CN107605490A - Single hole large cross-section tunnel double side wall construction conversion process - Google Patents

Single hole large cross-section tunnel double side wall construction conversion process Download PDF

Info

Publication number
CN107605490A
CN107605490A CN201710748122.2A CN201710748122A CN107605490A CN 107605490 A CN107605490 A CN 107605490A CN 201710748122 A CN201710748122 A CN 201710748122A CN 107605490 A CN107605490 A CN 107605490A
Authority
CN
China
Prior art keywords
side wall
double side
tunnel
predicament
supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710748122.2A
Other languages
Chinese (zh)
Other versions
CN107605490B (en
Inventor
董汉军
石磊
刘毅
张勇
康晓平
彭振
肖飞
贺祖浩
李向阳
张志强
赵才
郭真
徐少红
石福龙
冯德定
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN201710748122.2A priority Critical patent/CN107605490B/en
Publication of CN107605490A publication Critical patent/CN107605490A/en
Application granted granted Critical
Publication of CN107605490B publication Critical patent/CN107605490B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of single hole large cross-section tunnel double side wall construction conversion process, comprise the following steps:The first step:Mid-board is moved to the left, interim inverted arch moves overlapped with CRD mid-board, interim inverted arch gradually downward on the left of double side wall tunnel;Second step:Base tunnel top bar at left and right sides of double side wall, get out of a predicament or an embarrassing situation and middle part top bar excavation supporting, reserved middle part is got out of a predicament or an embarrassing situation Core Soil;3rd step:Light section benching tunnelling method top bar, excavation supporting of getting out of a predicament or an embarrassing situation;4th step:Top bar at left and right sides of middle section CRD, right side are got out of a predicament or an embarrassing situation excavation supporting;5th step:Get out of a predicament or an embarrassing situation in the middle part of double side wall excavation supporting, excavation supporting of being got out of a predicament or an embarrassing situation on the right side of CRD.The present invention is combined and constructed using the movement of two side-wall pilot tunnel mid-board and remaining core soil in advance, is ensured that construction safety is convenient, is reduced cost, accelerating construction progress, arrangement and method for construction adjustment flexibility is big, and surrouding rock deformation hardly develops, and disclosure satisfy that the project construction strict to deformation requirements.

Description

Single hole large cross-section tunnel double side wall construction conversion process
Technical field
The present invention relates to vcehicular tunnel, city underground engineering technical field, more particularly to a kind of single hole large cross-section tunnel are double Side wall construction conversion process.
Background technology
With the continuous development of urban rail transit in China, the construction of subway enters a peak period.In new and old tunnel Linkage section and other specific conditions under, the situation that large cross-section tunnel is changed to double-hole tunnel can be run into.Due to tunnel cross-section Difference, there is some difference for lining style, supporting parameter and digging construction method, determines and engineering method conversion is faced during constructing tunnel Situation.Because section size differs greatly with design of its support, in the case where not removing temporary support, construction inconvenience, such as go out Slag can only be carried out manually with charging.One kind is needed on the premise of temporary support is not removed, and ensures construction safety and continuous new Technique, engineering method.
The content of the invention
, can be with the invention provides a kind of single hole large cross-section tunnel double side wall construction conversion process to overcome above mentioned problem In the case where not removing temporary support, complete single hole large cross-section tunnel and changed to double hole CRD and benching tunnelling method.
The technical solution adopted by the present invention is:
Single hole large cross-section tunnel double side wall construction conversion process, comprises the following steps:
The first step:Mid-board is moved to the left on the left of large cross-section tunnel double side wall overlaps with CRD mid-boards, is left office on double side wall The interim inverted arch of rank is moved down to be moved to the interim inverted arch of CRD up/down steps and overlapped;
Second step:Base tunnel top bar, excavation supporting of getting out of a predicament or an embarrassing situation on the right side of double side wall, double side wall left side base tunnel top bar, leave office Rank excavation supporting, double side wall middle part top bar excavation supporting, reserves Core Soil of being got out of a predicament or an embarrassing situation in the middle part of double side wall;
3rd step:Light section benching tunnelling method top bar, excavation supporting of getting out of a predicament or an embarrassing situation;
4th step:Top bar, excavation supporting of getting out of a predicament or an embarrassing situation on the left of middle section CRD, CRD right sides top bar excavation supporting;
5th step:Get out of a predicament or an embarrassing situation in the middle part of double side wall Core Soil excavation supporting, excavation supporting of being got out of a predicament or an embarrassing situation on the right side of CRD.
A segment distance starts to construct in face of double side wall tunnel excavation to tunnel conversion in the first step, while During Initial Stage Construction Supporting and temporary supporting system installation.
The preliminary bracing includes the gibs such as main body preliminary bracing, mid-board supporting and interim inverted arch supporting, every After individual pilot drive, the preliminary bracing needs to close.
Double side wall tunnel temporary supporting system construction stops when being moved to CRD tunnel partition walls and the coincidence of interim inverted arch Only.
Fine-tuning benching tunnelling method tunnel shoulder height in the first step, makes double side wall up/down steps inverted arch and benching tunnelling method step It is completely superposed.
In 5th step, large cross-section tunnel gib and interim inverted arch are removed after construction, carries out two lining constructions.
The beneficial effects of the invention are as follows:
The present invention is combined and constructed using the movement of two side-wall pilot tunnel mid-board and remaining core soil in advance, convenient construction, Reserved double side wall Core Soil of getting out of a predicament or an embarrassing situation excavates after tunnel conversion, ensure that the safety of tunnel excavation, reduces cost, accelerate to apply Work progress, arrangement and method for construction adjustment flexibility is big, and surrouding rock deformation hardly develops, and disclosure satisfy that the project strict to deformation requirements Construction.
Brief description of the drawings
Below in conjunction with the drawings and specific embodiments, the present invention is further detailed explanation.
Fig. 1 is the single hole big cross section double side wall tunnel structure schematic diagram of the present invention.
Drawing reference numeral explanation:1st, mid-board on the right side of double side wall;2nd, interim inverted arch on the right side of double side wall;3rd, interval on the left of double side wall Wall;4th, interim inverted arch in the middle part of double side wall;5th, interim inverted arch on the left of double side wall;6th, Core Soil.
Embodiment
As shown in figure 1, one of embodiment provided by the invention, single hole large cross-section tunnel double side wall construction conversion process, bag Include following steps:
The first step:Mid-board 3 is moved to the left on the left of large cross-section tunnel double side wall overlaps with CRD mid-boards, above and below double side wall The interim inverted arch of step is moved to coincidence to the interim inverted arch of CRD up/down steps;
Second step:Double side wall right side base tunnel top bar excavation supporting simultaneously applies interim inverted arch 2 on the right side of double side wall, the double side wall right side Side is got out of a predicament or an embarrassing situation excavation supporting, and base tunnel top bar excavation supporting simultaneously applies interim inverted arch 5, double side wall on the left of double side wall on the left of double side wall Left side is got out of a predicament or an embarrassing situation excavation supporting, and top bar excavation supporting simultaneously applies interim inverted arch 4 in the middle part of double side wall in the middle part of double side wall, in double side wall Subordinate's step remaining core soil in advance 6;
3rd step:Light section benching tunnelling method top bar excavation supporting, excavation supporting of getting out of a predicament or an embarrassing situation;
4th step:Middle section CRD left side top bar excavation supportings simultaneously apply interim inverted arch, excavation branch of being got out of a predicament or an embarrassing situation on the left of CRD Shield, CRD right side top bar excavation supportings simultaneously apply interim inverted arch;
5th step:Get out of a predicament or an embarrassing situation in the middle part of double side wall Core Soil excavation supporting, excavation supporting of being got out of a predicament or an embarrassing situation on the right side of CRD.
25m starts in face of double side wall tunnel excavation to tunnel conversion, mid-board 3 on the left of large cross-section tunnel double side wall by Step is moved to the left, until being overlapped with CRD or so mid-board, interim inverted arch 5 moves gradually downward on the left of double side wall, until and CRD The interim inverted arch of step overlaps in up and down.If inverted arch is not completely superposed with benching tunnelling method step during double side wall up/down steps, need to finely tune Benching tunnelling method tunnel shoulder height makes its coincidence.
When construction large cross-section tunnel double side wall mid-board and interim inverted arch, while During Initial Stage Construction supporting and temporary supporting system Installation, temporary supporting system construction stop when being moved to CRD tunnel partition walls and the coincidence of interim inverted arch, and the preliminary bracing includes Gib, the preliminary bracings such as main body preliminary bracing, mid-board supporting and interim inverted arch supporting need to be in each pilot drives After close.
After completing preliminary bracing, continue progressively to construct double side wall right side top bar excavation supporting and apply double side wall right side to face When inverted arch 2, excavation supporting of getting out of a predicament or an embarrassing situation on the right side of double side wall, top bar excavation supporting on the left of double side wall, get out of a predicament or an embarrassing situation out on the left of double side wall Supporting is dug, double side wall middle part top bar excavation supporting simultaneously applies interim inverted arch 4 in the middle part of double side wall, got out of a predicament or an embarrassing situation in the middle part of double side wall reserved Core Soil 6.
Then light section benching tunnelling method constructing tunnel top bar, excavation supporting of getting out of a predicament or an embarrassing situation are carried out, CRD tunnel excavation supports are simultaneously applied Make interim inverted arch, top bar excavation supporting on the right side of got out of a predicament or an embarrassing situation on the left of CRD excavation supporting, and CRD.
Soil of being got out of a predicament or an embarrassing situation in the middle part of big cross section double side wall tunnel is finally excavated, excavation supporting of being got out of a predicament or an embarrassing situation on the right side of construction CRD tunnels is complete Into after construction, large cross-section tunnel gib and interim inverted arch are removed, carries out two lining constructions.
It is described above, simply presently preferred embodiments of the present invention, the invention is not limited in above-mentioned embodiment, as long as It reaches the technique effect of the present invention with identical means, should all belong to protection scope of the present invention.

Claims (6)

  1. The conversion process 1. single hole large cross-section tunnel double side wall is constructed, it is characterised in that comprise the following steps:
    The first step:Mid-board is moved to the left on the left of large cross-section tunnel double side wall overlaps with CRD mid-boards, and double side wall up/down steps face When inverted arch move down to be moved to the interim inverted arch of CRD up/down steps and overlap;
    Second step:Base tunnel top bar, excavation supporting of getting out of a predicament or an embarrassing situation on the right side of double side wall, double side wall left side base tunnel top bar, get out of a predicament or an embarrassing situation out Supporting is dug, double side wall middle part top bar excavation supporting, reserves Core Soil of being got out of a predicament or an embarrassing situation in the middle part of double side wall;
    3rd step:Light section benching tunnelling method top bar, excavation supporting of getting out of a predicament or an embarrassing situation;
    4th step:Top bar, excavation supporting of getting out of a predicament or an embarrassing situation on the left of middle section CRD, CRD right sides top bar excavation supporting;
    5th step:Get out of a predicament or an embarrassing situation in the middle part of double side wall Core Soil excavation supporting, excavation supporting of being got out of a predicament or an embarrassing situation on the right side of CRD.
  2. 2. single hole large cross-section tunnel double side wall construction conversion process according to claim 1, it is characterised in that:In the first step A segment distance starts to construct in face of double side wall tunnel excavation to tunnel conversion, while During Initial Stage Construction supporting and temporary supporting system peace Dress.
  3. 3. single hole large cross-section tunnel double side wall construction conversion process according to claim 2, it is characterised in that:The initial stage Supporting includes the gibs such as main body preliminary bracing, mid-board supporting and interim inverted arch supporting, described after each pilot drive Preliminary bracing needs to close.
  4. 4. single hole large cross-section tunnel double side wall construction conversion process according to claim 2, it is characterised in that:The bilateral The temporary supporting system construction of wall tunnel stops when being moved to CRD tunnel partition walls and the coincidence of interim inverted arch.
  5. 5. single hole large cross-section tunnel double side wall construction conversion process according to claim 1, it is characterised in that:In the first step Fine-tuning benching tunnelling method tunnel shoulder height, makes double side wall up/down steps inverted arch be completely superposed with benching tunnelling method step.
  6. 6. single hole large cross-section tunnel double side wall construction conversion process according to claim 1, it is characterised in that:5th step In, large cross-section tunnel gib and interim inverted arch are removed after construction, carries out two lining constructions.
CN201710748122.2A 2017-08-28 2017-08-28 Single hole large cross-section tunnel double side wall construction conversion process Active CN107605490B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710748122.2A CN107605490B (en) 2017-08-28 2017-08-28 Single hole large cross-section tunnel double side wall construction conversion process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710748122.2A CN107605490B (en) 2017-08-28 2017-08-28 Single hole large cross-section tunnel double side wall construction conversion process

Publications (2)

Publication Number Publication Date
CN107605490A true CN107605490A (en) 2018-01-19
CN107605490B CN107605490B (en) 2018-11-09

Family

ID=61056174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710748122.2A Active CN107605490B (en) 2017-08-28 2017-08-28 Single hole large cross-section tunnel double side wall construction conversion process

Country Status (1)

Country Link
CN (1) CN107605490B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109611101A (en) * 2018-12-04 2019-04-12 中铁二十四局集团有限公司 A kind of section in Tunneling by mining method converts construction technology
CN109630140A (en) * 2018-12-14 2019-04-16 广西大学 The dynamic partition pilot tunnel method on big cross section gradual change Soft Rock Tunnel stratum
CN109989757A (en) * 2019-04-03 2019-07-09 长安大学 Super-span tunnel is in V grade of engineering method conversion construction method to IV grade of country rock section
CN110331980A (en) * 2019-06-17 2019-10-15 中国铁建大桥工程局集团有限公司 A kind of shallow embedding fine sand layer tunnel Varied section transition and conversion construction method
CN110821502A (en) * 2019-11-29 2020-02-21 中铁隧道局集团有限公司 Novel construction method for entrance section of weak surrounding rock large-span mountain tunnel
CN112523760A (en) * 2020-12-18 2021-03-19 山东高速科技发展集团有限公司科技研发中心 Construction method for converting double-side-wall pilot tunnel into CD method in large-section tunnel
CN113389566A (en) * 2021-07-30 2021-09-14 中铁十二局集团有限公司 Construction method for rapid expanding excavation and conversion by CRD (China railway track) normal double-side-wall pit guiding method
CN113417645A (en) * 2021-06-01 2021-09-21 上海宝冶集团有限公司 Large-section tunnel excavation method based on double-side-wall pit guiding method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000282800A (en) * 1999-03-30 2000-10-10 Kajima Corp Method and facilities for stocking, carrying and sending out shield segments in pit
CN102226398A (en) * 2011-06-02 2011-10-26 中铁二院工程集团有限责任公司 Soft rock four-line large-span tunnel compound double-side wall bracing cable conversion excavation construction method
CN103628887A (en) * 2013-11-28 2014-03-12 中铁十三局集团有限公司 Large-section water-rich saturated fine sand railway tunnel excavation method
CN103939106A (en) * 2014-04-03 2014-07-23 北京交科公路勘察设计研究院有限公司 Construction method for converting two side-wall pilot tunnel method to CRD method
CN104879131A (en) * 2015-05-06 2015-09-02 中国电建集团华东勘测设计研究院有限公司 Large-span tunnel excavation method for upper soft and lower hard compound strata
CN205936644U (en) * 2016-08-12 2017-02-08 中铁二十局集团第四工程有限公司 Tunnel lining construction structure based on two side wall drift methods
CN107060772A (en) * 2017-03-23 2017-08-18 中铁五局集团成都工程有限责任公司 Large section construction method is mutated for Line for Passenger Transportation standard section

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000282800A (en) * 1999-03-30 2000-10-10 Kajima Corp Method and facilities for stocking, carrying and sending out shield segments in pit
CN102226398A (en) * 2011-06-02 2011-10-26 中铁二院工程集团有限责任公司 Soft rock four-line large-span tunnel compound double-side wall bracing cable conversion excavation construction method
CN103628887A (en) * 2013-11-28 2014-03-12 中铁十三局集团有限公司 Large-section water-rich saturated fine sand railway tunnel excavation method
CN103939106A (en) * 2014-04-03 2014-07-23 北京交科公路勘察设计研究院有限公司 Construction method for converting two side-wall pilot tunnel method to CRD method
CN103939106B (en) * 2014-04-03 2016-05-18 北京交科公路勘察设计研究院有限公司 A kind of double side wall pilot tunnel method is to the construction method of CRD method conversion
CN104879131A (en) * 2015-05-06 2015-09-02 中国电建集团华东勘测设计研究院有限公司 Large-span tunnel excavation method for upper soft and lower hard compound strata
CN205936644U (en) * 2016-08-12 2017-02-08 中铁二十局集团第四工程有限公司 Tunnel lining construction structure based on two side wall drift methods
CN107060772A (en) * 2017-03-23 2017-08-18 中铁五局集团成都工程有限责任公司 Large section construction method is mutated for Line for Passenger Transportation standard section

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
乔东: "大断面黄土隧道中CRD法向双侧壁导坑法的转换", 《山西建筑》 *
赵爱军: "双侧壁向CRD转换施工工艺浅析", 《山西建筑》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109611101A (en) * 2018-12-04 2019-04-12 中铁二十四局集团有限公司 A kind of section in Tunneling by mining method converts construction technology
CN109630140A (en) * 2018-12-14 2019-04-16 广西大学 The dynamic partition pilot tunnel method on big cross section gradual change Soft Rock Tunnel stratum
CN109989757A (en) * 2019-04-03 2019-07-09 长安大学 Super-span tunnel is in V grade of engineering method conversion construction method to IV grade of country rock section
CN110331980A (en) * 2019-06-17 2019-10-15 中国铁建大桥工程局集团有限公司 A kind of shallow embedding fine sand layer tunnel Varied section transition and conversion construction method
CN110821502A (en) * 2019-11-29 2020-02-21 中铁隧道局集团有限公司 Novel construction method for entrance section of weak surrounding rock large-span mountain tunnel
CN112523760A (en) * 2020-12-18 2021-03-19 山东高速科技发展集团有限公司科技研发中心 Construction method for converting double-side-wall pilot tunnel into CD method in large-section tunnel
CN112523760B (en) * 2020-12-18 2022-05-13 山东高速工程咨询集团有限公司科技研发中心 Construction method for converting double-side-wall pilot tunnel into CD method in large-section tunnel
CN113417645A (en) * 2021-06-01 2021-09-21 上海宝冶集团有限公司 Large-section tunnel excavation method based on double-side-wall pit guiding method
CN113389566A (en) * 2021-07-30 2021-09-14 中铁十二局集团有限公司 Construction method for rapid expanding excavation and conversion by CRD (China railway track) normal double-side-wall pit guiding method
CN113389566B (en) * 2021-07-30 2022-04-08 中铁十二局集团有限公司 Construction method for rapid expanding excavation and conversion by CRD (China railway track) normal double-side-wall pit guiding method

Also Published As

Publication number Publication date
CN107605490B (en) 2018-11-09

Similar Documents

Publication Publication Date Title
CN107605490B (en) Single hole large cross-section tunnel double side wall construction conversion process
CN104047623B (en) A kind of big across cavern excavation construction method
CN104653187B (en) Water-rich sand layer geology large cross-section tunnel excavation method
CN105041349A (en) Underground excavation construction method for expanded excavation of station on basis of metro regional shield tunnel
CN108442943A (en) A kind of branch-cut bridge section tunnel and Double side heading method construction method
CN102121385B (en) Tunnel excavation method for extending existing single-hole tunnel into double-arch tunnel
CN101566064B (en) Large-section tunnel construction method
CN101086209A (en) Shield tunneling and shallow tunneling combined construction method for building underground station
CN205936644U (en) Tunnel lining construction structure based on two side wall drift methods
CN204457792U (en) A kind ofly dig large diameter shield tunnel with many pilot tunnel methods and the subway station of building
CN110924952B (en) Construction method for three-step seven-step normal medium rock pillar method conversion of super-large section tunnel
CN110735656A (en) Method for reversely building underground excavation station tunnel with ultra-large section in soft rock area based on arch cover method
CN104632227A (en) Subway station excavation technology of single-layer beam arch structure
CN106837357A (en) A kind of no-dig technique pipe-roof method of use curve pipe canopy
CN104632245A (en) Method using multi-pilot-tunnel expanding excavation large-diameter shield tunnel for building subway station
CN110905524A (en) Method for excavating and supporting subway station tunnel by adopting underground excavation construction channel
CN106246190B (en) A kind of nine base tunnel construction methods of tunnel and Double side wall
CN101539021A (en) Road tunnel excavation method
CN110486021B (en) Construction method for converting large-section tunnel into two small-section tunnels
CN113107500B (en) Variable cross-section tunnel construction method
CN113027495B (en) Underground excavation large-span station construction method implemented by interval tunnel organization
CN205036380U (en) Block of four encircles PBA and secretly digs subway station major structure
CN204457789U (en) A kind of stake arch wall supports the subway station digging large diameter shield tunnel and build
CN107120119B (en) The construction method of Underground Subway Station
CN108222945A (en) Utilize the construction method of main and auxiliary layering sap excavating extra-large cross-section Underground Subway Station

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Liu Yi

Inventor after: Zhang Zhiqiang

Inventor after: Zhao Cai

Inventor after: Guo Zhen

Inventor after: Xu Shaohong

Inventor after: Shi Fulong

Inventor after: Feng Deding

Inventor after: Shi Lei

Inventor after: Dong Hanjun

Inventor after: Zhang Yong

Inventor after: Kang Xiaoping

Inventor after: Peng Zhen

Inventor after: Xiao Fei

Inventor after: He Zuhao

Inventor after: Li Xiangyang

Inventor before: Dong Hanjun

Inventor before: Zhang Zhiqiang

Inventor before: Zhao Cai

Inventor before: Guo Zhen

Inventor before: Xu Shaohong

Inventor before: Shi Fulong

Inventor before: Feng Deding

Inventor before: Shi Lei

Inventor before: Liu Yi

Inventor before: Zhang Yong

Inventor before: Kang Xiaoping

Inventor before: Peng Zhen

Inventor before: Xiao Fei

Inventor before: He Zuhao

Inventor before: Li Xiangyang

GR01 Patent grant
GR01 Patent grant