CN107599158A - A kind of process for prestressed component two directions tension - Google Patents
A kind of process for prestressed component two directions tension Download PDFInfo
- Publication number
- CN107599158A CN107599158A CN201710881021.2A CN201710881021A CN107599158A CN 107599158 A CN107599158 A CN 107599158A CN 201710881021 A CN201710881021 A CN 201710881021A CN 107599158 A CN107599158 A CN 107599158A
- Authority
- CN
- China
- Prior art keywords
- tension
- mould
- ground tackle
- reinforcing bar
- prestressed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
A kind of process for prestressed component two directions tension, 1:Make prestressed component be deposited in mould, tension ground tackle is being placed at a certain distance from die nose portion;2:Barricade is set between tension ground tackle and mould, and barricade is respectively arranged on the second reinforcing bar both sides;3:Make the first reinforcing bar pass through through hole, and pass through connection component and the second bar connecting;4:Lock sleeve is inserted on the first reinforcing bar, lock sleeve is located at the outside through hole of tension ground tackle;5:Make mould rearward end identical with die nose portion arrangement, using stretching machine, make mould front and back ends while carry out tensioning.The present invention sets up fixed barricade and tension ground tackle using both mold ends, and prestressed stress is shared on the tension ground tackle and barricade at both ends, mould is undertaken prestressing force;Simultaneously for the larger situation of prestressing force, when applying prestressing force to reinforcing bar, both ends can be achieved and operate prestressed application simultaneously, both ends carry out prestressed stretch-draw simultaneously, can save the time of the tension process of half.
Description
Technical field
The present invention relates to a kind of process for prestressed component two directions tension, belong to technical field of civil engineering.
Background technology
At present, prestressed component is widely used in fields such as highway bridge, railroad bridge, side slope antiskids.In advance
Prestressed concrete is to make up the phenomenon that crack occurs too early in concrete, before component use, gives concrete one in advance
Precompression, i.e., in the tensile region of concrete, reinforcing bar is carried out tensioning by the method that manually reinforces, using the retraction force of reinforcing bar,
Concrete in tension area is set to be stressed in advance, this precharge pressure stored, when component bears to produce pulling force by external load,
The precompression in concrete in tension zone is offset first, is then increased with load, is just made concrete in tension, which limits concrete
Elongation, delay or avoid the appearance in crack, this is just called prestressed concrete.
The production in enormous quantities of scale is done step-by-step in the production of prefabricated components, and the span of mould increases, and is realizing prestressing force
When application, occur prestressing force it is larger in the case of, easily make it that die deformation and prestress application are difficult, traditional prestressing force
Tensioning on mould, mostly using mould one end carry out tensioning, also significantly limit the efficiency of production.
It is therefore desirable to invent a kind of method for stretching of new prestressed component to solve the above problems.
The content of the invention
The present invention difficult caused by prestress application, have found for prestressed component and a kind of be used for prestressed component
The process of two directions tension.
To reach above-mentioned purpose, the technical solution adopted by the present invention is:A kind of work for prestressed component two directions tension
Process, including the stretching machine provided with pressure gauge, lock sleeve, mould, the first steel of tensioning for placing the prestressed component
Second reinforcing bar of muscle and the prestressed component, in addition to tension ground tackle and connection component;The tension ground tackle is included by preceding
Plate, back plate, upper plate, lower plate, the casing of left plate and right panel composition, the upper plate and the lower plate be symmetrical arranged, the left plate and
The right panel is symmetrical arranged;The foreboard is provided with through hole corresponding with second reinforcing bar, and the back plate and the foreboard are symmetrical
Set;The connection component includes the first sleeve, second sleeve and locking stud, and first sleeve, second sleeve inside are
Provided with screw thread, the locking stud both ends are connected with first sleeve, second sleeve respectively;
The process of the two directions tension concretely comprises the following steps:
Step 1:Make the prestressed component be deposited in the mould, placed at a certain distance from the die nose portion
The tension ground tackle, the through hole of the tension ground tackle are corresponding with second reinforcement location;
Step 2:Barricade is set between the tension ground tackle and the mould, and the barricade is respectively arranged on second reinforcing bar two
Side, the tension ground tackle are fixedly installed with the barricade;
Step 3:Make first reinforcing bar pass through the through hole, and pass through the connection component and second bar connecting;
Step 4:The lock sleeve is inserted on first reinforcing bar, the lock sleeve is located at the outer side through hole of the tension ground tackle
Place;
Step 5:Make the mould rearward end identical with die nose portion arrangement, using stretching machine, make the mould forward and backward
End carries out tensioning simultaneously, and stretching mode is single tendon stretch.
Preferably technical scheme is:The mould ends are 3-5m with tension ground tackle distance.
Preferably technical scheme is:The mould ends are 1-2m with barricade distance.
Preferably technical scheme is:The material of the barricade is concrete.
Preferably technical scheme is:The material of the tension ground tackle is thickness 10-30mm steel plate.
Because above-mentioned technical proposal is used, the present invention this have the advantage that compared with prior art:
The present invention sets up fixed barricade and tension ground tackle using both mold ends, and prestressed stress is shared into the tensioning anchor at both ends
On tool and barricade, mould is not set to undertake prestressing force;The larger situation of prestressing force is directed to simultaneously, when applying prestressing force to reinforcing bar, this
Invention can be achieved both ends and operate prestressed, reinforced application simultaneously, and both ends carry out prestressed stretch-draw simultaneously, can save of half
Draw the time of process.
Brief description of the drawings
Fig. 1 is two directions tension process schematic perspective view.
Fig. 2 is tension ground tackle schematic perspective view.
Fig. 3 is connection component schematic perspective view.
In the figures above, prestressed component 1, stretching machine 2, lock sleeve 3, mould 4, the first reinforcing bar 5, the second reinforcing bar 6, tensioning
Anchorage 7, connection component 8, through hole 9, the first sleeve 10, second sleeve 11, lock stud 12, barricade 13.
Embodiment
Embodiments of the present invention are illustrated by particular specific embodiment below, those skilled in the art can be by this explanation
Content disclosed by book understands other advantages and effect of the present invention easily.
Refer to Fig. 1 ~ Fig. 3.It should be clear that in the description of the invention, it is necessary to explanation, term " " center ", " on ",
" under ", "left", "right", " vertical ", " level ", " interior ", the orientation of the instruction such as " outer " or position relationship be based on shown in the drawings
Orientation or position relationship, or the invention product using when the orientation usually put or position relationship, be for only for ease of and retouch
State the present invention and simplify description, rather than indicate or imply that signified device or element there must be specific orientation, with specific
Azimuth configuration and operation, therefore be not considered as limiting the invention.In addition, term " first ", " second ", " the 3rd " etc.
It is only used for distinguishing description, and it is not intended that instruction or hint relative importance.The art such as term " level ", " vertical ", " pendency "
Language is not offered as requiring part abswolute level or pendency, but can be slightly tilted.As " level " only refers to that its direction is relative
It is more horizontal for " vertical ", it is not to represent that the structure must be fully horizontal, but can be slightly tilted.
In the description of the invention, it is also necessary to explanation, unless otherwise clearly defined and limited, term " setting ",
" installation ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or one
Connect body, can be mechanical connection or electrical connection, can be joined directly together, can also be indirect by intermediary
It is connected, can is the connection of two element internals.For the ordinary skill in the art, on being understood with concrete condition
State the concrete meaning of term in the present invention.
As shown in Fig. 1 ~ Fig. 3, a kind of process for prestressed component two directions tension, including provided with pressure gauge
Stretching machine 2, lock sleeve 3, place the mould 4 of prestressed component 1, the first reinforcing bar 5 of tensioning and prestressed component 1 second
Reinforcing bar 6, in addition to tension ground tackle 7 and connection component 8;Tension ground tackle 7 is included by foreboard, back plate, upper plate, lower plate, left plate and the right side
The casing of plate composition, upper plate and lower plate are symmetrical arranged, and left plate and right panel are symmetrical arranged;Foreboard is provided with corresponding with the second reinforcing bar 6
Through hole 9, back plate is symmetrical arranged with foreboard;Connection component 8 includes the first sleeve 10, second sleeve 11 and locks stud 12, and first
Screw thread is equipped with inside sleeve 10, second sleeve 11, locking stud 12 both ends connect with the first sleeve 10, second sleeve 11 respectively
Connect;
The process of two directions tension concretely comprises the following steps:
Step 1:Make prestressed component 1 be deposited in mould 4, tension ground tackle is being placed at a certain distance from the leading section of mould 4
7, the position correspondence of 9 and second reinforcing bar of through hole 6 of tension ground tackle 7;Avoid and tensioning directly carried out on mould 4, prestressing force compared with
In the case of big, it can prevent mould 4 from deforming.
Step 2:Barricade 13 is set between tension ground tackle 7 and mould 4, barricade 13 is respectively arranged on the both sides of the second reinforcing bar 6,
Anchorage 7 is drawn to be fixedly installed with barricade 13;Fixed barricade 13 and tension ground tackle 7 are set up using the both ends of mould 4, by prestressed stress
Share on the tension ground tackle 7 and barricade 13 at both ends, mould 4 is undertaken prestressing force, in the case where prestressing force is larger, avoid
The deformation of mould 4.
Step 3:Make the first reinforcing bar 5 pass through through hole 9, and be connected by connection component 8 with the second reinforcing bar 6;The end of first reinforcing bar 5
Portion is fixed on inside the first sleeve 10 after being inserted in the first sleeve 10, and the end of the second reinforcing bar 6 is fixed on after being inserted in second sleeve 11
Inside two sleeves 11, then the first sleeve 10 and second sleeve 11 are screwed and locking the both ends of stud 12, screwed up with a wrench.
Step 4:Lock sleeve 3 is inserted on the first reinforcing bar 5, lock sleeve 3 is at the outer side through hole 9 of tension ground tackle 7;Opening
During drawing, lock sleeve 3 can play the function of preventing that the first reinforcing bar 5 from bouncing back, and improve operating efficiency.
Step 5:Make the rearward end of mould 4 identical with the leading section arrangement of mould 4, using stretching machine 2, make the front and back ends of mould 4 same
Shi Jinhang tensioning, stretching mode are single tendon stretch.Both ends can be achieved and operate prestressed, reinforced application simultaneously, both ends are carried out simultaneously
Prestressed stretch-draw, the time of the tension process of half can be saved.
Preferred embodiment is:The end of mould 4 and tension ground tackle 7 are apart from for 3m.The distance is stayed to the arrangement of barricade 13
Enough positions, have also stayed operating space to staff, and the use length of the first reinforcing bar 5 can also intercept in right amount, save material
Do not cause to waste.
Preferred embodiment is:The end of mould 4 and barricade 13 are apart from for 1m.1m is stayed between the end of mould 4 and barricade 13
Distance be convenient to operation personnel disengaging, without entrance of climbing over the walls;The use length of first reinforcing bar 5 can also intercept in right amount, save material
Do not cause to waste.
Preferred embodiment is:The material of barricade 13 is concrete.Using concrete material, compression strength is high, compared with
When high-prestressed application, the active force that tension ground tackle 7 is given can be also sustained, it is applied widely.
Preferred embodiment is:The material of tension ground tackle 7 is thickness 20mm steel plate.Using thicker steel plate manufacture
Anchorage 7 is drawn, is unlikely to deform, service life length, in production, typically fixed case is placed, is easy to practical operation to use.
The above embodiments merely illustrate the technical concept and features of the present invention, and its object is to allow person skilled in the art
Scholar can understand present disclosure and implement according to this, and it is not intended to limit the scope of the present invention.It is all according to the present invention
The equivalent change or modification that Spirit Essence is made, it should all be included within the scope of the present invention.
Claims (5)
1. a kind of process for prestressed component two directions tension, including the stretching machine provided with pressure gauge, lock sleeve, placement
Second reinforcing bar of the mould of the prestressed component, the first reinforcing bar of tensioning and the prestressed component, it is characterised in that:
Also include tension ground tackle and connection component;The tension ground tackle includes being made up of foreboard, back plate, upper plate, lower plate, left plate and right panel
Casing, the upper plate and the lower plate be symmetrical arranged, and the left plate and the right panel are symmetrical arranged;The foreboard is provided with and institute
Through hole corresponding to the second reinforcing bar is stated, the back plate is symmetrical arranged with the foreboard;The connection component includes the first sleeve, second
Sleeve and locking stud, are equipped with screw thread inside first sleeve, second sleeve, the locking stud both ends respectively with it is described
First sleeve, second sleeve connection;
The process of the two directions tension concretely comprises the following steps:
Step 1:Make the prestressed component be deposited in the mould, placed at a certain distance from the die nose portion
The tension ground tackle, the through hole of the tension ground tackle are corresponding with second reinforcement location;
Step 2:Barricade is set between the tension ground tackle and the mould, and the barricade is respectively arranged on second reinforcing bar two
Side, the tension ground tackle are fixedly installed with the barricade;
Step 3:Make first reinforcing bar pass through the through hole, and pass through the connection component and second bar connecting;
Step 4:The lock sleeve is inserted on first reinforcing bar, the lock sleeve is located at the outer side through hole of the tension ground tackle
Place;
Step 5:Make the mould rearward end identical with die nose portion arrangement, using stretching machine, make the mould forward and backward
End carries out tensioning simultaneously, and stretching mode is single tendon stretch.
2. the process according to claim 1 for prestressed component two directions tension, it is characterised in that:The mould
End is 3-5m with tension ground tackle distance.
3. the process according to claim 1 for prestressed component two directions tension, it is characterised in that:The mould
End is 1-2m with barricade distance.
4. the process according to claim 1 for prestressed component two directions tension, it is characterised in that:The barricade
Material be concrete.
5. the process according to claim 1 for prestressed component two directions tension, it is characterised in that:The tensioning
The material of anchorage is thickness 10-30mm steel plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710881021.2A CN107599158A (en) | 2017-09-26 | 2017-09-26 | A kind of process for prestressed component two directions tension |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710881021.2A CN107599158A (en) | 2017-09-26 | 2017-09-26 | A kind of process for prestressed component two directions tension |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107599158A true CN107599158A (en) | 2018-01-19 |
Family
ID=61058558
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710881021.2A Pending CN107599158A (en) | 2017-09-26 | 2017-09-26 | A kind of process for prestressed component two directions tension |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107599158A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109397523A (en) * | 2018-12-25 | 2019-03-01 | 郴州远大住宅工业有限公司 | A kind of deformed bar tensioning tooling and its application method |
CN110565546A (en) * | 2019-09-09 | 2019-12-13 | 长沙理工大学 | Detachable device for assembling prestress for bridge structure and reinforcing method |
CN113290692A (en) * | 2021-07-02 | 2021-08-24 | 中交一公局第二工程有限公司 | Simple tensioning method for prefabricated part steel bar |
CN110565546B (en) * | 2019-09-09 | 2024-04-16 | 长沙理工大学 | Detachable device for assembling prestress for bridge structure and reinforcing method |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19907781A1 (en) * | 1999-02-24 | 2000-08-31 | Dennert Kg Veit | Molding box has flat hollow base, lengthwise and transverse walls, tension bars and nuts on threaded ends of tie rods. |
JP2001310318A (en) * | 2000-04-27 | 2001-11-06 | Nippon Ps:Kk | Mobile type pretensioning machine |
CN2777121Y (en) * | 2005-02-22 | 2006-05-03 | 刘大康 | Prestressed double T plate steel wire tension device |
JP2007245508A (en) * | 2006-03-15 | 2007-09-27 | Kajima Corp | Method for producing pretension member |
JP2008126544A (en) * | 2006-11-21 | 2008-06-05 | Oriental Shiraishi Corp | Prestress introduction method and prestressed concrete member by pretension method |
CN102785290A (en) * | 2011-05-19 | 2012-11-21 | 中铁二十三局集团轨道交通工程有限公司 | Core-penetrating pull-type pedestal for pre-tensioned pre-stressing U-shaped beam and construction method thereof |
CN102953378A (en) * | 2012-12-06 | 2013-03-06 | 中铁四局集团有限公司 | Single-hole and double-beam prestressed anchor tensioning device |
CN103448142A (en) * | 2013-08-29 | 2013-12-18 | 俞晓东 | Supporting pile tensioning device |
CN104070603A (en) * | 2014-05-30 | 2014-10-01 | 江苏固丰管桩集团有限公司 | Tensioning assembly for producing prestressed concrete pile without end plate |
CN205291219U (en) * | 2015-12-23 | 2016-06-08 | 建华建材(江西)有限公司 | Reinforced concrete mould |
CN205521921U (en) * | 2016-02-25 | 2016-08-31 | 上海大禺预制构件有限公司 | Whole straining means |
-
2017
- 2017-09-26 CN CN201710881021.2A patent/CN107599158A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19907781A1 (en) * | 1999-02-24 | 2000-08-31 | Dennert Kg Veit | Molding box has flat hollow base, lengthwise and transverse walls, tension bars and nuts on threaded ends of tie rods. |
JP2001310318A (en) * | 2000-04-27 | 2001-11-06 | Nippon Ps:Kk | Mobile type pretensioning machine |
CN2777121Y (en) * | 2005-02-22 | 2006-05-03 | 刘大康 | Prestressed double T plate steel wire tension device |
JP2007245508A (en) * | 2006-03-15 | 2007-09-27 | Kajima Corp | Method for producing pretension member |
JP2008126544A (en) * | 2006-11-21 | 2008-06-05 | Oriental Shiraishi Corp | Prestress introduction method and prestressed concrete member by pretension method |
CN102785290A (en) * | 2011-05-19 | 2012-11-21 | 中铁二十三局集团轨道交通工程有限公司 | Core-penetrating pull-type pedestal for pre-tensioned pre-stressing U-shaped beam and construction method thereof |
CN102953378A (en) * | 2012-12-06 | 2013-03-06 | 中铁四局集团有限公司 | Single-hole and double-beam prestressed anchor tensioning device |
CN103448142A (en) * | 2013-08-29 | 2013-12-18 | 俞晓东 | Supporting pile tensioning device |
CN104070603A (en) * | 2014-05-30 | 2014-10-01 | 江苏固丰管桩集团有限公司 | Tensioning assembly for producing prestressed concrete pile without end plate |
CN205291219U (en) * | 2015-12-23 | 2016-06-08 | 建华建材(江西)有限公司 | Reinforced concrete mould |
CN205521921U (en) * | 2016-02-25 | 2016-08-31 | 上海大禺预制构件有限公司 | Whole straining means |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109397523A (en) * | 2018-12-25 | 2019-03-01 | 郴州远大住宅工业有限公司 | A kind of deformed bar tensioning tooling and its application method |
CN110565546A (en) * | 2019-09-09 | 2019-12-13 | 长沙理工大学 | Detachable device for assembling prestress for bridge structure and reinforcing method |
CN110565546B (en) * | 2019-09-09 | 2024-04-16 | 长沙理工大学 | Detachable device for assembling prestress for bridge structure and reinforcing method |
CN113290692A (en) * | 2021-07-02 | 2021-08-24 | 中交一公局第二工程有限公司 | Simple tensioning method for prefabricated part steel bar |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207862749U (en) | A kind of novel combination type sunpender | |
CN103628477B (en) | A kind of prestressing force charger for glass fiber-reinforced polymer anchor pole | |
CN109750791A (en) | A kind of assembled large overhanging steel structure | |
CN104533018A (en) | Prestress tensioning anchorage device for FRP (Fiber Reinforce Plastic) ribs | |
CN108487070A (en) | A kind of construction method of the double-deck interim prestressed tie bar of steel truss arch | |
CN107599158A (en) | A kind of process for prestressed component two directions tension | |
CN102561210B (en) | Carbon fiber bar in-vitro prestressed tensioning device and using method thereof | |
CN108678225A (en) | The built-in steel plate combined shear wall of built-in presstressed reinforcing steel steel pipe concrete frame and the practice | |
CN102505806B (en) | Connection device special for prestressed reinforcement with screw thread at end head | |
CN111663447A (en) | Prestressed bending and anchoring device for pre-tensioning precast beam plate and construction method | |
KR101251118B1 (en) | A manufacturing method of a composite steel box girder using prestressed concrete for a positive moment area of a bridge | |
CN202370175U (en) | Special connecting device for prestressed reinforcements with screw threads at ends | |
CN105666688B (en) | A kind of prefabricated pile, pile body and production method | |
CN110469140A (en) | A kind of construction method of Vierendeel girder prestressed reinforcement | |
CN103061513B (en) | A kind of reinforcing steel bar machinery anchoring process | |
CN204960340U (en) | Full -prestressed stretch -draw sleeve -board spare | |
CN210636685U (en) | Steel bar connecting structure of precast concrete beam and precast concrete vertical component | |
CN210858003U (en) | Aluminum alloy template beam with buckle device | |
CN208803704U (en) | A kind of capping beam template structure | |
CN203320428U (en) | Novel reinforcing device of reinforced concrete bridge and bridge deck | |
CN203393615U (en) | Plug pin type steel strand stopping device | |
CN203160543U (en) | Arc-surface carbon-fiber board clamping piece | |
CN201597115U (en) | Pipe pile prestressed tension device | |
CN203347245U (en) | Inner pinned limiting device for steel strand | |
CN206408542U (en) | A kind of novel in vitro prestressed reinforcement device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180119 |
|
RJ01 | Rejection of invention patent application after publication |