CN110454191A CN201910772264.1A CN201910772264A CN110454191A CN 110454191 A CN110454191 A CN 110454191A CN 201910772264 A CN201910772264 A CN 201910772264A CN 110454191 A CN110454191 A CN 110454191A
Authority
CN
China
Prior art keywords
endless tube
tube piece
plate
negative endless
ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910772264.1A
Other languages
Chinese (zh)
Other versions
CN110454191B (en
Inventor
谭瑞
李念国
唐立宪
车家伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rail Transit Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Rail Transit Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rail Transit Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Rail Transit Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201910772264.1A priority Critical patent/CN110454191B/en
Publication of CN110454191A publication Critical patent/CN110454191A/en
Application granted granted Critical
Publication of CN110454191B publication Critical patent/CN110454191B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/12Temporary supports for use during building; Accessories
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/40Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention provides the construction methods of a kind of length adjustment ring of negative endless tube piece and negative endless tube piece, the device include for connect negative endless tube piece and be covered in the negative endless tube piece end face preceding ring flat-plate and rear ring flat-plate, the plate face of the preceding ring flat-plate and the rear ring flat-plate is oppositely arranged, and is connected with muti-piece support plate between the preceding ring flat-plate and the rear ring flat-plate.The present invention solves the problems, such as originating the construction of portal ring beam and need to cutting off the first endless tube piece and special section of jurisdiction and cannot be directed at service channel for tunnel starting well.

Description

The construction method of the length adjustment ring of negative endless tube piece and negative endless tube piece
Technical field
The present invention relates to Shield Construction Technique fields, and in particular to a kind of the length adjustment ring and negative endless tube piece of negative endless tube piece Construction method.
Background technique
The length of the section of jurisdiction as used in current domestic conventional shield-tunneling construction is essentially 1.2 meters or 1.5 meters, in normal shield Behind structure machine completion tunnel when progress portal ring beam construction, after removing negative endless tube piece, served as a contrast to there are enough progress portal ring beams to construct The position of block is required to cut off the first endless tube piece to provide lining cutting position, this has resulted in unnecessary additional construction With great security risk.
Equally, the middle part in most shield tunnel sections can all set service channel.Service channel position is special section of jurisdiction (all steel ring or compound steel loop).The installation site of special section of jurisdiction must accurately correspond to design mileage.Since the size of section of jurisdiction is fixed With the fixation of shield launching position, usually there is deviation in the position of actual service channel and the position in design liaison channel, Prevent actual service channel is from being just aligned special section of jurisdiction, and will be extremely difficult to the fine position of service channel, it is right Large effect will be generated in the function of later period service channel.
Summary of the invention
To overcome the defects of present in the prior art, the length adjustment ring and negative endless tube piece of a kind of negative endless tube piece are now provided Construction method, to solve originating the construction of portal ring beam and need to cutting off the first endless tube piece and special section of jurisdiction cannot be right for tunnel starting well The problem of quasi- service channel.
To achieve the above object, a kind of construction method of negative endless tube piece is provided, comprising the following steps:
In Tunnel Design, the remote of hole ring beam is originated by what the laying start position of positive endless tube piece was set to the tunnel The side for originating vertical shaft from the tunnel;
In described originate reaction frame is installed in vertical shaft;
The length adjustment ring of polycyclic negative endless tube piece and at least one negative endless tube piece is provided, so that the polycyclic negative endless tube piece and institute State the sum of length of length adjustment ring of negative endless tube piece equal to the reaction frame to the positive endless tube piece laying start position it Between distance;
In on the reaction frame, entrance orientations are originated described in, and the polycyclic negative endless tube piece and the negative endless tube are installed The length adjustment ring of piece so that the length adjustment ring of the negative endless tube piece be embedded at it is between negative endless tube piece described in two rings or described Between reaction frame and the negative endless tube piece.
The present invention also provides a kind of length adjustment rings of negative endless tube piece, including for connecting negative endless tube piece and being covered in institute State the preceding ring flat-plate and rear ring flat-plate of the end face of negative endless tube piece, the preceding ring flat-plate and it is described after the plate face of ring flat-plate be oppositely arranged, before described Muti-piece support plate is connected between ring flat-plate and the rear ring flat-plate.
Further, the outer diameter of the preceding ring flat-plate, it is described after the outer diameter of ring flat-plate be adapted with the outer diameter of the negative endless tube piece.
Further, the width of the preceding ring flat-plate and the rear ring flat-plate is respectively greater than the width for being equal to the negative endless tube piece.
Further, support plate described in muti-piece is laid along the cyclic direction interval of the preceding ring flat-plate.
Further, supporting element is telescopically installed between the preceding ring flat-plate and the rear environmental protection.
Further, the supporting element is hydraulic cylinder.
Further, the preceding ring flat-plate includes the first arc panel of muti-piece of splicing cyclization, and the rear ring flat-plate includes being spliced into The second arc panel of muti-piece of ring, the size of first arc panel and the size of second arc panel match, the support Plate is connected between first arc panel and second arc panel, the both ends of first arc panel and second arc Connecting plate is connected separately between the both ends of plate, the connecting plate at the both ends of first arc panel is connected to adjacent described first The connecting plate of the end of arc panel.
The beneficial effects of the present invention are the length adjustment ring of negative endless tube piece of the invention can make the first ring after using The outside of positive endless tube piece can just reserve the position of subsequent construction portal ring beam, do not need to remove in subsequent negative endless tube piece It cuts off section of jurisdiction again afterwards, and then improves constructing tunnel efficiency, while making special section of jurisdiction corresponding to service channel in maximum journey Being located at design mileage on degree, that is, so that special section of jurisdiction is directed at service channel, to preferably play the function of service channel Can, avoid service channel from being finely adjusted.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the length adjustment ring of the negative endless tube piece of the embodiment of the present invention.
Fig. 2 is the scheme of installation of the length adjustment ring of the negative endless tube piece of the embodiment of the present invention.
Fig. 3 is the construction schematic diagram of the negative endless tube piece of the embodiment of the present invention.
Fig. 4 is schematic diagram after the dismounting of the negative endless tube piece of the embodiment of the present invention.
Specific embodiment
Illustrate embodiments of the present invention below by way of specific specific example, those skilled in the art can be by this specification Other advantages and efficacy of the present invention can be easily understood for disclosed content.The present invention can also pass through in addition different specific realities The mode of applying is embodied or practiced, the various details in this specification can also based on different viewpoints and application, without departing from Various modifications or alterations are carried out under spirit of the invention.
Fig. 1 is that structural schematic diagram, Fig. 2 of the length adjustment ring of the negative endless tube piece of the embodiment of the present invention are the embodiment of the present invention The scheme of installation of length adjustment ring of negative endless tube piece, the construction schematic diagram for the negative endless tube piece that Fig. 3 is the embodiment of the present invention, figure 4 be schematic diagram after the dismounting of the negative endless tube piece of the embodiment of the present invention.
Referring to figs. 1 to 4, the present invention provides a kind of length adjustment rings of negative endless tube piece, comprising: preceding ring flat-plate, after Ring flat-plate and support plate 13.
Specifically, the plate face of preceding ring flat-plate and rear ring flat-plate is oppositely arranged.Muti-piece support is connected between preceding ring flat-plate and rear ring flat-plate Plate 13.Preceding ring flat-plate and rear ring flat-plate are used to connect the end face of negative endless tube piece 4, and are covered in the end face of negative endless tube piece 4.When in use, Preceding ring flat-plate, rear ring flat-plate are connected to the negative endless tube piece of two adjacent rings by segment bolt.
In the present embodiment, the outer diameter of preceding ring flat-plate, rear ring flat-plate outer diameter be adapted with the outer diameter of negative endless tube piece 4.And in Fig. 2 In, in order to show negative endless tube piece length adjustment ring installation site, spy the length adjustment ring of negative endless tube piece is highlighted.
As a kind of preferable embodiment, the width of preceding ring flat-plate and rear ring flat-plate is respectively greater than the width for being equal to negative endless tube piece 4 Degree.
In the present embodiment, the quantity of support plate 13 is muti-piece.Muti-piece support plate 13 is along the cyclic direction interval of preceding ring flat-plate It lays.
In order to enable the stronger and closely knit end face for being close to negative endless tube piece of preceding ring flat-plate, rear ring flat-plate, preceding ring flat-plate and rear environmental protection Between supporting element 14 is telescopically installed.
As a kind of preferable embodiment, supporting element 14 is hydraulic cylinder.
Efficient for installation, preceding ring flat-plate includes the first arc panel of muti-piece 111 of splicing cyclization.Ring flat-plate includes being spliced into afterwards The second arc panel of muti-piece 121 of ring.The size of first arc panel 111 and the size of the second arc panel 121 match.Support plate 13 It is connected between the first arc panel 111 and the second arc panel 121.The two of the both ends of first arc panel 111 and the second arc panel 121 Connecting plate a is connected separately between end.The connecting plate a at the both ends of the first arc panel 111 is connected to the first adjacent arc panel 111 End connecting plate a.
As a kind of preferable embodiment, the connecting plate a at the both ends of the first arc panel 111 is bolted in adjacent The connecting plate a of the end of one arc panel 111.
In the present embodiment, the quantity of the first arc panel is two pieces;The quantity of second arc panel is also two pieces.
The present invention provides a kind of construction method of negative endless tube piece, comprising the following steps:
S1: in Tunnel Design, the remote of hole ring beam is originated by what the laying start position of positive endless tube piece was set to tunnel The side for originating vertical shaft from tunnel.
Specifically, the laying start position of the positive endless tube piece 5 of the first ring is set to the tunnel in Tunnel Design Originate the side for originating vertical shaft 2 in the separate tunnel of hole ring beam 6.
After the later period removes negative endless tube piece, so that the close side for originating vertical shaft 2 of the positive endless tube piece 5 of the first ring reserves 6 construction location of ring beam.
S2: in originating reaction frame 3 is installed in vertical shaft 2.
On the opposite borehole wall for originating vertical shaft 2 of tunnel portal, reaction frame 3 is installed.
S3: providing the length adjustment ring 1 of polycyclic negative endless tube piece 4 and at least one negative endless tube piece so that polycyclic negative endless tube piece 4 and The sum of length of length adjustment ring 1 of negative endless tube piece is equal to the distance between the laying start position of reaction frame to positive endless tube piece.
Specifically, providing the length adjustment ring 1. of polycyclic negative endless tube piece and at least one negative endless tube piece
The calculation formula of the quantity of specific negative endless tube piece are as follows:
Wherein, S is the distance between the laying start position of the positive endless tube piece 5 of 3 to the first ring of reaction frame;
L is the length of the negative endless tube piece of each ring.
The value of n is the resulting positive integer of method that truncates.For example,Then the value of n is 7.
Correspondingly, the length of the length adjustment ring 1 of negative endless tube piece is L '=S-n × L, wherein n is that the method that truncates is resulting just Integer.
As a kind of preferable embodiment, it is used in turn for the ease of the length adjustment ring of negative endless tube piece, negative endless tube The quantity of the length adjustment ring 1 of piece be it is multiple, the length summation of the length adjustment ring 1 of multiple negative endless tube pieces is equal to L '.Negative endless tube The length adjustment ring of piece can be single or be applied in combination.
As shown in Fig. 2, the length adjustment ring 1 of each negative endless tube piece can be installed between the negative endless tube piece of two rings, also may be used To be installed between negative endless tube piece and reaction frame.
S4: on reaction frame 3, towards entrance orientations are originated, the length adjustment of polycyclic negative endless tube piece 4 and negative endless tube piece is installed Ring 1, so that the length adjustment ring 1 of negative endless tube piece is embedded between the negative endless tube piece 4 of two rings or between reaction frame and negative endless tube piece 4.
As shown in figure 4, after tunnel duct piece is all installed, after removing negative endless tube piece, the positive endless tube piece 5 of the first ring Outside is formed with 6 construction location of work ring beam.
The length adjustment ring of negative endless tube piece of the invention can make the outside of the positive endless tube piece of the first ring just after using The position that subsequent construction portal ring beam can be reserved does not need to cut off section of jurisdiction, Jin Erti again after subsequent negative endless tube piece is removed High constructing tunnel efficiency, at the same make special section of jurisdiction corresponding to service channel to the full extent be located at design mileage Place, that is, so that special section of jurisdiction is directed at service channel, to preferably play the function of service channel, service channel is avoided to carry out Fine tuning.
It should be noted that this specification structure depicted in this specification institute accompanying drawings, ratio, size etc., only to cooperate The bright revealed content of book is not intended to limit the invention enforceable limit so that those skilled in the art understands and reads Fixed condition, therefore do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size, not It influences still fall in disclosed technology contents under the effect of present invention can be generated and the purpose that can reach and obtain In the range of capable of covering.Meanwhile it is cited such as "upper", "lower", "left", "right", " centre " and " one " in this specification Term is merely convenient to being illustrated for narration, rather than to limit the scope of the invention, the change of relativeness or tune It is whole, under the content of no substantial changes in technology, when being also considered as the enforceable scope of the present invention.
The present invention has been described in detail with reference to the accompanying drawings, those skilled in the art can be according to upper It states and bright many variations example is made to the present invention.Thus, certain details in embodiment should not constitute limitation of the invention, this Invention will be using the range that the appended claims define as protection scope.

Claims (8)

1. a kind of construction method of negative endless tube piece, which comprises the following steps:
In Tunnel Design, the laying start position of positive endless tube piece is set to the separate institute for originating hole ring beam in the tunnel State the side for originating vertical shaft in tunnel;
In described originate reaction frame is installed in vertical shaft;
The length adjustment ring of polycyclic negative endless tube piece and at least one negative endless tube piece is provided, so that the polycyclic negative endless tube piece is born with described The sum of length of length adjustment ring of endless tube piece is equal to the reaction frame between the laying start position of the positive endless tube piece Distance;
In on the reaction frame, entrance orientations are originated described in, and the polycyclic negative endless tube piece and the negative endless tube piece are installed Length adjustment ring, so that the length adjustment ring of the negative endless tube piece is embedded between negative endless tube piece described in two rings or the counter-force Between frame and the negative endless tube piece.
2. a kind of length adjustment ring of negative endless tube piece, which is characterized in that including for connecting negative endless tube piece and being covered in described negative The plate face of the preceding ring flat-plate and rear ring flat-plate of the end face of endless tube piece, the preceding ring flat-plate and the rear ring flat-plate is oppositely arranged, the preceding ring flat-plate Muti-piece support plate is connected between the rear ring flat-plate.
3. the length adjustment ring of negative endless tube piece according to claim 2, which is characterized in that the outer diameter of the preceding ring flat-plate, institute The outer diameter for stating rear ring flat-plate is adapted with the outer diameter of the negative endless tube piece.
4. the length adjustment ring of negative endless tube piece according to claim 2, which is characterized in that the preceding ring flat-plate and the rear ring The width of plate is respectively greater than the width for being equal to the negative endless tube piece.
5. the length adjustment ring of negative endless tube piece according to claim 2, which is characterized in that support plate described in muti-piece is described in It lays at the cyclic direction interval of preceding ring flat-plate.
6. the length adjustment ring of negative endless tube piece according to claim 2, which is characterized in that the preceding ring flat-plate and the rear ring Supporting element is telescopically installed between guarantor.
7. the length adjustment ring of negative endless tube piece according to claim 6, which is characterized in that the supporting element is hydraulic oil Cylinder.
8. the length adjustment ring of negative endless tube piece according to claim 2, which is characterized in that the preceding ring flat-plate includes being spliced into The first arc panel of muti-piece of ring, the rear ring flat-plate include the second arc panel of muti-piece of splicing cyclization, the ruler of first arc panel The very little size with second arc panel matches, and the support plate is connected to first arc panel and second arc panel Between, it is connected separately with connecting plate between the both ends of first arc panel and the both ends of second arc panel, described first The connecting plate at the both ends of arc panel is connected to the connecting plate of the end of adjacent first arc panel.
CN201910772264.1A 2019-08-21 2019-08-21 Length adjusting ring of negative ring segment and construction method of negative ring segment Active CN110454191B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910772264.1A CN110454191B (en) 2019-08-21 2019-08-21 Length adjusting ring of negative ring segment and construction method of negative ring segment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910772264.1A CN110454191B (en) 2019-08-21 2019-08-21 Length adjusting ring of negative ring segment and construction method of negative ring segment

Publications (2)

Publication Number Publication Date
CN110454191A true CN110454191A (en) 2019-11-15
CN110454191B CN110454191B (en) 2024-07-12

Family

ID=68488121

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910772264.1A Active CN110454191B (en) 2019-08-21 2019-08-21 Length adjusting ring of negative ring segment and construction method of negative ring segment

Country Status (1)

Country Link
CN (1) CN110454191B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236954A (en) * 2020-02-21 2020-06-05 中建八局轨道交通建设有限公司 Sand box counter-force device for shield initiation in tunnel and negative ring pipe piece dismantling method
CN112145197A (en) * 2020-10-19 2020-12-29 中建八局轨道交通建设有限公司 Method for removing zero-ring duct pieces of underground excavated tunnel
CN113279788A (en) * 2021-06-10 2021-08-20 北京市政建设集团有限责任公司 Novel steel negative ring pipe structure for shield construction

Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01263392A (en) * 1988-04-15 1989-10-19 Hazama Gumi Ltd Segment erector device for shield excavator
JP2913623B1 (en) * 1998-03-18 1999-06-28 西松建設株式会社 Lining structure of shield tunnel
JPH11229792A (en) * 1998-02-18 1999-08-24 Penta Ocean Constr Co Ltd Shield tunnel construction method and segment piece therefor
JP2001317287A (en) * 2000-05-09 2001-11-16 Yoshiji Matsumoto Method for installing shield machine at propulsion starting position
JP2006233752A (en) * 2006-04-13 2006-09-07 Kumagai Gumi Co Ltd Construction method for tunnel
JP2007051433A (en) * 2005-08-16 2007-03-01 Kajima Corp Sealing structure between segments and sealing method for segment
JP2008002070A (en) * 2006-06-20 2008-01-10 Shimizu Corp Tunnel excavator, reaming tunnel excavator and excavating method
CN204327103U (en) * 2014-12-12 2015-05-13 中铁十一局集团城市轨道工程有限公司 A kind of reaction frame started for tunneling shield
CN104929655A (en) * 2015-05-31 2015-09-23 中铁一局集团有限公司 Method for reducing subway shield tunnel portal construction risks
CN205225271U (en) * 2015-11-13 2016-05-11 中铁二院工程集团有限责任公司 Shield constructs portal collar tie beam structure suitable for shield constructs end not to be had with solid
CN205558933U (en) * 2016-04-25 2016-09-07 中铁十一局集团城市轨道工程有限公司 Steel loop convenient to concrete burden ring canal piece is demolishd
CN206053969U (en) * 2016-08-29 2017-03-29 广州市市政工程设计研究总院 A kind of shield tunnel and open cut main body portal ring beam hermetic water-proof structure
CN107575239A (en) * 2017-10-16 2018-01-12 粤水电轨道交通建设有限公司 A kind of portable shield launching device for small space
CN207245718U (en) * 2017-07-14 2018-04-17 北京建工土木工程有限公司 A kind of special section of jurisdiction of shield receiving terminal
CN108119159A (en) * 2018-01-25 2018-06-05 中铁第勘察设计院集团有限公司 Shield export & import interface processing structure and its method
CN108661667A (en) * 2018-06-28 2018-10-16 济南轨道交通集团有限公司 It is a kind of that shield ventilating shaft is facilitated to bear the device and application method that endless tube piece is removed
CN208184741U (en) * 2018-05-17 2018-12-04 淮安市中球盾构技术服务有限公司 Steel bushing auxiliary device for shield launching
CN109026055A (en) * 2018-08-08 2018-12-18 北京建工土木工程有限公司 Frost wall building enclosure and its construction method in the construction of portal ring beam
CN109184756A (en) * 2018-10-17 2019-01-11 中建八局轨道交通建设有限公司 For removing the device and method of negative endless tube piece in shield dark-excavated passageway
CN109208637A (en) * 2018-08-08 2019-01-15 北京建工土木工程有限公司 Increase the construction method of open-cut station newly on the basis of existing tunnel

Patent Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01263392A (en) * 1988-04-15 1989-10-19 Hazama Gumi Ltd Segment erector device for shield excavator
JPH11229792A (en) * 1998-02-18 1999-08-24 Penta Ocean Constr Co Ltd Shield tunnel construction method and segment piece therefor
JP2913623B1 (en) * 1998-03-18 1999-06-28 西松建設株式会社 Lining structure of shield tunnel
JP2001317287A (en) * 2000-05-09 2001-11-16 Yoshiji Matsumoto Method for installing shield machine at propulsion starting position
JP2007051433A (en) * 2005-08-16 2007-03-01 Kajima Corp Sealing structure between segments and sealing method for segment
JP2006233752A (en) * 2006-04-13 2006-09-07 Kumagai Gumi Co Ltd Construction method for tunnel
JP2008002070A (en) * 2006-06-20 2008-01-10 Shimizu Corp Tunnel excavator, reaming tunnel excavator and excavating method
CN204327103U (en) * 2014-12-12 2015-05-13 中铁十一局集团城市轨道工程有限公司 A kind of reaction frame started for tunneling shield
CN104929655A (en) * 2015-05-31 2015-09-23 中铁一局集团有限公司 Method for reducing subway shield tunnel portal construction risks
CN205225271U (en) * 2015-11-13 2016-05-11 中铁二院工程集团有限责任公司 Shield constructs portal collar tie beam structure suitable for shield constructs end not to be had with solid
CN205558933U (en) * 2016-04-25 2016-09-07 中铁十一局集团城市轨道工程有限公司 Steel loop convenient to concrete burden ring canal piece is demolishd
CN206053969U (en) * 2016-08-29 2017-03-29 广州市市政工程设计研究总院 A kind of shield tunnel and open cut main body portal ring beam hermetic water-proof structure
CN207245718U (en) * 2017-07-14 2018-04-17 北京建工土木工程有限公司 A kind of special section of jurisdiction of shield receiving terminal
CN107575239A (en) * 2017-10-16 2018-01-12 粤水电轨道交通建设有限公司 A kind of portable shield launching device for small space
CN108119159A (en) * 2018-01-25 2018-06-05 中铁第勘察设计院集团有限公司 Shield export & import interface processing structure and its method
CN208184741U (en) * 2018-05-17 2018-12-04 淮安市中球盾构技术服务有限公司 Steel bushing auxiliary device for shield launching
CN108661667A (en) * 2018-06-28 2018-10-16 济南轨道交通集团有限公司 It is a kind of that shield ventilating shaft is facilitated to bear the device and application method that endless tube piece is removed
CN109026055A (en) * 2018-08-08 2018-12-18 北京建工土木工程有限公司 Frost wall building enclosure and its construction method in the construction of portal ring beam
CN109208637A (en) * 2018-08-08 2019-01-15 北京建工土木工程有限公司 Increase the construction method of open-cut station newly on the basis of existing tunnel
CN109184756A (en) * 2018-10-17 2019-01-11 中建八局轨道交通建设有限公司 For removing the device and method of negative endless tube piece in shield dark-excavated passageway

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈洁锐;朱科峰;: "负环片在矿山法隧道中的安拆施工技术", 山西建筑, no. 18 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236954A (en) * 2020-02-21 2020-06-05 中建八局轨道交通建设有限公司 Sand box counter-force device for shield initiation in tunnel and negative ring pipe piece dismantling method
CN111236954B (en) * 2020-02-21 2021-08-17 中建八局轨道交通建设有限公司 Sand box counter-force device for shield initiation in tunnel and negative ring pipe piece dismantling method
CN112145197A (en) * 2020-10-19 2020-12-29 中建八局轨道交通建设有限公司 Method for removing zero-ring duct pieces of underground excavated tunnel
CN113279788A (en) * 2021-06-10 2021-08-20 北京市政建设集团有限责任公司 Novel steel negative ring pipe structure for shield construction
CN113279788B (en) * 2021-06-10 2022-07-22 北京市政建设集团有限责任公司 Novel steel negative ring pipe structure for shield construction

Also Published As

Publication number Publication date
CN110454191B (en) 2024-07-12

Similar Documents

Publication Publication Date Title
CN110454191A (en) The construction method of the length adjustment ring of negative endless tube piece and negative endless tube piece
CN102242570B (en) Method for reinforcing transmission line iron tower
CN206987887U (en) Subway tunnel electromechanical equipment and pipeline quick fixation structure
CN207363017U (en) Assembled arthitecutral structure
CN210577507U (en) Bridge with adjustable mounting height
CN105720353A (en) Antenna structure for wireless network coverage manhole cover and installation method of antenna structure
CN208996738U (en) The anti-faulting of slab ends mounting structure of shield duct piece
CN209324355U (en) Mating traction system after a kind of shield machine
CN218029187U (en) Building structure reinforcing apparatus
CN207523478U (en) A kind of contact net support device being installed in tunnel built-in groove
CN107359568A (en) A kind of cable testing bridge
EP1058363B1 (en) Releasable flange connection for the external conductor of a gas-insulated conductor system
CN106930323A (en) Pipe gallery prefabricated panel is from load supporting structure
CN209608229U (en) A kind of low-voltage cable laying apparatus
CN106677814B (en) One kind can widen row's formula support apparatus
CN109505631A (en) The adjustable bracketing of pipe curtain inner support
DE9300924U1 (en) Metal grid secured with optical fibers
CN207750585U (en) A kind of Large Diameter Pipeline pipeline is with regard to positioning auxiliary device
CN206759011U (en) Support for the section cable laying of track traffic underground
CN106981854B (en) Holder for the section cable laying of rail traffic underground
CN219606226U (en) Temporary pipeline support for pipe jacking construction
CN105089282A (en) Tool special for wire drawing installation of electric transmission line guyed tower and wire drawing method
CN113690794B (en) Ultra-long span net sealing method based on mountain
CN211036704U (en) Limiting device for steel strand for prepressing
CN220505071U (en) Tunnel construction protective structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant