CN202152670U - Horizontal Well Sectional Measures Construction String - Google Patents

Horizontal Well Sectional Measures Construction String Download PDF

Info

Publication number
CN202152670U
CN202152670U CN2011202409306U CN201120240930U CN202152670U CN 202152670 U CN202152670 U CN 202152670U CN 2011202409306 U CN2011202409306 U CN 2011202409306U CN 201120240930 U CN201120240930 U CN 201120240930U CN 202152670 U CN202152670 U CN 202152670U
Authority
CN
China
Prior art keywords
packer
sliding sleeve
centralizer
oil pipe
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011202409306U
Other languages
Chinese (zh)
Inventor
马发明
徐兴权
佘朝毅
石玉民
尹强
张华礼
桑宇
喻成刚
马辉运
王柯
王大江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN2011202409306U priority Critical patent/CN202152670U/en
Application granted granted Critical
Publication of CN202152670U publication Critical patent/CN202152670U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

A horizontal well subsection measure construction pipe column is applied to oil and gas underground construction. The upper end of the guide shoe is connected with a check valve and a seat sealing ball seat, and the upper end of the seat sealing ball seat is connected with 3-10 sliding sleeve packer groups; the upper end of the sliding sleeve packer group is connected with a connecting oil pipe and a suspension packer, the upper end of the suspension packer is connected with a sealing insertion pipe, a centralizer, a hydraulic anchor and an oil pipe, and the oil pipe extends to a well head; the sliding sleeve packer group is characterized in that two ends of the expansion packer are respectively connected with a centralizer, and the other end of the centralizer is connected with a pitching sliding sleeve. The effect is as follows: and the multi-well section of the horizontal well can be reformed by adopting a multi-stage sliding sleeve. The joint effect on the well wall, particularly the open hole well wall, is good, and is suitable for sections of horizontal wells and open hole well completions; when can effectively avoid the tubular column to descend, the packer that arouses because of the water effect in the tubular column sets up the seal midway, and owing to set up one-way inlet means, has increased the reliability of tubular column.

Description

水平井分段措施施工管柱Horizontal Well Sectional Measures Construction String

技术领域 technical field

本实用新型涉及石油天然气生产用井下措施施工管柱组合,尤其涉及一种水平井、大斜度井裸眼多级分段措施施工管柱。  The utility model relates to a combination of downhole measure construction pipe strings for petroleum and natural gas production, in particular to an open hole multi-stage segmental measure construction pipe string for horizontal wells and high-inclination wells. the

背景技术 Background technique

在石油天然气开采过程中,对一些低渗透或自身天然能量较低、产量下降快的油、气井,在开采一段时间后,一般都需要对储层进行具有针对性的分层、分段措施施工改造,以提高储层的采收率。措施改造包括酸化、压裂、注水等。现有的井下分段措施施工管柱技术,虽然在一定程度上能够实现对直井和套管完井的水平井进行分段措施作业,但还存在可分段少、作业成本高等缺点,尤其是在对裸眼完井的水平井进行分段措施施工时,还存在一定难度,主要体现在:由于井壁不规则,水平裸眼段多级封隔难度大;无相应锚定机构,管柱蠕动容易引起封隔器密封失效难以达到分段效果;水平井井眼轨迹复杂,加之管柱自身摩擦阻力等因素,措施施工管柱下入水平段困难。  In the process of oil and natural gas exploitation, for some oil and gas wells with low permeability or low natural energy and rapid production decline, after a period of exploitation, it is generally necessary to carry out targeted layering and segmented construction of the reservoir Transformation to enhance the recovery of the reservoir. Transformation measures include acidification, fracturing, water injection, etc. Although the existing downhole segmented construction string technology can realize the segmented operation of vertical wells and horizontal wells completed with casing to a certain extent, it still has the disadvantages of few segments and high operating costs. There are still some difficulties in the construction of horizontal wells with open hole completion, mainly reflected in: due to the irregular well wall, the multi-stage isolation of the horizontal open hole section is difficult; there is no corresponding anchoring mechanism, and the pipe string is easy to creep It is difficult to achieve the segmentation effect due to the failure of the seal of the packer; the wellbore trajectory of the horizontal well is complex, coupled with factors such as the frictional resistance of the pipe string itself, it is difficult to run the construction pipe string into the horizontal section. the

实用新型内容 Utility model content

本实用新型的目的是:提供一种水平井分段措施施工管柱,适用于直井和套管完井的水平井,还可应用于裸眼完井的水平井,满足安全下入的基础上,对井段进行多级机械分段封隔,满足井下多级酸化、压裂、注水等多种措施施工工艺的需要。  The purpose of this utility model is: to provide a horizontal well segmented construction pipe string, which is suitable for horizontal wells with vertical wells and casing completions, and can also be applied to horizontal wells with open hole completions. Multi-level mechanical segmental isolation is carried out on the well section to meet the needs of various construction techniques such as downhole multi-level acidizing, fracturing, and water injection. the

本实用新型采用的技术方案是:水平井分段措施施工管柱,主要由油管、水力锚、扶正器、密封插管、悬挂封隔器、连接油管、扩张式 封隔器、投球滑套、座封球座、单流阀和引鞋组成,其特征在于:在引鞋的上端连接有单流阀,单流阀的上端连接座封球座,座封球座的上端连接3~10个滑套封隔器组;滑套封隔器组的上端连接连接油管,连接油管的上端连接有悬挂封隔器,悬挂封隔器的上端连接有密封插管,密封插管的上连接有扶正器,扶正器的上端连接有水力锚,水力锚的上端连接有油管,油管一直到井口;所述的滑套封隔器组是由扩张式封隔器、投球滑套和扶正器组成,在扩张式封隔器的两端分别连接有一个扶正器,在扶正器的另一端连接一个投球滑套,投球滑套的另一端与下一滑套封隔器组的扶正器连接。  The technical scheme adopted by the utility model is: the construction string of the horizontal well segmented measures, mainly composed of oil pipe, hydraulic anchor, centralizer, sealing intubation, suspension packer, connecting oil pipe, expansion packer, ball-throwing sleeve, It is composed of a seat seal ball seat, a check valve and a guide shoe, and is characterized in that a check valve is connected to the upper end of the guide shoe, the upper end of the check valve is connected with a seat seal ball seat, and the upper end of the seat seal ball seat is connected with 3 to 10 Sliding sleeve packer group; the upper end of the sliding sleeve packer group is connected to the connecting tubing, the upper end of the connecting tubing is connected to a hanging packer, the upper end of the hanging packer is connected to a sealing cannula, and the upper end of the sealing cannula is connected to a righting device, the upper end of the centralizer is connected with a hydraulic anchor, and the upper end of the hydraulic anchor is connected with an oil pipe, and the oil pipe reaches the wellhead; Two ends of the expandable packer are respectively connected with a centralizer, and the other end of the centralizer is connected with a ball-pitching sleeve, and the other end of the ball-pitching sleeve is connected with the centralizer of the next sleeve packer group. the

所述的投球滑套采用的是定压滑套或可钻式投球滑套。  What described pitching sliding sleeve adopts is constant pressure sliding sleeve or drillable type pitching sliding sleeve. the

本实用新型的有益效果:水平井分段措施施工管柱,采用多级滑套能实现对水平井多井段改造。扩张式封隔器7具有密封面长,承压指标高,对井壁尤其是裸眼井壁贴合效果好,适用于水平井、裸眼完井的井段;能有效避免管柱下入时,因管柱内水力作用引起的封隔器中途坐封,且由于设置了单向进液装置,增加了管柱的可靠性。  The beneficial effect of the utility model is that: the segmented construction pipe string of the horizontal well adopts the multi-stage sliding sleeve to realize the multi-section reconstruction of the horizontal well. The expandable packer 7 has a long sealing surface, high pressure bearing index, good adhesion to the well wall, especially the open hole wall, and is suitable for horizontal wells and open hole completion well sections; it can effectively avoid the The packer is set halfway due to the hydraulic action in the pipe string, and the reliability of the pipe string is increased due to the installation of a one-way liquid inlet device. the

附图说明 Description of drawings

图1是本实用新型水平井分段措施施工管柱结构示意图。  Fig. 1 is a schematic diagram of the structure of the utility model horizontal well segmented construction pipe string. the

图2是本实用新型水平井分段措施施工管柱下入井内座封前的结构示意图。  Fig. 2 is a schematic diagram of the structure of the utility model horizontal well segmented construction pipe string before it is lowered into the well and sealed. the

图中,1-油管,2-水力锚,3-扶正器,4-密封插管,5-悬挂封隔器,6-连接油管,7-扩张式封隔器,8-投球滑套,9-座封球座,10-单流阀,11-引鞋,12-坐封油管。  In the figure, 1-oil pipe, 2-hydraulic anchor, 3-stabilizer, 4-sealing cannula, 5-hanging packer, 6-connecting oil pipe, 7-expandable packer, 8-balling sleeve, 9 -sealing ball seat, 10-check valve, 11-lead shoe, 12-setting oil pipe. the

具体实施方式 Detailed ways

实施例1:以一个水平井分段措施施工管柱为例,对本实用新型作 进一步详细说明。  Embodiment 1: take a horizontal well segmental measures construction string as an example, the utility model is described in further detail. the

参阅图1。本实用新型水平井分段措施施工管柱,主要由油管1、水力锚2、扶正器3、密封插管4、悬挂封隔器5、连接油管6、扩张式封隔器7、投球滑套8、座封球座9、单流阀10和引鞋11组成。使用的部件全在市场能采购到。  See Figure 1. The construction string of the horizontal well in the utility model is mainly composed of a tubing 1, a hydraulic anchor 2, a centralizer 3, a sealing intubation tube 4, a suspension packer 5, a connecting tubing 6, an expansion packer 7, and a ball-throwing sleeve. 8. It is composed of seat seal ball seat 9, check valve 10 and guide shoe 11. The components used are all available in the market. the

水平井分段措施施工管柱自下而上是:在引鞋11的上端连接有一个单流阀10,单流阀10的上端连接一个座封球座9,座封球座9的上端连接五个滑套封隔器组,能封隔四个地层。滑套封隔器组是由一个扩张式封隔器7、一个投球滑套8和两个扶正器3组成,在扩张式封隔器7的两端分别连接有一个扶正器3,在扶正器3的另一端连接一个可钻式投球滑套8,可钻式投球滑套8的另一端与下一滑套封隔器组的扶正器3连接。滑套封隔器组的上端连接连接油管6,连接油管6的上端连接有一个悬挂封隔器5,悬挂封隔器5的上端连接有密封插管4,密封插管4的上连接有扶正器3,扶正器3的上端连接有水力锚2,水力锚2的上端连接有油管1,油管1一直到井口。  Sectional measures for horizontal well construction pipe string from bottom to top: a check valve 10 is connected to the upper end of the guide shoe 11, the upper end of the check valve 10 is connected to a seat seal ball seat 9, and the upper end of the seat seal ball seat 9 is connected to Five sliding sleeve packers can isolate four formations. The sliding sleeve packer set is composed of an expanding packer 7, a ball-throwing sliding sleeve 8 and two centralizers 3. A centralizer 3 is connected to the two ends of the expanding packer 7 respectively. The other end of the 3 is connected to a drillable ball-throwing sleeve 8, and the other end of the drillable ball-throwing sleeve 8 is connected to the centralizer 3 of the next sleeve packer group. The upper end of the sliding sleeve packer group is connected to the connecting tubing 6, the upper end of the connecting tubing 6 is connected to a hanging packer 5, the upper end of the hanging packer 5 is connected to the sealing cannula 4, and the upper end of the sealing cannula 4 is connected to the righting 3, the upper end of the centralizer 3 is connected with a hydraulic anchor 2, and the upper end of the hydraulic anchor 2 is connected with an oil pipe 1, and the oil pipe 1 reaches the wellhead. the

简述水平井分段措施施工管柱工作原理。参阅图2。应根据油层分段情况配置五个滑套封隔器组。首先,连接好丢手管柱,丢手管柱是悬挂封隔器5到引鞋11总称。在丢手管柱的上部连接坐封油管12,利用坐封油管12将丢手管柱下入井内到设计位置。其次,投入小直径低密度密封球,当密封球到达座封球座9时,管柱内压力升高,悬挂封隔器5和扩张式封隔器7坐封,待坐封完成后,继续提高管柱内压力,丢手管柱便可实现对井段进行的有效封隔。参阅图1。然后,取出坐封油管12,下入密封插管4以上部分,密封插管4与悬挂封隔器5密封对接。升高管柱内压力,水力锚2在措施施工管柱内外压差的作用下,对措施施工管柱进行锚定,继续升高管柱内压力,使投球滑套8打开,进行第一段的措施施工作业;需要对第二段进行措施施工作业时,便 可投入稍大直径低密度密封球,当该低密度密封球到达所对应的可钻式投球滑套8后,升高管柱内压力,打开可钻式投球滑套8,可进行第二段的措施施工作业,依次类推,便可完成第三、四、五等段的措施施工作业。作业完成后,取出措施施工管柱,下入其他相应管柱即可进行生产或测试等作业。  Briefly describe the working principle of the construction string of the horizontal well segmented measures. See Figure 2. Five sliding sleeve packer groups should be configured according to the oil layer segmentation. First, connect the drop pipe string, which is the general term for the suspension packer 5 to the guide shoe 11 . The setting oil pipe 12 is connected to the upper part of the abandoned pipe string, and the abandoned pipe string is lowered into the well to the designed position by using the set oil pipe 12 . Secondly, put in a small-diameter and low-density sealing ball. When the sealing ball reaches the seating ball seat 9, the pressure in the pipe string rises, and the hanging packer 5 and the expansion packer 7 are set. After the setting is completed, continue Increase the internal pressure of the pipe string and effectively isolate the well section without letting go of the pipe string. See Figure 1. Then, the setting tubing 12 is taken out, and the part above the sealing cannula 4 is lowered, and the sealing cannula 4 is sealed butted with the suspension packer 5 . Increase the internal pressure of the pipe string, and the hydraulic anchor 2 anchors the construction pipe string under the action of the pressure difference between the inside and outside of the construction pipe string, and continues to increase the internal pressure of the pipe string, so that the ball sliding sleeve 8 is opened, and the first stage is carried out. When it is necessary to carry out measure construction work on the second section, a slightly larger diameter low-density sealing ball can be put in, and when the low-density sealing ball reaches the corresponding drillable ball-throwing sleeve 8, the pipe string is raised Internal pressure, open drillable ball throwing sliding sleeve 8, can carry out the measure construction operation of the second section, and so on, just can finish the measure construction operation of the 3rd, 4th, 5th, etc. sections. After the operation is completed, take out the construction pipe string for measures, and lower it into other corresponding pipe strings to carry out production or testing operations. the

Claims (2)

1.一种水平井分段措施施工管柱,主要由油管(1)、水力锚(2)、扶正器(3)、密封插管(4)、悬挂封隔器(5)、连接油管(6)、扩张式封隔器(7)、投球滑套(8)、座封球座(9)、单流阀(10)和引鞋(11)组成,其特征在于:在引鞋(11)的上端连接有单流阀(10),单流阀(10)的上端连接座封球座(9),座封球座(9)的上端连接3~10个滑套封隔器组;滑套封隔器组的上端连接连接油管(6),连接油管(6)的上端连接有悬挂封隔器(5),悬挂封隔器(5)的上端连接有密封插管(4),密封插管(4)的上连接有扶正器(3),扶正器(3)的上端连接有水力锚(2),水力锚(2)的上端连接有油管(1),油管(1)一直到井口;所述的滑套封隔器组是由扩张式封隔器(7)、投球滑套(8)和扶正器(3)组成,在扩张式封隔器(7)的两端分别连接有一个扶正器(3),在扶正器(3)的另一端连接一个投球滑套(8),投球滑套(8)的另一端与下一滑套封隔器组的扶正器(3)连接。1. A horizontal well segmented construction string mainly consists of oil pipe (1), hydraulic anchor (2), centralizer (3), sealing intubation pipe (4), suspension packer (5), connecting oil pipe ( 6), composed of expandable packer (7), ball sliding sleeve (8), seat seal ball seat (9), check valve (10) and guide shoe (11), characterized in that: guide shoe (11) ) is connected to a check valve (10), the upper end of the check valve (10) is connected to the seat seal ball seat (9), and the upper end of the seat seal ball seat (9) is connected to 3 to 10 sliding sleeve packer groups; The upper end of the sliding sleeve packer group is connected to the connecting tubing (6), the upper end of the connecting tubing (6) is connected to a hanging packer (5), and the upper end of the hanging packer (5) is connected to a sealing cannula (4), A centralizer (3) is connected on the sealing intubation tube (4), the upper end of the centralizer (3) is connected with a hydraulic anchor (2), and the upper end of the hydraulic anchor (2) is connected with an oil pipe (1), and the oil pipe (1) has been to the wellhead; the sliding sleeve packer group is composed of an expanding packer (7), a ball-throwing sliding sleeve (8) and a centralizer (3), and the two ends of the expanding packer (7) are A centralizer (3) is connected, and a pitching sleeve (8) is connected to the other end of the centralizer (3), and the other end of the pitching sleeve (8) is connected to the centralizer (3 )connect. 2.根据权利要求1所述的水平井分段措施施工管柱,其特征是:所述的投球滑套(8)采用的是定压滑套或可钻式投球滑套。2. The horizontal well segmented construction pipe string according to claim 1, characterized in that: the ball-throwing sleeve (8) is a constant-pressure sliding sleeve or a drillable ball-throwing sleeve.
CN2011202409306U 2011-07-08 2011-07-08 Horizontal Well Sectional Measures Construction String Expired - Lifetime CN202152670U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202409306U CN202152670U (en) 2011-07-08 2011-07-08 Horizontal Well Sectional Measures Construction String

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202409306U CN202152670U (en) 2011-07-08 2011-07-08 Horizontal Well Sectional Measures Construction String

Publications (1)

Publication Number Publication Date
CN202152670U true CN202152670U (en) 2012-02-29

Family

ID=45693170

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202409306U Expired - Lifetime CN202152670U (en) 2011-07-08 2011-07-08 Horizontal Well Sectional Measures Construction String

Country Status (1)

Country Link
CN (1) CN202152670U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106050200A (en) * 2016-08-01 2016-10-26 中嵘能源科技集团有限公司 Method for injecting high-pressure air into low-permeability reservoir to perform oxidative pyrolysis and displacement of oil
CN106223911B (en) * 2016-08-01 2018-08-14 中嵘能源科技集团有限公司 It is a kind of to note strong pressure-air, oxygen-enriched flooding method to deep buried hill reservoir
CN110206531A (en) * 2019-05-23 2019-09-06 广州海洋地质调查局 A kind of oil pipe of horizontal well production profile test method and device
CN112324415A (en) * 2020-11-05 2021-02-05 中国石油天然气股份有限公司 Combined segmented reconstruction method for selective repeated reconstruction of old well
CN113756740A (en) * 2020-06-03 2021-12-07 中国石油天然气股份有限公司 Sectional plugging control measures for screen completions Pipe string and sectioned plugging control measures for screen completions

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106050200A (en) * 2016-08-01 2016-10-26 中嵘能源科技集团有限公司 Method for injecting high-pressure air into low-permeability reservoir to perform oxidative pyrolysis and displacement of oil
CN106223911B (en) * 2016-08-01 2018-08-14 中嵘能源科技集团有限公司 It is a kind of to note strong pressure-air, oxygen-enriched flooding method to deep buried hill reservoir
CN110206531A (en) * 2019-05-23 2019-09-06 广州海洋地质调查局 A kind of oil pipe of horizontal well production profile test method and device
CN110206531B (en) * 2019-05-23 2024-04-09 广州海洋地质调查局 Method and device for testing output profile of horizontal well oil pipe
CN113756740A (en) * 2020-06-03 2021-12-07 中国石油天然气股份有限公司 Sectional plugging control measures for screen completions Pipe string and sectioned plugging control measures for screen completions
CN112324415A (en) * 2020-11-05 2021-02-05 中国石油天然气股份有限公司 Combined segmented reconstruction method for selective repeated reconstruction of old well

Similar Documents

Publication Publication Date Title
CN201714364U (en) Staged fracturing acidizing tool string for open hole completion of horizontal well
CN201165866Y (en) Horizontal well separate mining and combined mining pipe column
CN102808584B (en) Mechanical water plugging pipe string and method for multi-point water outlet in multi-stage fracturing horizontal well with casing completion
CN201567960U (en) Floating casing pipe installing pipe series
CN201705219U (en) Lateral drilling gravel pack completion string
CN103422846B (en) Open hole horizontal well completion and fracturing integrated string
CN201705276U (en) Well completion and flow string of horizontal well
CN202152670U (en) Horizontal Well Sectional Measures Construction String
CN201671623U (en) Pipe column for leakage finding and separate mining of horizontal well
CN105952378A (en) Tree-shape structure well drilling and completion and yield increasing method
CN104213846A (en) Selective Production String and Working Method of Multi-Stage Fracturing Horizontal Well Completion with Casing
CN112267866B (en) Production string and method for staged fracturing of small-diameter pipes for sidetracking and small-bore wells
CN201738822U (en) String for upper horizontal well cementation and lower screen pipe gravel pack completion
CN202215223U (en) Open-hole horizontal well with unlimited stages of staged fracturing downhole string
CN201810292U (en) Separated layer water injection process tubular column
CN104120997A (en) Pipe strings for horizontal wells
CN105587300B (en) Oil recovery method for horizontal well
CN201412134Y (en) Small casing pipe multi-layer fracturing process pipe column
CN104912535B (en) A multi-cluster fracturing sliding sleeve in a stage
CN204252929U (en) Oil Production Water Plugging String
CN111472738A (en) Switchable well cementation sliding sleeve water control fracturing method for horizontal well
CN112282718B (en) Combined pipe string for sidetracking well and slim hole well and use method
CN204040992U (en) Pipe strings for horizontal wells
CN202810675U (en) Mechanical water plugging pipe string for multi-stage fracturing horizontal well with casing completion and multi-point water outlet
CN205349316U (en) Two single deck tape -recorder staged fracturing technology tubular columns that seal of compression

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120229