CN202152670U - Sectioned construction pipe column of horizontal well - Google Patents

Sectioned construction pipe column of horizontal well Download PDF

Info

Publication number
CN202152670U
CN202152670U CN2011202409306U CN201120240930U CN202152670U CN 202152670 U CN202152670 U CN 202152670U CN 2011202409306 U CN2011202409306 U CN 2011202409306U CN 201120240930 U CN201120240930 U CN 201120240930U CN 202152670 U CN202152670 U CN 202152670U
Authority
CN
China
Prior art keywords
packer
sliding sleeve
seat
oil pipe
centralizer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011202409306U
Other languages
Chinese (zh)
Inventor
马发明
徐兴权
佘朝毅
石玉民
尹强
张华礼
桑宇
喻成刚
马辉运
王柯
王大江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN2011202409306U priority Critical patent/CN202152670U/en
Application granted granted Critical
Publication of CN202152670U publication Critical patent/CN202152670U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to a sectioned construction pipe column of a horizontal well, which is used for petroleum-natural gas underground construction, wherein a check valve and a seat seal ball seat are connected to the upper end of a guide shoe, and 3 to 10 sliding bush packer groups are connected to the upper end of the seat seal ball seat; an oil pipe and a hanging packer are connected to the upper ends of the sliding bush packer groups, a sealing inset pipe, centering guides, a hydraulic anchor and an oil pipe are connected to the upper end of the hanging packer, and the oil pipe extends till the well head; each sliding bush packer group has the structure that two centering guides are connected to the two ends of an expansion packer respectively, and the other end of each centering guide is connected with a ball injecting sliding bush. The utility model has the benefits that the multistage sliding bushes are adopted to improve multi-sections of the horizontal well; the pipe column is particularly and satisfactorily attached to the wall of an open hole well, and is suitable for well sections of the horizontal well and the open hole well; and the mid-way seat sealing of the packer caused by the hydraulic action in the pipe column when the pipe column goes into the water can be effectively avoided, and the pipe column become more reliable by adding an one-way liquid feeding device.

Description

Horizontal well in segments measure operating tool string
Technical field
The utility model relates to petroleum gas production with the combination of down-hole measure operating tool string, relates in particular to a kind of horizontal well, the multistage segmentation measure of high angle hole bore hole operating tool string.
Background technology
In the oil and gas exploitation process; To some hyposmosis or self natural energy is lower, output descends fast oil, gas well; After exploitation a period of time, generally all need carry out pointed layering, segmentation measure construction transformation, to improve the recovery ratio of reservoir to reservoir.Measures to reform comprises acidifying, pressure break, water filling etc.Existing down-hole segmentation measure operating tool string technology; Though can realize to a certain extent the horizontal well of straight well and cased hole completion is carried out segmentation measure operation; But also there are shortcomings such as sectional is few, operating cost height, especially when the horizontal well to barefoot completion carries out segmentation measure construction, also have certain difficulty; Be mainly reflected in: because the borehole wall is irregular, the multistage packing difficulty of horizontal bare hole section is big; Do not have corresponding anchor mechanism, the tubing string wriggling causes that easily the packer sealing inefficacy is difficult to reach subsection efect; Horizontal well track is complicated, factor such as tubing string self friction resistance in addition, and the measure operating tool string is lowered to the horizontal segment difficulty.
The utility model content
The purpose of the utility model is: a kind of horizontal well in segments measure operating tool string is provided; Be applicable to the horizontal well of straight well and cased hole completion; Also can be applicable to the horizontal well of barefoot completion; On the basis that satisfied safety is lowered to, the well section is carried out multi-stage mechanical segmentation packing, satisfy the needs of multiple measure construction technologies such as down-hole multilevel acidifying, pressure break, water filling.
The technical scheme that the utility model adopts is: horizontal well in segments measure operating tool string; Mainly form by oil pipe, hydraulic anchor, centralizer, sealing intubate, hanging packer, connection oil pipe, inflatable packer, pitching sliding sleeve, seat blocking seat, ball-and-seat and guide shoe; It is characterized in that: the upper end at guide shoe is connected with ball-and-seat; The upper end Connection Block blocking seat of ball-and-seat, the upper end of seat blocking seat connects 3~10 sliding sleeve packer groups; The upper end of sliding sleeve packer group connects oil pipe; The upper end that connects oil pipe is connected with hanging packer; The upper end of hanging packer is connected with the sealing intubate, is connected with centralizer on the sealing intubate, and the upper end of centralizer is connected with hydraulic anchor; The upper end of hydraulic anchor is connected with oil pipe, and oil pipe is until well head; Described sliding sleeve packer group is made up of inflatable packer, pitching sliding sleeve and centralizer; Be connected with a centralizer respectively at the two ends of inflatable packer; The other end at centralizer connects a pitching sliding sleeve, and the other end of pitching sliding sleeve is connected with the centralizer of next sliding sleeve packer group.
What described pitching sliding sleeve adopted is level pressure sliding sleeve or drillable ball injection sliding sleeve.
The beneficial effect of the utility model: horizontal well in segments measure operating tool string, adopt multistage sliding sleeve can realize the transformation of many wells of horizontal well section.Inflatable packer 7 has the sealing face length, and the pressure-bearing index is high, and it is effective that the borehole wall especially bore hole borehole wall is fitted, and is applicable to the well section of horizontal well, barefoot completion; Can effectively avoid fashionable under the tubing string, the packer that causes because of hydraulic action in the tubing string sets midway, and owing to be provided with unidirectional feeding device, has increased the reliability of tubing string.
Description of drawings
Fig. 1 is the utility model horizontal well in segments measure operating tool string structural representation.
Fig. 2 is the structural representation before the utility model horizontal well in segments measure operating tool string G.I.H seat envelope.
Among the figure, the 1-oil pipe, the 2-hydraulic anchor, the 3-centralizer, 4-seals intubate, the 5-hanging packer, 6-connects oil pipe, the 7-inflatable packer, 8-pitching sliding sleeve, 9-seat blocking seat, the 10-ball-and-seat, the 11-guide shoe, 12-sets oil pipe.
The specific embodiment
Embodiment 1: with a horizontal well in segments measure operating tool string is example, and the utility model is done further explain.
Consult Fig. 1.The utility model horizontal well in segments measure operating tool string mainly is made up of oil pipe 1, hydraulic anchor 2, centralizer 3, sealing intubate 4, hanging packer 5, connection oil pipe 6, inflatable packer 7, pitching sliding sleeve 8, seat blocking seat 9, ball-and-seat 10 and guide shoe 11.The parts that use entirely in the city field energy purchase.
Horizontal well in segments measure operating tool string is from bottom to top: be connected with a ball-and-seat 10 in the upper end of guide shoe 11, the upper end of ball-and-seat 10 connects a seat blocking seat 9, and the upper end of seat blocking seat 9 connects five sliding sleeve packer groups, can four stratum of packing.Sliding sleeve packer group is made up of an inflatable packer 7, a pitching sliding sleeve 8 and two centralizers 3; Be connected with a centralizer 3 respectively at the two ends of inflatable packer 7; The other end at centralizer 3 connects a drillable ball injection sliding sleeve 8, and the other end of drillable ball injection sliding sleeve 8 is connected with the centralizer 3 of next sliding sleeve packer group.The upper end of sliding sleeve packer group connects oil pipe 6; The upper end that connects oil pipe 6 is connected with a hanging packer 5; The upper end of hanging packer 5 is connected with sealing intubate 4, is connected with centralizer 3 on the sealing intubate 4, and the upper end of centralizer 3 is connected with hydraulic anchor 2; The upper end of hydraulic anchor 2 is connected with oil pipe 1, and oil pipe 1 is until well head.
Summary horizontal well in segments measure operating tool string operating principle.Consult Fig. 2.Should be according to five sliding sleeve packer groups of oil reservoir segmentation situation configuration.At first, connect the tubing string of giving up, the tubing string of giving up is that hanging packer 5 is to guide shoe 11 general names.Set oil pipe 12 in the connection of the top of the tubing string of giving up, utilization sets oil pipe 12 and will give up the tubing string G.I.H to design attitude.Secondly, drop into minor diameter low-density ball sealer, when ball sealer arrives seat blocking seat 9; The tubing string internal pressure raises, and hanging packer 5 sets with inflatable packer 7, after waiting to set completion; Continue to improve the tubing string internal pressure, the tubing string of giving up just can be realized effective packing that the well section is carried out.Consult Fig. 1.Then, take out and set oil pipe 12, be lowered to sealing intubate 4 with top, sealing intubate 4 and hanging packer 5 sealed butt joint.Rising tubing string internal pressure, hydraulic anchor 2 are carried out grappling to the measure operating tool string under the effect of measure operating tool string inside and outside differential pressure, continue rising tubing string internal pressure, and pitching sliding sleeve 8 is opened, and carry out first section measure construction operation; In the time of need carrying out the measure construction operation to second section; Just can drop into major diameter low-density ball sealer slightly, after this low-density ball sealer arrives pairing drillable ball injection sliding sleeve 8, rising tubing string internal pressure; Open drillable ball injection sliding sleeve 8; Can carry out second section measure construction operation, and the like, just can accomplish third and fourth, the measure construction operation of sections such as five.After operation is accomplished, take out the measure operating tool string, be lowered to that other corresponding tubing strings can be produced or operation such as test.

Claims (2)

1. horizontal well in segments measure operating tool string; Mainly form by oil pipe (1), hydraulic anchor (2), centralizer (3), sealing intubate (4), hanging packer (5), connection oil pipe (6), inflatable packer (7), pitching sliding sleeve (8), seat blocking seat (9), ball-and-seat (10) and guide shoe (11); It is characterized in that: be connected with ball-and-seat (10) in the upper end of guide shoe (11); The upper end Connection Block blocking seat (9) of ball-and-seat (10), the upper end of seat blocking seat (9) connects 3~10 sliding sleeve packer groups; The upper end of sliding sleeve packer group connects oil pipe (6); The upper end that connects oil pipe (6) is connected with hanging packer (5); The upper end of hanging packer (5) is connected with sealing intubate (4), is connected with centralizer (3) on the sealing intubate (4), and the upper end of centralizer (3) is connected with hydraulic anchor (2); The upper end of hydraulic anchor (2) is connected with oil pipe (1), and oil pipe (1) is until well head; Described sliding sleeve packer group is made up of inflatable packer (7), pitching sliding sleeve (8) and centralizer (3); Be connected with a centralizer (3) respectively at the two ends of inflatable packer (7); The other end at centralizer (3) connects a pitching sliding sleeve (8), and the other end of pitching sliding sleeve (8) is connected with the centralizer (3) of next sliding sleeve packer group.
2. horizontal well in segments measure operating tool string according to claim 1 is characterized in that: what described pitching sliding sleeve (8) adopted is level pressure sliding sleeve or drillable ball injection sliding sleeve.
CN2011202409306U 2011-07-08 2011-07-08 Sectioned construction pipe column of horizontal well Expired - Lifetime CN202152670U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202409306U CN202152670U (en) 2011-07-08 2011-07-08 Sectioned construction pipe column of horizontal well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202409306U CN202152670U (en) 2011-07-08 2011-07-08 Sectioned construction pipe column of horizontal well

Publications (1)

Publication Number Publication Date
CN202152670U true CN202152670U (en) 2012-02-29

Family

ID=45693170

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202409306U Expired - Lifetime CN202152670U (en) 2011-07-08 2011-07-08 Sectioned construction pipe column of horizontal well

Country Status (1)

Country Link
CN (1) CN202152670U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106050200A (en) * 2016-08-01 2016-10-26 中嵘能源科技集团有限公司 Method for injecting high-pressure air into low-permeability reservoir to perform oxidative pyrolysis and displacement of oil
CN106223911A (en) * 2016-08-01 2016-12-14 中嵘能源科技集团有限公司 A kind of to deep buried hill reservoir note strong pressure-air, oxygen-enriched flooding method
CN110206531A (en) * 2019-05-23 2019-09-06 广州海洋地质调查局 A kind of oil pipe of horizontal well production profile test method and device
CN112324415A (en) * 2020-11-05 2021-02-05 中国石油天然气股份有限公司 Combined segmented reconstruction method for selective repeated reconstruction of old well
CN113756740A (en) * 2020-06-03 2021-12-07 中国石油天然气股份有限公司 Screen pipe well completion sectional plugging adjustment measure pipe column and screen pipe well completion sectional plugging adjustment measure method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106050200A (en) * 2016-08-01 2016-10-26 中嵘能源科技集团有限公司 Method for injecting high-pressure air into low-permeability reservoir to perform oxidative pyrolysis and displacement of oil
CN106223911A (en) * 2016-08-01 2016-12-14 中嵘能源科技集团有限公司 A kind of to deep buried hill reservoir note strong pressure-air, oxygen-enriched flooding method
CN106223911B (en) * 2016-08-01 2018-08-14 中嵘能源科技集团有限公司 It is a kind of to note strong pressure-air, oxygen-enriched flooding method to deep buried hill reservoir
CN110206531A (en) * 2019-05-23 2019-09-06 广州海洋地质调查局 A kind of oil pipe of horizontal well production profile test method and device
CN110206531B (en) * 2019-05-23 2024-04-09 广州海洋地质调查局 Method and device for testing output profile of horizontal well oil pipe
CN113756740A (en) * 2020-06-03 2021-12-07 中国石油天然气股份有限公司 Screen pipe well completion sectional plugging adjustment measure pipe column and screen pipe well completion sectional plugging adjustment measure method
CN112324415A (en) * 2020-11-05 2021-02-05 中国石油天然气股份有限公司 Combined segmented reconstruction method for selective repeated reconstruction of old well

Similar Documents

Publication Publication Date Title
CN102587981B (en) Underground salt cavern gas storage and building method thereof
CN201567960U (en) Floating casing pipe installing pipe series
CN106014346B (en) A kind of mating plunger lift water pumping gas production method and device of speed column
CN202152670U (en) Sectioned construction pipe column of horizontal well
CN201212387Y (en) Gas injection, gas production and brine discharge integration process pipe column for underground gas storage
CN201593405U (en) Integrated tubular column for horizontal well completion and fracturing production
CN201705219U (en) Lateral drilling gravel pack completion string
CN102979495A (en) Multi-cluster current limiting fracturing string of open hole horizontal well and fracturing method thereof
CN103422812B (en) The coal bed gas multi-branch horizontal drilling well of individual well eye and completion method
CN103184859A (en) Device and method for exploitation for single-well injection-production
CN105156088B (en) Binary channels injects multiple-string packer fracturing strings and its application method
CN205936557U (en) Water injection oil production pipe
CN202152643U (en) Layering production pressure measuring tubular column for exploiting oil wells in multilayer mode
CN201810292U (en) Separated layer water injection process tubular column
CN102454381A (en) Oil-gas reservoir barefoot well cementing and completion method and device
CN102434192A (en) Device and method for enhancing coal seam fracturing effect
CN201738822U (en) String for upper horizontal well cementation and lower screen pipe gravel pack completion
CN203239303U (en) Extraction device used for injection and extraction of same well
CN203515342U (en) Completion pipe string for multi-cluster perforation fracture
CN110273666A (en) Deep water exploitation of gas hydrates system and recovery method
CN201620785U (en) Pressure-controlled hydraulic pushing tool
CN202866741U (en) Expanding open hole packer with hydraulic control lock
CN104806196A (en) Casing floating system for horizontal well
CN204827256U (en) Seal up and adopt down screen pipe and fill sand control integration operating tool string
CN201416414Y (en) Integral combination type electric cable-passing through packer for deep well

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20120229

CX01 Expiry of patent term