CN107587850A - Completion guide shoe - Google Patents

Completion guide shoe Download PDF

Info

Publication number
CN107587850A
CN107587850A CN201710958442.0A CN201710958442A CN107587850A CN 107587850 A CN107587850 A CN 107587850A CN 201710958442 A CN201710958442 A CN 201710958442A CN 107587850 A CN107587850 A CN 107587850A
Authority
CN
China
Prior art keywords
guide
joint
guide rod
head
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710958442.0A
Other languages
Chinese (zh)
Inventor
杨红亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Shengxin Huarui Petroleum Technology Co Ltd
Original Assignee
Tianjin Shengxin Huarui Petroleum Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Shengxin Huarui Petroleum Technology Co Ltd filed Critical Tianjin Shengxin Huarui Petroleum Technology Co Ltd
Priority to CN201710958442.0A priority Critical patent/CN107587850A/en
Publication of CN107587850A publication Critical patent/CN107587850A/en
Pending legal-status Critical Current

Links

Abstract

The present invention discloses completion guide shoe, including joint, the joint has internal thread, and the upper thread segment of the internal thread is used to be connected with flow string and lower thread segment connection guide rod, and the guide rod is connected with joint screw thread and the steady pin by being set radially across the joint is locked with joint;The pushing or above carrying by flow string when down tube is hampered, the guide head can be turned an angle to avoid obstruction by guide finger along the guide groove on the guide rod;The guide finger is radially arranged and is connected the guide rod with guide head;The top of the guide head is threadedly coupled gland, and spring is housed between the gland, joint on the guide rod.The present invention can be realized by pushing or above carry flow string and rotated when meeting and hindering to avoid obstacle by guide head, can thus make flow string is completely lower to arrive design attitude.

Description

Completion guide shoe
Technical field
The present invention relates to completion guide shoe technical field, and in particular to completion guide shoe.
Background technology
With the development of World Economics, the demand of the energy is increasingly increased, oil as the energy major consumers product to generation Boundary's expanding economy plays vital effect, and after 20th century, oil and gas extraction are with consuming significantly Increase, and with annual 200000000 tons of speed sustainable growth.Under this historical background, extended reach well, horizontal well and high angle hole are to produce High, extra large oil circuit is measured to adopt and the features such as oil reservoir exposed area is big, be now widely used in ocean stone gas field development, old filed stable yields and In low permeability oil and gas field exploitation.
In Completion Operations, flow string need to meet following basic principle:1. meet safety requirements;2. meet normal production Technological requirement;3. meet production test and well stimulation requirement;4. it is simple in construction, construction is easy etc..Conventional flow string most bottom End can connect a conventional guide shoe, it is impossible to freely activity;, often can be because of when arriving High angle section or horizontal segment under flow string Frictional resistance or step cause it is not in place under flow string so that completion period extend, increase completion cost etc..Therefore, solve Extended reach well, horizontal well and high angle hole High angle section and horizontal segment make because not in place under flow string caused by frictional resistance or step Completion period extend, increase completion cost the problem of, turn into the problem of to be solved.
The content of the invention
In view of the technical drawbacks of the prior art, it is an object of the present invention to provide completion guide shoe.
Technical scheme is used by realize the purpose of the present invention:
Completion guide shoe, including joint, the joint have internal thread, and the upper thread segment of the internal thread is used for and production Tubing string connects and lower thread segment connection guide rod, and the guide rod is connected with joint screw thread and by being set radially across the joint Steady pin and joint lock;The bottom of the guide rod is arranged in hollow guide head moving up and down;Met in down tube Pushing or above carrying by flow string during resistance, the guide head can be rotated by guide finger along the guide groove on the guide rod Certain angle is to avoid obstruction;The guide finger is radially arranged and is connected the guide rod with guide head;The guide head Top threaded connection gland, spring is housed between the gland, joint on the guide rod.
Guide pin hole is offered on the barrel of the guide head, the guide finger is arranged in guide pin hole and led with described Formed and be slidably connected to groove.
The outside of the guide pin hole is provided with jump ring with the fixation guide finger by jump-ring slot.
The guide rod is hollow tubular structure, and the gland center has centre bore, and the gland passes through center borehole jack It is threadedly coupled after on the guide rod with the guide head to prevent the guide rod from departing from guide head.
The inside of the guide head has limited step hole or shoulder hole, and the guide rod is correspondingly formed adaptable rank Terraced rod-like structure, with to guide head move up and down stroke carry out it is spacing.
The present invention can run into barrier in lower flow string by above technical scheme by pushing flow string and realizing When hindering by guide head rotate an angle to avoid obstacle, push and by rotate also can not avoid the obstacle when, can on Flow string is carried, guide head is rotated further by an angle, so operates repeatedly, until the success of guide head obstacle detouring, can thus make Flow string is completely lower to arrive design attitude.
Brief description of the drawings
Fig. 1 is the structural representation of completion guide shoe;
Fig. 2 is section expanded schematic diagram of the guide rod along line A-A;
In figure:1. internal thread, 2. joints, 3. steady pins, 4. guide rods, 5. springs, 6. glands, 7. guide fingers, 8. jump rings, 9. guide head.
Embodiment
The present invention is described in further detail below in conjunction with the drawings and specific embodiments.It is it should be appreciated that described herein Specific embodiment only to explain the present invention, be not intended to limit the present invention.
Referring to shown in Fig. 1-2, completion guide shoe, including joint 2, the joint has an internal thread 1, the internal thread it is upper Thread segment is used to be connected with flow string and lower thread segment connection guide rod 4, and the guide rod is connected with joint screw thread and by footpath Locked to the steady pin 3 set through the joint and joint;The bottom of the guide rod 4 is arranged on hollow move up and down Guide head 9 in;When down tube is hampered, is often pushed or above carried once by flow string, the guide head 9 can pass through guide finger 7, along the guide groove 41 (as shown in Figure 2) on the guide rod 4, rotate certain angle to avoid obstruction;The guiding Pin 7 is radially arranged, and the guide rod 4 is connected with guide head 9;The top threaded connection gland 6 of the guide head 9, it is described Spring 5 is housed on guide rod 4 between the gland 6, joint 2.
Wherein, the steady pin can prevent the joint and the guide rod back-off.
As shown in Fig. 2 in the present invention, described guide groove 41 is set, as shown in Fig. 2 leading on the outer wall of the guide rod 4 There is the vertically-guided portion with the diameter parallel of guide rod to groove 41, and guiding is folded to what the vertically-guided portion communicated Portion, vertically-guided portion and is folded on the outside of guide part and is respectively provided with arc-shaped limit portion 42, is folded to the arc-shaped limit portion connection of guide part Formation is folded to mobile tilt guides, including upper tilt guides, lower tilt guides, communicates between them, so as to realize The function of guiding is folded to, so as to so that guide finger 7 moves in the mobile route that it is limited, the direction of arrow as shown in Figure 2 Move so that the guide head of connection rotates together.
Wherein, offer guide pin hole on the barrel of the guide head, the guide finger be arranged in guide pin hole and with The guide groove is formed and is slidably connected.
Wherein, the outside of the guide pin hole is provided with jump ring 8 by jump-ring slot and used with the fixation guide finger, the jump ring Come off in preventing that guide finger from releasing.
Wherein, the guide rod 4 is hollow tubular structure, and the gland center 6 has centre bore, and the gland is in Heart hole, after being enclosed on the guide rod, it is threadedly coupled with the guide head 9, to prevent the guide rod from departing from guide head.
Wherein, the inside of the guide head has limited step hole or shoulder hole, and being correspondingly formed for the guide rod is mutually fitted The ladder rod-like structure answered, with to guide head move up and down stroke carry out it is spacing.
When meeting card because pit shaft is unclean to High angle section and waterpower section under flow string, continue to push flow string, lead It can be moved to head with the mobile route that the guide groove of guide finger on the guide bar limits, while compression spring, by In guide groove specific path set, and cause guide head rotate an angle, if success obstacle detouring, flow string may proceed to Preceding movement;If unsuccessful, then upper lifting pipe post, spring reset so that guide head can rotate an angle again, again obstacle detouring;Just So push repeatedly, upper lifting pipe post;Often push, above carry a tubing string, guide head just rotates an angle, until guide head obstacle detouring Success, flow string is completely lower to arrive design attitude.
Lamps structure principle of the present invention is simple, easy to operate;Meet card and obstacle detouring can be achieved by the rotation of guide head;Can solve big Displacement well, horizontal well and high angle hole High angle section and horizontal segment are because not in place under flow string caused by frictional resistance or step so that Completion period extend, increase completion cost the problem of.
The present invention can run into barrier in lower flow string by above technical scheme by pushing flow string and realizing An angle is rotated to avoid obstacle by guide head when hindering, when the obstacle can not be avoided, flow string is above carried, makes guide head An angle is rotated further by, so repeatedly until the success of guide head obstacle detouring, can thus make flow string is completely lower to arrive design attitude.
Described above is only the preferred embodiment of the present invention, it is noted that for the common skill of the art For art personnel, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications Also it should be regarded as protection scope of the present invention.

Claims (5)

1. completion guide shoe, it is characterised in that including joint, the joint has internal thread, the upper thread segment of the internal thread For being connected with flow string and lower thread segment connection guide rod, the guide rod is connected with joint screw thread and by radially across institute The steady pin and joint for stating joint setting are locked;The bottom of the guide rod is arranged on hollow guide head moving up and down It is interior;The pushing or above carrying by flow string when down tube is hampered, the guide head can be by guide fingers along the guide rod Guide groove turn an angle to avoid obstruction;The guide finger is radially arranged and connects the guide rod and guide head Connect;The top of the guide head is threadedly coupled gland, and spring is housed between the gland, joint on the guide rod.
2. completion guide shoe according to claim 1, it is characterised in that offer guide finger on the barrel of the guide head Hole, the guide finger are arranged in guide pin hole and formed with the guide groove and be slidably connected.
3. completion guide shoe according to claim 2, it is characterised in that the outside of the guide pin hole is provided with by jump-ring slot Jump ring is with the fixation guide finger.
4. completion guide shoe according to claim 1, it is characterised in that the guide rod is hollow tubular structure, the pressure Lid center has a centre bore, the gland be threadedly coupled after being enclosed on by centre bore on the guide rod with the guide head to prevent Only the guide rod departs from guide head.
5. completion guide shoe according to claim 1, it is characterised in that the inside of the guide head have limited step hole or Shoulder hole, the guide rod are correspondingly formed adaptable ladder rod-like structure, are carried out with the stroke that moves up and down to guide head It is spacing.
CN201710958442.0A 2017-10-16 2017-10-16 Completion guide shoe Pending CN107587850A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710958442.0A CN107587850A (en) 2017-10-16 2017-10-16 Completion guide shoe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710958442.0A CN107587850A (en) 2017-10-16 2017-10-16 Completion guide shoe

Publications (1)

Publication Number Publication Date
CN107587850A true CN107587850A (en) 2018-01-16

Family

ID=61053958

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710958442.0A Pending CN107587850A (en) 2017-10-16 2017-10-16 Completion guide shoe

Country Status (1)

Country Link
CN (1) CN107587850A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020142080A1 (en) * 2018-12-31 2020-07-09 Halliburton Energy Services, Inc. Perturbation based well path reconstruction
CN113719639A (en) * 2020-05-26 2021-11-30 苏州旭创科技有限公司 Pipeline switching device

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4413682A (en) * 1982-06-07 1983-11-08 Baker Oil Tools, Inc. Method and apparatus for installing a cementing float shoe on the bottom of a well casing
CN201241620Y (en) * 2008-07-31 2009-05-20 大港油田集团有限责任公司 Rotary type fin guide head
CN201474631U (en) * 2009-08-28 2010-05-19 中国海洋石油总公司 Large-diameter guide shoe with variable guide port
CN102619481A (en) * 2012-04-13 2012-08-01 中国石油天然气集团公司 Mechanical completion string running tool
US20130000921A1 (en) * 2011-06-30 2013-01-03 Baker Hughes Incorporated Apparatus to remotely actuate valves and method thereof
CN203334978U (en) * 2013-07-03 2013-12-11 天津克睿特维科技发展有限公司 Spring type automatic reversing guiding shoe
CN203742480U (en) * 2014-01-29 2014-07-30 中国石油集团西部钻探工程有限公司 Clamping-preventing casing guide device
CN204082034U (en) * 2014-08-18 2015-01-07 中国石油集团长城钻探工程有限公司 A kind of mechanical type continuous rotation completion guide shoe
CN107227938A (en) * 2017-07-12 2017-10-03 中国石油集团西部钻探工程有限公司 Well rotary guide shoe assembly can be repaired
CN207363613U (en) * 2017-10-16 2018-05-15 天津盛鑫华瑞石油技术有限公司 Completion guide shoe

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4413682A (en) * 1982-06-07 1983-11-08 Baker Oil Tools, Inc. Method and apparatus for installing a cementing float shoe on the bottom of a well casing
CN201241620Y (en) * 2008-07-31 2009-05-20 大港油田集团有限责任公司 Rotary type fin guide head
CN201474631U (en) * 2009-08-28 2010-05-19 中国海洋石油总公司 Large-diameter guide shoe with variable guide port
US20130000921A1 (en) * 2011-06-30 2013-01-03 Baker Hughes Incorporated Apparatus to remotely actuate valves and method thereof
CN102619481A (en) * 2012-04-13 2012-08-01 中国石油天然气集团公司 Mechanical completion string running tool
CN203334978U (en) * 2013-07-03 2013-12-11 天津克睿特维科技发展有限公司 Spring type automatic reversing guiding shoe
CN203742480U (en) * 2014-01-29 2014-07-30 中国石油集团西部钻探工程有限公司 Clamping-preventing casing guide device
CN204082034U (en) * 2014-08-18 2015-01-07 中国石油集团长城钻探工程有限公司 A kind of mechanical type continuous rotation completion guide shoe
CN107227938A (en) * 2017-07-12 2017-10-03 中国石油集团西部钻探工程有限公司 Well rotary guide shoe assembly can be repaired
CN207363613U (en) * 2017-10-16 2018-05-15 天津盛鑫华瑞石油技术有限公司 Completion guide shoe

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020142080A1 (en) * 2018-12-31 2020-07-09 Halliburton Energy Services, Inc. Perturbation based well path reconstruction
CN112969840A (en) * 2018-12-31 2021-06-15 哈里伯顿能源服务公司 Disturbance-based borehole diameter reconstruction
GB2592765A (en) * 2018-12-31 2021-09-08 Halliburton Energy Services Inc Perturbation based well path reconstruction
GB2592765B (en) * 2018-12-31 2022-08-31 Halliburton Energy Services Inc Perturbation based well path reconstruction
CN112969840B (en) * 2018-12-31 2023-03-10 哈里伯顿能源服务公司 Disturbance-based borehole diameter reconstruction
CN113719639A (en) * 2020-05-26 2021-11-30 苏州旭创科技有限公司 Pipeline switching device

Similar Documents

Publication Publication Date Title
CN201567960U (en) Floating casing pipe installing pipe series
CN104213861B (en) A kind of expansion tube expanding process and tool system
CN107587850A (en) Completion guide shoe
CN103075143A (en) Method for testing fluid-producing section of horizontal pump well
CN107060702B (en) A kind of coupling type underground throttle device
CN101187305A (en) Single pipe co-well oil-pumping and water-injecting technological system
CN203201467U (en) Steering tool for jet drilling radial well through hydraulic-controlled hollow spherical joint connection
CN102493784B (en) Drillable ball injection sliding sleeve for oil-gas well staged fracturing
CN109779575A (en) A kind of deep camber wellbore sand control completion tubing string and completion method
CN201671557U (en) Bended head hydraulic rotating joint
CN207363613U (en) Completion guide shoe
CN202152670U (en) Sectioned construction pipe column of horizontal well
CN104612944B (en) A kind of thick oil pump
CN104179470A (en) Fishing pipe
CN103742084B (en) A kind of variable gauge stabilizer
CN104153722A (en) Casing centralizer
CN204344428U (en) A kind of thick oil pump
CN200949423Y (en) Hydraulic reduced drilling tool stabilizer
CN102635311A (en) Orienting device for drilling of radial horizontal well
CN203925960U (en) Improved eccentric feedback oil sucking pump
CN203640629U (en) Variable diameter stabilizer
CN203334978U (en) Spring type automatic reversing guiding shoe
CN201106441Y (en) Three segment separate-infusing tubular pile for horizontal well water-injection
CN202348153U (en) Reducing drilling stabilizer
CN210798931U (en) Mechanical type pressurization self-rotation tool

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination