CN107587484A - A kind of rock for exempting from toe board structure - Google Patents
A kind of rock for exempting from toe board structure Download PDFInfo
- Publication number
- CN107587484A CN107587484A CN201710772488.3A CN201710772488A CN107587484A CN 107587484 A CN107587484 A CN 107587484A CN 201710772488 A CN201710772488 A CN 201710772488A CN 107587484 A CN107587484 A CN 107587484A
- Authority
- CN
- China
- Prior art keywords
- panel
- enrockment
- toe board
- support plate
- rockfill
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Revetment (AREA)
Abstract
The invention discloses a kind of rock for exempting from toe board structure, including assigning into the support plate in water, the side of the supporting plate is provided with the outer slope of panel enrockment substrate, the outer slope of the panel enrockment substrate is provided with panel enrockment toe board close to the side of support plate, the panel enrockment toe board is provided with panel enrockment substrate close to the side of support plate, panel is provided between the enrockment substrate and support plate, the panel includes shock resistance panel layer and course of sandbags, side of the support plate away from panel is provided with panel rockfill, the panel rockfill includes concrete stack layers, upstream rockfill area, rockfill area under gravel laydown area and downstream water, the concrete stack layers are located at top side, the upstream rockfill area is located at the downside of concrete stack layers.It is of the invention compared with existing rock, have that excavation supporting quantities is small, reduces that the enrockment amount of filling and panel quantities, terrain adaptability are relatively strong, can reduce the advantages of slag field scale.
Description
Technical field
The invention belongs to hydro-structure technical field, and in particular to a kind of rock for exempting from toe board structure.
Background technology
The main body of rock-fill dams is to use gravel embankment, is equipped with the dam that impervious body is built up.It is one kind of earth and rockfill dam.This dam
Advantage is can to make full use of local natural material, adapts to different geological conditions, and construction method is easier, and anti-seismic performance is good
Deng.Its deficiency is that construction diversion and flood releasing structure need to be typically set outside dam, and existing face dam needs toe board as panel
Supporting mass, toe board in order to meet the anti-requirement for blending intensity, it is necessary to be arranged on the enough basement rock of intensity, therefore embedding depth is larger,
Cause slope excavating amount larger, and bring substantial amounts of support engineering amount therewith.The excavation of toe board inner slope, which also increases, simultaneously fills out
The amount of building.Although part excavated material can above dam utilize, but still there is a large amount of abandon to be stacked, it is necessary to transport to slag field.
The content of the invention
The invention aims to solve Face Rockfill Dam excavation in the prior art to cause excavation supporting quantities
It is larger and the problem of thus caused slag field is larger, and a kind of rock for exempting from toe board structure proposed.
To achieve these goals, present invention employs following technical scheme:
It is a kind of to exempt from the rock of toe board structure, including the support plate assigned into water, the side of the supporting plate set
There is the outer slope of panel enrockment substrate, the outer slope of the panel enrockment substrate is provided with panel enrockment toe board close to the side of support plate, described
Panel enrockment toe board is provided with panel enrockment substrate close to the side of support plate, is provided between the panel enrockment substrate and support plate
Panel, the panel include shock resistance panel layer and course of sandbags, and side of the support plate away from panel is provided with panel rockfill,
The panel rockfill includes rockfill area under concrete stack layers, upstream rockfill area, gravel laydown area and downstream water, the concrete
Stack layers are located at top side, and the upstream rockfill area is located at the downside of concrete stack layers, and the gravel stacks area and is located at upstream enrockment
Under area and downstream water between rockfill area, the upper end of the support plate, which is inserted with, fills tunnel closure pipe, and fills tunnel closure pipe
One end connects with the inside of panel enrockment substrate, and the upper end for filling tunnel closure pipe is inserted with filling closure pipe.
Preferably, space is left between panel enrockment substrate and panel the enrockment toe board, and gap is filled with flower hilllock
Rock metalling.
Preferably, the course of sandbags is placed on support plate, shock resistance panel layer and panel enrockment substrate in a stacked fashion
Between.
Preferably, the outside of rockfill area includes under the concrete stack layers, upstream rockfill area, gravel laydown area and downstream water
There is impermeable steel wire.
Preferably, weld together between the filling tunnel closure pipe and filling closure pipe.
Preferably, one end of the filling tunnel closure pipe in panel enrockment substrate, which is provided with, fills tunnel as mouth.
In the present invention, because panel is attached on bedding material, not power transmission substantially is to toe board, as long as therefore connecting knot with panel
Structure keeps homeostasis.When side slope is compared with time slack, grout curtain is carried out at the top of side slope at former toe board position, when side slope is steeper
When, move towards location arrangements grouting tunnel along former toe board and carry out grout curtain, blocked behind the tunnel inducer that is in the milk.In slope table
After coating and completely decomposed layer etc. are disposed in face, grooving pours one piece of soleplate, and sealing is buried in the inside, reserved and slab joint,
Form periphery fissure.Due to substantially avoided the excavation of toe board side slope, reduce excavation supporting amount, while reduce enrockment and fill
Amount, decreases panel quantities.Soleplate, which is poured after completion reaches some strength, to be needed to carry out consolidation grouting.Due to soleplate
Follow contours pour, stronger than toe board structure for terrain adaptability, and remaining structure is identical with conventional panels rock-fill dams, present invention knot
Structure is simple, compared with existing rock, have excavation supporting quantities is small, reduce the enrockment amount of filling and panel quantities,
Terrain adaptability is relatively strong, can reduce the advantages of slag field scale.
Brief description of the drawings
Fig. 1 is a kind of structural representation for the rock for exempting from toe board structure proposed by the present invention;
Fig. 2 is a kind of structural representation for the rock part A for exempting from toe board structure proposed by the present invention.
In figure:1- gravel laydown areas, 2- shock resistance panel layers, 3- panel enrockment toe boards, 4- panel enrockment substrates, 5- panels
The outer slope of enrockment substrate, 6- fill tunnel as mouth, 7- course of sandbags, 8- concrete stack layers, 9- upstreams rockfill area, enrockment under 10- downstream waters
Area, 11- support plates, the filling closure pipes of 12-, 13- fill tunnel closure pipe.
Embodiment
The invention will be further described with reference to the accompanying drawings and examples, but not as any limitation of the invention.
In the description of the invention, it is to be understood that term " on ", " under ", "front", "rear", "left", "right", " top ",
The orientation or position relationship of the instruction such as " bottom ", " interior ", " outer " are based on orientation shown in the drawings or position relationship, merely to just
In the description present invention and simplify description, rather than instruction or imply signified device or element must have specific orientation, with
Specific azimuth configuration and operation, therefore be not considered as limiting the invention.
Reference picture 1-2, support plate 11 that is a kind of to exempt from the rock of toe board structure, including assigning into water, supporting plate
11 side is provided with the outer slope 5 of panel enrockment substrate, and the outer slope 5 of panel enrockment substrate is provided with panel enrockment close to the side of support plate 11
Toe board 3, panel enrockment toe board 3 are provided with panel enrockment substrate 4, panel enrockment substrate 4 and support plate close to the side of support plate 11
Panel is provided between 11, panel includes shock resistance panel layer 2 and course of sandbags 7, and side of the support plate 11 away from panel is provided with panel
Rockfill, panel rockfill include rockfill area 10 under concrete stack layers 8, upstream rockfill area 9, gravel laydown area 1 and downstream water, mixed
Solidifying mound layer 8 is located at top side, and upstream rockfill area 9 is located at the downside of concrete stack layers 8, and gravel laydown area 1 is located at upstream enrockment
Under area 9 and downstream water between rockfill area 10, the upper end of support plate 11, which is inserted with, fills tunnel closure pipe 13, and fills tunnel closure pipe
13 one end connects with the inside of panel enrockment substrate 4, and the upper end for filling tunnel closure pipe 13 is inserted with filling closure pipe 12, panel
Space is left between enrockment substrate 4 and panel enrockment toe board 3, and gap is filled with granite stones layer, course of sandbags 7 is with stacking
Mode be placed between support plate 11, shock resistance panel layer 2 and panel enrockment substrate 4, concrete stack layers 8, upstream rockfill area
9th, the outside of rockfill area 10 includes impermeable steel wire under gravel laydown area 1 and downstream water, fills tunnel closure pipe 13 and filling
Closure pipe 12 between weld together, in panel enrockment substrate 4 fill tunnel closure pipe 13 one end be provided with fill tunnel as
Mouth 6.
In the present invention, because panel is attached on bedding material, not power transmission substantially is to toe board, as long as therefore connecting knot with panel
Structure keeps homeostasis.When side slope is compared with time slack, grout curtain is carried out at the top of side slope at former toe board position, when side slope is steeper
When, move towards location arrangements grouting tunnel along former toe board and carry out grout curtain, blocked behind the tunnel inducer that is in the milk.In slope table
After coating and completely decomposed layer etc. are disposed in face, grooving pours one piece of soleplate, and sealing is buried in the inside, reserved and slab joint,
Form periphery fissure.Due to substantially avoided the excavation of toe board side slope, reduce excavation supporting amount, while reduce enrockment and fill
Amount, decreases panel quantities.Soleplate, which is poured after completion reaches some strength, to be needed to carry out consolidation grouting.Due to soleplate
Follow contours pour, stronger than toe board structure for terrain adaptability.
Certainly, the above is the concrete application example of the present invention, and the present invention also has other embodiments, all using equivalent
The technical scheme that replacement or equivalent transformation are formed, all falls within protection domain of the presently claimed invention.
Claims (6)
- Exempt from the rock of toe board structure 1. a kind of, including the support plate (11) assigned into water, it is characterised in that the branch The side of fagging (11) is provided with the outer slope (5) of panel enrockment substrate, and the outer slope (5) of the panel enrockment substrate is close to support plate (11) Side is provided with panel enrockment toe board (3), and the panel enrockment toe board (3) is provided with panel heap ground mass close to the side of support plate (11) Plate (4), is provided with panel between the panel enrockment substrate (4) and support plate (11), the panel includes shock resistance panel layer (2) With course of sandbags (7), side of the support plate (11) away from panel is provided with panel rockfill, and the panel rockfill includes coagulation Rockfill area (10) under mound layer (8), upstream rockfill area (9), gravel laydown area (1) and downstream water, concrete stack layers (8) position In top side, the upstream rockfill area (9) is located at the downside of concrete stack layers (8), and the gravel laydown area (1) is located at upstream heap Under stone area (9) and downstream water between rockfill area (10), the upper end of the support plate (11), which is inserted with, fills tunnel closure pipe (13), It is described to fill the upper of tunnel closure pipe (13) and the one end for filling tunnel closure pipe (13) connects with the inside of panel enrockment substrate (4) End is inserted with filling closure pipe (12).
- A kind of 2. rock for exempting from toe board structure according to claim 1, it is characterised in that the panel heap ground mass Space is left between plate (4) and panel enrockment toe board (3), and gap is filled with granite stones layer.
- A kind of 3. rock for exempting from toe board structure according to claim 1, it is characterised in that the course of sandbags (7) It is placed in a stacked fashion between support plate (11), shock resistance panel layer (2) and panel enrockment substrate (4).
- A kind of 4. rock for exempting from toe board structure according to claim 1, it is characterised in that the concrete stack layers (8), impermeable steel wire is included on the outside of rockfill area (10) under upstream rockfill area (9), gravel laydown area (1) and downstream water.
- A kind of 5. rock for exempting from toe board structure according to claim 1, it is characterised in that the filling tunnel closure Weld together between pipe (13) and filling closure pipe (12).
- 6. a kind of rock for exempting from toe board structure according to claim 1, it is characterised in that positioned at panel heap ground mass One end of filling tunnel closure pipe (13) in plate (4), which is provided with, fills tunnel as mouth (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710772488.3A CN107587484B (en) | 2017-08-31 | 2017-08-31 | Panel rock-fill dam with toe board under small stress |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710772488.3A CN107587484B (en) | 2017-08-31 | 2017-08-31 | Panel rock-fill dam with toe board under small stress |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107587484A true CN107587484A (en) | 2018-01-16 |
CN107587484B CN107587484B (en) | 2023-03-24 |
Family
ID=61050802
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710772488.3A Active CN107587484B (en) | 2017-08-31 | 2017-08-31 | Panel rock-fill dam with toe board under small stress |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107587484B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109215116A (en) * | 2018-08-31 | 2019-01-15 | 贵州省水利水电勘测设计研究院 | A kind of rock-faced dam dam facing plate toe board structure integrated design method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101644041A (en) * | 2009-08-27 | 2010-02-10 | 中国水电顾问集团华东勘测设计研究院 | Face rockfill dam toe board structure constructed on completely weathered bed rock and construction method thereof |
CN105297685A (en) * | 2015-11-23 | 2016-02-03 | 中国电建集团贵阳勘测设计研究院有限公司 | Base concrete face rock fill dam and construction method thereof |
CN205077453U (en) * | 2015-08-21 | 2016-03-09 | 中国电建集团贵阳勘测设计研究院有限公司 | Dam structure that panel rock -fill dam and upstream cofferdam combine |
CN106120662A (en) * | 2016-08-17 | 2016-11-16 | 中国电建集团西北勘测设计研究院有限公司 | High-modulus rock-faced dam dam, a kind of local |
CN206015620U (en) * | 2016-08-25 | 2017-03-15 | 中国电建集团西北勘测设计研究院有限公司 | A kind of rock for preventing face slab rupture |
CN106759133A (en) * | 2017-01-13 | 2017-05-31 | 中国电建集团华东勘测设计研究院有限公司 | The mixing structure of dam type and construction method of a kind of homogeneous earth and rockfill dam and rock |
CN207143862U (en) * | 2017-08-31 | 2018-03-27 | 贵州省水利水电勘测设计研究院 | A kind of rock that toe board structure is replaced using grouting way |
-
2017
- 2017-08-31 CN CN201710772488.3A patent/CN107587484B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101644041A (en) * | 2009-08-27 | 2010-02-10 | 中国水电顾问集团华东勘测设计研究院 | Face rockfill dam toe board structure constructed on completely weathered bed rock and construction method thereof |
CN205077453U (en) * | 2015-08-21 | 2016-03-09 | 中国电建集团贵阳勘测设计研究院有限公司 | Dam structure that panel rock -fill dam and upstream cofferdam combine |
CN105297685A (en) * | 2015-11-23 | 2016-02-03 | 中国电建集团贵阳勘测设计研究院有限公司 | Base concrete face rock fill dam and construction method thereof |
CN106120662A (en) * | 2016-08-17 | 2016-11-16 | 中国电建集团西北勘测设计研究院有限公司 | High-modulus rock-faced dam dam, a kind of local |
CN206015620U (en) * | 2016-08-25 | 2017-03-15 | 中国电建集团西北勘测设计研究院有限公司 | A kind of rock for preventing face slab rupture |
CN106759133A (en) * | 2017-01-13 | 2017-05-31 | 中国电建集团华东勘测设计研究院有限公司 | The mixing structure of dam type and construction method of a kind of homogeneous earth and rockfill dam and rock |
CN207143862U (en) * | 2017-08-31 | 2018-03-27 | 贵州省水利水电勘测设计研究院 | A kind of rock that toe board structure is replaced using grouting way |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109215116A (en) * | 2018-08-31 | 2019-01-15 | 贵州省水利水电勘测设计研究院 | A kind of rock-faced dam dam facing plate toe board structure integrated design method |
Also Published As
Publication number | Publication date |
---|---|
CN107587484B (en) | 2023-03-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101298782B (en) | Method and system for basement engineering water proof and water drain | |
CN104131575B (en) | A kind of karst height grows the leak stopping water discharge method of the stratum dam foundation | |
CN106759104A (en) | Ecological slope protection structure and construction method | |
CN104652581B (en) | Multi-stage slope anchoring structure for realizing rainwater and sewage separation | |
CN106592614A (en) | Water leakage point blockage method in foundation pit water stop curtain | |
CN105781575A (en) | Water-rich stratum pipe piece combination structure and construction method thereof | |
CN110004991A (en) | Underground structure anti-floating system and construction method based on raised type tangs plate | |
CN105544622A (en) | Floating resisting device, and seepage insulation device and drainage path checking device thereof for underground building | |
CN110374060A (en) | A kind of the reservoir seepage-proofing structure and construction method of rock-fill dams dam facing and earth and stone material backfill bottom storehouse | |
CN106592346A (en) | Head chute separated type ballastless track cutting bed structure for middle-strong salinized soil areas | |
CN204174631U (en) | A kind of foundation ditch falls the water drainage structure in dark region | |
CN108547260A (en) | A kind of full library basin Anti-seeping technology structure of karst area and construction method | |
CN107816050A (en) | A kind of concrete cofferdam and earth rock cofferdam combined cofferdam and its construction method | |
CN107152012A (en) | Sluice construction technique | |
CN207537975U (en) | Deep covering layer top panel Rockfill Dam based moisture barrier structure | |
CN107881987A (en) | Deep covering layer top panel Rockfill Dam based moisture barrier structure | |
CN111424695B (en) | Seepage-proofing and leakage-stopping method for deep-buried karst pipeline | |
CN207143862U (en) | A kind of rock that toe board structure is replaced using grouting way | |
CN107587484A (en) | A kind of rock for exempting from toe board structure | |
CN108149637A (en) | A kind of vertical bank revetment structure and its construction method | |
CN106801402A (en) | A kind of construction method for the antiseepage of landscape artificial lake | |
CN208455573U (en) | A kind of full library basin Anti-seeping technology structure of karst area | |
CN107178088A (en) | A kind of basement waterproofing foundation pit structure and its construction method | |
CN209194466U (en) | A kind of Reservoir Bank leakage preventing structure | |
CN211312563U (en) | Anti-seepage and anti-impact overflow cofferdam structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20190911 Address after: 550081 No. 187 Shilin West Road, Guanshan Lake District, Guiyang City, Guizhou Province Applicant after: GUIZHOU WATER INVESTMENT GROUP Co.,Ltd. Applicant after: GUIZHOU SURVEY & DESIGN Research Institute FOR WATER RESOURCES AND HYDROPOWER Address before: 550002 No. 27 South Baoshan Road, Nanming District, Guizhou, Guiyang Applicant before: Guizhou Survey & Design Research Institute for Water Resources and Hydropower |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |