CN107605195A - Circularly descend intelligent parking garage - Google Patents
Circularly descend intelligent parking garage Download PDFInfo
- Publication number
- CN107605195A CN107605195A CN201710994312.2A CN201710994312A CN107605195A CN 107605195 A CN107605195 A CN 107605195A CN 201710994312 A CN201710994312 A CN 201710994312A CN 107605195 A CN107605195 A CN 107605195A
- Authority
- CN
- China
- Prior art keywords
- garage
- parking
- circularly
- bicycle
- intelligent parking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The present invention, which devises, a kind of circularly descends intelligent parking garage, including garage outer wall, vertical passageway, automatic lifting unit, bicycle parking route, pick-up route, landing and garage bottom.The beneficial effects of the invention are as follows saved ground resource;Avoid the problem of habitation environment quality such as daylighting, ventilation around the influence that parking building is brought is built on ground;According to the parking stall breach of surrounding communities, the similar round underground intelligent parking garage of suitable parking stall number can shallowly be built deeply, avoids a large amount of vacant problem of resource waste of the night as Large Underground Public Parking.
Description
Technical field
It is particularly a kind of circularly to descend intelligent parking garage the present invention relates to deep layer tunneling technique.
Background technology
Past following period of time, static traffic Facilities Construction are more to lag relative to dynamic traffic Facilities Construction,
City " parking difficulty " problem causes motorist to look about parking stall, causes more roads that congested in traffic and environment occurs indirectly dirty
Dye, turn into a big problem of the operation of puzzlement urban static traffic and automobile industry development.Each metropolitan road road-surface concrete in China
All occupy sizable ratio, although road road-surface concrete facilitates parking for motor vehicle, add static traffic area, road
Interior parking is essentially all to take pavement and bicycle lane, therefore causes mutually to strive between pedestrian, bicycle and motor vehicle
Road, trigger traffic disturbance, have a strong impact on the traffic capacity of road, and easily cause the generation of traffic accident.
This land used just is reserved without for park construction in planning before many cities, and with urban transportation
Develop rapidly also without the development strategy for adjusting construction of parking facilities in time, parking supply and demand contradiction, people are just gradually
The importance that static traffic is made rational planning for gradually is recognized, but urban land growing tension, planning parking lot land used become non-again
It is often difficult, the planning in parking lot, serious hysteresis is built, it follows that the phagocytosis people's normal life of automobile parking slowly
Activity space and road, have a strong impact on people's quality of life and road passage capability.The construction in parking lot is with management because it is returned
The difference of category, from design, build, that management links are designed into planning, urban construction, public security, communications and transportation, industry and commerce etc. is multiple
Department.Therefore, because the limits of functions and powers limit simply, each does what he thinks is right, Each performs its own functions for each department, it is impossible to performance effectively and reasonably
It is completed the effect in parking lot.Due to " parking difficulty ", bringing Traffic Capacity of Urban Road again reduces, easily induces traffic thing
Therefore, urban vitality reduce, a series of problems, such as environmental pollution is serious, turn into one of worsening urban disease.
The content of the invention
The problem of existing for prior art, the present invention provide a kind of circular intelligent underground parking garage, solve motor vehicle
Speedup is swift and violent, parking position wretched insufficiency and parking space planning, builds the problems such as serious hysteresis.
To achieve the above object, the present invention adopts the following technical scheme that:
Circularly descend intelligent parking garage, including garage outer wall, vertical passageway, automatic lifting unit, bicycle parking route, pick-up route,
Landing, garage bottom, it is characterised in that:The garage outer wall for circularly descending intelligent parking garage be wrapped in it is described circularly under
The outermost layer of intelligent parking garage, circularly descend the first floor of intelligent parking garage to be provided with landing, landing respectively with bicycle parking
Route is connected with pick-up route, and bicycle parking route and pick-up route are separated;Automatic lifting unit is in vertical passageway, garage bottom
It is the orlop for circularly descending intelligent parking garage, is connected with garage outer wall.
Wherein, described garage outer wall level cross-sectionn is circle, and garage outer wall is made up of Double Layer Circular steel plate, circular double
It is connected between the two-layered steel plates of layer steel plate by steel cross rib, filling water-proof concrete inside Double Layer Circular steel plate;Described circle
Shape double-layer plate is split along height, and the specific number of plies of Double Layer Circular steel plate determines according to engineering is actual;Circle between levels
Double-layer plate strangles connection by connecting;Every layer of Double Layer Circular steel plate is divided into 8 pieces, between two blocks of Double Layer Circular steel plates adjacent with layer
The joinery and its construction set by steel plate both ends connects;The Double Layer Circular steel plate at garage bottom is arranged to cutting shoe layer, the circle of remainder layer
Double-layer plate is arranged to index bed;Described Double Layer Circular steel plate uses prefabrication, and described water-proof concrete pours for scene
Build.
Wherein, described landing includes four parking of automobile platforms and two bicycle parking platforms;
Wherein, automobile lifting platform and bicycle hoistable platform, described automobile liter are provided with described automatic lifting unit
Drop platform and bicycle hoistable platform 360 ° of automatic rotations and can do the translation on different height, automobile in vertical passageway
Hoistable platform quantity is four, and bicycle hoistable platform quantity is two.
Wherein, it is described circularly to descend the intelligent parking garage first floor that several vehicle parking spaces are set, in index bed and bottom
Every layer is provided with several vehicle parking spaces and three bicycle parking positions, and each bicycle parking position can park some certainly
Driving;Steel column I, steel column II each one are set between adjacent vehicle parking space and bicycle parking position two-by-two, outside garage
The side of wall is steel column I, and the side close to vertical passageway is steel column II, steel column I and the up/down perforation of steel column II, adjacent two steel column I
Between by stupefied I connection of steel, by stupefied I connection of steel between adjacent two steel column II, pass through steel stupefied II between steel column I and steel column II and connect
Fixation is connect, described landing is arranged on stupefied I top of steel.
Wherein, the quantity of the vehicle parking space is set according to actual conditions.
Wherein, it is described circularly to descend the bicycle parking position of intelligent parking garage and vehicle parking space to be arranged as required to fill
Electric stake, spray equipment is set on each bicycle parking position and vehicle parking space.
Wherein, circularly descending intelligent parking garage inner surface setting has a drainage system and ventilating system, and garage bottom is along outside garage
Wall is provided with gutter, and it is inclined plane circularly to descend intelligent parking garage ground floor.
The beneficial effects of the invention are as follows using subterranean resource, ground resource has been saved;Ground machine formula parking building is gathered
Occupation of land is small, land utilization ratio is high and all advantages such as intelligent parking;Avoid ground and build around the influence that parking building is brought and adopt
The problem of habitation environment qualities such as light, ventilation;According to the parking stall breach of surrounding communities, suitable parking stall number can shallowly be built deeply
Similar round underground intelligent parking garage, avoid a large amount of vacant wastings of resources of as Large Underground Public Parking night and ask
Topic.
Brief description of the drawings
Fig. 1 is circularly to descend intelligent parking garage floor plan.
Fig. 2 is circularly to descend intelligent parking garage side view.
Fig. 3 is circularly to descend intelligent parking garage first floor schematic diagram.
Fig. 4 is circularly to descend intelligent parking garage index bed schematic diagram.
Fig. 5 is circularly to descend intelligent parking garage steel column distribution schematic diagram.
Fig. 6 is the cutting shoe layer schematic diagram for circularly descending intelligent parking garage.
Fig. 7 is the joinery and its construction schematic diagram for circularly descending intelligent parking garage.
Fig. 8 is the normal structure schematic diagram for circularly descending intelligent parking garage.
In figure, 1 is garage outer wall, and 1-1 is Double Layer Circular steel plate, and 1-2 is water-proof concrete, and 1-1-1 is cutting shoe layer, 1-1-
2 be index bed, and 1-1-3 strangles for connection, and 1-1-4 is joinery and its construction, and 2 be vertical passageway, and 3 be automatic lifting unit, and 4 be automobile liter
Platform drops, and 5 be bicycle parking route, and 6 be pick-up route, and 7 be landing, and 7-1 is parking of automobile platform, and 7-2 is bicycle parking
Platform, 8 be bicycle hoistable platform, and 9 be bicycle parking position, and 10 be vehicle parking space, and 11 be steel column I, and 12 be steel column II, 13
It is steel stupefied II for steel stupefied I, 14,15 be garage bottom, and 16 be charging pile, and 17 be spray equipment, and 18 be gutter, and 19 be draining system
System, 20 be ventilating system, and 21 be steel cross rib.
Embodiment
Below in conjunction with the accompanying drawings and the present invention is described in detail embodiment, but they can not be interpreted as to the present invention
The restriction of protection domain.
As shown in figures 1-8, intelligent parking garage is circularly descended, mainly includes garage outer wall 1, vertical passageway 2, automatic lifting list
Member 3, bicycle parking route 5, pick-up route 6, landing 7, garage bottom 15;The level cross-sectionn of garage outer wall 1 sets circular;Outside garage
Wall 1 is configured to Double Layer Circular steel plate 1-1, and Double Layer Circular steel plate 1-1 is split along height, and the specific number of plies determines according to engineering is actual;
Steel cross rib 21 is provided between two layers of Double Layer Circular steel plate 1-1 to be connected;The Double Layer Circular steel plate 1-1 at garage bottom 15 is arranged to
Cutting shoe layer 1-1-1, the Double Layer Circular steel plate 1-1 of remainder layer are arranged to index bed 1-1-2;Every layer of Double Layer Circular steel plate 1-1 is divided into 8
Block, every piece of steel plate both ends set joinery and its construction 1-1-4, every layer of adjacent two Double Layer Circulars steel plate 1-1 to pass through mortise-tenon joint;Levels
Double Layer Circular steel plate 1-1 strangle 1-1-3 connections by connecting, avoid the vertical piece of adjacent layer same vertically in line;Every layer
Filling water-proof concrete 1-2 inside Double Layer Circular steel plate 1-1;Double Layer Circular steel plate 1-1 uses prefabrication, water-proof concrete 1-
2 be cast in situs;It is described circularly to descend intelligent parking garage to may be designed as 7-10 layers from top to bottom, it can also be arranged as required into
If dried layer;
Four automobile lifting platforms 4 and two bicycle hoistable platforms 8, automobile liter are provided with described automatic lifting unit 3
Drop platform 4 and bicycle hoistable platform 8 360 ° of automatic rotations and can do the translation on different height in vertical passageway 2,
Distribution, which is actually needed, so as to basis deposits, withdraws car task;Bicycle parking route 5 and pick-up route 6 are separated;
The first floor of intelligent parking garage is circularly descended to be provided with landing 7, including four parking of automobile platform 7-1, two voluntarily
Car landing 7-2;The first floor is provided with several vehicle parking spaces 10, and other every layer of layers are provided with several vehicle parking spaces 10
With three bicycle parking positions 9, each parking stall can stop some bicycles;Adjacent vehicle parking space 10 and voluntarily two-by-two
Steel column I 11, steel column II 12 each one are set between car parking stall 9, the side of garage outer wall 1 is provided with steel column I 11, it is close
The side of vertical passageway 2 is provided with steel column II 12, steel column I 11, the up/down perforation of steel column II 12;Between adjacent two steel column I 11, it is adjacent
It is solid by stupefied II 14 connection of steel between two adjacent steel columns I 11 and steel column II 12 by stupefied I 13 connection of steel between two steel columns II 12
It is fixed;Landing 7 is arranged on stupefied I 13 top of steel;
The quantity of vehicle parking space 10 is set according to actual conditions;The bicycle parking position 9 of underground parking garage and vehicle parking space
10 can be arranged as required to charging pile 16, and charging service is provided when can be parked for new-energy automobile;Each bicycle parking position 9 He
Spray equipment 17 is all set on vehicle parking space 10, using extinction by automatic sprinkling;Garage bottom 15 is provided with draining along garage outer wall 1
Ditch 18, garage floor are inclined plane;Garage inner surface setting has drainage system 19, ventilating system 20.
Automobile lifting platform 4 can extend and retract as needed, when depositing automobile, drive vehicle and reached by bicycle parking route 5
Landing 7 stops, after driver has stopped car and walked out landing 7, by intelligence control system, by automobile lifting platform 4
Stretch out and the vehicle on landing 7 is transferred to automobile lifting platform 4, automobile lifting platform 4, which shrinks, afterwards moves to vehicle
Vehicle is down to required parking tier by vertical passageway 2, automobile lifting platform 4, is sent into its vehicle by intelligence control system and is corresponded to
Vehicle parking space 10.During pick-up, control automobile lifting platform 4 that vehicle is moved into automobile lifting platform 4 by intelligence control system
Afterwards, by vertical passageway 2, vehicle is risen into landing 7, driver drives to leave away along pick-up route 6;
Bicycle hoistable platform 8 can extend and retract as needed, and when parking bicycle, cycling reaches by bicycle parking route 5
Landing 7 stops, after driver has stopped car and walked out landing 7, by intelligence control system, by bicycle hoistable platform
Vehicle on landing 7 is transferred to bicycle hoistable platform 8 by 8 stretchings, and bicycle hoistable platform 8 is shunk vehicle afterwards
Vertical passageway 2 is moved to, and vehicle is down to required parking tier by bicycle hoistable platform 8, its vehicle is given by intelligence control system
Enter corresponding parking stall.During pick-up, control bicycle hoistable platform 8 that vehicle is moved into bicycle lifting by intelligence control system and put down
After platform 8, by vertical passageway 2, vehicle is risen into landing 7, driver drives to leave away along pick-up route 6.
Described above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should
It is considered as protection scope of the present invention.
Claims (8)
1. intelligent parking garage is circularly descended, including garage outer wall(1), vertical passageway(2), automatic lifting unit(3), bicycle parking route
(5), pick-up route(6), landing(7), garage bottom(15), it is characterised in that:The car for circularly descending intelligent parking garage
Storehouse outer wall(1)The outermost layer for circularly descending intelligent parking garage is wrapped in, circularly descends the first floor of intelligent parking garage to be provided with
Landing(7), landing(7)Respectively with bicycle parking route(5)With pick-up route(6)It is connected, and bicycle parking route(5)And pick-up
Route(6)It is separated;Automatic lifting unit(3)In vertical passageway(2)It is interior, garage bottom(15)It is circularly to descend intelligent parking garage
Orlop, with garage outer wall(1)It is connected.
2. according to claim 1 circularly descend intelligent parking garage, it is characterised in that:Described garage outer wall(1)It is horizontal
Cross section is circular, garage outer wall(1)By Double Layer Circular steel plate(1-1)It is made, Double Layer Circular steel plate(1-1)Two-layered steel plates it
Between by steel cross rib(21) it is connected, Double Layer Circular steel plate(1-1)Inside filling water-proof concrete(1-2);Described circle is double
Layer steel plate(1-1)Split along height, Double Layer Circular steel plate(1-1)The specific number of plies according to engineering it is actual determine;Between levels
Double Layer Circular steel plate(1-1)Strangled by connecting(1-1-3)Connection;Every layer of Double Layer Circular steel plate(1-1)It is divided into 8 pieces, with layer phase
Two blocks of adjacent Double Layer Circular steel plates(1-1)Between the joinery and its construction that is set by steel plate both ends(1-1-4)Connection;Garage bottom(15)
Double Layer Circular steel plate(1-1)It is arranged to cutting shoe layer(1-1-1), the Double Layer Circular steel plate of remainder layer(1-1)It is arranged to index bed
(1-1-2);Described Double Layer Circular steel plate(1-1)Using prefabrication, described water-proof concrete(1-2)For cast in situs.
3. according to claim 1 circularly descend intelligent parking garage, it is characterised in that:Described landing(7)Including
Four parking of automobile platforms(7-1)With two bicycle parking platforms(7-2).
4. according to claim 1 circularly descend intelligent parking garage, it is characterised in that:Described automatic lifting unit(3)
It is upper to be provided with automobile lifting platform(4)With bicycle hoistable platform(8), described automobile lifting platform(4)Lifted with bicycle
Platform(8)Can 360 ° of automatic rotations and can be in vertical passageway(2)Inside do the translation on different height, automobile lifting platform(4)
Quantity is four, bicycle hoistable platform(8)Quantity is two.
5. according to claim 1 circularly descend intelligent parking garage, it is characterised in that:Described circularly descends intelligent parking
The storehouse first floor sets several vehicle parking spaces(10), every layer is provided with several vehicle parking spaces in index bed and bottom(10)With
Three bicycle parking positions (9), each bicycle parking position (9) can park some bicycles;Adjacent automobile stops two-by-two
Parking stall(10)Steel column I is set between bicycle parking position (9)(11), steel column II(12)Each one, close to garage outer wall(1)'s
Side is steel column I(11), close to vertical passageway(2)Side be steel column II(12), steel column I(11)With steel column II(12)Pass through up and down
It is logical, adjacent two steel column I(11)Between pass through steel stupefied I(13)Connection, adjacent two steel column II(12)Between pass through steel stupefied I(13)Even
Connect, steel column I(11)With steel column II(12)Between pass through steel stupefied II(14)It is connected, described landing(7)It is arranged on steel
Stupefied I(13)Top.
6. a kind of intelligent parking garage is circularly descended according to claim 5, it is characterised in that:The vehicle parking space(10)
Quantity set according to actual conditions.
7. a kind of intelligent parking garage is circularly descended according to claim 5, it is characterised in that:It is described circularly to descend Intelligent stop
The bicycle parking position in garage(9)And vehicle parking space(10)Charging pile can be arranged as required to(16), each bicycle parking
Position(9)And vehicle parking space(10)On spray equipment is all set(17).
8. a kind of intelligent parking garage is circularly descended according to claim 1, it is characterised in that:Circularly descend intelligent parking garage
Inner surface setting has drainage system(19)With ventilating system (20), garage bottom(15)Along garage outer wall(1)It is provided with gutter
(18), it is inclined plane circularly to descend intelligent parking garage ground floor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710994312.2A CN107605195A (en) | 2017-10-23 | 2017-10-23 | Circularly descend intelligent parking garage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710994312.2A CN107605195A (en) | 2017-10-23 | 2017-10-23 | Circularly descend intelligent parking garage |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107605195A true CN107605195A (en) | 2018-01-19 |
Family
ID=61079240
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710994312.2A Withdrawn CN107605195A (en) | 2017-10-23 | 2017-10-23 | Circularly descend intelligent parking garage |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107605195A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110616933A (en) * | 2019-10-23 | 2019-12-27 | 张率 | Underground parking lot with assembled immersed tube vertical shaft and radiation type jacking tubes and construction method thereof |
CN114592730A (en) * | 2021-10-25 | 2022-06-07 | 全焜 | Intelligent parking garage under highway |
CN114592731A (en) * | 2021-10-25 | 2022-06-07 | 全焜 | Peacetime and war time combined underground garage |
CN115478722A (en) * | 2021-06-15 | 2022-12-16 | 蔡绍利 | Circulating double-deck bus parking storehouse |
-
2017
- 2017-10-23 CN CN201710994312.2A patent/CN107605195A/en not_active Withdrawn
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110616933A (en) * | 2019-10-23 | 2019-12-27 | 张率 | Underground parking lot with assembled immersed tube vertical shaft and radiation type jacking tubes and construction method thereof |
CN115478722A (en) * | 2021-06-15 | 2022-12-16 | 蔡绍利 | Circulating double-deck bus parking storehouse |
CN114592730A (en) * | 2021-10-25 | 2022-06-07 | 全焜 | Intelligent parking garage under highway |
CN114592731A (en) * | 2021-10-25 | 2022-06-07 | 全焜 | Peacetime and war time combined underground garage |
WO2023071201A1 (en) * | 2021-10-25 | 2023-05-04 | 全焜 | Intelligent parking garage under highway |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107605195A (en) | Circularly descend intelligent parking garage | |
WO2008009189A1 (en) | A land saving and energy saving, unblocked ecological urban system with ordered space | |
CN203783216U (en) | Overpass-type planar-movement spatial parking garage | |
CN205382741U (en) | Automatic change six to removing stereo garage | |
WO2014071543A1 (en) | Municipal crossroads structure | |
CN106869549A (en) | Eccentric screw formula sky parking and its underground construction method | |
CN105735088A (en) | Pavement brick and pavement | |
CN105386623A (en) | Multistory parking garage for urban minor roads | |
CN207944757U (en) | A kind of underground public transport field garage parking | |
CN208518403U (en) | Circularly descend intelligent parking garage | |
CN102182336B (en) | Underground garage | |
CN106677207A (en) | Staggered type underground traffic pipe gallery car entrance and exit structure | |
CN204356602U (en) | A kind of intersection constructed parking garage structure | |
CN202081674U (en) | Stereoscopic maintenance-free light steel structure parking garage | |
CN206681443U (en) | Eccentric screw formula sky parking | |
CN114592730A (en) | Intelligent parking garage under highway | |
CN114277843A (en) | Underground passage structure and construction method | |
CN205677320U (en) | A kind of underground height piles up multi-layer intelligent fully automatic stereo-parking garage | |
CN210564546U (en) | Highway double-deck shield tunnel section structure | |
CN205206425U (en) | City minor road sky parking field | |
CN206090618U (en) | Semi -underground flood control utility tunnel | |
CN212641171U (en) | Road surface parking bridge | |
CN206769493U (en) | Underground rotating type stereo carport | |
CN102127984B (en) | Underground garage | |
CN204960433U (en) | Intersection stereo garage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180119 |
|
WW01 | Invention patent application withdrawn after publication |