in operations, there is only peaces Full hidden danger, and low efficiency, and tube coupling is easy mutually to collide with the pipeline under slot, causes piping failure.
Summary of the invention
It is an object of the invention to overcome the above deficiencies in the existing technologies, and provide a kind of safety preferably, apply The higher road rain water pipeline construction method of work efficiency rate.
Technical solution used by the present invention solves the above problems is:
A kind of road rain water pipeline construction method, including following implementation steps:
Measurement of the step 1. according to construction conduit slope and the landform of locality, before carrying out channel excavation;
Step 2. carries out channel excavation according to the distribution of present situation pipeline and practical geological condition;
Step 3. channel bottom making concrete foundation bed course;
Step 4. carries out down tube and docking operation, and is sealed to interface tube using cement mortar;
Step 5. carries out closed-water test;
Step 6. carries out backfilling operation,
It is characterized by: above-mentioned steps 4 include that step is implemented as follows:
1) in one positioning pipelayer attachment of channel bottom setting, positioning pipelayer attachment has a downward opening postposition positioning empty Between and an opening up preposition located space, postposition located space covers on downwards on mounted pipeline, realizes mounted The positioning of pipeline and positioning pipelayer attachment, i.e., the positioning of preposition located space and mounted conduit axis;
2) pipeline to be installed is hung in into preposition located space, realizes the axis of pipeline and mounted pipeline to be installed Alignment,
3) axis by pipeline to be installed along pipeline to be installed slides, so that pipe main body end to be installed be connect Enter mounted pipeline birdsmouth.
Road rain water pipeline construction method of the present invention can be based on previous pipeline, provide positioning base to the pipeline of rear installation Standard, to realize quickly positioning, fast and easy docking improves operating efficiency, and during down tube, avoid and pass through people Work, with plank, and carries out centering and dials straight movement in crowbar underlay, security risk is avoided, since preposition located space provides The channel of guiding, while avoiding the case where pipeline under tube coupling slot mutually collides, causes piping failure;Postposition located space is not The positioning of preposition located space only may be implemented, and during pipeline falls to preposition located space, it can be effectively right Pipeline in postposition located space is limited, and is prevented in docking operation, and the pipeline in postposition located space shifts.
Preferably, above-mentioned steps 4 include that step is implemented as follows: being fixed with an automatic mortar sealing on positioning pipelayer attachment Device, automatic mortar closing device are pressed against two sealers in the interface of two pipelines, and two sealers are sealed in automatic mortar 50 ° of positive and negative rotation under the driving of mouthful device, the interface of pipeline is coated in rotation process from the mortar that sealer squeezes out, this latter two Sealer is under the driving of automatic mortar closing device, the positive and negative rotation again under the driving of automatic mortar closing device of two sealers 50 °, so that the mortar covering of interface is more uniform.Using this structure, solve below pipe joint since space is limited, The difficulty of manual operation buttering inconvenience may be implemented the sealing of the automation to the interface of pipeline, improve operating efficiency.
Preferably, the positioning pipelayer attachment includes positioning driving, appliance stand, hydraulic supporting feet, postposition localization machine Structure and pre-posed positioning mechanism, the two sides of appliance stand are fixed with hydraulic supporting feet, and described device bracket passes through positioning lifting rope connection It drives a vehicle, has on appliance stand for covering on the postposition located space on pipe main body from top to down, the postposition is fixed to positioning Position mechanism includes that postposition left side is managed, postposition right side is managed, side pipe and postposition delivery device in postposition, is managed on the left of postposition, the postposition right side Side pipe is rotatably installed in postposition located space in side pipe, postposition, the axis of side pipe in the axis and postposition of postposition left side pipe Between be in 40 °~50 ° of angle, be in 40 °~50 ° of angle between the axis of side pipe in the axis of pipe and postposition on the right side of postposition, Pipe, postposition right side pipe are located at the left and right sides of side pipe in postposition on the left of postposition, are fixed on appliance stand for sensing pipe The pipeline limit switch of road body outer wall position, after appliance stand is put down from top to bottom, manage on the left of postposition, managed on the right side of postposition, The outer wall of side pipe is against the tube wall of the pipe main body in postposition located space, the pipeline master of realization device bracket and postposition in postposition The positioning of body, has the preposition located space of the pipe main body for accepting whereabouts on appliance stand, and the two of preposition located space Side is respectively and fixedly provided with the guide plate being obliquely installed, and the postposition positioning mechanism includes preposition left side pipe, preposition right side pipe, preposition push Mechanism, the left side pipe driving mechanism for preposition left side pipe to be unfolded, the right side pipe driving mechanism for preposition right side pipe to be unfolded, institute State left side pipe driving mechanism, right side pipe driving mechanism includes the first hinged seat, the second hinged seat, side pipe support rod and side pipe Hydraulic cylinder, the first hinged seat are hinged on appliance stand, and the second hinged seat is hinged on one end of side pipe support rod, the side pipe branch The other end of strut is hinged on the telescopic rod of side pipe hydraulic cylinder, the first hinged seat, the second hinged seat of left side pipe driving mechanism Respectively with the rotation connection at the both ends of preposition left side pipe, the first hinged seat of right side pipe driving mechanism, the second hinged seat respectively and The rotation connection at the both ends of preposition right side pipe, after the pipe main body of whereabouts is fallen into preposition located space, in preposition located space The pipe walls support of pipe main body managed, on the outer wall of preposition right side pipe in preposition left side, realize the pipe main body and device of whereabouts The positioning of bracket, the pipe main body in the pipe main body and preposition located space in postposition located space is in coaxial position at this time It sets, so that the pipeline birdsmouth for needing to dock can be directed to the pipe main body fallen by realizing.
Preferably, preposition delivery device and postposition delivery device include lateral push rod and two push hydraulic oil The cylinder body of cylinder, two push hydraulic cylinders is fixed on appliance stand, and the telescopic rod of two push hydraulic cylinders is fixed horizontal respectively To the both ends of push rod.
Preferably, pipeline to be installed hangs in preposition located space, the pipe by lifting pipeline device in step 4 Road hanging apparatus includes automatic catching mechanism for being grabbed to pipeline, for vertical and move horizontally the machine of automatically grabbing The lifting crane of structure, the automatic catching mechanism include support rod and two grabbing assemblies, and grabbing assembly includes sliding bar, card Pawl, connecting plate grab hydraulic cylinder and unloading hydraulic cylinder, offer sliding eye on support rod, one end of sliding bar is slidably installed In sliding eye, one end, claw, the telescopic rod for grabbing hydraulic cylinder and the cylinder for unloading hydraulic cylinder of the fixed sliding bar of connecting plate The cylinder body of body, the crawl hydraulic cylinder is fixed on support rod, and the telescopic rod of the unloading hydraulic cylinder is located at claw and support rod Between, the automatic catching mechanism is connected to lifting crane by grabbing lifting rope, and the both ends of the crawl lifting rope are fixed on support The both ends of bar are fixed on lifting crane in the middle part of the crawl lifting rope.
Preferably, automatic mortar closing device includes positioning conduit, mobile conduit, mortar conveying mechanism, round-arced tooth Item, gear, conduit supporting plate drive motor and two mortar closing components, mortar closing component include conduit connecting rod, conduit Supporting plate, conduit extension rod, compressor arm, pressure spring and sealer, section of the positioning conduit and mobile conduit and conduit supporting plate Face is in semicircular arc, and the positioning conduit is fixed on appliance stand, and the mobile conduit is slidably arranged in positioning conduit, fixed Conduit fluting is offered on the inside of the conduit of position, one end of conduit connecting rod passes through the end that conduit slots and fixes mobile conduit, The other end fixed catheter supporting plate of the conduit connecting rod, one end of conduit extension rod is fixed on the output of sealer drive motor On axis, the pedestal of sealer drive motor is fixed on conduit supporting plate, and arc-shaped rack is fixed on conduit supporting plate, conduit supporting plate The pedestal of drive motor is fixed on appliance stand, the fixed gear of the drive shaft of the conduit supporting plate drive motor, gear engagement Arc-shaped rack, compressor arm are slidably mounted on the other end of conduit extension rod, the fixed sealer in the end of compressor arm, on compressor arm It is arranged with the pressure spring for withstanding compressor arm to rear ramp, sealer includes metal case and rubber retracting cylinder, rubber retracting cylinder One end be fixed on one end of metal case, rubber retracting cylinder has undulatory barrel, metal case and rubber retracting cylinder All have for the slurry channel by mortar, the mortar conveying mechanism include mortar storage bucket, transport tube, conveying screw rod, Screw drive motor, the import of the outlet connection transport tube of the mortar storage bucket, conveying screw rod are rotatably installed in transport tube, The output shaft of conveying screw rod connecting screw driving motor, the outlet of the transport tube are connected to can by flexible delivery pipe The slurry channel of body.
Preferably, the bottom of the hydraulic supporting feet offers support leg groove, it is fixed with and is used in support leg groove Contact ground bottoms out limit switch.
Compared with prior art, the present invention having the following advantages that and effect: road rain water pipeline construction method of the present invention can To be based on previous pipeline, positioning datum is provided to the pipeline of rear installation, to realize quickly positioning, fast and easy docking is mentioned High operating efficiency, and during down tube is avoided by manually in crowbar underlay with plank, and carry out centering dial it is straight dynamic Make, avoids security risk, since preposition located space provides the channel of guiding, while avoiding the pipeline phase under tube coupling slot The case where mutually colliding, causing piping failure;The positioning of preposition located space not only may be implemented in postposition located space, but also in pipe During road falls to preposition located space, effectively the pipeline in postposition located space can be limited, prevented right In termination process, the pipeline in postposition located space shifts.
Detailed description of the invention
Fig. 1 is the using state structure diagram of the automatic portable pipe mill of the embodiment of the present invention.
Fig. 2 is the using state structure diagram of positioning pipelayer attachment of the embodiment of the present invention.
Fig. 3 is the using state structure diagram of postposition positioning mechanism of the embodiment of the present invention.
Fig. 4 is the using state structure diagram of pre-posed positioning mechanism of the embodiment of the present invention.
Fig. 5 is the using state structure diagram of the automatic mortar closing device of the embodiment of the present invention.
Fig. 6 is the mounting structure schematic diagram of sealer of the embodiment of the present invention.
Fig. 7 is the using state structure diagram of automatic catching mechanism of the embodiment of the present invention.
Number in figure as follows: mobile devices 1, vehicle frame 2, lifting pipeline device 3 position pipelayer attachment 4, chassis 11, crawler belt 12, driving wheel 13, tensioning wheel 14, support wheel 15, traveling space 16, automatic catching mechanism 31, lifting crane 32, support rod 311, Grabbing assembly 312, sliding bar 3121, claw 3122, connecting plate 3123 grab hydraulic cylinder 3124, unload hydraulic cylinder 3125, positioning Driving 41, appliance stand 42, hydraulic supporting feet 43, support leg groove 431 bottom out limit switch 432, postposition located space 441, Pipe 442 on the left of postposition, pipe 443 on the right side of postposition, side pipe 444 in postposition, pipeline limit switch 445, laser lamp 446, preposition positioning Space 451, guide plate 452, preposition left side pipe 453, preposition right side pipe 454, left side pipe driving mechanism 455, right side pipe driving machine Structure 456, the first hinged seat 4571, the second hinged seat 4572, side pipe support rod 4573, side pipe hydraulic cylinder 4574, preposition pusher Structure 461, postposition delivery device 462, lateral push rod 471 push hydraulic cylinder 472, and automatic mortar closing device 48 positions conduit 481, mobile conduit 482, mortar conveying mechanism 483, arc-shaped rack 484, gear 485, conduit supporting plate drive motor 486, sand Slurry closing component 487, conduit connecting rod 4871, conduit supporting plate 4872, conduit extension rod 4873, compressor arm 4874, pressure spring 4875, Conduit fluting 4811, metal case 48761, rubber retracting cylinder 48762, mortar storage bucket 4831, transport tube 4832, screw drive Motor 4833, flexible delivery pipe 4834, sealer drive motor 488, pipeline 5
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawing and by embodiment, and following embodiment is to this hair Bright explanation and the invention is not limited to following embodiments.
Referring to Fig. 1-Fig. 7, the automatic portable pipe mill of the present embodiment, including mobile devices, vehicle frame, lifting pipeline device and positioning paving Pipe device, the mobile devices 1 include 12 driving mechanism of crawler belt and chassis 11, and 12 driving mechanism of crawler belt includes crawler belt 12, drives Driving wheel 13, tensioning wheel 14, support wheel 15 and hydraulic drive motor have between two 12 driving mechanisms of crawler belt and accommodate pipeline Travel space 16, traveling space 16 has width when and height so that in automatic portable pipe mill driving process, will not and pipeline It causes to interfere, the driving wheel 13, tensioning wheel 14, support wheel 15 are rotatably installed on chassis 11, the driving wheel 13, tensioning wheel 14, support wheel 15 is against the inside of crawler belt 12, and the hydraulic drive motor connects driving wheel 13.
The lifting pipeline device 3 include automatic catching mechanism 31 for being grabbed to pipeline 5, for vertical and The lifting crane 32 of automatic catching mechanism 31 is moved horizontally, the automatic catching mechanism 31 includes that support rod 311 and two grab Component 312 is taken, grabbing assembly 312 includes sliding bar 3121, claw 3122, connecting plate 3123, crawl hydraulic cylinder 3124 and unloads Carrier fluid cylinder pressure 3125 offers sliding eye on support rod 311, and one end of sliding bar 3121 is slidably mounted in sliding eye, connection One end, claw 3122, the telescopic rod for grabbing hydraulic cylinder 3124 and the unloading hydraulic cylinder 3125 of the fixed sliding bar 3121 of plate 3123 Cylinder body, it is described crawl hydraulic cylinder 3124 cylinder body be fixed on support rod 311, it is described unloading hydraulic cylinder 3125 telescopic rod position Between claw 3122 and support rod 311, the automatic catching mechanism 31 is connected to lifting crane 32 by grabbing lifting rope, described The both ends of crawl lifting rope are fixed on the both ends of support rod 311, are fixed on lifting crane 32 in the middle part of the crawl lifting rope, described Lifting crane 32 is fixed on vehicle frame 2.Automatic catching mechanism 31 quickly and effectively can carry out crawl fixation to pipeline, and can be with After the completion of lifting, rapid automatized unloading is realized, avoid security risk caused by manually being unloaded in channel bottom, lead to The connection structure for crossing crawl lifting rope is relatively reasonable, is conducive to keep the balance in hoisting process.Lifting crane 32 is for driving certainly Dynamic grasping mechanism 31 all around moves up and down.
The positioning pipelayer attachment 4 includes 41, appliance stand 42, hydraulic supporting feet 43, postposition positioning mechanism of positioning driving And pre-posed positioning mechanism, the two sides of appliance stand 42 are fixed with hydraulic supporting feet 43, described device bracket 42 passes through positioning lifting rope It is connected to positioning driving 41, positioning driving 41 is all around moved up and down for driving device bracket 42, solid on appliance stand 42 Surely there is the laser lamp 446 for projecting laser harness downwards.Laser lamp 446 can emit downwards laser harness, and laser harness is beaten On pipeline, the relative position to operator's reference unit bracket 42 and pipeline can be conducive to.
The bottom of the hydraulic supporting feet 43 offers support leg groove 431, is fixed in support leg groove 431 for connecing Tread surface bottoms out limit switch 432.
Have on appliance stand 42 for covering on the postposition located space 441 on pipe main body, the postposition from top to down Positioning mechanism includes pipe 442 on the left of postposition, pipe 443 on the right side of postposition, side pipe 444 and postposition delivery device 462 in postposition, postposition Left side pipe 442, pipe 443 on the right side of postposition, side pipe 444 is rotatably installed in postposition located space 441 in postposition, pipe on the left of postposition It is in 40 °~50 ° of angle between the axis of side pipe 444 in 442 axis and postposition, the axis and postposition of pipe 443 on the right side of postposition It is in 40 °~50 ° of angle between the axis of middle side pipe 444, pipe 442, postposition right side pipe 443 are located in postposition on the left of postposition The left and right sides of side pipe 444 is fixed with the pipeline limit switch for sense pipeline body outer wall position on appliance stand 42 445.Since pipe main body is tube-shaped structure, thus the outer wall of side pipe 444 is against in left side pipe, postposition right side pipe 443, postposition It on the outer wall of pipe main body, is managed on the left of the axial line distance of pipe main body, the distance of side pipe 444 is in postposition right side pipe 443, postposition The radius of pipe main body, thus 42 relative position of axis and appliance stand of pipe main body has been determined.Pipe 442 on the left of postposition, after Set that right side pipe 443, side pipe 444 is also convenient for realization device bracket 42 using rotational installation and carries out along the axis of pipe main body in postposition Sliding.
After appliance stand 42 is put down from top to bottom, managed on the left of postposition, side pipe 444 is outer in postposition right side pipe 443, postposition Wall is against the tube wall of the pipe main body in postposition located space 441, the positioning of the pipe main body of realization device bracket 42 and postposition.
There is the preposition located space 451 for accepting the pipe main body to fall, preposition located space on appliance stand 42 451 two sides are respectively and fixedly provided with the guide plate 452 being obliquely installed, and the postposition positioning mechanism includes preposition left side pipe 453, the preposition right side It is side pipe 454, preposition delivery device 461, the left side pipe driving mechanism 455 for preposition left side pipe 453 to be unfolded, preposition for being unfolded The right side pipe driving mechanism 456 of right side pipe 454, the left side pipe driving mechanism 455, right side pipe driving mechanism 456 include the One hinged seat 4571, the second hinged seat 4572, side pipe support rod 4573 and side pipe hydraulic cylinder 4574, the first hinged seat 4571 hinge It connects on appliance stand 42, the second hinged seat 4572 is hinged on one end of side pipe support rod 4573, the side pipe support rod 4573 The other end be hinged on the telescopic rod of side pipe hydraulic cylinder 4574, the first hinged seat 4571, second of left side pipe driving mechanism 455 The rotation connection with the both ends of preposition left side pipe 453 respectively of hinged seat 4572, the first hinged seat of right side pipe driving mechanism 456 4571, the second hinged seat 4572 rotation connection with the both ends of preposition right side pipe 454 respectively.Pipeline support is managed in preposition left side 453, when on preposition right side pipe 454, since the distance of the preposition left side pipe 453 of the axial line distance of pipeline, preposition right side pipe 454 is pipe The radius in road realizes the axis and of pipeline to be installed it is thus achieved that the positioning of the axis of pipeline and appliance stand 42 The axis of pipe laying realizes conllinear positioning, and preposition left side pipe 453, preposition right side pipe 454 may be implemented rotating around own axes Rotation, thus may be implemented to slide around the axis of pipeline convenient for pipeline,
After the pipe main body of whereabouts is fallen into preposition located space 451, the pipe of the pipe main body in preposition located space 451 Wall is supported on the outer wall of preposition left side pipe 453, preposition right side pipe 454, realizes the pipe main body and appliance stand 42 of whereabouts Positioning, the pipe main body in the pipe main body and preposition located space 451 in postposition located space 441 is in coaxial position at this time It sets, so that the pipeline birdsmouth for needing to dock can be directed to the pipe main body fallen by realizing.
Preposition delivery device 461 and postposition delivery device 462 include lateral push rod 471 and two push hydraulic cylinders 472, the cylinder body of two push hydraulic cylinders 472 is fixed on appliance stand 42, the telescopic rod point of two push hydraulic cylinders 472 The both ends of other fixed lateral push rod 471.
Automatic mortar closing device 48 is fixed on appliance stand 42, automatic mortar closing device 48 includes positioning conduit 481, mobile conduit 482, mortar conveying mechanism 483, arc-shaped rack 484, gear 485, conduit supporting plate drive motor 486 and Two mortar closing components 487, mortar closing component 487 include conduit connecting rod 4871, conduit supporting plate 4872, conduit extension rod 4873, compressor arm 4874, pressure spring 4875 and sealer, the positioning conduit 481 and mobile conduit 482 and conduit supporting plate 4872 section is in semicircular arc, and the positioning conduit 481 is fixed on appliance stand 42, and the mobile sliding of conduit 482 is set It sets in positioning conduit 481, the inside of positioning conduit 481 offers conduit fluting 4811, and one end of conduit connecting rod 4871 is worn Cross the end of conduit fluting 4811 and fixed mobile conduit 482, the other end fixed catheter supporting plate of the conduit connecting rod 4871 4872, one end of conduit extension rod 4873 is fixed on the output shaft of sealer drive motor 488, sealer drive motor 488 Pedestal be fixed on conduit supporting plate 4872, arc-shaped rack 484 is fixed on conduit supporting plate 4872, conduit supporting plate drive motor 486 pedestal is fixed on appliance stand 42, the fixed gear 485 of the drive shaft of the conduit supporting plate drive motor 486, gear 485 engagement arc-shaped racks 484, compressor arm 4874 are slidably mounted on the other end of conduit extension rod 4873, compressor arm 4874 Sealer is fixed in end, and the pressure spring 4875 for withstanding compressor arm 4874 to rear ramp, sealer are arranged on compressor arm 4874 Including metal case 48761 and rubber retracting cylinder 48762, one end of rubber retracting cylinder 48762 is fixed on metal case 48761 One end, rubber retracting cylinder 48762 have undulatory barrel, and metal case 48761 and rubber retracting cylinder 48762 all have use In the slurry channel by mortar, the mortar conveying mechanism 483 includes mortar storage bucket 4831, transport tube 4832, conveying spiral shell Bar, screw drive motor 4833, the import of the outlet connection transport tube 4832 of the mortar storage bucket 4831, conveying screw rod rotation It is mounted in transport tube 4832, the output shaft of conveying screw rod connecting screw driving motor 4833, the outlet of the transport tube 4832 The slurry channel of metal case 48761 is connected to by flexible delivery pipe 4834.
This implementation correspondingly provides a kind of road rain water pipeline construction method, including following implementation steps:
Measurement of the step 1. according to construction conduit slope and the landform of locality, before carrying out channel excavation;
Step 2. carries out channel excavation according to the distribution of present situation pipeline and practical geological condition, and channel excavation is opened using machinery When digging to more than design substrate absolute altitude 0.2 meter, hand excavation is used instead to designed elevation, the bottom width of groove should be than pipeline structures cross Section the widest part side widens 0.5 meter, with guarantee foundation construction and Pipe installing it is necessary to operating space;
Step 3. channel bottom making concrete foundation bed course, before making, to channel bottom should in advance by designed elevation and Axis correction, and mud and sundries should be removed, concrete foundation bed course must not be higher than design altitude, must not surpass lower than design altitude Cross l0mm;
Step 4. carries out down tube and docking operation using automatic portable pipe mill, and is sealed to interface tube using cement mortar, under By one end between two inspection shafts, pipeline should slowly be fallen on down on concrete foundation bed course pipe, prevent down tube rope from fractureing Or Guan Ji is smashed in impact suddenly, the preparation before down tube checks the quality of tubing, interface material, and tubing used must have production The product quality certification and survey report, pipe inner and outer surfaces answer it is bright and clean smooth, no honeycomb, slump, dew muscle, hollowing, tubing have rupture, The defects of interface misrun, scarce side, does not allow using armored concrete tube outer surface is not allow for crack;Inside pipe wall fracture width is not It obtains more than 0.05mm;
Step 5. carries out closed-water test;
Step 6. carries out backfilling operation, more than tube top is backfilled in fact with 30cm sand, groove rest part is sieved with soil and is often filled out 20cm compacting, terminates, soil moisture content to be measured of banketing after rain after groove is filled and led up, and is such as more than that regulation can not backfill, has in slot After water must then exclude, meeting regulation can be backfilled.
Automatic portable pipe mill operating procedure 4 includes following operating process:
1) automatic portable pipe mill is hung in groove by large-scale lifting machine, and makes the first segment pipe of access rear side inspection shaft Road is located between two 12 driving mechanisms of crawler belt of automatic portable pipe mill.
2) automatic portable pipe mill is travelled to position is adapted to, and 41 control positioning pipelayer attachment 4 of positioning driving all around moves, makes The light that laser lamp 446 on pipelayer attachment 4 issues must be positioned and be incident upon the birdsmouth of the first length of tubing appropriate position rearward downwards Set (10cm-40cm or so).
3) 41 control positioning pipelayer attachment 4 of positioning driving declines, so that postposition located space 441 covers on the first length of tubing On, after pipeline limit switch 445 touches the outer wall of first segment pipe main body, position pipelayer attachment stops decline, releases at this time Traction in the front-back direction to positioning pipelayer attachment 4, so that positioning pipelayer attachment 4 has the freedom degree being moved forward and backward.
4) the lateral push rod 471 of postposition delivery device 462 is located at the front of the first length of tubing birdsmouth, pushes in postposition Under the driving of the push hydraulic cylinder 472 of mechanism 462, after lateral push rod 471 moves a distance, it is against the undertaking of the first length of tubing On the end face of mouth, under the promotion of lateral push rod 471, positioning pipelayer attachment 4 is moved forward, until lateral push rod 471 moves to Push the stroke end of hydraulic cylinder 472.
5) hydraulic supporting feet 43 of 42 two sides of appliance stand, which is stretched out, touches trench bottom surfaces up to bottoming out limit switch 432, Positioning pipelayer attachment 4 is securely supported in trench bottom surfaces.
6) lifting crane 32 of lifting pipeline device 3 controls automatic catching mechanism 31 and all around moves, so that grabbing automatically It takes mechanism 31 to be moved on ground the pipeline location set in advance, manually support rod 311 is moved to above pipeline, this latter two Grabbing assembly 312 moves toward one another under the action of grabbing hydraulic cylinder 3124, so that claw 3122 is caught in pipeline, realizes to pipe The crawl in road, the telescopic rod of two unloading hydraulic cylinders 3125 is against respectively in the both ends of the surface of pipeline at this time.
7) pipeline on automatic catching mechanism 31 is controlled in lifting crane 32 to be moved to above groove, and make pipe main body Fall in preposition located space 451, the outer wall support of pipe main body on preposition left side pipe 453, preposition right side pipe 454, this When make the oil outlet for grabbing hydraulic cylinder 3124 and oil inlet be in channel status, while the telescopic rod for unloading hydraulic cylinder 3125 is stretched Out, so that claw 3122 is pushed out in pipeline, so that completing automatic catching mechanism 31 is detached from pipeline, at this time preposition delivery device 461 lateral push rod 471 is located at the front of the pipeline birdsmouth just fallen.
8) under the driving of the push hydraulic cylinder 472 of preposition delivery device 461, lateral push rod 471 moves a distance Afterwards, be against on the end face of the pipe main body just fallen, under the promotion of lateral push rod 471, the pipeline just fallen be pushed rearward into, Until lateral push rod 471 moves to the stroke end of push hydraulic cylinder 472, the pipe main body just fallen at this time and first segment Pipeline birdsmouth completes docking.
9) under the action of sealer drive motor 488, conduit extension rod 4873 is rotated, and sealer is against two pipelines Interface, under the action of screw drive motor 4833, conveying screw rod rotation, thus by mortar via flexible delivery pipe 4834 It is pushed into slurry channel, under the action of conduit supporting plate drive motor 486,50 ° of 484 positive and negative rotation of arc-shaped rack (is rotated clockwise 50 °, then rotate counterclockwise 50 °) so that 50 ° of sealer positive and negative rotation (rotate clockwise 50 °, then rotate counterclockwise 50 °), from And by two sealers squeeze out mortar can fill entire interface, hereafter sealer not squeeze mortar in the case where, then 50 ° of positive and negative rotation (rotates clockwise 50 °, then rotates counterclockwise 50 °), so that the mortar covering of interface is more uniform.
10) preposition left side pipe 453, preposition right side pipe 454 fold outward under the action of side pipe hydraulic cylinder 4574, avoid Interference is generated in preposition left side pipe 453, preposition 454 motion process of right side pipe with the outer wall of pipeline, positioning is sling in positioning driving 41 Pipelayer attachment 4 to initial, set position, the hydraulic supporting feet 43 of 42 two sides of appliance stand rises,
11) circulation executes step 1 to 10 steps, until the distance between the front end of pipeline and inspection shaft of front side are being less than In the range of duct length, the connection of the pipeline of front end and the inspection shaft of front side is realized using artificial brick pipeline at this time.
Above content is only illustrations made for the present invention described in this specification.Technology belonging to the present invention The technical staff in field can make various modifications or additions to the described embodiments or by a similar method Substitution, content without departing from description of the invention or beyond the scope defined by this claim should belong to this The protection scope of invention.

Claims (6)

1. a kind of road rain water pipeline construction method, including following implementation steps:
Measurement of the step 1. according to construction conduit slope and the landform of locality, before carrying out channel excavation;
Step 2. carries out channel excavation according to the distribution of present situation pipeline and practical geological condition;
Step 3. channel bottom making concrete foundation bed course;
Step 4. carries out down tube and docking operation, and is sealed to interface tube using cement mortar;
Step 5. carries out closed-water test;
Step 6. carries out backfilling operation,
It is characterized by: above-mentioned steps 4 include that step is implemented as follows:
1) channel bottom setting one positioning pipelayer attachment, positioning pipelayer attachment have a downward opening postposition located space and One opening up preposition located space, postposition located space cover on downwards on mounted pipeline, realize mounted pipeline With the positioning of positioning pipelayer attachment;
2) pipeline to be installed is hung in into preposition located space, realizes the axis pair of pipeline and mounted pipeline to be installed Standard,
3) axis by pipeline to be installed along pipeline to be installed slides, thus by pipe main body end access to be installed The pipeline birdsmouth of installation,
The positioning pipelayer attachment includes positioning driving, appliance stand, hydraulic supporting feet, postposition positioning mechanism and preposition localization machine Structure, the two sides of appliance stand are fixed with hydraulic supporting feet, and described device bracket is connected to positioning driving, device by positioning lifting rope Have on bracket for covering on the postposition located space on pipe main body from top to down, the postposition positioning mechanism includes a postposition left side It manages, side pipe and postposition delivery device in postposition, is managed on the left of postposition, side pipe is equal in postposition right side pipe, postposition on the right side of side pipe, postposition It is rotatably installed in postposition located space, the folder in the axis and postposition of postposition left side pipe between the axis of side pipe in 40 °~50 ° Angle is in 40 °~50 ° of angle between the axis of side pipe in the axis of pipe and postposition on the right side of postposition, pipe on the left of postposition, on the right side of postposition Pipe is located at the left and right sides of side pipe in postposition, and the pipeline for sense pipeline body outer wall position is fixed on appliance stand Limit switch is managed on the left of postposition, is managed on the right side of postposition, the outer wall of side pipe is against in postposition after appliance stand is put down from top to bottom The positioning of the pipe main body of the tube wall of pipe main body in postposition located space, realization device bracket and postposition, on appliance stand With the preposition located space for accepting the pipe main body to fall, the two sides of preposition located space, which are respectively and fixedly provided with, to be obliquely installed Guide plate, the postposition positioning mechanism include preposition left side pipe, preposition right side pipe, preposition delivery device, for a preposition left side to be unfolded The left side pipe driving mechanism of side pipe, the right side pipe driving mechanism for preposition right side pipe to be unfolded, the left side pipe driving mechanism, the right side Side pipe driving mechanism includes the first hinged seat, the second hinged seat, side pipe support rod and side pipe hydraulic cylinder, the first hinged seat hinge It connects on appliance stand, the second hinged seat is hinged on one end of side pipe support rod, and the other end of the side pipe support rod is hinged on On the telescopic rod of side pipe hydraulic cylinder, the first hinged seat of left side pipe driving mechanism, the second hinged seat respectively with preposition left side pipe The rotation connection at both ends, the first hinged seat of right side pipe driving mechanism, the second hinged seat respectively with the both ends of preposition right side pipe Rotation connection, after the pipe main body of whereabouts is fallen into preposition located space, the tube wall branch of the pipe main body in preposition located space It supports and is managed, on the outer wall of preposition right side pipe in preposition left side, realize the positioning of the pipe main body and appliance stand of whereabouts, at this time postposition The pipe main body in pipe main body and preposition located space in located space is in position coaxial, to realize to the pipe fallen Road main body can be directed at the pipeline birdsmouth for needing to dock.
2. road rain water pipeline construction method according to claim 1, it is characterised in that: above-mentioned steps 4 include following real It applies step: being fixed with an automatic mortar closing device on positioning pipelayer attachment, automatic mortar closing device connects two pipelines Mouthful place against two sealers, two sealers 50 ° of positive and negative rotation under the driving of automatic mortar closing device, in rotation process from The mortar that sealer squeezes out is coated in the interface of pipeline, this latter two sealer is under the driving of automatic mortar closing device, and two A sealer 50 ° of positive and negative rotation again under the driving of automatic mortar closing device, so that the mortar covering of interface is more uniform.
3. road rain water pipeline construction method according to claim 1, it is characterised in that: preposition delivery device and postposition push away Sending mechanism includes lateral push rod and two push hydraulic cylinders, and the cylinder body of two push hydraulic cylinders is fixed on appliance stand On, the both ends of the telescopic rod difference fixed lateral push rod of two push hydraulic cylinders.
4. road rain water pipeline construction method according to claim 1, it is characterised in that: in step 4, pipeline to be installed Preposition located space is hung in by lifting pipeline device, the lifting pipeline device includes automatic for being grabbed to pipeline Grasping mechanism, for vertical and move horizontally the lifting crane of automatic catching mechanism, the automatic catching mechanism includes support Bar and two grabbing assemblies, grabbing assembly include sliding bar, claw, connecting plate, crawl hydraulic cylinder and unloading hydraulic cylinder, branch Sliding eye is offered on strut, one end of sliding bar is slidably mounted in sliding eye, one end of the fixed sliding bar of connecting plate, card The cylinder body of pawl, the telescopic rod for grabbing hydraulic cylinder and the cylinder body for unloading hydraulic cylinder, the crawl hydraulic cylinder is fixed on support rod, Between claw and support rod, the automatic catching mechanism is connected to the telescopic rod of the unloading hydraulic cylinder by grabbing lifting rope Lifting crane, the both ends of the crawl lifting rope are fixed on the both ends of support rod, are fixed on lifting row in the middle part of the crawl lifting rope Che Shang.
5. road rain water pipeline construction method according to claim 2, it is characterised in that: mortar closing device includes automatically Position conduit, mobile conduit, mortar conveying mechanism, arc-shaped rack, gear, conduit supporting plate drive motor and two mortar envelopes Mouthful component, mortar closing component include conduit connecting rod, conduit supporting plate, conduit extension rod, compressor arm, pressure spring and sealer, The section of the positioning conduit and mobile conduit and conduit supporting plate is in semicircular arc, and the positioning conduit is fixed on appliance stand On, the mobile conduit is slidably arranged in positioning conduit, and it positions and offers conduit fluting on the inside of conduit, conduit connecting rod One end passes through the end that conduit slots and fixes mobile conduit, the other end fixed catheter supporting plate of the conduit connecting rod, conduit One end of extension rod is fixed on the output shaft of sealer drive motor, and the pedestal of sealer drive motor is fixed on conduit supporting plate On, arc-shaped rack is fixed on conduit supporting plate, and the pedestal of conduit supporting plate drive motor is fixed on appliance stand, the conduit The fixed gear of the drive shaft of supporting plate drive motor, gear engage arc-shaped rack, and compressor arm is slidably mounted on conduit extension rod Sealer is fixed in the other end, the end of compressor arm, and the pressure spring for withstanding compressor arm to rear ramp, sealing are arranged on compressor arm Device includes metal case and rubber retracting cylinder, and one end of rubber retracting cylinder is fixed on one end of metal case, rubber retracting cylinder tool There is undulatory barrel, metal case and rubber retracting cylinder all have for the slurry channel by mortar, and the mortar is defeated Sending mechanism includes mortar storage bucket, transport tube, conveying screw rod, screw drive motor, and the outlet connection of the mortar storage bucket is defeated The import of cylinder is sent, conveying screw rod is rotatably installed in transport tube, the output shaft of conveying screw rod connecting screw driving motor, described defeated The slurry channel for sending the outlet of cylinder to be connected to metal case by flexible delivery pipe.
6. road rain water pipeline construction method according to claim 1, it is characterised in that: the bottom of the hydraulic supporting feet Support leg groove is offered, is fixed in support leg groove and bottoms out limit switch for contact ground.
CN201710842035.3A 2017-09-18 2017-09-18 Road rain water pipeline construction method Active CN107606306B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710842035.3A CN107606306B (en) 2017-09-18 2017-09-18 Road rain water pipeline construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710842035.3A CN107606306B (en) 2017-09-18 2017-09-18 Road rain water pipeline construction method

Publications (2)

Publication Number Publication Date
CN107606306A CN107606306A (en) 2018-01-19
CN107606306B true CN107606306B (en) 2019-07-12

Family

ID=61060277

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710842035.3A Active CN107606306B (en) 2017-09-18 2017-09-18 Road rain water pipeline construction method

Country Status (1)

Country Link
CN (1) CN107606306B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111139916B (en) * 2020-01-18 2020-11-27 广州坚磊建设有限公司 Direct-buried section reinforced concrete drainage pipeline installation construction process
CN111911711A (en) * 2020-07-15 2020-11-10 谢祥松 Natural gas energy pipeline laying construction method
CN111853411A (en) * 2020-07-21 2020-10-30 陆成伍 Hydraulic engineering pipeline rapid butt joint sealing device and sealing method
CN114960901A (en) * 2022-05-19 2022-08-30 佛山市市政建设工程有限公司 Rainwater pipeline automatic alignment installation device

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1157383A (en) * 1996-02-17 1997-08-20 株式会社好手 Lead pipe configuration for underground pipe laying
WO2013166559A1 (en) * 2012-05-09 2013-11-14 Gerard O'brien Attachment for pipe laying
CN103615043A (en) * 2013-11-06 2014-03-05 中铁二十一局集团第二工程有限公司 Surface directly-buried drain pipe assembly bearing large equipment or dynamic load, and construction method thereof
CN204063686U (en) * 2014-09-18 2014-12-31 中冶集团武汉勘察研究院有限公司 Buried tube type underground heat exchange structure is disturbed in a kind of cyclic group hole
CN104594379A (en) * 2014-11-28 2015-05-06 中铁二十三局集团第二工程有限公司 Heat insulation culvert pipe system between internal lines in railway station and burial and construction method
EP2921599A1 (en) * 2014-03-17 2015-09-23 Die Spezialelemente AG Device for the connection of elements, element for the construction of a channel and method for laying elements
CN104989875A (en) * 2015-05-19 2015-10-21 中国海洋石油总公司 Submarine pipeline flange underwater abutting joint installation method
CN105479045A (en) * 2015-11-18 2016-04-13 西南石油大学 External butt joint worktable of large-caliber pipes
CN107166092A (en) * 2017-06-23 2017-09-15 中交四航局第二工程有限公司 A kind of pipeline underwater mating method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1157383A (en) * 1996-02-17 1997-08-20 株式会社好手 Lead pipe configuration for underground pipe laying
WO2013166559A1 (en) * 2012-05-09 2013-11-14 Gerard O'brien Attachment for pipe laying
CN103615043A (en) * 2013-11-06 2014-03-05 中铁二十一局集团第二工程有限公司 Surface directly-buried drain pipe assembly bearing large equipment or dynamic load, and construction method thereof
EP2921599A1 (en) * 2014-03-17 2015-09-23 Die Spezialelemente AG Device for the connection of elements, element for the construction of a channel and method for laying elements
CN204063686U (en) * 2014-09-18 2014-12-31 中冶集团武汉勘察研究院有限公司 Buried tube type underground heat exchange structure is disturbed in a kind of cyclic group hole
CN104594379A (en) * 2014-11-28 2015-05-06 中铁二十三局集团第二工程有限公司 Heat insulation culvert pipe system between internal lines in railway station and burial and construction method
CN104989875A (en) * 2015-05-19 2015-10-21 中国海洋石油总公司 Submarine pipeline flange underwater abutting joint installation method
CN105479045A (en) * 2015-11-18 2016-04-13 西南石油大学 External butt joint worktable of large-caliber pipes
CN107166092A (en) * 2017-06-23 2017-09-15 中交四航局第二工程有限公司 A kind of pipeline underwater mating method

Also Published As

Publication number Publication date
CN107606306A (en) 2018-01-19

Similar Documents

Publication Publication Date Title
CN107387870B (en) A kind of automatic pipe-laying equipment
CN107606306B (en) Road rain water pipeline construction method
CN107524217A (en) A kind of automatic portable pipe mill
CN104343455B (en) Long-distance curved jacking pipe and pipe roof construction technique
CN113833480A (en) Shield initial tunneling and arrival construction method
CN205349351U (en) Tunnel disease comprehensive improvement system
CA3054504C (en) Automated pipeline construction apparatus, system and method
CN110422770A (en) The vertical deployment equipment of flexible membrane
CN110344490A (en) A kind of town road drain pipe construction equipment and method
CN115405343B (en) Anchor rod trolley for coal mine anchor net injection integrated supporting construction and construction method
CN110029714B (en) Installation device for engineering drainage pipeline
CN104776268A (en) Mechanical construction method for mounting large-caliber reinforced concrete drainage pipe
CN110285261A (en) Sewage conduct laying process
CN207362978U (en) Position pipelayer attachment
CN101693243B (en) Dredging system of sewage pipeline with large-pipe diameter
CN209669961U (en) Dam flood-discharge hole underwater desilting system
CN104534168B (en) A kind of deep pipeline burying machine
CN101701471B (en) Silt operation device of large-caliber sewage conduit desilting system
CN109763532A (en) A kind of dam flood-discharge hole underwater desilting system
CN206562662U (en) Digging type block clearing silt dredging device
CN207295928U (en) Pipeline location closing device
CN101694108B (en) Sewage level controlling device of dredging system for sewage pipeline with large-pipe diameter
CN106638898A (en) Mounting device of bell and spigot concrete drain pipeline and construction method thereof
CN210442032U (en) Hanging adjustable water injection device
CN206267275U (en) A kind of erecting device of faucet concrete drainage pipeline

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211228

Address after: 311500 Zhejiang Yuanfeng Garden Construction Co., Ltd., FengChuan Avenue, Tonglu County, Hangzhou City, Zhejiang Province

Patentee after: Zhejiang Yuanfeng Garden Construction Co.,Ltd.

Address before: 310000 2nd floor, office building, No. 02-67, beitanghe Road, Xixing street, Binjiang District, Hangzhou City, Zhejiang Province

Patentee before: Jin Dan