CN100497886C - Coal mining process including prop type mining and prop recovery - Google Patents

Coal mining process including prop type mining and prop recovery Download PDF

Info

Publication number
CN100497886C
CN100497886C CNB2006100849610A CN200610084961A CN100497886C CN 100497886 C CN100497886 C CN 100497886C CN B2006100849610 A CNB2006100849610 A CN B2006100849610A CN 200610084961 A CN200610084961 A CN 200610084961A CN 100497886 C CN100497886 C CN 100497886C
Authority
CN
China
Prior art keywords
coal
pillar
anchor pole
beat
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2006100849610A
Other languages
Chinese (zh)
Other versions
CN1858401A (en
Inventor
段连权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB2006100849610A priority Critical patent/CN100497886C/en
Publication of CN1858401A publication Critical patent/CN1858401A/en
Application granted granted Critical
Publication of CN100497886C publication Critical patent/CN100497886C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The present invention discloses one coal mining process includes the following steps: mounting rock bolt; mounting pit prop; coal falling; re-mounting rock bolt; filling coal and transporting coal; and prop pulling, caving roof and breaking coal pillar. The coal mining process has the advantages of production safety, being reasonable and economic, high coal recovery rate, etc.

Description

The coal winning technology of coal column is reclaimed in pillar-and-panel work
Technical field:
The present invention relates to a kind of coal winning technology, especially relate to the coal winning technology that coal column is reclaimed in a kind of pillar-and-panel work.
Background technology:
Regional underground coal resource reserve such as Yulin, Erdos is abundant, and condition of coal seam occurrence is superior, bury shallow, monoclinal structure, inclination angle 1-3 degree, wide slow undulation, tomography, fold agensis in the zone belong to the simple structure district.The coal seam is stable, and ature of coal is good, and gas bearing capacity is low, and water yield is little.But,, adopt room formula coal-mining method at present owing to multiple reasons such as production technique and fund inputs, cause the resource serious waste, coal recovery rate extremely low (32%-38%) is in order to save the national resources waste, turn waste into wealth, benefit the nation and the people, the coal winning technology of coal column is reclaimed in special invention pillar-and-panel work.
Summary of the invention:
The object of the present invention is to provide a kind of a kind of pillar-and-panel work that remaining coal column in the present colliery fully can be reclaimed to reclaim the coal winning technology of coal column.
Purpose of the present invention is implemented by following technical scheme: the coal winning technology of coal column is reclaimed in pillar-and-panel work, and it includes following steps:
(1), beats anchor pole; (2), beat pillar; (3), coal breakage; (4), beat anchor pole again; (5), coaling, transport coal; (6), prop drawing, caving and broken coal column; Wherein
(1), beats anchor pole: at first beat anchor pole on the top board in the tunnel of having exploited;
(2), beat pillar: in the middle of having beaten the tunnel of anchor pole, beat pillar;
(3), coal breakage: remaining coal column is carried out coal breakage;
(4), beat anchor pole again: remaining coal column is carried out on the coal breakage new exposed top board afterwards beaten anchor pole again;
(5), coaling, transport coal; With loader the coal that falls is loaded onto car, transport work plane to ground;
(6), prop drawing, caving coal and broken coal column: the pillar that will beat reclaims, caving coal and broken coal column.
Described step (6) includes following steps: (a) the described pillar of having beaten is reclaimed; When (b) thickness in coal seam surpasses 0.3 meter on the described bordroom top board, can go up shipment coal machinery, reclaim, when protecting the top coal, in the middle of next row's coal column of preparing to exploit, beat the emergency exit and carry out coal blasting protecting the top coal above 3 meters to protecting the top coal; (C), coaling, transport coal: after having put the top coal, shipment coal machinery begins to enter in the bordroom that first row has coal column transports dress, is prohibited from entering the operation of caving district.
Described step (6) includes following steps: (a) the described pillar of having beaten is reclaimed; (b) protect the top coal less than 0.3 meter, or do not possess carrier loader, directly carry out the caving coal, simultaneously remaining coal column is carried out coal breakage.
The described anchor pole of beating is that roof-bolter is beaten anchor pole or manually beaten anchor pole.
Ranks spacing between per two described anchor poles is no more than 2.0m, and the length of described anchor pole is 1.5-2.2m, and described bolt diameter is not less than 0.16m.
The described pillar of beating is for to make metal mainstay or to beat wooden prop.
The diameter of described wooden prop is not less than 0.12m, and the post of described per two wooden props is apart from being not more than 1m; Or the post of described per two metal mainstays is apart from being not more than 0.6m.
Described coal breakage is coal blasting or mechanical coal breakage.
Described coalingging coaling for people's frock coal or machinery; The fortune coal is agricultural vehicle or machinery fortune coal.
Described prop drawing is artificial prop drawing or mechanical prop drawing.
The invention has the advantages that: (1) production safety: relatively coal wall (remove to combine and adopt), the present invention can avoid roof fall, fall post, machinery accident such as hurt sb.'s feelings.Than coal wall (remove to combine and adopt) safety factor height.(2) economical rationality: relative longwall system, the equipment of this coal-mining method (electrical distribution system, transportation system, face timbering) less investment, skilled worker is few, and output is many, the efficiency height.(3) coal recovery rate height: compare with room mining, coal recovery rate can improve about 40%, and working section recovery reaches more than 75%.Be not less than the rate of extraction of coal wall.(4) control spontaneous fire: handle the goaf owing to carry out whole caving methods, protect top coal and float coal all pile things on played the effect of air-isolation down below, can control spontaneous fire.(5) disaster of minimizing pernicious gas: the mine in superficial part coal seam, because carrying out the method for all striding, the goaf handles, and local and ground connects, and forms the nature ventilating shaft, constitutes natural ventilation, and pernicious gas just can be discharged work plane without mechanical ventilation.(6) prevent the large tracts of land roof fall: handle the goaf owing to carry out whole caving methods,, top board has been carried out the pressure release, therefore the large tracts of land roof fall can not occur along with work plane is pushed ahead.Adopt this coal-getter's artistic skill to reclaim remaining coal column, turn waste into wealth, benefit the nation and the people.
Applicable elements:
(1), mining depth is more shallow, generally be no more than 200 meters dark.
(2), the coal seam of stable roof.
(3), the inclination angle 10 the degree below, be preferably horizontal coal seam.
(4), negative is more smooth, not too soft, and top board does not have trickle.
(5), present low gas coal seam, preferably spontaneous fire not.
Description of drawings:
Fig. 1 is a work plane general layout plan of the present invention.
Fig. 2 is the 1-1 sectional drawing of Fig. 1.
Fig. 3 is the 2-2 sectional drawing of Fig. 1.
Fig. 4 is the 3-3 sectional drawing of Fig. 1.
The specific embodiment:
Embodiment 1: the coal mining geology overview is as follows: average 8 meters of coal seam thickness, 3.2 meters of mining heights; Horizontal coal seam; Present low gas; Immediate roof is chiltern mud stone, arenaceous shale; No false roof and Lao Ding; No trickle.
The coal winning technology that coal column is reclaimed in pillar-and-panel work includes following steps:
(1), beats anchor pole; (2), beat pillar; (3), coal breakage; (4), beat anchor pole again; (5), coaling, transport coal; (6), prop drawing, caving coal and broken coal column; Wherein
(1), beats anchor pole: at first beat anchor pole on the top board in the tunnel of having exploited; Beating anchor pole is manually to beat anchor pole.Ranks spacing 2.0m between per two anchor poles, the length of anchor pole is 1.5m, bolt diameter 0.16m.
(2), beat pillar: in the middle of having beaten the tunnel of anchor pole, beat pillar; Beat pillar for beating wooden prop.The diameter 0.18m of wooden prop, and the post of per two wooden props is apart from 1m;
(3), coal breakage: remaining coal column is carried out coal breakage; Coal breakage is a coal blasting.Coal blasting: at first tap, use the coal column perforating of electric coal drill then to the bordroom both sides, dark 2.0 meters of eye, direction and rib angle 10-20 degree, are blown out at powder charge, on line.As Fig. 1, Fig. 2, Fig. 3, shown in Figure 4.
(4), beat anchor pole again: remaining coal column is carried out on the coal breakage new exposed top board afterwards beaten anchor pole again; Beating anchor pole is manually to beat anchor pole.Ranks spacing between per two anchor poles is 2.0m, and the length of anchor pole is 1.5m, bolt diameter 0.16m.
(5), coaling, transport coal; With loader the coal that falls is loaded onto agricultural vehicle, transport work plane to ground;
(6), prop drawing, caving coal and broken coal column; (a) the described pillar of having beaten is reclaimed; (b) thickness in coal seam is 4.8 meters on the described bordroom top board, on load and transport coal machinery, reclaim protecting the top coal, carry out coal blasting to protecting the top coal preparing to beat the emergency exit in the middle of next row's coal column of exploitation; (C) coal is coaling, transported to machinery; After having put the top coal, shipment coal machinery begins to enter in the bordroom that first row has coal column transports dress, is prohibited from entering the operation of caving district.
Embodiment 2: the coal mining geology overview: average 2.2 meters of coal seam thickness, 2.2 meters of mining heights; Horizontal coal seam; Present low gas; Immediate roof is hard sandstone, arenaceous shale; No false roof; No trickle.
The coal winning technology that coal column is reclaimed in pillar-and-panel work includes following steps:
(1), beats anchor pole; (2), beat pillar; (3), coal breakage; (4), beat anchor pole again; (5), coaling, transport coal; (6), prop drawing, caving and broken coal column;
(1), beats anchor pole: at first beat anchor pole on the top board in the tunnel of having exploited; Beating anchor pole is that roof-bolter is beaten anchor pole.Ranks spacing .1.0m between per two anchor poles, the length of anchor pole is 2.2m, bolt diameter 0.18m.
(2), beat pillar: in the middle of having beaten the tunnel of anchor pole, beat pillar; Beat pillar for beating the metal friction pillar.The post of per two metal friction pillars is apart from 0.6m.
(3), coal breakage: remaining coal column is carried out coal breakage; Coal breakage is a coal blasting.Coal blasting: at first tap, use the coal column perforating of electric coal drill then to the bordroom both sides, dark 2.0 meters of eye, direction and rib angle 10-20 degree, are blown out at powder charge, on line.As Fig. 1, Fig. 2, Fig. 3, shown in Figure 4.
(4), beat anchor pole again: remaining coal column is carried out on the coal breakage new exposed top board afterwards beaten anchor pole again; Beating anchor pole is manually to beat anchor pole.Ranks spacing between per two anchor poles is 1.0m, and the length of anchor pole is 2.2m, bolt diameter 0.18m.
(5), coaling, transport coal; With manually the coal that falls being loaded onto agricultural vehicle, transport work plane to ground;
(6), prop drawing, caving coal and broken coal column; The pillar of having beaten is reclaimed, and prop drawing is artificial prop drawing; The artificial caving of forcing is carried out in the goaf.
Embodiment 3: the coal mining geology overview: average 4.2 meters of coal seam thickness, 3.8 meters of mining heights; Horizontal coal seam; Present low gas; Immediate roof is chiltern mud stone, arenaceous shale; Old top is arranged; No trickle.
The coal winning technology that coal column is reclaimed in pillar-and-panel work includes following steps:
(1), beats anchor pole; (2), beat pillar; (3), coal breakage; (4), beat anchor pole again; (5), coaling, transport coal; (6) prop drawing, caving and broken coal column; Wherein
(1), beats anchor pole: at first beat anchor pole on the top board in the tunnel of having exploited; Beating anchor pole is that roof-bolter is beaten anchor pole.Ranks spacing 1.5m between per two anchor poles, the length of anchor pole is 1.8m, bolt diameter 0.16m.
(2), beat pillar: in the middle of having beaten the tunnel of anchor pole, beat pillar; Beat pillar for beating wooden prop.The diameter 0.12m of wooden prop, and the post of per two wooden props is apart from 0.5m;
(3), coal breakage: remaining coal column is carried out coal breakage; Coal breakage is a coal blasting.Coal blasting: at first tap, use the coal column perforating of electric coal drill then to the bordroom both sides, dark 2.0 meters of eye, direction and rib angle 10-20 degree, are blown out at powder charge, on line.As Fig. 1, Fig. 2, Fig. 3, shown in Figure 4.
(4), beat anchor pole again: remaining coal column is carried out on the coal breakage new exposed top board afterwards beaten anchor pole again; Beating anchor pole is manually to beat anchor pole.Ranks spacing between per two anchor poles is 1.5m, and the length of anchor pole is 2.0m, bolt diameter 0.16m.
(5), coaling, transport coal; With loader the coal that falls is loaded onto agricultural vehicle, transport work plane to ground;
(6), prop drawing, caving coal and broken coal column; The pillar of having beaten is reclaimed, and prop drawing is artificial prop drawing; The artificial caving of forcing is carried out in the goaf.

Claims (10)

1, the coal winning technology of coal column is reclaimed in a kind of pillar-and-panel work, it is characterized in that it includes following steps:
(1), beats anchor pole; (2), beat pillar; (3), coal breakage; (4), beat anchor pole again; (5), coaling, transport coal; (6), prop drawing, caving and broken coal column; Wherein
(1), beats anchor pole: at first beat anchor pole on the top board in the tunnel of having exploited;
(2), beat pillar: in the middle of having beaten the tunnel of anchor pole, beat pillar;
(3), coal breakage: remaining coal column is carried out coal breakage;
(4), beat anchor pole again: remaining coal column is carried out on the coal breakage new exposed top board afterwards beaten anchor pole again;
(5), coaling, transport coal; With loader the coal that falls is loaded onto car, transport work plane to ground;
(6), prop drawing, caving coal and broken coal column: the pillar that will beat reclaims, caving coal and broken coal column.
2, the coal winning technology of coal column is reclaimed in a kind of pillar-and-panel work according to claim 1, it is characterized in that described step (6) includes following steps: (a) the described pillar of having beaten is reclaimed; When (b) thickness in coal seam surpasses 0.3 meter on the described bordroom top board, on load and transport coal machinery, reclaim protecting the top coal, when protecting the top coal and surpassing 3 meters, carry out coal blasting to protecting the top coal preparing to beat the emergency exit in the middle of next row's coal column of exploitation; (C), coaling, transport coal: after having put the top coal, shipment coal machinery begins to enter in the bordroom that first row has coal column transports dress, is prohibited from entering the operation of caving district.
3, the coal winning technology of coal column is reclaimed in a kind of pillar-and-panel work according to claim 1, it is characterized in that described step (6) includes following steps: (a) the described pillar of having beaten is reclaimed; (b) when protecting the top coal, or when not possessing carrier loader, will carry out the caving coal, and remaining coal column will be carried out coal breakage less than 0.3 meter.
4, according to the coal winning technology of claim 1 or 2 or 3 described a kind of pillar-and-panel works recovery coal columns, it is characterized in that the described anchor pole of beating is that roof-bolter is beaten anchor pole or manually beaten anchor pole.
5, reclaim the coal winning technology of coal columns according to claim 1 or 2 or 3 described a kind of pillar-and-panel works, it is characterized in that, ranks spacing between per two described anchor poles is no more than 2.0m, and the length of described anchor pole is 1.5-2.2m, and described bolt diameter is not less than 0.16m.
6, according to the coal winning technology of claim 1 or 2 or 3 described a kind of pillar-and-panel works recovery coal columns, it is characterized in that the described pillar of beating is for to make metal mainstay or to beat wooden prop.
7, the coal winning technology of coal column is reclaimed in a kind of pillar-and-panel work according to claim 6, it is characterized in that the diameter of described wooden prop is not less than 0.18m, and the post of described per two wooden props is apart from being not more than 1m; Or the post of described per two metal mainstays is apart from being not more than 0.6m.
8, according to the coal winning technology of claim 1 or 2 or 3 described a kind of pillar-and-panel works recovery coal columns, it is characterized in that described coal breakage is coal blasting or mechanical coal breakage.
9, reclaim the coal winning technology of coal columns according to claim 1 or 2 or 3 described a kind of pillar-and-panel works, it is characterized in that, described coalingging coaling for people's frock coal or machinery; The fortune coal is agricultural vehicle or machinery fortune coal.
10, according to the coal winning technology of claim 1 or 2 or 3 described a kind of pillar-and-panel works recovery coal columns, it is characterized in that described prop drawing is artificial prop drawing or mechanical prop drawing.
CNB2006100849610A 2006-05-31 2006-05-31 Coal mining process including prop type mining and prop recovery Expired - Fee Related CN100497886C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100849610A CN100497886C (en) 2006-05-31 2006-05-31 Coal mining process including prop type mining and prop recovery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100849610A CN100497886C (en) 2006-05-31 2006-05-31 Coal mining process including prop type mining and prop recovery

Publications (2)

Publication Number Publication Date
CN1858401A CN1858401A (en) 2006-11-08
CN100497886C true CN100497886C (en) 2009-06-10

Family

ID=37297348

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100849610A Expired - Fee Related CN100497886C (en) 2006-05-31 2006-05-31 Coal mining process including prop type mining and prop recovery

Country Status (1)

Country Link
CN (1) CN100497886C (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100554642C (en) * 2007-09-19 2009-10-28 中国矿业大学 A kind of method of long-wall integrated-extraction reclaiming room-type coal column mining
CL2008003560A1 (en) * 2008-11-28 2009-05-04 Corporacion Nac Del Cobre De Chile Method for the continuous extraction of mineral in underground works, destined for the permanent production of extraction from the points of exploitation, includes building exploitation galleries, in which the center defined by a group of galleries crosses a street to transport ore, and preconditioning of rock.
CN101858216B (en) * 2010-04-22 2012-05-23 中国矿业大学 Method for recovering stagnant coal pillars left by breast type coal mining method
CN101839134B (en) * 2010-04-22 2012-04-04 中国矿业大学 Method for recovering irregular stagnant coal pillars left by room coal mining method
CN102852524B (en) * 2012-10-09 2014-10-22 中国铝业股份有限公司 Method for utilizing hydraulic support to improve bauxite recovery rate
CN111005724B (en) * 2019-11-14 2021-01-12 南华大学 Method for stoping residual ores on top and bottom plates of slowly-inclined goaf

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
SR—500型薄煤层连续采煤机房柱式采煤方法的应用. 张宽礼.同煤科技,第3期. 1997
SR—500型薄煤层连续采煤机房柱式采煤方法的应用. 张宽礼.同煤科技,第3期. 1997 *
纳林庙矿区小点煤柱支护回采方法初探. 宋占有,张志军.内蒙古煤炭经济,第3期. 2001
纳林庙矿区小点煤柱支护回采方法初探. 宋占有,张志军.内蒙古煤炭经济,第3期. 2001 *
连续采煤机房柱式开采在神府矿区应用初探. 赵学文.煤矿设计,第2期. 1998
连续采煤机房柱式开采在神府矿区应用初探. 赵学文.煤矿设计,第2期. 1998 *

Also Published As

Publication number Publication date
CN1858401A (en) 2006-11-08

Similar Documents

Publication Publication Date Title
CN103590831B (en) A kind of gentle dip is thin-the novel mining methods of middle thickness orebody
CN104405395B (en) Mining method for transition of underground ore body from open stope mining method to caving mining method
CN100554642C (en) A kind of method of long-wall integrated-extraction reclaiming room-type coal column mining
CN101368482B (en) Novel technique of slight-pitch ore body overall mining method
CN101509377B (en) High-dipping ore block house column mining method
CN105019904B (en) Mining- machine-based slowly inclined thin ore vein mechanized continuous mining method
CN102094647B (en) Safe and efficient fully-mechanized mining method for thin coal seam under two hard conditions
CN103775085B (en) High-dipping medium-thickness seam flexible type shield digging one supporting is without pillar working
CN100497886C (en) Coal mining process including prop type mining and prop recovery
CN101302931B (en) Method for extracting rim angle coal and re-extracting after warehouse coal extracting
CN106089205A (en) A kind of room-and-pillar method filling mining method being applicable to very thin ore body under water body
CN101725352A (en) Method for filling solid and fully mechanizing and recovering room type coal pillar
CN104533416A (en) Large-scale mechanized non-sill-pillar sub-level caving mining method for extremely thick ore body
CN101285384B (en) Large diameter, deep borehole and non undercutting mining method
CN1982649A (en) Mining method
CN103061767B (en) Lower to horizontal slice Dry-placed fill mining
CN105804748A (en) Method for mining hanging wall ore by subareas under open-air transportation system
CN101725351A (en) Filling stope pillar recovery mining method
CN105909284A (en) Sloughing prevention and control method for large mining height coal wall
CN100494628C (en) Comprehensive coal mining method
CN103982185B (en) Upright opening and lateral aperture work in coordination with the mechanization sublevel cut and fill method of back production
CN104989402A (en) Medium-deep hole room pillar mining method for limestone underground mine mining
CN109026003B (en) Continuous mining method of spiral auger mining machine for gently inclined extremely-thin vein soft rock ore body
CN100552185C (en) Concrete pole top protection mining method
CN115653602A (en) Reserved interval type pillar upward access filling mining method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090610

Termination date: 20130531