CN107575227A CN201710728476.0A CN201710728476A CN107575227A CN 107575227 A CN107575227 A CN 107575227A CN 201710728476 A CN201710728476 A CN 201710728476A CN 107575227 A CN107575227 A CN 107575227A
Authority
CN
China
Prior art keywords
coal
mining
winning machine
dust
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710728476.0A
Other languages
Chinese (zh)
Inventor
宋欣
荣河海
屈年华
王丽敏
王爱卿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heilongjiang University of Science and Technology
Original Assignee
Heilongjiang University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heilongjiang University of Science and Technology filed Critical Heilongjiang University of Science and Technology
Priority to CN201710728476.0A priority Critical patent/CN107575227A/en
Publication of CN107575227A publication Critical patent/CN107575227A/en
Pending legal-status Critical Current

Links

Landscapes

  • Auxiliary Methods And Devices For Loading And Unloading (AREA)

Abstract

The invention belongs to technical field of coal mine, discloses a kind of coal-mining method and roof controlling method, and the coal-mining method includes:Working face is using single middle thick coal seam full-seam mining inclined longwall retrusive all across the comprehensive mechanical coal mining for falling method;Specifically include:Coal-winning machine coal cutting, scratch board conveyor transporting coal, hydraulic support stand top plate, elapse scratch board conveyor;Coal-winning machine two-ways coal cutting, roller spin are crushed coal with pick, coal are voluntarily loaded into drag conveyor using unit drum blade and conveyer ramp plate, Triangle Coal is cut in both sides termination using beveling feed;In production process, by coal cutting ,-shifting frame-pushes away drag conveyor order and carried out;There is provided a kind of roof controlling method simultaneously.The present invention solves the problems, such as dust-proof effect difference in mining.

Description

A kind of coal-mining method and roof controlling method
Technical field
The invention belongs to technical field of coal mine, more particularly to a kind of coal-mining method and roof controlling method.
Background technology
Mine Dust is one of five big disaster of mine, and the dust of underground is essentially from operation fields such as coal mining, driving, transports Institute.70%~80% dust is as caused by getting working face in the mine of mechanical coal mining.In recent years, with coal mine machinery Change the continuous improvement of driving degree, particularly extensive application of the fully-mechanized digging machine in tunnelling, because machine driven headings section (reaches greatly To 20~25m2), high concentration is produced, influence of the caused dust to working face operating environment is increasing, and dust concentration can Up to 300~1000mg/m3, seriously endanger the health of worker.External spraying in China's tunneling working face generally use unit at this stage The dedusting methods such as dust-settling technology, dust removal by ventilation, wet dust removal, injection duster.But due to various dedusting technologies deficiency and Limitation, still results in that tunneling working face dust-producing amount is big, and visibility is relatively low, not only compromises the health of staff, and seriously Mine safety is threatened.Therefore adopt an effective measure and preventing and treating is carried out to tunneling working face dust be particularly important.Particularly one A little traditional dry type depositing dust dedusting technologies and measure can not increasingly meet the needs of production because dust Control is ineffective, To find out its cause, mainly it is the absence of the control dirt dedusting theoretical direction of system and adapts to coal seam characteristic and the technology wound of piercing technique requirement Newly.Therefore the integrated control for downhole powder dust turns into important realistic problem urgently to be resolved hurrily at present, has important theory Meaning and practical value.
In existing full-seam mining long-wall mining, it is related to using two coal-winning machines while the discussion exploited, but its Simply in the case where considering face length increasing to 300 meters~1000 meters, mined simultaneously using two coal-winning machines;Its institute The coal-mining method stated is to support the use two coal-winning machines and a drag conveyor, and long-armed working face is divided into two upwards walking Part, an exploitation part, its purpose is to improve the efficiency of coal mining, increases mine yield, still, brings working face The problems such as pressure manifestation increase and drag conveyor load increase severely and produce accident increase and management difficulty increasing.To 6.3~7.3 The problem of ultra-thick coal bed of rice is exploited, and its is maximum is not the efficiency mined, but in ultra-thick coal bed recovery process, because Rib exposure is more and wall caving and roof fall phenomenon distinct issues occurs, the production practice technology that existing two coal-winning machines are mined, Wall caving and the roof fall occurred in ultra-thick coal bed exploitation effectively can not be improved and solved the problems, such as, equally will also influence coal mining efficiency With the security of coal mining;Meanwhile the arrangement of ultra-thick coal bed working face be also unsuitable for it is long, when face length is more than 350m, The support issues of ultra-thick coal bed will will also be increased substantially by severe challenge, underground maintenance cost.Its excessively increasing of comprehensive analysis Add after face length using two coal-winning machines method of coal mining and uneconomical simultaneously.It is defeated using a coal-winning machine, a scraper plate Send machine and the supporting coal winning technology of hydraulic support, it is not necessary to working face is arranged oversize, be the master that current fully-mechanized mining working is mined Coal-mining method is wanted, although by having been able to exploit less than 6 meters high seams after being improved this mining way, make Coal wall caving and top plate roof fall phenomenon can not be handled timely and effectively when exploiting 6.3~7.3m ultra-thick coal bed with this method, will The efficiency of coal mining is had a strong impact on, the advantage of high working face full-seam mining coal-mining method can not be played.
In summary, the problem of prior art is present be:It is poor for dust-proof effect in existing coal mining;The efficiency of coal mining is low; On the one hand the existing high hair of management top plate can not reduce the inbreak of goaf inside ceiling panel rock, reduce the heat dissipation capacity of balkstone;Separately On the one hand, the entrained out heat of goaf air leaking can not be reduced.
The content of the invention
The problem of existing for prior art, the invention provides a kind of coal-mining method and roof controlling method.
The present invention is achieved in that
A kind of coal-mining method, the coal-mining method is using whole caving methods processing goaf, with single middle thick coal seam, one Secondary mining full height inclined longwall retrusive all across fall method mine;Including:
Coal-winning machine coal cutting, scratch board conveyor transporting coal, hydraulic support stand top plate, elapse scratch board conveyor;Coal-winning machine is two-way Coal cutting, roller spin are crushed coal with pick, and it is defeated that coal is voluntarily loaded to scraper plate using unit drum blade and conveyer ramp plate Machine is sent, Triangle Coal is cut in both sides termination using beveling feed;In production process, by coal cutting-shifting frame-push away drag conveyor order enter OK.And arrange that coal winning machine spray device for reducing dust, headentry Belt transport are reprinted around coal seam in coal-winning machine coal cutting Point dust guard, the lane depositing dust drenching installation of working face two and working face coal bunker coal dropping point and the anti-device for reducing dust of main haulage roadway.
Further, in described coal-mining method, by the top coal of middle thick ultra-thick coal bed upper curtate working face extraction using all Caving method forms upper curtate goaf, and the extensible canopy installed on hydraulic support is stretched out, immediate support exposure top plate, then by three Level wall supporting device is completely or partially opened, and is protected and is exposed rib;After first half coal-winning machine 10~15 meters of distances of cut, closing on One, which is arranged, in lower curtate below upper curtate goaf takes over section stope drift active workings;Take in section stope drift active workings and upper curtate Side extraction drift is parallel to be staggeredly spaced a distance, and arranges in the opposite side for taking over section working face and is put down with back production on the inside of upper curtate Section is non-faces dead zone stope drift active workings for parallel the taking in lane, makes to take over the inclined arrangement of section working face, carries out taking over section afterwards The back production of working face;After lower curtate exploitation, hydraulic support and time shift frame, and three-stage side protecting device is all stretched out, protect and expose Rib;Two coal-winning machines are exploited in the same direction, and when the coal-winning machine cut of the cut first half is to buttock, cut lower curtate is adopted Coal machine starts to chamfer feed to Return-ing direction, is changed to cut upper curtate;The cut leads to the upper curtate coal-winning machine cut of end The coal seam of end head, then from end beveled feed, cut lower curtate coal seam, and so on exploit;
Described three-stage side protecting device is made up of one-level face guard, secondary protecting side plate and three-stage side protecting plate three parts, can be with Simultaneously or partially open;
Length is not small after one-level face guard, secondary protecting side plate and the three-stage side protecting plate of the three-stage side protecting device all stretch out In the half of mining height;
It is 15~20m that section stope drift active workings, which are taken over, with extraction drift parallel distance on the inside of upper curtate;
The distance of interlocking of extraction drift on the inside of section stope drift active workings and upper curtate of taking over is 1~3m.
Further, at handpiece of scraper conveyer inward in 1m, trough two helps bottom respectively to install row spraying, often arranges 4~6 Individual shower nozzle, water source are controlled with original outside electrospray tandem and using same switch.
Further, in the coal-winning machine coal cutting, in coal-mining method, coal winning machine spray device for reducing dust, Φ 10mm steel is utilized Muscle is welded into the circular steel ring that two diameters are respectively 400mm and 25mm, and the two is with the zigzag reinforcement welding of a root long 100mm At one piece, connection reinforcing bar and Φ 25mm steel ring vertical connections, flushed with Φ 400mm steel rings, Φ 25mm steel ring fixed covers spray outside Mist joint base position, make Φ 400mm steel rings planes with cutting lane into vertical.
Further, in the coal-winning machine coal cutting, fully-mechanized mining working transportation roadway Belt transport transfer point dust guard, reprinting Point position adhesive tape shelf two is helped to be fixed into inverted triangle shape with 1m × 2m steel plates, and a hemi-closure space will be surrounded at transfer point, and On the basis of being sprayed in original top position, two help two shower nozzles of each increase, so form circular cone type and catch konisphere.
Further, in the coal-winning machine coal cutting, the lane depositing dust drenching installation of working face two, first on the basis of original water curtain, Add gauze to be transformed into water curtain net, secondly release nozzle spray function, form low-pressure gravity flow water hole, become by original spraying Vertical linearity water drenching, water outlet bore dia are maintained at 5~10mm, and pitch of holes 50mm, water drenching is online to water curtain, form one of water Curtain, water curtain sieve bottom and place top of moving into one's husband's household upon marriage set tank water receiving, and top tank institute water receiving drenches two again to be helped on gauze, and last two The water drenching that side bottom tank is accepted leads to ditch with water pipe.
Further, in the coal-winning machine coal cutting, working face coal bunker coal dropping point and the anti-device for reducing dust of main haulage roadway, use are soft Cloth skin to coal-treating nozzle surrounding parcel and extend on adhesive tape, when coal breakage directly drop down onto and avoided on adhesive tape and high speed winds stream is carried out Docking;On the other hand outside coal dropping point 1.0m, along adhesive tape traffic direction, 0.8~1.5m of diameter semicircles are made with iron sheet, two Side perforation, which is fixed on adhesive tape shelf, forms closing space, closing length 5m, and a spraying, wetting are set every 1.5m in space Coal body top layer.
Further, the management method of the hydraulic support stand top plate includes:Top plate is managed with comprehensive filling method:
When being divulged information using mining advancing and U-shaped, inleakage is all bigger.And drawing back is used, tunnel is tamped, with And the ventilation of W shapes and pressure ventilation, goaf air leaking can be reduced, also can according to the changing rule in goaf air leaking flow field, Inside goaf, windbreak is constructed every 30~50 meters.
Advantages of the present invention and good effect are:
The present invention solves the problems, such as dust-proof effect difference in mining.Due to leaking into stope and air -return duct from goaf In it is distinguished and admirable to bring substantial amounts of heat into, so it is also a larger thermal source.When being divulged information using mining advancing and U-shaped, Inleakage is all bigger.And present invention drawing back is adopted, tunnel, and the ventilation of W shapes and pressure ventilation are tamped, can be subtracted Few goaf air leaking, also inside goaf, gear can be constructed every 30~50 meters according to the changing rule in goaf air leaking flow field Brattice, to reduce goaf air leaking, so as to efficiently control the hot moisture for bringing working face into by goaf air leaking.
Grouting filling management top plate is carried out to work face goaf, on the one hand reduces the inbreak of goaf inside ceiling panel rock, Reduce the heat dissipation capacity of balkstone;On the other hand, after goaf is filled with, leaking out for goaf substantially reduces, so as to reduce The entrained heat out of goaf air leaking.In addition, the temperature of charges is lower than the temperature of country rock and air, can be empty to mine Gas plays cooling effect.Surveyed according to similar mine, replace original whole caving methods to manage top plate using whole filling methods, make work unexpectedly Make 5~10 DEG C of face mercury dropped.The actual conditions in colliery, with the improvement of filler, the exploitation of absorbing and cooling temperature filler Utilize, when being mined in the future under the protection coal pillar in the exploitation process of working face or under village, under railway, under river etc., It is contemplated that filling management top plate using goaf grouting, the temperature of stope is substantially reduced.
The use of the staged full-seam mining coal mining new technology of the present invention, can realize ultra-thick coal bed safety and high efficiency, Coal mining rate is improved to greatest extent.Its major advantage is:
1. being exploited using staged full-seam mining, the height of disposable exposure rib can be reduced, improves the advance of the face Speed, the influence of top plate mining pressure is reduced, asked so as to effectively solve caused wall caving and roof fall in ultra-thick coal bed recovery process Topic.
2. being exploited using staged full-seam mining, the thickness in full-seam mining coal mining coal seam can be improved from present 7m It is the important breakthrough of production technique to 8m.
3. using staged full-seam mining exploitation ultra-thick coal bed using two coal-winning machines while cut, each coal-winning machine The height of cut is all controlled within 4.0 meters, and it is relatively low so can effectively to solve power during existing coal-winning machine cut ultra-thick coal bed Problem, the cutting speed of coal-winning machine can be greatly improved, so as to improve mine yield.
Ultra-thick coal bed is exploited using staged full-seam mining coal-mining method, existing high seam full-seam mining can be made up The deficiency of coal-mining method, further develop for high seam full-seam mining technology and a kind of feasible coal-mining method is provided.
Brief description of the drawings
Fig. 1 is coal-mining method provided in an embodiment of the present invention and roof controlling method flow chart.
Fig. 2 is fully-mechanized mining working front and rear part provided in an embodiment of the present invention drag conveyor spraying Optimizing Reconstruction design sketch.
Fig. 3 is cutting coal machine atomizing de-dusting apparatus Optimizing Reconstruction design sketch provided in an embodiment of the present invention.
Fig. 4 is transfer point atomizing de-dusting apparatus Optimizing Reconstruction design sketch provided in an embodiment of the present invention.
Fig. 5 is dustproof water screen device for reducing dust Optimizing Reconstruction design sketch provided in an embodiment of the present invention
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to embodiments, to the present invention It is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to Limit the present invention.
The application principle of the present invention is described in detail below in conjunction with the accompanying drawings.
A kind of coal-mining method, the coal-mining method include:
Working face is using single middle thick coal seam full-seam mining inclined longwall retrusive all across the comprehensive mechanization for falling method Mine;Specifically include:
S101:Coal-winning machine coal cutting;
S102:Scratch board conveyor transporting coal;
S103:Hydraulic support stand top plate;
S104:Elapse scratch board conveyor;
Coal-winning machine two-ways coal cutting, roller spin are crushed coal with pick, utilize unit drum blade and conveyer ramp plate Coal is voluntarily loaded into drag conveyor, Triangle Coal is cut in both sides termination using beveling feed;In production process, by coal cutting-shifting frame- Drag conveyor order is pushed away to carry out.
The management method of the hydraulic support stand top plate includes:Top plate is managed with comprehensive filling method:
In described coal-mining method, the top coal of middle thick ultra-thick coal bed upper curtate working face extraction is used into whole caving method shapes Into upper curtate goaf, the extensible canopy installed on hydraulic support is stretched out, immediate support exposure top plate, then filled three-stage side protecting All or part of opening is put, protects and exposes rib;After first half coal-winning machine 10~15 meters of distances of cut, adopted closing on upper curtate One, which is arranged, in lower curtate below dead zone takes over section stope drift active workings;Section stope drift active workings are taken over to put down with back production on the inside of upper curtate Lane is parallel to be staggeredly spaced a distance, and is arranged in the opposite side for taking over section working face parallel with extraction drift on the inside of upper curtate Take over that section is non-to face dead zone stope drift active workings, make to take over the inclined arrangement of section working face, carry out taking over section working face afterwards Back production;After lower curtate exploitation, hydraulic support and time shift frame, and three-stage side protecting device is all stretched out, protect and expose rib;Two Coal-winning machine is exploited in the same direction, and when the coal-winning machine cut of the cut first half is to buttock, the coal-winning machine of cut lower curtate starts Feed is chamfer to Return-ing direction, is changed to cut upper curtate;The cut is to the upper curtate coal-winning machine cut go side head of end Coal seam, then from end beveled feed, cut lower curtate coal seam, and so on exploit;
Described three-stage side protecting device is made up of one-level face guard, secondary protecting side plate and three-stage side protecting plate three parts, can be with Simultaneously or partially open;
Length is not small after one-level face guard, secondary protecting side plate and the three-stage side protecting plate of the three-stage side protecting device all stretch out In the half of mining height;
It is 15~20m that section stope drift active workings, which are taken over, with extraction drift parallel distance on the inside of upper curtate;
The distance of interlocking of extraction drift on the inside of section stope drift active workings and upper curtate of taking over is 1~3m.
Due to from goaf leak into stope and air -return duct it is distinguished and admirable to bring substantial amounts of heat into, so it is also One larger thermal source.When being divulged information using mining advancing and U-shaped, inleakage is all bigger.And drawing back is used, tamp Tunnel, and the ventilation of W shapes and pressure ventilation, can reduce goaf air leaking, also can be according to the change in goaf air leaking flow field Rule, inside goaf, windbreak is constructed every 30~50 meters, to reduce goaf air leaking, so as to efficiently control by adopting Dead zone, which is leaked out, brings the hot moisture of working face into.
Grouting filling management top plate is carried out to work face goaf, on the one hand reduces the inbreak of goaf inside ceiling panel rock, Reduce the heat dissipation capacity of balkstone;On the other hand, after goaf is filled with, leaking out for goaf substantially reduces, so as to reduce The entrained heat out of goaf air leaking.In addition, the temperature of charges is lower than the temperature of country rock and air, can be empty to mine Gas plays cooling effect.Surveyed according to similar mine, replace original whole caving methods to manage top plate using whole filling methods, make work unexpectedly Make 5~10 DEG C of face mercury dropped.The actual conditions in colliery, with the improvement of filler, the exploitation of absorbing and cooling temperature filler Utilize, when being mined in the future under the protection coal pillar in the exploitation process of working face or under village, under railway, under river etc., It is contemplated that filling management top plate using goaf grouting, the temperature of stope is substantially reduced.
The application principle of the present invention is further described with reference to specific embodiment.
Coal-mining method provided in an embodiment of the present invention and coal winning technology
(1) coal-mining method
Working face is using single middle thick coal seam full-seam mining inclined longwall retrusive all across the comprehensive mechanization for falling method Mine.
(2) coal winning technology
Coal winning technology:Coal-winning machine coal cutting-scratch board conveyor transporting coal-hydraulic support stand top plate-passage scraper plate transport Machine, goaf is handled using whole caving methods.
Working face is transported using MG300/720 electrical haulage shearers and SGZ800/800 types flexible flightconveyor.Adopt Coal machine two-ways coal cutting, roller spin are crushed coal with pick, using unit drum blade and conveyer ramp plate by coal from luggage Enter drag conveyor, Triangle Coal is cut in both sides termination using beveling feed.In production process, by coal cutting ,-shifting frame-pushes plate conveying Machine order is carried out, and coal-winning machine is 24 meters (i.e. 16 pack supports) with the spacing distance for moving drag conveyor.
1) synthesis dust prevention
(1) each belt transfer point, scraper-trough conveyer head, coal bunker mouth etc. will install sprayer unit, and disintegrating machine must install dust cover With sprayer unit (or deduster), and there is special messenger to be responsible for.Transfer point drop should be less than 0.5m, if must be installed more than 0.5m Chute or guide plate.Each transfer point, which is lifted, will install fixed, adjustable sprayer unit.Sprayer unit spraying will nebulize (spraying pressure Power is more than 0.7MPa), eject position is reasonable, using normal.Milling coal hole coal discharge outlet must all install sprayer unit or deduster, make Atomizing de-dusting is carried out during industry or must not be less than 8MPa with deduster dedusting, atomisation pressure.Dust prevention system and synthesis dust prevention facility must Must improve it is complete, and ensure normal use.
(2) coal-winning machine must use inside and outside sprayer unit, and internal spraying pressure is not less than 2MPa, and external spraying pressure is not less than 4.0MPa, if inner sprayer unit can not normally spray, external spraying pressure cannot be less than 8.0MPa, and hydraulic pressure deficiency must use height Atomizing pump is pressed, strengthens safeguarding and ensures normal use, atomization will get well, and must start shooting after first boiling water during coal mining, must first stop when stopping adopting Cut off the water after machine, the damage of such as anhydrous or sprayer unit must be shut down.
(3) when working face meets rock thickness more than 200mm, when length is more than 5m, coal-winning machine is forbidden directly to cut rock; Meet before rock is blown out will blowing out 20m scope internal frames nearby, on shelf back timber, the place such as rib carry out watering and lowering dust.Explosion When to open to blow out and sprayed between section and forward and backward 10 groups of framves.Perforating must use wet drilling, and explosion must use water stemming material.
(4) daily maintenance crew of unit in charge of construction will clean coal dust once to working face, and two will clean a dant along each former class Dirt, prevent coal dust from accumulating.
(5) working face must every frame install and move frame automatic sprayer, drop post, synchronous spraying when moving frame, disintegrating machine is necessary Dust cover and sprayer unit are installed, spraying and spillplate are sprayed and must nebulized using during use between the face frame that works.
2) fully-mechanized mining working dust concentration detects
The instrument and method of fully-mechanized mining working dust concentration detection are identical with the instrument and method that fully mechanized workface detects, when Sampled during coal-winning machine coal cutting, sampling position is located at away from coal-winning machine return side 10m, fortune is blurted out and the use place for mouth of rolling back and rationalizing At away from face end 10m.Dust concentration testing result is shown in Table 1.
The dust concentration testing result of table 1
The full dirt of N2717 coal-faces can be seen that according to the dust concentration testing result of table 1 and exhale dust concentration to be all far above State health standards, and the dust concentration of two crossheadings is slightly above state health standards, this explanation dust is with distinguished and admirable along work Make face gradually to be settled, only a small number of small particle dust are with distinguished and admirable motion, as long as therefore taking adequate measures coal-winning machine Dust is timely caught caused by coal cutting, it becomes possible to is obtained good dust-laying effect, is conveyed for the scraper plate at two crossheadings Machine transfer point, belt transfer point, coal bunker coal dropping point, main haulage roadway gatehead and the dust collector of water curtain in two lanes are improved can To obtain good synthesis dust prevention effect.
3) comprehensive anti-measurements for reduction optimisation technique scheme
The main dust process of fully-mechanized mining working have coal-winning machine coal cutting, coal breakage, coaling, hydraulic moving stand, transport reprint, Transporter coal breakage etc..With the improvement of coal winning technology, the use of deep, the high-power mechanical coal excavation apparatus of large conveying quantity is cut greatly now, with And the extension with exploiting field, coal stream is in the lengthening of working face transportation range, the increase of transfer point quantity so that working face and tunnel Coal powder content in air remains high.Survey the ore deposit fully-mechanized mining working dust concentration and be up to 102.81mg/m3, significantly larger than coal The allowed maximum concentration 10mg/m of the 739th article of regulation of ore deposit safety code3.It is right due to dust itself composition and its characteristic There is great threat in the staff of Work places and the security of environment on coalface.Therefore, using effective dust-proof And measurements for reduction, suppress dirt source, block dirt stream, treat both principal and secondary aspect of disease, just seem extremely important.At present, scene is taken main dust-proof Measure is exactly the method progress depositing dust that dust point is sprayed spray sprinkler between support using unit in process of production, according to underground The situation of actual dust concentration, propose to carry out fully-mechanized mining working coal dust the measure of the comprehensive regulation.
4) fully-mechanized mining working surface conveyer transfer point dust guard:
(1) original present situation:Reprinting sprayer unit is installed above at head, and sprayer unit orientation is directed at coal breakage Point, this measure can soak a part of coal body of conveyor surface, play a part of dust-proof effect, but fully-mechanized mining working production period Between coal output it is big, and often wind speed is higher at extra exit under working face, and it is thicker that conveyer transports coal body, and bottom coal body can not be by Wetting, when reprinting whereabouts, coal body flies away, and trickle coal body particle, which is entrained in air intake, in not wetted coal body enters work Face.
(2) prioritization scheme:At handpiece of scraper conveyer inward in the range of 1m, trough two helps bottom respectively to install row spray Mist, often arranges 4~6 shower nozzles, and water source is controlled (as shown in Figure 2) with original outside electrospray tandem and using same switch.
So installation spraying in top soaks conveyer top layer coal body, and the spraying of bottom improvement and installation is by the following coal body in top layer Soaked, it is comprehensive to reduce Dust Concentration at the drag conveyor of working face front and rear part.
5) fully mechanized mining cutting coal machine external spraying device for reducing dust
(1) original present situation:It is each at rocking arm before and after cutting coal machine that external spraying device at one is set, spray towards pick, because of coal cutting It is larger that lane position wind speed is cut residing for machine, water smoke caused by coal dust caused by coal cutting machine cylinder coal cutting and external spraying is together distinguished and admirable Take away and back into Shang Fu lanes by cutting lane, causing to cut Xiang Jishangfu lanes during coal cutting, lane position coal dust is big and air humidity close to cutting Height, have a strong impact on operation workers ' safety health.
(2) prioritization scheme:Using Φ 10mm reinforcement weldings into two diameters be respectively 400mm (the soft gauze bags of steel ring Around) and 25mm (this data depends on external spraying bond diameter) circular steel ring, the two is with the zigzag reinforcing bar of a root long 100mm One piece is welded on, reinforcing bar and Φ 25mm steel ring vertical connections is connected, is flushed with Φ 400mm steel rings, Φ 25mm steel ring fixed covers exist External spraying joint base position, make Φ 400mm steel rings planes with cutting lane into vertical (as shown in Figure 3).This measure utilizes Air Filter Principle is caught with the distinguished and admirable water smoke and coal dust to wave of high speed, coal dust is mixed to form the big water coal of quality with water smoke and is sunk, can Efficiently and effectively reduce coal dust and water smoke caused by coal cutting.
6) fully-mechanized mining working transportation roadway Belt transport transfer point dust guard
(1) original present situation:Static shelving at adhesive tape head transfer point, 1~2, shower nozzle is installed on shelf, is directed at coal dropping point, Atomizing de-dusting is opened during producing coal, when coal amount is excessive, on the one hand trickle water dust, the opposing party caused by water smoke and coal dust hit The not wetted coal body in face is flown upward, and Dust Concentration is often higher before and after transfer point.
(2) prioritization scheme:In transfer point position, adhesive tape shelf two helps to use 1m (width) × 2m (length) steel plates into " inverted triangle " shape It is fixed, a hemi-closure space (as shown in Figure 4) will be surrounded at transfer point, and on the basis of the spraying of original top position, two Two shower nozzles of each increase are helped, " circular cone type " is so formed and catches konisphere, can be greatly improved and catch dirt effect.
7) the lane depositing dust drenching installation of working face two
(1) original present situation:1 water is respectively installed in secondary entrance to a lane with inner above and below working face in the range of 20~50m beyond extra exit Curtain, carry out tunneling boring depositing dust.This measure because injection flow rate is big, water curtain nearby can not operation, pedestrian, when air quantity is larger, a large amount of water smokes Farther place is floated towards with the wind, causes neighbouring staff garments often to be drenched, and most of administrative staff are to avoid being drenched often shortening Water curtain even is stopped, does not have due dust-laying effect, and a large amount of waste water drainages are difficult.
(2) prioritization scheme:First on the basis of original water curtain, gauze is added to be transformed into water curtain net, secondly by nozzle spray work( It can release, form low-pressure gravity flow water hole, becoming vertical linearity water drenching by original spraying, (water outlet bore dia is unsuitable excessive, should It is maintained at 5~10mm, pitch of holes 50mm), water drenching is online to water curtain, forms water curtain together truly, water curtain net bottom Portion and place top of moving into one's husband's household upon marriage set tank water receiving, and top tank institute water receiving drenches two again to be helped on gauze, and last two help bottom tank The water drenching of undertaking leads to ditch (as shown in Figure 5) with water pipe, it is so distinguished and admirable in dust meet water curtain net and form water coal slime then quilt Water drenching washes away.
On the one hand the dust after chance water is avoided to continue to fly upward;Another aspect avoids near caused by spraying and holdee Clothes is drenched, the setting for top water receiving tank of moving into one's husband's household upon marriage avoids water drenching and drenched to holdee.
8) working face coal bunker coal dropping point and the anti-device for reducing dust of main haulage roadway
(1) original present situation:Spraying is set above coal bunker, and lower section turns coal-treating nozzle dress by feeder connection and spilt to adhesive tape, slips For coal mouth away from adhesive tape height 1.0m, lower section sets spraying alignment coal dropping point, carries out depositing dust, and because of coal bunker, to slip coal amount big at present, if reprinting The spraying that point is set is so that quantity is more, water yield can play greatly certain depositing dust purpose, but so easily cause coal body overly moist, influence Transhipment and ature of coal, on the other hand because coal dropping port is remote away from adhesive tape distance, and adhesive tape main entry is generally air intake main entry, and wind speed is higher, falls Coal dust is easily flown upward during coal and during transhipment.
(2) prioritization scheme:On the one hand coal breakage dust production resource is eliminated, because of safety factor, coal-treating nozzle can not be extended on adhesive tape, right This to coal-treating nozzle surrounding parcel and extend on adhesive tape using soft cloth skin, such coal breakage directly drop down onto avoided on adhesive tape with High speed winds stream is docked, and releases this dust production resource;On the other hand outside coal dropping point 1.0m, along adhesive tape traffic direction, iron sheet is used 0.8~1.5m of diameter (diameter is on the basis of adhesive tape shelf width) semicircles are made, two help perforation to be fixed on shape on adhesive tape shelf Into closing space, more than length 5m is closed, set one to spray every 1.5m in space, Wetting Coal top layer, this avoid After coal body drops down onto on adhesive tape in transportation with head-on high speed is distinguished and admirable dock caused by coal dust fly upward.
9) other dust preventions
For the further Dust Concentration for reducing fully-mechanized mining working, in actual production process, may be used also with reference to above-mentioned measure To use following method.
Coal-bed flooding.If playing dry hole in coal seam in advance before back production, press water is injected by drilling, oozes water Enter to inside coal body, increase the adhesion strength between the moisture of coal and grit, and reduce the intensity and fragility of coal, reduce coal when mining The growing amount of dirt.Coal-bed flooding plays continuous dustproof effect in whole exploitation process, has a positive effect, but quantities compared with Greatly, water consumption is big, influences ature of coal.
Screen is set at the air intake of working face, reduces as far as possible and distinguished and admirable enters goaf.Also set in working face upper port Air curtain is put, guiding is distinguished and admirable to be avoided producing vortex here.
Artificial spray sprinkler periodically is carried out to air intake lane tunnel and return aircourse, reduces the dust of wall.10)
Comprehensive anti-depositing dust optimization points for attention
The shower nozzle outer of drag conveyor bottom installation should avoid stretching with helping to be maintained on a section in conveying machine baffle Go out after baffle plate the quarrel block conveyed to break.
Coal bunker guard should strengthen making an inspection tour, and avoid bulk materials from entering coal bunker and cause to close the damage of iron sheet.
Each place spraying nozzle and water yield control should be determined according to the dust-proof pressure of supply water of working face and coal output, be kept away Exempt from that water is small fully Wetting Coal and water to cause the appearance of coal body overly moist situation greatly.
The present invention manages top plate with comprehensive filling method
Due to from goaf leak into stope and air -return duct it is distinguished and admirable to bring substantial amounts of heat into, so it is also One larger thermal source.When being divulged information using mining advancing and U-shaped, inleakage is all bigger.And drawing back is used, tamp Tunnel, and the ventilation of W shapes and pressure ventilation, can reduce goaf air leaking, also can be according to the change in goaf air leaking flow field Rule, inside goaf, windbreak is constructed every 30~50 meters, to reduce goaf air leaking, so as to efficiently control by adopting Dead zone, which is leaked out, brings the hot moisture of working face into.
Grouting filling management top plate is carried out to work face goaf, on the one hand reduces the inbreak of goaf inside ceiling panel rock, Reduce the heat dissipation capacity of balkstone;On the other hand, after goaf is filled with, leaking out for goaf substantially reduces, so as to reduce The entrained heat out of goaf air leaking.In addition, the temperature of charges is lower than the temperature of country rock and air, can be empty to mine Gas plays cooling effect.Surveyed according to similar mine, replace original whole caving methods to manage top plate using whole filling methods, make work unexpectedly Make 5~10 DEG C of face mercury dropped.The actual conditions in colliery, with the improvement of filler, the exploitation of absorbing and cooling temperature filler Utilize, when being mined in the future under the protection coal pillar in the exploitation process of working face or under village, under railway, under river etc., It is contemplated that filling management top plate using goaf grouting, the temperature of stope is substantially reduced.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention All any modification, equivalent and improvement made within refreshing and principle etc., should be included in the scope of the protection.

Claims (8)

1. a kind of coal-mining method, it is characterised in that the coal-mining method is using whole caving methods processing goaf;Including:Mine Machine cut coal, scratch board conveyor transporting coal, hydraulic support stand top plate, elapse scratch board conveyor;Coal-winning machine two-ways coal cutting, roller spin Coal is crushed with pick, coal is voluntarily loaded into drag conveyor, both sides termination using unit drum blade and conveyer ramp plate Triangle Coal is cut using beveling feed;By coal cutting ,-shifting frame-pushes away drag conveyor order and carried out;And the coal seam in coal-winning machine coal cutting Surrounding arrangement coal winning machine spray device for reducing dust, headentry Belt transport transfer point dust guard, the lane of working face two drop Dirt drenching installation and working face coal bunker coal dropping point and the anti-device for reducing dust of main haulage roadway.
2. coal-mining method as claimed in claim 1, it is characterised in that the coal-mining method specifically includes:By middle thick super thick coal The top coal of layer upper curtate working face extraction forms upper curtate goaf using whole caving methods, flexible by what is installed on hydraulic support Beam stretches out, and immediate support exposure top plate, then completely or partially opens three-stage side protecting device, protects and expose rib;Work as upper half After 10~15 meters of distances of portion's coal-winning machine cut, arrange that taking over section for one returns in the lower curtate below upper curtate goaf is closed on Adopt tunnel;Take over that extraction drift on the inside of section stope drift active workings and upper curtate is parallel to be staggeredly spaced a distance, taking over section work Make the opposite side arrangement in face and upper curtate inner side extraction drift parallel taking over section is non-to face dead zone stope drift active workings, make to take over section The inclined arrangement of working face, carry out taking over the back production of section working face afterwards;After lower curtate exploitation, hydraulic support and time shift frame, And all stretch out three-stage side protecting device, protect and expose rib;Two coal-winning machines are exploited in the same direction, when the coal-winning machine of the cut first half When cut is to buttock, the coal-winning machine of cut lower curtate starts to chamfer feed to Return-ing direction, is changed to cut upper curtate;Institute Cut is stated to the coal seam on the upper curtate coal-winning machine cut go side head of end, then from end beveled feed, cut lower curtate coal Layer, reciprocal exploitation;
Described three-stage side protecting device is made up of one-level face guard, secondary protecting side plate and three-stage side protecting plate three parts, can be simultaneously Or partially open;
Length, which is not less than, after one-level face guard, secondary protecting side plate and the three-stage side protecting plate of the three-stage side protecting device all stretch out adopts High half;
It is 15~20m that section stope drift active workings, which are taken over, with extraction drift parallel distance on the inside of upper curtate;
The distance of interlocking of extraction drift on the inside of section stope drift active workings and upper curtate of taking over is 1~3m.
3. coal-mining method as claimed in claim 1, it is characterised in that at handpiece of scraper conveyer inward in 1m, trough two Help bottom respectively installation one row spraying, often arrange 4~6 shower nozzles, water source with it is original outside electrospray tandem and using it is same switch into Row control.
4. coal-mining method as claimed in claim 1, it is characterised in that in the described coal-winning machine coal cutting, sprayed outside coal-winning machine Mist device for reducing dust utilizes the circular steel ring that Φ 10mm reinforcement weldings are respectively 400mm and 25mm into two diameters, two circular steels Circle, at one piece, connects reinforcing bar and Φ 25mm steel ring vertical connections, with Φ 400mm steel with the zigzag reinforcement welding of a root long 100mm Circle flushes, and Φ 25mm steel rings fixed covers make Φ 400mm steel rings planes with cutting lane into vertical in external spraying joint base position.
5. coal-mining method as claimed in claim 1, it is characterised in that in the described coal-winning machine coal cutting, working face transport Lane Belt transport transfer point dust guard is helped to be fixed into inverted triangle shape with 1m × 2m steel plates in transfer point position adhesive tape shelf two, will A hemi-closure space is surrounded at transfer point, and on the basis of the spraying of original top position, two help two shower nozzles of each increase, this Sample forms circular cone type and catches konisphere.
6. coal-mining method as claimed in claim 1, it is characterised in that in described coal-mining method,
In the coal-winning machine coal cutting, the lane depositing dust drenching installation of working face two adds gauze to be transformed into first on the basis of original water curtain Water curtain net;Secondly nozzle spray function is released, forms low-pressure gravity flow water hole, vertical linearity leaching is become by original spraying Water, water outlet bore dia is in 5~10mm, and pitch of holes 50mm, water drenching is online to water curtain, forms one of water curtain, water curtain sieve bottom and Move into one's husband's household upon marriage and locate top setting tank water receiving, top tank institute water receiving drenches two again to be helped on gauze, and last two help bottom tank to accept Water drenching lead to ditch with water pipe.
7. coal-mining method as claimed in claim 1, it is characterised in that in the coal-winning machine coal cutting, working face coal bunker coal dropping point And the anti-device for reducing dust of main haulage roadway carries out surrounding parcel to coal-treating nozzle using soft cloth skin and extended on adhesive tape;On the other hand exist Outside coal bunker coal dropping point 1.0m, along adhesive tape traffic direction, 0.8~1.5m of diameter semicircles are made with iron sheet, two help perforation to fix In forming closing space on adhesive tape shelf, length 5m is closed, set one to spray every 1.5m in space, Wetting Coal top layer.
A kind of 8. management method of the top plate of coal-mining method as claimed in claim 1, it is characterised in that the management method bag Include:
Top plate is managed with comprehensive filling method:
Using drawing back, tunnel, and the ventilation of W shapes and pressure ventilation are tamped;Inside goaf, every 30~50 meters of structures Build windbreak.
CN201710728476.0A 2017-08-23 2017-08-23 A kind of coal-mining method and roof controlling method Pending CN107575227A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710728476.0A CN107575227A (en) 2017-08-23 2017-08-23 A kind of coal-mining method and roof controlling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710728476.0A CN107575227A (en) 2017-08-23 2017-08-23 A kind of coal-mining method and roof controlling method

Publications (1)

Publication Number Publication Date
CN107575227A true CN107575227A (en) 2018-01-12

Family

ID=61034498

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710728476.0A Pending CN107575227A (en) 2017-08-23 2017-08-23 A kind of coal-mining method and roof controlling method

Country Status (1)

Country Link
CN (1) CN107575227A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111706329A (en) * 2020-06-28 2020-09-25 中国矿业大学 Intelligent mining process integrating excavation, transportation, branch and branch
CN112431593A (en) * 2020-10-15 2021-03-02 重庆市能源投资集团科技有限责任公司 Automatic coal cutting process
CN113464141A (en) * 2021-08-25 2021-10-01 国能神东煤炭集团有限责任公司 Triangular coal area recovery method
CN114893180A (en) * 2022-04-26 2022-08-12 秦兵文 Dust device and coal-winning machine

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2175830Y (en) * 1993-12-07 1994-08-31 谢成龙 External sprayer held on iron-chain guide
CN101457645A (en) * 2008-04-30 2009-06-17 天地科技股份有限公司 Thick coal seam stepwise full-seam coal mining method
CN202300472U (en) * 2011-10-30 2012-07-04 山西晋城无烟煤矿业集团有限责任公司 Transfer point air-permeable dust-proof mesh enclosure
CN202880432U (en) * 2012-11-14 2013-04-17 淄博矿业集团有限责任公司岱庄煤矿 Belt conveyor transfer structure with dust cover
CN103982184A (en) * 2014-06-10 2014-08-13 山东黄金矿业(莱州)有限公司三山岛金矿 Falling ore directional slip control method adopting underground mine bottom-pillar-free caving mining method
CN203835431U (en) * 2014-04-26 2014-09-17 淄博矿业集团有限责任公司埠村煤矿 Dust collecting and settling device for underground coal mine
CN104564068A (en) * 2014-12-15 2015-04-29 山东科技大学 Comprehensive dust preventing and treating device for fully-mechanized coal mining working face with large mining height of coal mine
CN204436449U (en) * 2015-02-03 2015-07-01 张士春 A kind ofly catch dirt curtain for underground coal mine
CN204624603U (en) * 2015-03-27 2015-09-09 山东科技大学 A kind of enclosed negative pressure two secondary control dust collector for colliery conveyer transfer point

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2175830Y (en) * 1993-12-07 1994-08-31 谢成龙 External sprayer held on iron-chain guide
CN101457645A (en) * 2008-04-30 2009-06-17 天地科技股份有限公司 Thick coal seam stepwise full-seam coal mining method
CN202300472U (en) * 2011-10-30 2012-07-04 山西晋城无烟煤矿业集团有限责任公司 Transfer point air-permeable dust-proof mesh enclosure
CN202880432U (en) * 2012-11-14 2013-04-17 淄博矿业集团有限责任公司岱庄煤矿 Belt conveyor transfer structure with dust cover
CN203835431U (en) * 2014-04-26 2014-09-17 淄博矿业集团有限责任公司埠村煤矿 Dust collecting and settling device for underground coal mine
CN103982184A (en) * 2014-06-10 2014-08-13 山东黄金矿业(莱州)有限公司三山岛金矿 Falling ore directional slip control method adopting underground mine bottom-pillar-free caving mining method
CN104564068A (en) * 2014-12-15 2015-04-29 山东科技大学 Comprehensive dust preventing and treating device for fully-mechanized coal mining working face with large mining height of coal mine
CN204436449U (en) * 2015-02-03 2015-07-01 张士春 A kind ofly catch dirt curtain for underground coal mine
CN204624603U (en) * 2015-03-27 2015-09-09 山东科技大学 A kind of enclosed negative pressure two secondary control dust collector for colliery conveyer transfer point

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
周海洋: "《综采工作面综合防降尘系统优化》", 《中州煤炭》 *
纪志久: "《艾友矿热害治理技术研究》", 《中国优秀硕士学位论文全文数据库 工程科技I辑》 *
郭晓强等: "《临空区回采巷道优化布置防冲技术研究及应用》", 《湖南科技大学学报(自然科学版)》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111706329A (en) * 2020-06-28 2020-09-25 中国矿业大学 Intelligent mining process integrating excavation, transportation, branch and branch
CN112431593A (en) * 2020-10-15 2021-03-02 重庆市能源投资集团科技有限责任公司 Automatic coal cutting process
CN113464141A (en) * 2021-08-25 2021-10-01 国能神东煤炭集团有限责任公司 Triangular coal area recovery method
CN114893180A (en) * 2022-04-26 2022-08-12 秦兵文 Dust device and coal-winning machine

Similar Documents

Publication Publication Date Title
WO2019140812A1 (en) Mining method for single steeply-inclined thick coal seam
CN107575227A (en) A kind of coal-mining method and roof controlling method
CN104251139B (en) Coal-face Collapsed zone filling mining method
CN104564068B (en) Comprehensive dust preventing and treating device for fully-mechanized coal mining working face with large mining height of coal mine
CN110410076B (en) Filling mining method for recovering left coal pillars in goaf of old house pillar
CN102094647A (en) Safe and efficient fully-mechanized mining method for thin coal seam under two hard conditions
CN105927269A (en) Gas control method of outburst coal seam
CN106812550A (en) A kind of fully-mechanized mining working crosses the method that major fault prevents and treats Period of Coal Seam Spontaneous Combustion
CN109403974A (en) A kind of mine, which picks up, unloads pumping and fills lasting exploit design method
CN105952453A (en) Long wall advancing type mechanical non-roadway mining complete plant for coal seam face
CN205638458U (en) Accelerate construction structures of broken system construction speed of underground swift current
CN202266260U (en) Technical equipment for separating coal from gangue and backfilling gangue
CN109915197A (en) A kind of method that rock gangway km directional long borehole substitution middle part bottom pumping rock gangway is taken out at bottom
CN210829265U (en) Top coal caving mining system for medium-thickness coal seam with extra-large dip angle
CN101302933A (en) Method for developing rock lane comprehensive mechanization developing operation
CN110578523A (en) Method and system for mining top coal of medium-thickness coal seam with extra-large dip angle
CN100497886C (en) Coal mining process including prop type mining and prop recovery
CN104989402A (en) Medium-deep hole room pillar mining method for limestone underground mine mining
CN104632224B (en) Shortwall hydraulic mining method along strike
CN104329117B (en) Installation method of comprehensive mechanized filling, coal mining and open-off cutting equipment
CN105697054A (en) Mode of arranging high-gas coal seam high dip tunnel for drawing out gas and gas extraction method
CN107191200B (en) A kind of turn rock gangway speedy drivage material and Gunning material delivery method
CN112901170B (en) Coal-aluminum joint mining method for shared working face
Shi et al. Application of longwall top coal caving in challenging geological conditions
CN114961728A (en) Stope coal pillar-free mining method for comprehensively preventing rock burst and gas

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180112