CN107575239A - A kind of portable shield launching device for small space - Google Patents

A kind of portable shield launching device for small space Download PDF

Info

Publication number
CN107575239A
CN107575239A CN201710962665.4A CN201710962665A CN107575239A CN 107575239 A CN107575239 A CN 107575239A CN 201710962665 A CN201710962665 A CN 201710962665A CN 107575239 A CN107575239 A CN 107575239A
Authority
CN
China
Prior art keywords
reaction frame
small space
launching device
side girder
stand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710962665.4A
Other languages
Chinese (zh)
Other versions
CN107575239B (en
Inventor
林锡坤
林辉
郑勇
黄进成
张雄辉
王涵林
杨帆
蔡智宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Water Power Urban Rail Transit Construction Co Ltd
Original Assignee
Guangdong Water Power Urban Rail Transit Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Water Power Urban Rail Transit Construction Co Ltd filed Critical Guangdong Water Power Urban Rail Transit Construction Co Ltd
Priority to CN201710962665.4A priority Critical patent/CN107575239B/en
Publication of CN107575239A publication Critical patent/CN107575239A/en
Application granted granted Critical
Publication of CN107575239B publication Critical patent/CN107575239B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of portable shield launching device for small space, including originating stand, reaction frame, horizontal support and reference rings, stand is originated to be fixed on starting well bottom plate, the both sides for originating stand are respectively fixed with side girder, an at least row positioning screw hole is respectively provided with the side girder of both sides, reaction frame is connected with arbitrary positioning screw hole on the side girder of both sides respectively by bolt, reaction frame is set vertically to be removably attached on the side girder of both sides, special-shaped ring flat-plate is fixed with reaction frame, reference rings are located at the front of reaction frame with leaving spacing, horizontal support ring is distributed between reaction frame and reference rings, and the both ends of horizontal support ring are separately fixed in special-shaped ring flat-plate and reference rings, make reaction frame, an entirety is formed between horizontal support and reference rings.The present invention saves construction cost and duration, and can be shield material and the enough working spaces of offer that are unearthed in small space without the negative endless tube piece of assembly.

Description

A kind of portable shield launching device for small space
Technical field
The present invention relates to a kind of device of shield method tunnel construction technical field, more particularly to one kind to be used for narrow and small sky Between middle shield launching portable shield launching device.
Background technology
At present, shield method occupies in the constructing tunnel fields such as subway tunnel, diversion, water supply tunnel, electric power tunnel Leading position, it is widely used.Depending on originating place size, shield can use entirety or separate launching, but no matter adopt Originated with which kind of mode, be required to a kind of device that enough counter-forces can be provided for shield machine driving, shield launching device is shield The prerequisite originated.
At present, the widely used fixed reaction frame of shield-tunneling construction adds the combination of assembled negative endless tube piece to be filled as shield launching Put.Reaction frame is fixed, and shield machine often pushes ahead a cell distance, i.e., an assembled ring bears ring between reaction frame and shield machine Section of jurisdiction, the rear end face of negative endless tube piece group are close to reaction frame, and front end face is close to the jack of shield machine, by negative endless tube piece group and instead Power frame provides enough propulsive thrust for shield machine, pushes ahead shield machine.So circulation, ensure smoothly originating for shield machine. After shield machine is tunneled to certain distance, shield shell meets shield thrust with stratum frictional force, and shield launching device no longer transmits shield After structure thrust, then shield launching device is removed, that is, remove reaction frame and negative endless tube piece group.
This shield launching device has some limitations:(1) need to make, hang in and install a number of negative ring Section of jurisdiction, and terminate to need to remove negative endless tube piece in construction and hang out, cause the problem of construction cost is big, long in time limit;(2) The assembly of negative endless tube piece has certain requirement to place size, though the assembly of negative endless tube piece, field can be met in narrow and small place The limitation on ground causes the construction of negative endless tube piece to have certain difficulty, and efficiency of construction high degree reduces;(3) in narrow and small place In, because negative endless tube piece occupies great space, shield material, the handling and transport of the earthwork are have impact on, because space limits, only The earthwork can be transported using hoist engine, each earthwork transportation amount is 1-2 side, and handling is extremely inefficient often up to 17 times.
The content of the invention
In order to solve the above-mentioned technical problem, the invention provides a kind of portable shield launching dress for small space Put, it has certain flexibility without assembled negative endless tube piece, saving construction cost and duration, can in small space For handling, the conevying efficiency of shield material and the be unearthed enough working spaces of offer, raising shield material and the earthwork.
In order to realize the purpose of the present invention, used technical scheme is:A kind of portable shield for small space Initiator device, including originate stand, reaction frame, horizontal support and reference rings, it is characterised in that:The stand that originates is fixed on the beginning Send out on the plate of shaft bottom, the both sides for originating stand are respectively fixed with along the side girder for originating the setting of stand direction, the side of both sides Be respectively provided with longeron at least one row along side girder direction set positioning screw hole, the reaction frame by bolt respectively with both sides Side girder on arbitrary positioning screw hole connection, reaction frame is vertically removably attached on the side girder of both sides, it is described Special-shaped ring flat-plate is fixed with reaction frame, the reference rings are located at the front of reaction frame, the horizontal support ring with leaving spacing It is distributed between reaction frame and reference rings, and the both ends of horizontal support ring are separately fixed in special-shaped ring flat-plate and reference rings, are made anti- An entirety is formed between power frame, horizontal support and reference rings.
As a further improvement on the present invention, in addition to diagonal brace, one end of the diagonal brace are fixed on reaction frame, the other end It is removably attached to by bolt on side girder.
As a further improvement on the present invention, the diagonal brace and the angle originated between stand are 38 degree.
As a further improvement on the present invention, the reference rings are annular, are welded by upper and lower two parts assembly.
As a further improvement on the present invention, the bottom of the reference rings is provided with orientation traveling wheel, the orientation walking Pulley can be close on the shield tail internal valve of shield machine.
As a further improvement on the present invention, the starting well bottom plate is provided with built-in fitting, described to originate stand and side is indulged Any one of beam or both is welded on built-in fitting.
As a further improvement on the present invention, the built-in fitting includes connecting plate and is located at least one set of connecting plate bottom Anchor rib, every group of anchor rib include two anchor ribs, the anchor rib in J-shaped, every group of two anchor ribs and connecting plate it Between be in π shape structures.
As a further improvement on the present invention, in addition to saddle and jack, the saddle are removably solid by bolt It is scheduled on the side girder at reaction frame rear, the jack is between saddle and reaction frame, and the jack is using saddle as branch Support point, thrust is on reaction frame.
As a further improvement on the present invention, the reaction frame is rectangular frame, and four edges of the reaction frame are equal Provided with oblique pedestal, oblique pedestal forms triangular structure with adjacent both sides.
As a further improvement on the present invention, the horizontal support uses seamless steel pipe, and the both ends of seamless steel pipe are welded with Flange, the horizontal support are separately fixed on special-shaped ring flat-plate and reference rings by the flange at both ends.
Beneficial effects of the present invention are:The present invention is set by setting side girder in the both sides for originating stand in side girder An at least row positioning screw hole is put, reaction frame is removably attached to by bolt on side girder, by tightening, quick-release bolt, Reaction frame is set arbitrarily to change fixed position on side girder.When carrying out shield launching, reaction frame, horizontal support and benchmark Ring forms a generally shield machine and provides propulsive thrust, and the jack of shield machine is acted in reference rings, and shield machine is pushed away using counter Power moves forward, and reaction frame needs to be moved forward along side girder according to the forward movement of shield machine, by reaction frame forward Running transform fixed position, horizontal support and reference rings move so that after shield machine moves forward, the jack of shield machine It still is able to act in reference rings, is moved forward so as to continue with propulsive thrust, so circulation, until completes shield launching.It is logical The present invention is crossed, without the negative endless tube piece of assembly, the process such as eliminates the manufacture of negative endless tube piece, hang in, be assembled, removing and hanging out, from And construction cost is reduced, save the duration;In the present invention, the space shared by negative endless tube piece, reaction frame, horizontal support and base are eliminated Lead ring can move with the movement of shield, in small space, with the movement of reaction frame, horizontal support and reference rings, Certain working space can be provided for shield-tunneling construction at reaction frame rear, be effectively utilized limited space, so as to Possess dregs bucket and hang native operating condition, it is possible to increase shield material and earthwork transportation efficiency;The present invention can reduce security risk point, Due to without assembled negative endless tube piece, negative endless tube piece lifting risk can be reduced, further, since space is sufficient, without using hoist engine Carry out hanging soil, avoid hoist engine use from colliding the event of hurting sb.'s feelings.
Brief description of the drawings
Fig. 1 is overall structure front view of the present invention;
Fig. 2 is overall structure side view of the present invention;
Fig. 3 is reaction frame of the present invention and originates stand schematic diagram;
Fig. 4 originates stand top view to be of the present invention;
Fig. 5 is special-shaped ring flat-plate schematic diagram of the present invention;
Fig. 6 is reference rings schematic diagram of the present invention;
Description of symbols:1- originates stand, 11- side girders, 12- positioning screw holes, 2- reaction frames, the oblique pedestals of 21-, 22- abnormity Ring flat-plate, 3- diagonal braces, 4- horizontal supports, 41- flanges, 5- reference rings, 51- orientations traveling wheel, 6- starting wells bottom plate, 61- are pre-buried Part, 62- connecting plates, 63- anchor ribs, 7- shield machines.
Embodiment
With reference to specific embodiment and accompanying drawing, the invention will be further described.
Guangzhou electric power tunnel civil engineering, originate well construction headroom size 23*8.4m, deep 17.5m, the diameter of shield machine 7 4.36m, shield body length 7.7m, weigh about 200 tons, begun using a kind of portable shield for small space of the present invention Transmitting apparatus carries out shield launching, and specific implementation is as follows:
As shown in figures 1 to 6, a kind of portable shield launching device for small space, including originate stand 1, reaction frame 2nd, diagonal brace 3, horizontal support 4 and reference rings 5.
Originate stand 1 and use steel structural form, be assemblied to form by two sections that length is respectively 9m and 4m, be mainly used in bearing The frictional force when gravity of shield machine 7 and propulsion.Originate stand 1 both sides be respectively and fixedly provided with along originate the direction of stand 1 setting Side girder 11, side girder 11 use steel box structure, and side girder 11 is provided with the positioning spiral shell that two row are set along the direction of side girder 11 Hole 12.
Because shield machine 7 weighs about 200 tons, so enough rigidity, intensity must be had by originating stand 1.In starting well It is embedded with 12 pieces of built-in fittings 61 on bottom plate 6, built-in fitting 61 is made of Steel material, including connecting plate 62 and is located at the bottom of connecting plate 62 Six groups of anchor ribs 63 in portion, each side three groups, every group of anchor rib 63 includes two anchor ribs 63, anchor rib 63 in J-shaped, It is in π shape structures between every group of two anchor ribs 63 and connecting plate 62.
Originate stand 1 and side girder 11 is fixed on starting well bottom plate 6, and effectively welded with built-in fitting 61, by pre-buried Part 61 provides enough anchor forces and resistance horizontal shear force, and movable type shield launching device is overall backward when avoiding shield driving Move and float.
Originate stand 1 and side girder 11 and gone into the well before shield machine 7 goes into the well assembling and location and installation and reinforced, originate stand 1 Connection between each component, and the connection originated between stand 1 and side girder 11 use M24, and intensity is 8.8 grade high-strength spiral shells Bolt, screw aperture are all higher than bolt 2mm.
Reaction frame 2 is rectangular frame, is made up of the underbeam of the upper beam at top, the column of both sides and bottom, the four of reaction frame 2 Individual edge is equipped with oblique pedestal 21, and oblique pedestal 21 forms triangular structure with adjacent both sides, using the stability of triangle, The support effect of reaction frame 2 can be improved.
Reaction frame 2 is connected with arbitrary positioning screw hole 12 on the side girder 11 of both sides respectively by bolt, reaction frame 2 is hung down Directly it is removably attached on the side girder 11 of both sides, the fixed position of reaction frame 2 is entered according to the propulsion position of shield machine 7 Row changes.
To ensure the uniform force of reaction frame 2, ensure reaction frame 2 end face is smooth and globality, fixed on reaction frame 2 different Shape ring flat-plate 22, the thrust of transmission is first acted on special-shaped ring flat-plate 22, then be transferred on reaction frame 2.
Reaction frame 2 is accurately positioned before installing, it is necessary to ask and originate stand 1, and is computed checking, to ensure the vertical of reaction frame 2 When pouring into a mould portal after being removed to position in nullring concrete section of jurisdiction, meet the physical dimension and connection request and the stabilization of support of portal Property.
2 each component of reaction frame is hung in starting well with gantry and docked with side girder 11 after installation on ground is good, reaction frame 2 Between each component connecting bolt use M24, the connecting bolt between reaction frame 2 and side girder 11 uses M30, intensity 10.9S Level steel construction high-strength bolt, screw aperture is all higher than bolt 2mm.
In order to ensure that shield machine 7 originates posture, when installing reaction frame 2 and originating stand 1, it need to ensure that originating stand 1 determines Within ± 10mm, height variation is controlled within ± 5mm for position installation left-right deviation control, the control of upper lower deviation ± 10mm it It is interior, to control the installation accuracy of reaction frame 2.Originate the angle < of the vertical direction of the horizontal axis of stand 1 and reaction frame 2 ± 2 ‰, shield attitude and design axis vertical trend deviation < 2 ‰, horizontal departure < ± 3 ‰.
Diagonal brace 3 is that reaction frame 2 provides back seat counter-force, ensures that shield machine 7 tunnels forward required thrust, diagonal brace 3 uses H types Steel I40b Three kinds of hors d'oeuvres is formed, and twice are set at the rear portion of reaction frame 2.Diagonal brace 3 and the angle originated between stand 1 are 38 degree.Diagonal brace 3 One end is fixed on reaction frame 2, and the other end is removably attached on side girder 11 by bolt, the fixed position of diagonal brace 3 with The change of reaction frame 2 and change.
Reference rings 5 are located at the front of reaction frame 2 with leaving spacing, are annular, by the assembled welding of upper and lower two half part Into, two bottom sides are provided with orientation traveling wheel 51, and orientation traveling wheel 51 can be close on the shield tail internal valve of shield machine 7, It is easy to reference rings 5 to walk and play a supportive role on shield tail internal valve.
When reference rings 5 are installed, first it will install and move to shaft bottom, and by the latter half under upper lower half two parts straddle truck Fixed in shield tail with channel-section steel;Then two hangers are welded on the point of shield tail 1 position, 11 point positions, will with two 2T chain block The top half of reference rings 5 is sling and welded with the latter half assembly.Reference rings 5 use two half parts composition up and down, are easy to transport Defeated and assembling.
Power transmission connection component on the basis of horizontal support 4 between ring 5 and reaction frame 2, horizontal support 4 use length for 1.84m, φ 219mm, thick 2cm seamless steel pipe, the both ends of seamless steel pipe are welded with flange 41.Horizontal support 4 totally 14, ring It is evenly distributed between reaction frame 2 and reference rings 5, and horizontal support 4 is separately fixed at special-shaped ring flat-plate by the flange 41 at both ends 22 and reference rings 5 on, make between reaction frame 2, horizontal support 4 and reference rings 5 formed an entirety.
During shield launching, the jack of shield machine 7 is acted in reference rings 5, passes through portable shield launching device Propulsive thrust promote shield machine 7 move forward.The thrust that reference rings 5 are subject to is transferred to special-shaped ring flat-plate 22 by horizontal support 4, passes therewith Reaction frame 2 is handed to, side girder 11 is then transferred to by diagonal brace 3 and originated on stand 1, is finally transferred to starting well bottom plate 6.Indulge side Beam 11 is steel box structure, big with the contact area of starting well bottom plate 6, power can be converted into area load by load, weaken and pass It is handed to the power of starting well bottom plate 6.
In shield tunneling process, reaction frame 2 needs to be moved forward along side girder 11 according to the reach of shield machine 7, can Applying external force in several ways moves forward reaction frame 2.In the present embodiment, pass through saddle and jack (not indicated in figure) Move forward reaction frame 2, saddle is removably attached to by bolt on the side girder 11 at the rear of reaction frame 2, jack position Between saddle and reaction frame 2, jack using saddle as the strong point, thrust on reaction frame 2, so as to by reaction frame 2 to It is preceding promotion one unit, then change saddle fixed position, by saddle to reach one unit, then fix, again by Jack promotes reaction frame 2, and so on, realizes the movement of reaction frame 2.
In the Guangzhou electric power tunnel civil engineering, starting well length 23m, only meet shield machine 7, connecting bridge and 8# chassis pendulum Put.At the initial stage that originates, shield machine 7 enters building enclosure diaphram wall, and driving thrust reaches 500t, and cylinder jack acts on base On lead ring 5, enough propulsive thrust is provided for the driving of shield machine 7.
When carrying out shield launching, shield machine 7 often moves forward 1m, portable shield launching device and then mobile 1m, specific behaviour Make as follows:First, the jack of shield machine 7 is acted in reference rings 5, and shield machine 7 is by propulsive thrust drilling depth 1m;2nd, shield is shunk The jack cylinder of machine 7;3rd, reaction frame 2, diagonal brace 3 are released and originates the bolt between stand 1;4th, elongation acts on reaction frame 2 On jack, reaction frame 2 is moved forward 1m, diagonal brace 3, horizontal support 4 and reference rings 5 move forward 1m, reference rings 5 and shield machine therewith 7 jack is mobile in place effectively to top;5th, second leg drilling depth.So circulation, until completing shield launching.In above-mentioned step In rapid, the surface soldered bracket of shield machine 7 is effectively fixed with originating stand 1, prevents shield machine 7 from retreating.The movement of reaction frame 2 is completed Afterwards, saddle and jack are dismantled, both are moved forward fixed after 1m, in order to the movement of reaction frame 2 next time.
Portable shield launching device stops movement when being moved to openings position, bolt fixes reaction frame 2, is shield driving Fixed counter-force is provided.Now, by the movement of portable shield launching device, 8m effective operations space is provided for active well, Dregs flows into dregs bucket by chute, hangs soil using 25t straddle trucks side, often by 8# chassis Belt Conveying to chassis afterbody The side of dipper capacity 6,41 ring dregs amount handlings of completion.After shield machine 7 enters soil body 15m, starting well meets electric locomotive with transporting Dolly working space, material and dregs are transported using electric locomotive.The transport of materials efficiency such as dregs and section of jurisdiction is improved, reduces construction Security risk point, ensure that shield machine 7 tunnels at least 4 rings/day, shorten the shield launching time.
In summary, such as specification and diagramatic content actual sample is made and through test is used for multiple times in the present invention, from making Seen with the effect of test, the provable present invention can reach its desired purpose, and practical value is unquestionable.It is provided above Embodiment only illustrates the present invention for convenient, not makees any formal limitation, any affiliated technology neck to the present invention Have usually intellectual in domain, if in the range of not departing from the present invention and carrying technical characteristic, utilize disclosed technology The equivalent embodiment for locally changing or modifying made by content, and without departing from the technical feature content of the present invention, still fall within In the range of the technology of the present invention feature.

Claims (10)

1. a kind of portable shield launching device for small space, including originate stand, reaction frame, horizontal support and benchmark Ring, it is characterised in that:The stand that originates is fixed on starting well bottom plate, the both sides for originating stand be respectively fixed with along The side girder of stand direction setting is originated, the positioning that at least one row are set along side girder direction is respectively provided with the side girder of both sides Screw, the reaction frame are connected with arbitrary positioning screw hole on the side girder of both sides respectively by bolt, make reaction frame vertically It is removably attached on the side girder of both sides, special-shaped ring flat-plate is fixed with the reaction frame, the reference rings are with leaving spacing The front of reaction frame is located at, the horizontal support ring is distributed between reaction frame and reference rings, and the both ends of horizontal support ring It is separately fixed in special-shaped ring flat-plate and reference rings, makes to form an entirety between reaction frame, horizontal support and reference rings.
A kind of 2. portable shield launching device for small space according to claim 1, it is characterised in that:Also wrap Diagonal brace is included, one end of the diagonal brace is fixed on reaction frame, and the other end is removably attached on side girder by bolt.
A kind of 3. portable shield launching device for small space according to claim 2, it is characterised in that:It is described Diagonal brace and the angle originated between stand are 38 degree.
A kind of 4. portable shield launching device for small space according to claim 1, it is characterised in that:It is described Reference rings are annular, are welded by upper and lower two parts assembly.
A kind of 5. portable shield launching device for small space according to claim 1, it is characterised in that:It is described The bottom of reference rings is provided with orientation traveling wheel, and the orientation traveling wheel can be close on the shield tail internal valve of shield machine.
A kind of 6. portable shield launching device for small space according to claim 1, it is characterised in that:It is described Starting well bottom plate is provided with built-in fitting, and described any one of stand and side girder or both of originating is welded on built-in fitting.
A kind of 7. portable shield launching device for small space according to claim 6, it is characterised in that:It is described Built-in fitting includes connecting plate and is located at least one set of anchor rib of connecting plate bottom, and every group of anchor rib includes two anchor ribs, institute It is in J-shaped to state anchor rib, and two of every group are in π shape structures between anchor rib and connecting plate.
A kind of 8. portable shield launching device for small space according to claim 1, it is characterised in that:Also wrap Saddle and jack are included, the saddle is removably attached to by bolt on the side girder at reaction frame rear, the jack Between saddle and reaction frame, the jack is using saddle as the strong point, and thrust is on reaction frame.
A kind of 9. portable shield launching device for small space according to claim 1, it is characterised in that:It is described Reaction frame is rectangular frame, and four edges of the reaction frame are equipped with oblique pedestal, and oblique pedestal forms three with adjacent both sides Angular structure.
A kind of 10. portable shield launching device for small space according to claim 1, it is characterised in that:Institute State horizontal support and use seamless steel pipe, the both ends of seamless steel pipe are welded with flange, the flange point that the horizontal support passes through both ends It is not fixed in special-shaped ring flat-plate and reference rings.
CN201710962665.4A 2017-10-16 2017-10-16 Movable shield launching device for narrow space Active CN107575239B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710962665.4A CN107575239B (en) 2017-10-16 2017-10-16 Movable shield launching device for narrow space

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710962665.4A CN107575239B (en) 2017-10-16 2017-10-16 Movable shield launching device for narrow space

Publications (2)

Publication Number Publication Date
CN107575239A true CN107575239A (en) 2018-01-12
CN107575239B CN107575239B (en) 2024-04-02

Family

ID=61037364

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710962665.4A Active CN107575239B (en) 2017-10-16 2017-10-16 Movable shield launching device for narrow space

Country Status (1)

Country Link
CN (1) CN107575239B (en)

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108049882A (en) * 2018-01-22 2018-05-18 中交第二航务工程局有限公司 Extra small starting well shield separate launching push construction method and its thrustor
CN108104836A (en) * 2018-01-31 2018-06-01 中铁四局集团有限公司 A kind of shield semi-ring is originated originates construction method with top counter-force support system and shield semi-ring
CN108661655A (en) * 2018-05-11 2018-10-16 中铁四局集团有限公司 A kind of big cross section shape of a hoof earth pressure balanced shield, EPBS method for tunnel construction based on shape of a hoof shield machine
CN108755755A (en) * 2018-06-19 2018-11-06 中交第二航务工程局有限公司 The prefabricated assembled piping lane of fragment equips the counterforce device originated
CN108868790A (en) * 2018-08-10 2018-11-23 中铁四局集团有限公司 Without the detachable reaction frame of the U-shaped shield of cutterhead
CN109026033A (en) * 2018-07-23 2018-12-18 石家庄铁道大学 A kind of counterforce device in shield ancillary equipment
CN109162760A (en) * 2018-09-12 2019-01-08 中交第二航务工程局有限公司 A kind of constructing metro tunnel safety-door device and its construction method
CN109839496A (en) * 2019-04-01 2019-06-04 粤水电轨道交通建设有限公司 A kind of tail seal grease of shield height emulation detection device and detection method
CN109869160A (en) * 2019-04-16 2019-06-11 中铁工程装备集团有限公司 A kind of shield launching device
CN110043273A (en) * 2019-04-18 2019-07-23 广东欣龙隧道装备股份有限公司 A kind of reaction frame installation method
CN110273691A (en) * 2019-08-05 2019-09-24 中交路桥北方工程有限公司 A kind of shield machine reaction frame
CN110454191A (en) * 2019-08-21 2019-11-15 中建八局轨道交通建设有限公司 The construction method of the length adjustment ring of negative endless tube piece and negative endless tube piece
CN110500106A (en) * 2019-10-09 2019-11-26 北京市市政四建设工程有限责任公司 A kind of shield launching reaction frame component
CN110513118A (en) * 2019-10-09 2019-11-29 北京市市政四建设工程有限责任公司 A kind of shield originates structure without negative ring and originates technique
CN110529129A (en) * 2019-10-09 2019-12-03 中建八局轨道交通建设有限公司 For the shield launching counter-force support device and counter-force method for supporting in narrow space
CN110566216A (en) * 2019-10-09 2019-12-13 北京市市政四建设工程有限责任公司 steel ring structure for shield launching
CN111173525A (en) * 2020-03-05 2020-05-19 西南科技大学 Supporting device for shield to penetrate building
CN111206936A (en) * 2020-02-10 2020-05-29 中铁二院重庆勘察设计研究院有限责任公司 Construction method for assembling and launching in shield tunnel
CN111456745A (en) * 2020-04-10 2020-07-28 齐鲁交通发展集团有限公司 Dragging device and dragging method for shield host in tunnel
CN112554893A (en) * 2020-11-18 2021-03-26 中交一公局厦门工程有限公司 Shield constructs quick-witted steel sleeve and starts supporting sealing system
CN113236267A (en) * 2021-06-25 2021-08-10 中铁工程装备集团技术服务有限公司 Shield starting counterforce device and using method thereof
CN114876475A (en) * 2022-05-26 2022-08-09 西南交通大学 Movable electric control shield launching device and control method thereof
CN115263342A (en) * 2022-07-29 2022-11-01 华东交通大学 Multifunctional operation frame for chiseling construction of earth pressure balance shield tunnel portal
CN110500106B (en) * 2019-10-09 2024-06-21 北京市市政四建设工程有限责任公司 Reaction frame assembly for shield launching

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002276288A (en) * 2001-01-12 2002-09-25 Morimotogumi:Kk Starting structure for excavator
JP2003035087A (en) * 2001-07-26 2003-02-07 Geo-Research Institute Starting method for shield machine
JP2003328680A (en) * 2002-05-14 2003-11-19 Hitachi Constr Mach Co Ltd Pipe jacking machine and pipe jacking method
JP2008196260A (en) * 2007-02-15 2008-08-28 Shimizu Corp Starting method of shield machine
CN101922295A (en) * 2010-08-23 2010-12-22 上海市第一市政工程有限公司 Shield translating station-crossing counter force system
CN102758634A (en) * 2012-08-01 2012-10-31 上海隧道工程股份有限公司 Assembling type reaction frame device for shield launching and propulsion
CN203905950U (en) * 2014-06-10 2014-10-29 中铁建设投资集团有限公司 Movable counterforce device used for shield-construction origination shaft
CN104653229A (en) * 2015-01-27 2015-05-27 粤水电轨道交通建设有限公司 Shielding sliding shoe curvilinear pushing-up hole-passing construction method
CN105178968A (en) * 2013-11-13 2015-12-23 葛洲坝集团第一工程有限公司 Pushing and supporting device of tunneling machine and construction method
CN107152285A (en) * 2017-04-28 2017-09-12 淮安市中球盾构技术服务有限公司 For shield launching and the servicing unit of reception
CN207278264U (en) * 2017-10-16 2018-04-27 粤水电轨道交通建设有限公司 A kind of portable shield launching device for small space

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002276288A (en) * 2001-01-12 2002-09-25 Morimotogumi:Kk Starting structure for excavator
JP2003035087A (en) * 2001-07-26 2003-02-07 Geo-Research Institute Starting method for shield machine
JP2003328680A (en) * 2002-05-14 2003-11-19 Hitachi Constr Mach Co Ltd Pipe jacking machine and pipe jacking method
JP2008196260A (en) * 2007-02-15 2008-08-28 Shimizu Corp Starting method of shield machine
CN101922295A (en) * 2010-08-23 2010-12-22 上海市第一市政工程有限公司 Shield translating station-crossing counter force system
CN102758634A (en) * 2012-08-01 2012-10-31 上海隧道工程股份有限公司 Assembling type reaction frame device for shield launching and propulsion
CN105178968A (en) * 2013-11-13 2015-12-23 葛洲坝集团第一工程有限公司 Pushing and supporting device of tunneling machine and construction method
CN203905950U (en) * 2014-06-10 2014-10-29 中铁建设投资集团有限公司 Movable counterforce device used for shield-construction origination shaft
CN104653229A (en) * 2015-01-27 2015-05-27 粤水电轨道交通建设有限公司 Shielding sliding shoe curvilinear pushing-up hole-passing construction method
CN107152285A (en) * 2017-04-28 2017-09-12 淮安市中球盾构技术服务有限公司 For shield launching and the servicing unit of reception
CN207278264U (en) * 2017-10-16 2018-04-27 粤水电轨道交通建设有限公司 A kind of portable shield launching device for small space

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
辜长军;: "广州地铁复合地层盾构掘进施工技术", 工程科技, no. 01 *

Cited By (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108049882B (en) * 2018-01-22 2023-06-27 中交第二航务工程局有限公司 Shield split starting pushing construction method and pushing device for ultra-small starting well
CN108049882A (en) * 2018-01-22 2018-05-18 中交第二航务工程局有限公司 Extra small starting well shield separate launching push construction method and its thrustor
CN108104836A (en) * 2018-01-31 2018-06-01 中铁四局集团有限公司 A kind of shield semi-ring is originated originates construction method with top counter-force support system and shield semi-ring
CN108104836B (en) * 2018-01-31 2023-05-30 中铁四局集团有限公司 Upper counter-force supporting system for shield semi-ring initiation and shield semi-ring initiation construction method
CN108661655A (en) * 2018-05-11 2018-10-16 中铁四局集团有限公司 A kind of big cross section shape of a hoof earth pressure balanced shield, EPBS method for tunnel construction based on shape of a hoof shield machine
CN108661655B (en) * 2018-05-11 2020-03-17 中铁四局集团有限公司 Large-section U-shaped earth pressure balance shield tunnel construction method based on U-shaped shield machine
CN108755755A (en) * 2018-06-19 2018-11-06 中交第二航务工程局有限公司 The prefabricated assembled piping lane of fragment equips the counterforce device originated
CN109026033A (en) * 2018-07-23 2018-12-18 石家庄铁道大学 A kind of counterforce device in shield ancillary equipment
CN108868790A (en) * 2018-08-10 2018-11-23 中铁四局集团有限公司 Without the detachable reaction frame of the U-shaped shield of cutterhead
CN109162760A (en) * 2018-09-12 2019-01-08 中交第二航务工程局有限公司 A kind of constructing metro tunnel safety-door device and its construction method
CN109162760B (en) * 2018-09-12 2024-02-27 中交第二航务工程局有限公司 Safety door device for subway tunnel construction and construction method thereof
CN109839496B (en) * 2019-04-01 2024-05-07 粤水电轨道交通建设有限公司 Shield tail sealing grease high-simulation detection equipment and detection method
CN109839496A (en) * 2019-04-01 2019-06-04 粤水电轨道交通建设有限公司 A kind of tail seal grease of shield height emulation detection device and detection method
CN109869160A (en) * 2019-04-16 2019-06-11 中铁工程装备集团有限公司 A kind of shield launching device
CN109869160B (en) * 2019-04-16 2024-03-26 中铁工程装备集团有限公司 Device for starting shield tunneling machine
CN110043273A (en) * 2019-04-18 2019-07-23 广东欣龙隧道装备股份有限公司 A kind of reaction frame installation method
CN110273691A (en) * 2019-08-05 2019-09-24 中交路桥北方工程有限公司 A kind of shield machine reaction frame
CN110454191A (en) * 2019-08-21 2019-11-15 中建八局轨道交通建设有限公司 The construction method of the length adjustment ring of negative endless tube piece and negative endless tube piece
CN110500106A (en) * 2019-10-09 2019-11-26 北京市市政四建设工程有限责任公司 A kind of shield launching reaction frame component
CN110566216A (en) * 2019-10-09 2019-12-13 北京市市政四建设工程有限责任公司 steel ring structure for shield launching
CN110513118A (en) * 2019-10-09 2019-11-29 北京市市政四建设工程有限责任公司 A kind of shield originates structure without negative ring and originates technique
CN110500106B (en) * 2019-10-09 2024-06-21 北京市市政四建设工程有限责任公司 Reaction frame assembly for shield launching
CN110529129A (en) * 2019-10-09 2019-12-03 中建八局轨道交通建设有限公司 For the shield launching counter-force support device and counter-force method for supporting in narrow space
CN111206936A (en) * 2020-02-10 2020-05-29 中铁二院重庆勘察设计研究院有限责任公司 Construction method for assembling and launching in shield tunnel
CN111206936B (en) * 2020-02-10 2021-03-02 中铁二院重庆勘察设计研究院有限责任公司 Construction method for assembling and launching in shield tunnel
CN111173525A (en) * 2020-03-05 2020-05-19 西南科技大学 Supporting device for shield to penetrate building
CN111456745A (en) * 2020-04-10 2020-07-28 齐鲁交通发展集团有限公司 Dragging device and dragging method for shield host in tunnel
CN112554893A (en) * 2020-11-18 2021-03-26 中交一公局厦门工程有限公司 Shield constructs quick-witted steel sleeve and starts supporting sealing system
CN113236267A (en) * 2021-06-25 2021-08-10 中铁工程装备集团技术服务有限公司 Shield starting counterforce device and using method thereof
CN114876475A (en) * 2022-05-26 2022-08-09 西南交通大学 Movable electric control shield launching device and control method thereof
CN115263342A (en) * 2022-07-29 2022-11-01 华东交通大学 Multifunctional operation frame for chiseling construction of earth pressure balance shield tunnel portal
CN115263342B (en) * 2022-07-29 2023-03-31 华东交通大学 Multifunctional operation frame for earth pressure balance shield tunnel portal chiseling construction

Also Published As

Publication number Publication date
CN107575239B (en) 2024-04-02

Similar Documents

Publication Publication Date Title
CN107575239A (en) A kind of portable shield launching device for small space
CN207278264U (en) A kind of portable shield launching device for small space
CN103243961B (en) Titanium plate steel inner tank reversed construction device for chimney of thermal power station
CN104033157B (en) For the packaged type counter-force equipment of launching shaft
CN103882813B (en) For calf support platform and the building method thereof of bridge pier and straining beam synchronous construction
CN104632251A (en) Integrally cast type mould plate trolley and construction method of concrete pouring of underground passage
CN103510541B (en) In a kind of mast-up hole, the device of steel pipe column is installed in lifting
CN106401592A (en) Construction method for tunnel boring off-contact sending and receiving platform of up-down overlapped tunnel
JP6345077B2 (en) Conveying apparatus and conveying method
CN210152292U (en) Horizontal sliding device
JP6349339B2 (en) Floor slab, bearing, inner wall, joint formwork and floor slab erection crane
KR100867238B1 (en) Separation of top and bottom possible electric moving car
CN103205526A (en) Pushing installation method for large converter
CN202139255U (en) Tooling platform for assembling converter body equipment
CN102146492A (en) Method for installing converter body equipment and tooling platform
CN107642089B (en) Narrow space concrete pouring method
CN210483094U (en) Inverted triangular pipe truss lifting device
CN106013014B (en) A kind of jacked piles with small section side wall lining formwork erection constructing device
CN104895108A (en) Bailey piece assembled movable-type truss unilateral framework system construction method
CN205977228U (en) Overlap that tunnel shield is built on stilts to start and receiving platform about being used for
CN201908665U (en) Movable variable-cross section lining trolley
CN110029671A (en) A kind of steep slope pile foundation steel bar cage transfers construction technology using aperture bracket section by section
CN206092014U (en) Interim support system transfer table car suitable for multi -pilot is wide open and digs
CN212614758U (en) Open cut tunnel is from moving lining cutting platform truck that props formula
CN114250807A (en) Lifting corridor platform, prefabricated pipe corridor assembly system and prefabricated pipe corridor construction process

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant