CN107558728B - Hydraulic climbing formwork climbs device for adjusting posture, hydraulic climbing formwork and attitude adjusting method - Google Patents

Hydraulic climbing formwork climbs device for adjusting posture, hydraulic climbing formwork and attitude adjusting method Download PDF

Info

Publication number
CN107558728B
CN107558728B CN201710518828.XA CN201710518828A CN107558728B CN 107558728 B CN107558728 B CN 107558728B CN 201710518828 A CN201710518828 A CN 201710518828A CN 107558728 B CN107558728 B CN 107558728B
Authority
CN
China
Prior art keywords
guide rail
layers
hydraulic
climbing formwork
slide device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710518828.XA
Other languages
Chinese (zh)
Other versions
CN107558728A (en
Inventor
杨德生
扶新立
夏卫庆
潘曦
顾建财
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction Group Co Ltd
Original Assignee
Shanghai Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction Group Co Ltd filed Critical Shanghai Construction Group Co Ltd
Priority to CN201710518828.XA priority Critical patent/CN107558728B/en
Publication of CN107558728A publication Critical patent/CN107558728A/en
Application granted granted Critical
Publication of CN107558728B publication Critical patent/CN107558728B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

A kind of hydraulic climbing formwork provided by the invention climbs device for adjusting posture, including several slide devices being set between building masonry wall and hydraulic climbing formwork, slide device includes connector, support shell, hydraulic cylinder and telescopic tongue, connector one end is fixedly connected with the guide rail of hydraulic climbing formwork, the other end is connected by one end of pin shaft and telescopic tongue, the other end of telescopic tongue and the mandril of hydraulic cylinder are fixed, drive telescopic tongue flexible by hydraulic cylinder, so as to adjust the horizontal distance between the guide rail and building connecting with connector.Hydraulic climbing formwork provided by the invention can realize that hydraulic climbing formwork vertically climbs, tilts to climb or reverse and climb by the horizontal distance between control guide rail and building, adapt to the situation that recess, protrusion or torsion occurs in building floor.It climbs attitude adjusting method the present invention also provides two kinds of hydraulic climbing formworks simultaneously, it is easy to operate, it is highly-safe.

Description

Hydraulic climbing formwork climbs device for adjusting posture, hydraulic climbing formwork and attitude adjusting method
Technical field
It climbs device for adjusting posture, hydraulic climbing formwork and attitude adjusting method the present invention relates to a kind of hydraulic climbing formwork, belongs to and build Build construction die carrier technology field.
Background technique
Hydraulic climbing formwork is a kind of construction formwork system, can accelerate the speed of construction, at present high-rise, super It is widely applied in high-building construction.Hydraulic climbing formwork is vertically attached to the outside of building, including form frame system and climbs System, form frame system include the load-bearing tripod of lower part and the frame body platform on top, and climbing system includes guide rail and climbing device, Climbing device includes the upper catching device being attached on guide rail and lower catching device, and is set between catching device and lower catching device Hydraulic jack.Wherein, load-bearing tripod is made of column, horizon bar and brace;Upper catching device, lower catching device pass through connection Bar is fixed on column.In construction, the column upper and lower ends of load-bearing tripod provide fixed branch by upper load-bearing support respectively Support provides reaction of bearing by lower load-bearing support, to be fixed on building;During climbing, load-bearing support in releasing With the constraint of lower load-bearing support and building, under the driving of hydraulic jack, upper catching device and lower catching device replace along guide rail It climbs, form frame system integrally climbs under the jacking effect of upper catching device along guide rail.
However, according to design requirement, the phenomenon that alien invasion of different floors is likely to occur protrusion, recess or torsion, at this In the case of kind, hydraulic climbing formwork needs a series of complex to operate, and could complete climbing for hydraulic climbing formwork.For example, there is building Upper one layer of alien invasion protrude, form protrusion, the hydraulic climbing formwork process of climbing generally includes following steps: load-bearing tripod Bottom end uses external force ejection → supporting leg of load-bearing support carries out contraction support replacement, tilts guide rail under replacement → to set at protrusion It sets anchoring part and upwardly extends load-bearing support restraint in guide rail → releasing, climbing system drives form frame system inclination to rise to Load-bearing seat supports leg carries out elongation support replacement, keeps guide rail vertical under load-bearing support → replacement in one layer → fixation.Work as hydraulic climbing formwork Form frame system entirely through protrusion after, then by a series of support replacements movement so that form frame system is restored vertical configuration by tilting to climb State.The shortcomings that existing hydraulic climbing formwork attitude-adjusting method, there are complicated for operation, inefficiency, construction speed is not only influenced, there is also Certain security risk.
Summary of the invention
For hydraulic climbing formwork in the prior art in the case of protrusion, recess or torsion, existing pose adjustment behaviour The problem of making complicated, inefficiency climbs device for adjusting posture the present invention provides a kind of hydraulic climbing formwork, including several is set to Slide device between building masonry wall and hydraulic climbing formwork, slide device include connector, support shell, hydraulic cylinder and stretch Tongue, connector one end are fixedly connected with the guide rail of hydraulic climbing formwork, and the other end is connected by one end of pin shaft and telescopic tongue, telescopic tongue The other end and the mandril of hydraulic cylinder fix, drive telescopic tongue flexible by hydraulic cylinder, connect so as to adjust with connector Guide rail and building between horizontal distance.Hydraulic climbing formwork provided by the invention, can by control guide rail and building it Between horizontal distance, realize hydraulic climbing formwork vertically climb, tilt to climb or reverse and climb, adapted to building floor appearance it is recessed The situation for falling into, protruding or reversing.It climbs attitude adjusting method the present invention also provides two kinds of hydraulic climbing formworks simultaneously, it is easy to operate, It is highly-safe.
In order to solve the above technical problems, the present invention includes following technical solution:
A kind of hydraulic climbing formwork climbs device for adjusting posture, and the device for adjusting posture includes several being set to building masonry wall Slide device between the guide rail of the hydraulic climbing formwork, the slide device include:
Connector, described connector one end are fixedly connected with the guide rail of the hydraulic climbing formwork, and the other end is provided at least two A pin hole;
Support shell, the support shell are hollow housing, are fixed on the building masonry wall;
Hydraulic cylinder is fixedly installed in the support shell;And
Telescopic tongue, described telescopic tongue one end are fixedly connected by pin shaft with the connector;The other end is set to the branch It in seat shell, and is fixed with the mandril of the hydraulic cylinder, passes through support shell axle center side described in the hydraulic cylinder drives edge To flexible.
Preferably, the support outer casing bottom is fixedly installed foot pad, and bolt hole, ground anchor bolt are provided on the foot pad The support shell is fixed on the building masonry wall across the bolt hole.
Preferably, two hydraulic cylinders are arranged side by side along support shell axle center two sides.
Preferably, the hydraulic cylinder includes the port connection stretched out from the preformed hole of the support shell.
Preferably, the port connection is connected with plug and play hydraulic pump, and the hydraulic pump can control two institutes simultaneously State the port connection of hydraulic cylinder.
Correspondingly, the present invention also provides a kind of hydraulic climbing formwork, including form frame system and climbing system, the form frame systems Including load-bearing tripod and frame body platform, the climbing system includes the guide rail being fixed on building masonry wall and is attached to Climbing device on the guide rail, which is characterized in that be arranged between the guide rail of the hydraulic climbing formwork and the building just like power Benefit requires the described in any item hydraulic climbing formworks of 1-5 to climb device for adjusting posture, the upper load-bearing support and cunning of the load-bearing tripod Moving device is detachably connected;The lower load-bearing support of the load-bearing tripod is buckled on the guide rail, the lower load-bearing support end Portion is provided with the idler wheel that can be slided along guide rail.
Correspondingly, the present invention also provides a kind of attitude adjusting method that climbs of hydraulic climbing formwork, the hydraulic climbing formwork is led Rail is vertically fixed by being mounted on building n-th layer and (n+1)th layer of slide device, and the n-th+2 layers are protruding layer, including protrusion Portion;The hydraulic climbing formwork attitude adjusting method that climbs includes the following steps:
S1. in the n-th+2 layers mounting slip device, the n-th+2 layers of slide device is than (n+1)th layer and the slide device of n-th layer Distance L is protruded horizontally up outward;
S2. synchronous driving n-th layer and (n+1)th layer of slide device make guide rail move horizontally distance L to building outside, Then the guide rail is extended to the n-th+2 layers, and is fixed with the n-th+2 layers of slide device;
S3. climbing system vertically rises to the n-th+2 layers along guide rail, and form frame system is driven vertically to climb, and makes load-bearing triangle The upper load-bearing support of frame is fixed with the n-th+2 layers of slide device.
Preferably, the n-th+3 layers of the building need to be by vertical relative to the n-th+2 layers progressive protrusion, the hydraulic climbing formwork It climbs and switchs to inclination and climb, the hydraulic climbing formwork attitude adjusting method that climbs further includes following steps:
S4. (n+1)th layer of lower square guide rail is removed, and the n-th+3 layers of slide device is installed, the n-th+3 layers slide device are than n-th+2 The slide device of layer protrudes horizontally up distance L outward;
S5. it keeps the n-th+2 layers slide device motionless, by (n+1)th layer of slide device level retraction distance L, tilts guide rail, And guide rail is extended upwardly to the n-th+3 layers, and fix with the n-th+3 layers of slide device;
S6. climbing system rises to the n-th+3 layers along guide rail inclination, and form frame system inclination is driven to climb, and makes load-bearing triangle The upper load-bearing support of frame is fixed with the n-th+3 layers of slide device.
Correspondingly, the present invention also provides the attitude adjusting method that climbs of another hydraulic climbing formwork, the hydraulic climbing formwork packets Include the guide rails one and guide rail two of at least two parallel arrangements, the guide rail one and guide rail two by be mounted on building n-th layer and (n+1)th layer of slide device is fixed, and the n-th+2 layers of building are corner layer, and the hydraulic climbing formwork climbs after needing corner about the z axis, institute The hydraulic climbing formwork attitude adjusting method that climbs is stated to include the following steps:
S1. make to retain the connection of pin shaft between the connector of slide device and telescopic tongue, make connector and telescopic tongue it Between by just connect be changed to it is hinged;
S2. keep the slide device connecting with guide rail one motionless, the slide device synchronization telescope that will be connect with guide rail two, with The n-th+2 layers corner layer have identical corner;
S3. in the n-th+2 layers mounting slip device, and extend the guide rail to the n-th+2 layers, by guide rail and the n-th+2 layers of cunning Moving device is fixed;
S4. climbing system vertically rises to the n-th+2 layers along guide rail, and form frame system is driven vertically to climb, and makes load-bearing triangle The upper load-bearing support of frame is fixed with the n-th+2 layers of slide device.
The present invention due to using the technology described above, is allowed to compared with prior art, have the following advantages that and actively imitate Fruit:
(1) it climbs device for adjusting posture the present invention provides a kind of hydraulic climbing formwork, including several is set to building masonry wall Slide device between hydraulic climbing formwork, slide device include connector, support shell, hydraulic cylinder and telescopic tongue, connector One end is fixedly connected with the guide rail of hydraulic climbing formwork, and the other end is connected by one end of pin shaft and telescopic tongue, the other end of telescopic tongue Fixed with the mandril of hydraulic cylinder, drive telescopic tongue flexible by hydraulic cylinder, so as to adjust the guide rail being connect with connector with Horizontal distance between building;
(2) connector is connect with telescopic tongue by least two pin shafts, the structure may be implemented connector and telescopic tongue it Between connection type just connect with it is hinged between switch, consequently facilitating connector is around pin shaft rotation when corner;
(3) hydraulic climbing formwork provided by the invention can realize liquid by the horizontal distance between control guide rail and building Pressure creeping formwork vertically climbs, tilts to climb or reverse and climb, and has adapted to the situation that recess, protrusion or torsion occurs in building floor;
(4) the lower load-bearing seat supports of traditional load-bearing tripod are on the alien invasion of building, due to different floors Layer height may be not identical, and leading to lower load-bearing support position may be the intermediate hole of two layers of floor of building frame structure Place, can not provide reaction of bearing, hydraulic climbing formwork provided by the invention, the lower load-bearing support of load-bearing tripod by roller supporting in On guide rail, not by floor gap away from variation influenced, the scope of application is more extensive.
(5) it climbs attitude adjusting method the present invention also provides two kinds of hydraulic climbing formworks simultaneously, it is easy to operate, it is highly-safe.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the slide device in first embodiment of the invention;
Fig. 2 is the structural schematic diagram of the hydraulic climbing formwork in second embodiment of the invention;
Fig. 3 is the cross-sectional view in Fig. 2 along A-A section;
Fig. 4 to Figure 10 is that the hydraulic climbing formwork in 3rd embodiment climbs pose adjustment procedure chart.
Figure label is as follows:
Building 100;N-th layer 101;(n+1)th layer 102;The n-th+2 layers 103;The n-th+3 layers 104;The n-th+4 layers 105;Protrusion 110;
Form frame system 200;Load-bearing tripod 210;Column 211;Horizon bar 212;Brace 213;Upper load-bearing support 214;Under Load-bearing support 215;Frame body platform 220;
Climbing system 300;Guide rail 310;Climbing device 320;Upper catching device 321, lower catching device 322, hydraulic jack 323;
Slide device 400;Connector 410;Pin hole 411;Support shell 420;Foot pad 421;Bolt hole 422;Hydraulic cylinder 430;Mandril 431;Port connection 432;Telescopic tongue 440.
Specific embodiment
Below in conjunction with the drawings and specific embodiments to hydraulic climbing formwork provided by the invention climb device for adjusting posture, hydraulic climb Mould and attitude adjusting method are described in further detail.In conjunction with following explanation and claims, advantages and features of the invention It will become apparent from.It should be noted that attached drawing is all made of very simplified form and using non-accurate ratio, only to it is convenient, Lucidly aid in illustrating the purpose of the embodiment of the present invention.
The present invention be directed to existing hydraulic climbing formworks when encountering the situation of outside vertical surface of building recess, protrusion or corner, There is a problem of that the process of climbing complicated for operation, inefficiency and safety are low, by setting between guide rail and outside vertical surface of building Slide device is set, to improve the connection type between guide rail and building masonry wall, and changes load-bearing branch on load-bearing tripod The fixed form of seat and lower load-bearing support so that hydraulic climbing formwork be made to have pose adjustment function of climbing, and has more extensive Applicability.
Embodiment one
The device for adjusting posture referring to Fig. 1, hydraulic climbing formwork provided by the invention climbs, including several it is set to building Slide device 400 between 100 walls and hydraulic climbing formwork, slide device 400 includes connector 410, support shell 420, hydraulic Oil cylinder 430 and telescopic tongue 440.
Wherein, support shell 420 is hollow housing, is fixed on 100 wall of building.In construction, usually first construct The frame structure of building 100, preferably, 420 bottom of support shell are fixedly installed foot pad 421, are provided with spiral shell on foot pad 421 Keyhole 422 passes through bolt hole 422 by ground anchor bolt and support shell 420 is fixed on the floor bottom plate of building 100.
Wherein, 410 one end of connector is fixedly connected with the guide rail 310 of hydraulic climbing formwork, and the other end is provided at least two pins Hole 411, and be fixedly connected by pin shaft with telescopic tongue 440.The structure may be implemented between connector 410 and telescopic tongue 440 Connection type just connect with hingedly between switch.For example, when being fixed between connector 410 and telescopic tongue 440 by multiple pin shafts When, it is therebetween just to connect;When extracting other pin shafts, when only retaining a pin shaft, be therebetween it is hinged, when hinged, company Connector 410 can be rotated around pin shaft.
Wherein, hydraulic cylinder 430 is fixedly installed in support shell 420, by oil pressure actuated front end mandril 431 it is flexible from And drive telescopic tongue 440 flexible.Preferably, two hydraulic cylinders 430 are arranged side by side along 420 axle center two sides of support shell.It is hydraulic Oil cylinder 430 includes the port connection 432 stretched out from the preformed hole of support shell 420, includes two on each hydraulic cylinder 430 Port connection 432, when hydraulic cylinder 430 carries out stretching cylinder or the operation of contracting cylinder, one of them is oil inlet, another is fuel-displaced Mouthful.Preferably, port connection 432 is connected with plug and play hydraulic pump, and hydraulic pump can control two hydraulic cylinders 430 simultaneously Port connection 432, two hydraulic cylinders 430 of simultaneously operating.
Wherein, 440 one end of telescopic tongue is fixed in the pin hole 411 of connector 410 by pin shaft;The other end is set to support In shell 420, and slid by 430 drives edge support shell of hydraulic cylinder, 420 axis direction.In the intracorporal telescopic tongue of support shell 440 two sides are welded with connecting plate, and connecting plate is fixedly connected with the mandril 431 of hydraulic cylinder 430.
To sum up, hydraulic climbing formwork provided by the invention climbs device for adjusting posture, and support shell is fixed by ground anchor bolt On the bottom plate of 100 floor of building, drive telescopic tongue 440 flexible by hydraulic cylinder 430, so as to adjust guide rail 310 with build Build the distance between 100 alien invasion of object.
Embodiment two
Fig. 2 and Fig. 3 are please referred to, and as shown in connection with fig. 1, hydraulic climbing formwork provided by the invention, including form frame system 200 and climb System 300 is risen, form frame system 200 includes load-bearing tripod 210 and frame body platform 220, and climbing system 300 includes being fixed on building Guide rail 310 on 100 floor bottom plate of object and the climbing device 320 being attached on guide rail 310,310 He of guide rail of hydraulic climbing formwork It is provided with hydraulic climbing formwork between building 100 to climb device for adjusting posture, the upper load-bearing support 214 of load-bearing tripod 210 and sliding Moving device 400 is detachably connected;The lower load-bearing support 215 of load-bearing tripod 210 is buckled on guide rail 310, lower load-bearing support 215 End is provided with the idler wheel that can be slided along guide rail 310.
Hydraulic climbing formwork provided by the invention includes at least two guide rails 310, every guide rail 310 at least through upper and lower two cunnings Moving device 400 is fixed on building 100.Then, hydraulic climbing formwork includes at least 4 slide devices 400, by controlling 4 cunnings The flexible stroke of 400 telescopic tongue 440 of moving device, the horizontal distance of adjustable guide rail 310 and 100 alien invasion of building, and can To adjust the inclination angle of guide rail 310.Climbing device 320 is attached on guide rail 310, form frame system 200 is attached on guide rail 310, from And the horizontal distance of controllable form frame system 200 and 100 alien invasion of building, and the inclination angle of adjustable form frame system 200 and With the corner of building 100.It vertically climbs to control form frame system 200, tilt to climb or reverse and climb.
In addition, the lower load-bearing support 215 of traditional load-bearing tripod 210 is supported on the alien invasion of building 100, due to The layer height of different floors may be not identical, and leading to lower 215 position of load-bearing support may be two layers of 100 frame structure of building At the intermediate hole of floor, reaction of bearing can not be provided.Hydraulic climbing formwork provided by the invention, the lower load-bearing of load-bearing tripod 210 Support 215 by roller supporting on guide rail 310, not by floor gap away from variation influenced, the scope of application is more extensive.
Embodiment three
Fig. 4 to Fig. 8 is please referred to, and combines Fig. 1 to Fig. 3, it is right when encountering a protruding layer when climbing upwards to hydraulic climbing formwork The hydraulic climbing formwork attitude adjusting method that climbs is further described.As shown in connection with fig. 4, the guide rail 310 of hydraulic climbing formwork is by being mounted on The n-th layer 101 of building 100 and (n+1)th layer 102 of slide device 400 are vertically fixed, and the n-th+2 layers 103 are protruding layer, outward Level protrusion distance L, forms protrusion 110, needs to be adjusted hydraulic climbing formwork posture of climbing by slide device 400, have Body includes the following steps:
S1. as shown in figure 5, in the n-th+2 layers 103 mounting slip device 400, the n-th+2 layers 103 of slide device 400 to the n-th The slide device 400 of+1 layer 102 and n-th layer 101 protrudes horizontally up distance L outward.
S2. as shown in fig. 6, synchronous driving n-th layer 101 and (n+1)th layer 102 of slide device 400, make guide rail 310 to building It builds and moves horizontally distance L on the outside of object 100, guide rail 310 is then extended to the n-th+2 layers 103, and filled with the n-th+2 layers 103 of sliding It is fixed to set 400.
S3. as shown in fig. 7, climbing system 300 vertically rises to the n-th+2 layers 103 along guide rail 310, and form frame system is driven 200 vertically climb, and keep the upper load-bearing support 214 of load-bearing tripod 210 and the n-th+2 layers 103 of slide device 400 fixed.
The present embodiment makes guide rail 310 towards building by the way that slide device 400 is arranged between guide rail 310 and building 100 100 outside horizontal translation distance L of object is built, to guarantee that hydraulic climbing formwork can be risen to upwards with protrusion under plumbness 110 the n-th+2 layers 103.As shown in figure 8, being completed to the n-th+4 layers 105 constructions, and the guide rail 310 of hydraulic climbing formwork is fixed on the n-th+3 layers 104, the n-th+4 layers 105 when, entire form frame system 200 is entirely through the n-th+2 layers 103 of protrusion 110, at this point, can pass through control Horizontal sliding device 400 makes the horizontal retraction distance L of telescopic tongue 440, so that guide rail 310 be made to move horizontally L towards building 100.
Further, when encountering the protruding layer of at least two progressive protrusions when hydraulic climbing formwork climbs upwards, slide device 400 440 stroke of telescopic tongue when being unable to satisfy formwork system and vertically climbing, need to do further tune to the posture of climbing of hydraulic climbing formwork It is whole.As shown in figure 9, the n-th+2 layers 103, the n-th+3 layers 104, the n-th+4 layers 105 successively outward progressive protrusion horizontal distance L, also Be, the n-th+2 layers 103 relative to (n+1)th layer of 102 protruding horizontal distance L, the n-th+3 layers 104 relative to the n-th+2 layers 103 again to It is overhanging go out horizontal distance L, the n-th+4 layers 105 relative to the n-th+3 layers 104 protruding horizontal distance L, hydraulic climbing formwork need to be by vertical It climbs and switchs to inclination and climb, the hydraulic climbing formwork attitude adjusting method that climbs further includes following steps:
S4. as shown in figure 9, removing (n+1)th layer of 102 lower square guide rail 310, and the n-th+3 layers 104 of slide device 400 is installed, The n-th+3 layers 400 to the n-th+2 layer 103 of 104 slide device protrudes horizontally up distance L outward;
S5. keep the n-th+2 layers 103 slide device 400 motionless, by the horizontal retraction distance of (n+1)th layer of 102 slide device 400 L tilts guide rail 310, and guide rail 310 is extended upwardly to the n-th+3 layers 104, and solid with the n-th+3 layers 104 of slide device 400 It is fixed;
S6. climbing system 300 rises to the n-th+3 layers 104 along the inclination of guide rail 310, and the inclination of form frame system 200 is driven to climb It rises, keeps the upper load-bearing support 214 of load-bearing tripod 210 and the n-th+3 layers 104 of slide device 400 fixed.
Preferred embodiment provided in this embodiment can be such that hydraulic climbing formwork inclination climbs when encountering the progressive protrusion of upper floor It rises, has the advantages that easy to operate, construction efficiency is high, highly-safe.
Example IV
Refering to Fig. 2 and Fig. 3, and Fig. 1 is combined, hydraulic climbing formwork includes the guide rail 310 of at least two parallel arrangements, for convenient for area Not, referred to as guide rail one and guide rail two, guide rail one and guide rail two are by being mounted on 100 n-th layer 101 of building and (n+1)th layer 102 Slide device 400 it is fixed, the n-th+2 layers 103 of building 100 are corner layer, and hydraulic climbing formwork climbs after needing corner about the z axis, hydraulic The creeping formwork attitude adjusting method that climbs includes the following steps:
S1. as shown in Figure 1, making to retain a pin shaft connection between the connector 410 of slide device 400 and telescopic tongue 440, Make to be changed to hingedly between connector 410 and telescopic tongue 440 by just connecing.In the case where a pin shaft acts on, it can be achieved that connector 410 is in water Square to rotation.
S2. keep first group of slide device 400 connecting with guide rail one motionless, the second group of sliding that will be connect with guide rail two 400 synchronization telescope of device, with the n-th+2 layers 103 with identical corner.First group is only used for filling two groups of slidings with second group It sets 400 to distinguish, in order to describe, has no and specify.Hydraulic climbing formwork integrally turns an angle along guide rail one, with corner Layer keeps equal angular, in order to which the form frame system 200 of hydraulic climbing formwork climbs upwards.
S3. in the n-th+2 layers 103 mounting slip device 400, and extend 310 to the n-th+2 layer 103 of guide rail, by guide rail 310 with The n-th+2 layers 103 of slide device 400 is fixed.
S4. climbing system 300 vertically rises to the n-th+2 layers 103 along guide rail 310, and form frame system 200 is driven vertically to climb It rises, keeps the upper load-bearing support 214 of load-bearing tripod 210 and the n-th+2 layers 103 of slide device 400 fixed.
The present embodiment changes the level between two guide rails 310 and building 100 by two groups of slide devices 400 of control Distance rotates hydraulic climbing formwork along Z axis, thus it is consistent with upper layer corner layer, guarantee that hydraulic climbing formwork vertically climbs.
It is further to note that embodiment three, four, five, describes single protruding layer, continuous protruding layer and corner respectively When layer, hydraulic climbing formwork climbs the method for pose adjustment, when there is single recessed layer, the situation of continuous recessed layer, hydraulic climbing formwork Climb pose adjustment method it is similar with embodiment three, four, if there is upper layer protrusion+corner complicated case, in conjunction with implementation Example three, five or example IV, five progress hydraulic climbing formworks are climbed pose adjustment, can equally hydraulic climbing formwork be made smoothly to climb.
Foregoing description is only the description to present pre-ferred embodiments, not to any restriction of the scope of the invention, this hair Any change, the modification that the those of ordinary skill in bright field does according to the disclosure above content, belong to the protection of claims Range.

Claims (7)

1. a kind of attitude adjusting method that climbs of hydraulic climbing formwork, which is characterized in that
The hydraulic climbing formwork, including form frame system and climbing system, the form frame system include load-bearing tripod and frame body platform, The climbing system includes the climbing device for being fixed on the guide rail on building masonry wall and being attached on the guide rail, special Sign is, hydraulic climbing formwork is provided between the guide rail of the hydraulic climbing formwork and the building and is climbed device for adjusting posture, described Device for adjusting posture includes several slide devices being set between building masonry wall and the guide rail of the hydraulic climbing formwork, described to hold The upper load-bearing support of weight tripod is detachably connected with slide device;The lower load-bearing support of the load-bearing tripod is buckled in described On guide rail, the lower load-bearing block end is provided with the idler wheel that can be slided along guide rail;
The slide device includes:
Connector, described connector one end are fixedly connected with the guide rail of the hydraulic climbing formwork, and the other end is provided at least two pins Hole;
Support shell, the support shell are hollow housing, are fixed on the building masonry wall;
Hydraulic cylinder is fixedly installed in the support shell;And
Telescopic tongue, described telescopic tongue one end are fixedly connected by pin shaft with the connector;The other end is set to outside the support It in shell, and fixes with the mandril of the hydraulic cylinder, is stretched by support shell axis direction described in the hydraulic cylinder drives edge Contracting;
The guide rail of the hydraulic climbing formwork is vertically fixed by being mounted on building n-th layer and (n+1)th layer of slide device, and n-th+2 Layer is protruding layer, including protrusion;The hydraulic climbing formwork attitude adjusting method that climbs includes the following steps:
S1. in the n-th+2 layers mounting slip device, the n-th+2 layers of slide device is more outside than the slide device of (n+1)th layer and n-th layer Protrude horizontally up distance L;
S2. synchronous driving n-th layer and (n+1)th layer of slide device make guide rail move horizontally distance L to building outside, then The guide rail is extended to the n-th+2 layers, and is fixed with the n-th+2 layers of slide device;
S3. climbing system vertically rises to the n-th+2 layers along guide rail, and form frame system is driven vertically to climb, and makes load-bearing tripod Upper load-bearing support is fixed with the n-th+2 layers of slide device.
2. a kind of attitude adjusting method that climbs of hydraulic climbing formwork as described in claim 1, which is characterized in that the building The n-th+3 layers relative to the n-th+2 layers progressive protrusion, the hydraulic climbing formwork need to be switched to inclination and be climbed by vertically climbing, described hydraulic to climb The mould attitude adjusting method that climbs further includes following steps:
S4. (n+1)th layer of lower square guide rail is removed, and the n-th+3 layers of slide device is installed, the n-th+3 layers slide device are than the n-th+2 layers Slide device protrudes horizontally up distance L outward;
S5. it keeps the n-th+2 layers slide device motionless, by (n+1)th layer of slide device level retraction distance L, tilts guide rail, and will Guide rail extends upwardly to the n-th+3 layers, and fixes with the n-th+3 layers of slide device;
S6. climbing system rises to the n-th+3 layers along guide rail inclination, and form frame system inclination is driven to climb, and makes load-bearing tripod Upper load-bearing support is fixed with the n-th+3 layers of slide device.
3. a kind of attitude adjusting method that climbs of hydraulic climbing formwork as described in claim 1, which is characterized in that the hydraulic climbing formwork The guide rail one and guide rail two being arranged in parallel including at least two, the guide rail one and guide rail two are by being mounted on building n-th layer Slide device with (n+1)th layer is fixed, and the n-th+2 layers of building are corner layer, and the hydraulic climbing formwork climbs after needing corner about the z axis, The hydraulic climbing formwork attitude adjusting method that climbs includes the following steps:
S1. make to retain the connection of pin shaft between the connector of slide device and telescopic tongue, make between connector and telescopic tongue by It just connects and is changed to hingedly;
S2. keep the slide device that connect with guide rail one motionless, the slide device synchronization telescope that will be connect with guide rail two, with n-th+ 2 layers of corner layer have identical corner;
S3. in the n-th+2 layers mounting slip device, and extend the guide rail to the n-th+2 layers, guide rail and the n-th+2 layers of sliding are filled Set fixation;
S4. climbing system vertically rises to the n-th+2 layers along guide rail, and form frame system is driven vertically to climb, and makes load-bearing tripod Upper load-bearing support is fixed with the n-th+2 layers of slide device.
4. the attitude adjusting method that climbs of the hydraulic climbing formwork as described in claims 1 or 2 or 3, which is characterized in that outside the support Shell bottom is fixedly installed foot pad, and bolt hole is provided on the foot pad, and ground anchor bolt passes through the bolt hole for the support Shell is fixed on the building masonry wall.
5. the attitude adjusting method that climbs of the hydraulic climbing formwork as described in claims 1 or 2 or 3, which is characterized in that along the support Two hydraulic cylinders are arranged side by side in shell axle center two sides.
6. the attitude adjusting method that climbs of hydraulic climbing formwork as claimed in claim 5, which is characterized in that the hydraulic cylinder includes The port connection stretched out from the preformed hole of the support shell.
7. the attitude adjusting method that climbs of hydraulic climbing formwork as claimed in claim 6, which is characterized in that the port connection connection There is plug and play hydraulic pump, the hydraulic pump can control the port connection of two hydraulic cylinders simultaneously.
CN201710518828.XA 2017-06-30 2017-06-30 Hydraulic climbing formwork climbs device for adjusting posture, hydraulic climbing formwork and attitude adjusting method Active CN107558728B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710518828.XA CN107558728B (en) 2017-06-30 2017-06-30 Hydraulic climbing formwork climbs device for adjusting posture, hydraulic climbing formwork and attitude adjusting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710518828.XA CN107558728B (en) 2017-06-30 2017-06-30 Hydraulic climbing formwork climbs device for adjusting posture, hydraulic climbing formwork and attitude adjusting method

Publications (2)

Publication Number Publication Date
CN107558728A CN107558728A (en) 2018-01-09
CN107558728B true CN107558728B (en) 2019-12-03

Family

ID=60972967

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710518828.XA Active CN107558728B (en) 2017-06-30 2017-06-30 Hydraulic climbing formwork climbs device for adjusting posture, hydraulic climbing formwork and attitude adjusting method

Country Status (1)

Country Link
CN (1) CN107558728B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487067B (en) * 2018-03-30 2019-07-09 中国十九冶集团有限公司 Climbing method of bridge high pier climbing formwork template
CN108487069B (en) * 2018-03-30 2019-07-09 中国十九冶集团有限公司 Method for realizing up-and-down sliding of reversing box by overturning and climbing template system
CN108661310B (en) * 2018-06-07 2023-12-01 中建一局集团建设发展有限公司 Inner wall climbing formwork device of shear wall and construction method thereof
CN108678365B (en) * 2018-06-13 2024-07-30 华西工程科技(深圳)股份有限公司 Self-angle-changing hydraulic climbing formwork system
CN110184937B (en) * 2019-06-11 2020-10-09 中铁七局集团有限公司 Hydraulic creeping formwork construction method based on digital control
CN110359696B (en) * 2019-07-25 2021-07-16 广州市第二建筑工程有限公司 Adjustable attached lifting scaffold and inclined climbing method thereof
CN111058609A (en) * 2019-12-30 2020-04-24 上海建工集团股份有限公司 Construction and protection integrated portable operation platform and method
CN111350346A (en) * 2020-03-23 2020-06-30 北京市建筑工程研究院有限责任公司 Creeping formwork attachment device for doubly-linked beam
CN111926712B (en) * 2020-08-12 2021-09-17 中交武汉港湾工程设计研究院有限公司 Intelligent construction method for main tower with large inclination angle

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202899617U (en) * 2012-11-15 2013-04-24 广州市京龙工程机械有限公司 Rotatable telescopic connection mechanism
CN103061500A (en) * 2013-01-11 2013-04-24 上海建工集团股份有限公司 Bowstring truss type fully-enclosed hydraulic climbing formwork system and application method for same
CN205063332U (en) * 2015-09-30 2016-03-02 中建六局建设发展有限公司 A creeping formwork structure of climbing for wall body variable cross section department
CN105908966B (en) * 2016-06-02 2017-12-22 中国建筑第八工程局有限公司 Climbing form system and its construction method for sloping core construction
CN106401174A (en) * 2016-06-02 2017-02-15 中国建筑第八工程局有限公司 Creeping formwork system used for construction of variable cross-section core tube and construction method of creeping formwork system
CN106049857B (en) * 2016-06-28 2018-10-09 上海建工集团股份有限公司 The support device of turbine screw continuously adjustable for hydraulic climbing die block system

Also Published As

Publication number Publication date
CN107558728A (en) 2018-01-09

Similar Documents

Publication Publication Date Title
CN107558728B (en) Hydraulic climbing formwork climbs device for adjusting posture, hydraulic climbing formwork and attitude adjusting method
CN111058618B (en) Combined type telescopic sleeve jacking device and method thereof
CN108222482B (en) Gate-type self-adapting stretching hydraulic climbing plateform system and its method of climbing
ES2637626T3 (en) Lifting unit to ascend and descend a scaffold
US6276912B1 (en) Climbing shuttering system for successive concreting of high vertical walls
CN106917499B (en) A kind of self-driving type full-automatic machine people's climbing frame
CN104120877B (en) A kind of hydraulic climbing die block system and climbing form method
CN106320713B (en) 3D building printing operation platform
CN101603375B (en) Multilayer telescopiform expanding three-dimensional stage
CN108532768A (en) The constructing device and its construction method of assembled architecture are built with box
CN112302693A (en) Subway tunnel antidetonation support column
CN201250085Y (en) Tilting-type hydraulic elevator
CN113279789A (en) Supporting device for tunnel construction
US10875750B2 (en) Device for actuating a mobile platform
CN110467113A (en) Large-tonnage tunnel anchorage dissipates cable saddle hanging apparatus and method
CN105951899A (en) Moving machine for detection table of static load of foundation pile
CN207974124U (en) The double-deck foundation pit combined steel support
CN219261680U (en) Movable pile foundation construction platform
CN110295766A (en) A kind of easy to remove and storage the support device of architectural engineering
CN103061262A (en) Cable-crossing crane and application method thereof
CN112060295B (en) Prefabricated plate stair processing usefulness mould with height-adjustable
CN201460305U (en) Multi-layered telescopiform three-dimensional stage
CN114314375A (en) Internal climbing type tower crane supporting device and climbing method
CN113914597A (en) Hoistway self-climbing device
CN205822282U (en) Foundation pile dead load monitor station shifting machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant