CN107558776B CN201710808967.6A CN201710808967A CN107558776B CN 107558776 B CN107558776 B CN 107558776B CN 201710808967 A CN201710808967 A CN 201710808967A CN 107558776 B CN107558776 B CN 107558776B
Authority
CN
China
Prior art keywords
prefabricated
flange
stereo garage
needed
prefabricated component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710808967.6A
Other languages
Chinese (zh)
Other versions
CN107558776A (en
Inventor
汤刚健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710808967.6A priority Critical patent/CN107558776B/en
Publication of CN107558776A publication Critical patent/CN107558776A/en
Application granted granted Critical
Publication of CN107558776B publication Critical patent/CN107558776B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention is a kind of completely new stereo garage assembly method,It includes flooring,Spandrel girder,Column,Basic integral preform,Prefabricated component is in A,B,C,D,E,F all around six direction face prefabricated flanges up and down,All prefabricated components are all connected by bolt and nut,Stereo garage is assembled with such prefabricated component,Upper and lower track,Elevator,A whole night is with regard to that can build up,Stereo garage as needed can be in roof,The upper green plants of side wall plantation,The present invention is solved in bustling big city,For example stereo garage is made in hospital road surface parking lot into,It is long that the stereo garage time is built with conventional method,It can cause social traffic jam,The present invention can be in a whole night with regard to that can build up stereo garage,Avoid urban traffic blocking,In addition the present invention is equipped with automobile runway up and down,Therefore it is more much lower than intelligent three-dimensional garage cost and later maintenance cost,Therefore the present invention will create the economic benefit and social benefit of bigger.

Description

The prefabricated component of flange is equipped in six direction to be assembled into stereo garage in a whole night
Technical field
Invention is related to a kind of assembled architecture, and in particular to a kind of prefabricated component that flange is equipped in six direction can be in an evening On be assembled into stereo garage.
Background technology
Make stereo garage into bustling big city, such as hospital road surface parking lot, stereo garage is built with conventional method Time is long, can cause social traffic heavy congestion.
Invention content
The present invention grows this shortcoming for now setting up the body garage time, provides and is equipped with flange height collection in six direction Into prefabricated component, this prefabricated component can be assembled into stereo garage in a whole night.
The prefabricated component of flange is equipped in six direction to be assembled into stereo garage in a whole night, by flooring 10, spandrel girder 4th, 6 integral preform of column, prefabricated component is in A, B, C, D, E, F all around six direction face prefabricated flange up and down, basic 12 bases It needs with flooring 10, spandrel girder 4,6 integral preform of column, all prefabricated components of stereo garage by bolt and nut can all connect It connects;Spandrel girder 4, column 6, basis 12, mounting hole 13 and six direction face flange number increase and decrease as needed it is prefabricated, water pipe and Power supply string holes 14, positioning pin 15, railing pedestal 8, plant growing basket 24, dilatation joint 20, railing 21 increase and decrease as needed it is prefabricated, on Lower track 19,23, elevator 22 increase and decrease prefabricated as needed, and stereo garage as needed can be in roof 25, the plant species of side wall 24 Plant the upper green plants of basket plantation;E faces flange 7 is equipped with location hole 9, and F faces flange 5 is equipped with positioning pin 15;Flange 1 is all around method Orchid, section h are by two outward openings, and base is opposite, is made of the channel steel of mutual distance, and channel steel is by base 1-2 and two sides Side 1-1,1-3 composition, two side 1-1 of side are welded by steel plate, and equipped with screw via 3, two sides of opposite side Side 1-3 is welded with prefabricated component steel reinforcement cage 16, and reinforcing rib 2 is welded in channel steel, and bolt and nut 18 is prefabricated for connecting two Part, 1 concave side of flange are prefabricated in floor side 17;Flange 11 is basic flange, and section m is a channel steel, and channel steel is by base 11- 2 and two side 11-1,11-3 compositions, side side 11-1 be equipped with screw via 3, opposite side side 11-3 and prefabricated component reinforcing bar Cage 16 is welded, and prefabricated in side of the base plate 26, and reinforcing rib 2 is welded in channel steel, and bolt and nut 18 is used for connecting two in advance Product.
Description of the drawings
Fig. 1, it is without basic prefabricated component schematic diagram.
Fig. 2, it is the prefabricated component schematic diagram with basis.
Fig. 3, it is prefabricated component schematic diagram.
Fig. 4, it is 11 section m of 1 section h of flange and flange.
Fig. 5, be assembling after stereo garage schematic diagram.
Fig. 6, it is the stereo garage schematic diagram with green plants after assembling.
Specific embodiment
The prefabricated component of flange is equipped in six direction to be assembled into stereo garage in a whole night, by flooring 10, spandrel girder 4th, 6 integral preform of column, prefabricated component is in A, B, C, D, E, F all around six direction face prefabricated flange up and down, basic 12 bases It needs with flooring 10, spandrel girder 4,6 integral preform of column, all prefabricated components of stereo garage by bolt and nut can all connect It connects;Spandrel girder 4, column 6, basis 12, mounting hole 13 and six direction face flange number increase and decrease as needed it is prefabricated, water pipe and Power supply string holes 14, positioning pin 15, railing pedestal 8, plant growing basket 24, dilatation joint 20, railing 21 increase and decrease as needed it is prefabricated, on Lower track 19,23, elevator 22 increase and decrease prefabricated as needed, and stereo garage as needed can be in roof 25, the plant species of side wall 24 Plant the upper green plants of basket plantation;E faces flange 7 is equipped with location hole 9, and F faces flange 5 is equipped with positioning pin 15;Flange 1 is all around method Orchid, section h are by two outward openings, and base is opposite, is made of the channel steel of mutual distance, and channel steel is by base 1-2 and two sides Side 1-1,1-3 composition, two side 1-1 of side are welded by steel plate, and equipped with screw via 3, two sides of opposite side Side 1-3 is welded with prefabricated component steel reinforcement cage 16, and reinforcing rib 2 is welded in channel steel, and bolt and nut 18 is prefabricated for connecting two Part, 1 concave side of flange are prefabricated in floor side 17;Flange 11 is basic flange, and section m is a channel steel, and channel steel is by base 11- 2 and two side 11-1,11-3 compositions, side side 11-1 be equipped with screw via 3, opposite side side 11-3 and prefabricated component reinforcing bar Cage 16 is welded, and prefabricated in side of the base plate 26, and reinforcing rib 2 is welded in channel steel, and bolt and nut 18 is used for connecting two in advance Product.

Claims (1)

1. the prefabricated component of flange is equipped in six direction to be assembled into stereo garage in a whole night, by flooring(10), spandrel girder (4), column(6)Integral preform, prefabricated component is on A, B, C, D, E, F all around six direction face prefabricated flange up and down, basis (12)As needed can and flooring(10), spandrel girder(4), column(6)Integral preform, all prefabricated components of stereo garage are complete Portion is connected by bolt and nut;Spandrel girder(4), column(6), basis(12), mounting hole(13)It is more with six direction face flange It is few to increase and decrease prefabricated, water pipe and power supply string holes as needed(14), positioning pin(15), railing pedestal(8), plant growing basket(24)、 Dilatation joint(20), railing(21)Increase and decrease prefabricated, upper and lower track as needed(19、23), elevator(22)Increase and decrease as needed it is prefabricated, Stereo garage as needed can be in roof(25), side wall(24)The upper green plants of plant growing basket plantation;E faces flange(7)If There is location hole(9), F faces flange(5)Equipped with positioning pin(15);
It is characterized in that:Flange(1)It is all around flange, for section h by two outward openings, base is opposite, there is mutual distance Channel steel forms, and channel steel is by base(1-2)With two sides(1-1、1-3)Composition, two sides of side(1-1)It is welded by steel plate It forms, and equipped with screw via(3), two sides of opposite side(1-3)With prefabricated component steel reinforcement cage(16)It is welded, reinforcing rib (2)It is welded in channel steel, bolt and nut(18)For connecting two prefabricated components, flange(1)Concave side is prefabricated in floor side (17);Flange(11)It is basic flange, section m is a channel steel, and channel steel is by base(11-2)With two sides(11-1、11-3) Composition, side side(11-1)Equipped with screw via(3), opposite side side(11-3)With prefabricated component steel reinforcement cage(16)Welding and Into, and it is prefabricated in side of the base plate(26), reinforcing rib(2)It is welded in channel steel, bolt and nut(18)For connecting two prefabricated components.
CN201710808967.6A 2017-09-09 2017-09-09 The prefabricated component of flange is equipped in six direction to be assembled into stereo garage in a whole night Active CN107558776B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710808967.6A CN107558776B (en) 2017-09-09 2017-09-09 The prefabricated component of flange is equipped in six direction to be assembled into stereo garage in a whole night

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710808967.6A CN107558776B (en) 2017-09-09 2017-09-09 The prefabricated component of flange is equipped in six direction to be assembled into stereo garage in a whole night

Publications (2)

Publication Number Publication Date
CN107558776A CN107558776A (en) 2018-01-09
CN107558776B true CN107558776B (en) 2018-06-15

Family

ID=60980430

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710808967.6A Active CN107558776B (en) 2017-09-09 2017-09-09 The prefabricated component of flange is equipped in six direction to be assembled into stereo garage in a whole night

Country Status (1)

Country Link
CN (1) CN107558776B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008190319A (en) * 2008-05-09 2008-08-21 Jfe Engineering Kk Floor structure of multistory parking garage
CN101408074A (en) * 2008-06-28 2009-04-15 杭州德萨机械技术开发有限公司 Convenient, flexible and assembled intelligent parking garage
CN103276929A (en) * 2013-06-14 2013-09-04 夏健鸣 Small three-dimensional garage
CN203729631U (en) * 2014-01-15 2014-07-23 杭州通识停车设备有限公司 Roadside parking rack
CN105257034A (en) * 2015-09-09 2016-01-20 重庆杰渝建筑机械有限公司 Method of building garage
CN105862900A (en) * 2016-05-25 2016-08-17 山东大学 Assembled type garage structure system based on precast piles and method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008190319A (en) * 2008-05-09 2008-08-21 Jfe Engineering Kk Floor structure of multistory parking garage
CN101408074A (en) * 2008-06-28 2009-04-15 杭州德萨机械技术开发有限公司 Convenient, flexible and assembled intelligent parking garage
CN103276929A (en) * 2013-06-14 2013-09-04 夏健鸣 Small three-dimensional garage
CN203729631U (en) * 2014-01-15 2014-07-23 杭州通识停车设备有限公司 Roadside parking rack
CN105257034A (en) * 2015-09-09 2016-01-20 重庆杰渝建筑机械有限公司 Method of building garage
CN105862900A (en) * 2016-05-25 2016-08-17 山东大学 Assembled type garage structure system based on precast piles and method

Also Published As

Publication number Publication date
CN107558776A (en) 2018-01-09

Similar Documents

Publication Publication Date Title
CN202245617U (en) Elevator well wall assembled by adopting combined type derricks
CN103290952A (en) Integrated assembled concrete frame and shear wall connection structure and construction method thereof
CN103774558B (en) A kind of automatic walking type mobile formwork for bridge construction
CN104912099A (en) Fabricated precast concrete box culvert
CN104499434A (en) Movable formwork for casting of wide-body box girder and construction method
CN106930599A (en) The steel structure platform that steel structure platform frame unit and assembling build
US20140270938A1 (en) Systems for converting an existing traffic intersection into an intersection having a roundabout, and related methods
CN107558776B (en) The prefabricated component of flange is equipped in six direction to be assembled into stereo garage in a whole night
JP3851539B2 (en) Block-type traffic roads, split-bridge-type traffic roads, and bridge traffic roads
CN103195277A (en) Overhead type stereo garage crossing over vehicle riding road
CN103924669B (en) A kind of assembled steel reinforced concrete composite frame structure
JP7097882B2 (en) Urban transportation and logistics system
CN110080117A (en) Portable simplified concrete barrier formwork vehicle and preparation method thereof
CN104675094A (en) Detachable type movable scaffold platform
CN202990497U (en) Modular parking lot
CN105257034A (en) Method of building garage
CN109853927A (en) A kind of honeycomb aluminum plate ceiling decoration construction method
CN203741723U (en) Automatic traveling type movable formwork used for bridge construction
CN112942154B (en) Culvert cover plate movable type support-free cast-in-place device and construction method thereof
CN1089134C (en) Building support upright column for top-lifting type building method
CN204455834U (en) Overhead step ladder cage
CN205242892U (en) Assembling type staircase
CN204299072U (en) The two badly bleeding stair of a kind of two circular hollow steel column supporting
CN204551225U (en) A kind of temporary bridge
KR101576215B1 (en) Prefabricated precast concrete girder for building construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant