CN207974124U - The double-deck foundation pit combined steel support - Google Patents
The double-deck foundation pit combined steel support Download PDFInfo
- Publication number
- CN207974124U CN207974124U CN201820336759.0U CN201820336759U CN207974124U CN 207974124 U CN207974124 U CN 207974124U CN 201820336759 U CN201820336759 U CN 201820336759U CN 207974124 U CN207974124 U CN 207974124U
- Authority
- CN
- China
- Prior art keywords
- support
- column
- foundation pit
- spreader beam
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses the supports of the double-deck foundation pit combined steel comprising upper layer support, lower layer support, interlayer connection part and support sector positioned at upper layer support lower section, upper layer support and lower layer support are supported in support sector;The upper layer support includes at least two the first supports extended in parallel, and the first contact bar is provided between the first support;Each first support includes two first level supports, has the first stull between two first levels support;The both ends of first support are fixedly connected in the first purlin in foundation pit;Lower layer support is similar with upper layer support construction;Interlayer connection part includes the vertical brace being connected between the first support and the corresponding second support and diagonal brace.Bracing members in the utility model have larger section in the vertical direction, increase the bending modulus of bracing members, improve the bending strength of bracing members, ensure that the safety of the larger foundation pit of excavation area in the construction process.
Description
Technical field
Field is gone along with sb. to guard him the utility model is related to subterranean excavation, and in particular to a kind of bilayer foundation pit combined steel support.
Background technology
In underground construction, to ensure the safety and efficiency of construction, generally requires and foundation pit enclosure is set around foundation pit, and
Purlin and supporting beam are set in foundation pit enclosure, ensure the safety in underground construction.
Multiple tracks is arranged in foundation pit to support, to prevent from influencing each other and improving the erection speed of support between supporting, one
As per pass support independently be erected in purlin, each road does not have a connection relation between supporting, but larger in excavation area and can not
In the Large Foundation Pit of step excavation, farther out due to the distance between opposite margin of foundation pit, the length of set support also compared with
Long, in the digging process of foundation pit, support is easier to bend, and support is made to fail.
Utility model content
In view of the above-mentioned problems, present applicant proposes the support of the double-deck foundation pit combined steel, which has in the vertical direction
There is larger section, increase the bending modulus of bracing members, improve the bending strength of bracing members, ensure that excavation area is larger
Foundation pit safety in the construction process, specific technical solution is as follows:
The double-deck foundation pit combined steel support, is arranged in foundation pit comprising upper layer support supports lower section positioned at upper layer
Lower layer support, interlayer connection part and support sector, upper layer support and lower layer support are supported in support sector;
The upper layer support includes the first support that at least two be arranged on first level face extend in parallel, adjacent
Two first support between be provided with the first contact bar;Each first support includes two first level supports disposed in parallel,
It is fixedly connected with the first stull between two first level supports;The both ends of first support are fixedly connected with the first purlin in foundation pit
On;
The lower layer support includes the second support that at least two be arranged on the second horizontal plane extend in parallel, adjacent
Two second support between be provided with the second contact bar;Each second support includes two second horizontal braces disposed in parallel,
It is fixedly connected with the second stull between two second horizontal braces;The both ends of second support are fixedly connected with the second purlin in foundation pit
On;
It is respectively provided with there are one the second support corresponding to each first support, the second support is located at the first corresponding support
Underface;
The interlayer connection part includes the vertical brace being connected between the first support and the corresponding second support and diagonal brace;
The column that the support sector sinks under including in foundation pit and the supporter being fixed on column;First support and second
Support is arranged on supporter.
Specifically, the first contact bar includes edge first straight connecting rod vertical with the extending direction of the first support, and
With the first diagonal control arm of the first straight connecting rod arrangement at an angle;The second contact bar includes along the extending direction with the second support
The second vertical straight connecting rod, and the second diagonal control arm with the second straight connecting rod arrangement at an angle.
In the utility model, upper layer support is supportted by first level to be connected in the first purlin, and lower layer support passes through the
Two horizontal braces are connected in the second purlin, and upper layer support is supported on lower layer support in corresponding purlin each independently, is avoided
When being deformed under external force, the two influences each other.
Upper layer support includes at least two first supports, and the first contact bar is provided between the first adjacent support,
So that entire upper layer support is formd reticular structure, after a certain first support is by external force, can be transmitted by the first contact bar
To other first supports, so that entire upper layer support is resisted the external force jointly, to reduce the deformation of some the first support, improve
Upper layer supports the resistivity to external force.Some is avoided first to generate moderate finite deformation, Jin Erying when being supported on by larger external force
Ring the safety of entire support system.Lower layer support with upper layer due to supporting similar structure, it may have same function.
Further, mutual corresponding first support and the second support are one group of support up and down, are all provided with corresponding to every group of support
It is equipped with one group of column, every group of column includes a plurality of uprights;The supporter includes the first supporter and the second supporter, wherein
First supporter is for supporting the first support, and the second supporter is for supporting the second support;
First supporter includes the first steel corbel being fixed on column and be horizontally set on the first steel corbel first
Spreader beam, the first support are movably disposed on the first spreader beam;Second supporter includes the second steel corbel being fixed on column
With the second spreader beam being horizontally set on the second steel corbel, the second support is movably disposed on the second spreader beam;
Every first spreader beam is at least supported on the first steel corbel on the column being distributed in two groups of columns at two;Every
Second spreader beam is at least supported on the second steel corbel on the column being distributed in two groups of columns at two.
Preferably, extending direction arrangement of a plurality of uprights in every group of column along the first support.
After spreader beam is set, at least supported due to spreader beam on the steel corbel on two column columns, every spreader beam at least may be used
To simultaneously support two first supports or the second support, the first support absolute altitude having the same being supported on identical spreader beam carries
The high rule degree of steel support structure, while also ensure that the first different supports are capable of providing identical resistance to the maximum extent
Power, to resist the pressure of the external soil body.Equally, it also ensure that the second different supports is capable of providing identical support to the maximum extent
Drag, to resist the pressure of the external soil body.
In this application, the first support is respectively adopted moveable mode with the second support and is arranged in the first spreader beam and second
On spreader beam, during so that the first support is supported on stress deformation with second, phase can be generated along the first spreader beam and the second spreader beam
To displacement, to eliminate external pressure.
Further, the first support is extended in a first direction with the second support;A plurality of uprights in every group of column are along
One direction is arranged;Column in two adjacent groups column arranges in a second direction, the first spreader beam and the second spreader beam cloth in a second direction
It sets;The second direction is vertical with first direction.
It is easier for installation that above-mentioned design can be such that the first support is supported with second, while can ensure first different
Support can generate more consistent deformation in vertical direction supporting point having the same after so that different first is supported on stress,
Equally, it different second is supported on after stress and can also generate more consistent deformation.
Further, it in each first support, in the opposite side for being provided with the first spreader beam of column, is provided with one and is resisted against
The first stull on column;In each second support, in the opposite side for being provided with the second spreader beam of column, be provided with one against
The second stull on column.Using the first crossbeam being resisted against on column, the first support is enable to be stablely supported at spreader beam
On, the movement of the first support in a second direction is maintained, the first support is enable to generate certain deformation, it is outer to eliminate
Carry out pressure.Equally, the first support can be stablely supported on spreader beam, maintain the shifting of the first support in a second direction
It is dynamic, so that the second support is generated certain deformation, to eliminate extraneous pressure.
To realize that the Fast Installation of the above-mentioned double-deck foundation pit combined steel support, the application also proposed one kind of the bracing members
Method of construction, in the method for construction,
First support include it is several save the supporting module that is linked in sequence, each section supporting module parallel is set including two
The first H profile steel set is equipped with first stull, the first H of adjacent two section supporting modules between two first H profile steels
Shaped steel links together, and when several section supporting modules are connected as one first support, the first H profile steel of interconnection is formed
First level supports;The edge of a wing of first H profile steel is horizontally disposed;
The method of construction includes the following steps:
(1) along setting position sinking fender post and column, several columns in same group is made to be arranged along first direction;
(2) in the space of fender post institute corral, earth excavation suspends the digging of the earthwork until the construction elevation that upper layer supports
Then pick installs the first purlin in the inside of fender post, the first steel corbel is installed on column, the is set up on the first steel corbel
One spreader beam, all first spreader beams are arranged along same level;
(3) upper layer support is set up, sets up the first support first, then the first contact of installation between the first adjacent support
Bar, wherein set up first support the step of include:
(31) first segment supporting module is installed on corresponding first spreader beam, then by one end of first segment supporting module
It is connected in the first purlin;
(32) temporary track is installed in the other end of first segment supporting module, the orbital plane of temporary track is made to be connected to first segment
Then second section supporting module is placed into first segment branch hold mode by the upper side of the upper side wing edge of the first H profile steel of supporting module
The upper side of the upper side wing edge of first H profile steel of block pushes the second section supporting module movement, the second section supporting module is made to be moved to
On temporary track, then by the second section supporting module lifting, the second section supporting module is made to be detached from temporary track;
Temporary track is removed, the second section supporting module is declined and is placed on corresponding first spreader beam, by the second section branch
One end of hold mode block is connected to the other end of first segment supporting module;
(33) according to step (32), supporting module is installed successively, the installation of supporting module is saved until completing inverse two;
(34) final section supporting module is installed, one end of final section supporting module is connected to inverse two and saves supporting module
On, the other end of final section supporting module is connected in the first purlin;
(35) according to step (31) to (34), the erection of the first all supports is completed;
(4) continue earth excavation up to the construction elevation of lower layer support, suspend the excavation of the earthwork, then in fender post
The second purlin is installed in side, and the second steel corbel is installed on column, the second spreader beam, all second spreader beams are set up on the second steel corbel
It is arranged along same level;
(5) lower layer support and interlayer connection part are installed:
(5.1) lower layer support is installed:
It sets up the second support successively on the second spreader beam, the both ends of the second support is fixed in the second purlin, adjacent
Second support between installation second contact bar, complete the installation of lower layer support;
(5.2) interlayer interconnecting piece is installed:
Vertical brace and diagonal brace are installed successively;
Step (5.1) and (5.2) part priority;
The construction of the double-deck foundation pit combined steel support is completed.
Preferably, the temporary track is to have reeded channel steel, H steel or I-steel, the notch of groove upward, groove
Inner bottom surface forms the orbital plane.
In the method for construction, the first support is divided into several section supporting modules, standard may be used in these supporting modules
Module can also be temporarily completed in building site, due to using more piece supporting module, can effectively be saved first and be supported on base
Built-up time in hole.Currently, the width due to foundation pit is larger, the hanging devices such as crane can not be used to carry out supporting module
Lifting, therefore edge supports module is made in the general support of part first that only will be close to margin of foundation pit, for edge supports module
Once lifted using hanging device, and for positioned at foundation pit middle section first support can only on-site consolidation mode into
The component for constituting the first support is transported in foundation pit, is then installed in place these components by construction personnel, use is this by row
It is less efficient when mode installs the first support.In this method of construction, using the method for being laid with temporary track, it will complete to assemble
Supporting module the top of installation site is first moved to by temporary track, temporary track is then removed again, due to will be a large amount of
Assembly working is previously-completed, and is effectively improved the installation effectiveness of the first support, while also improving the installation of entire bracing members
Efficiency.
Due to there is the barrier of the first support, the second support can not use the installation method of the first support, in installation second
When support, traditional live connecting method is still used, i.e., the component to have completed is transported into scene, using the side of piecewise assembly
Formula completes the installation of entire first support.
Further, it is equipped with for interim in supporting module in step (32) for convenience of the movement of supporting module
The idler wheel walked on track.
Further, to avoid supporting module in moving process, moving direction shifts, in the branch that installation is completed
The positive stop strip of supporting module offset for preventing from preparing to install is installed in the first H profile steel of hold mode block.
To improve installation effectiveness, the draft gear for drawing supporting module movement is installed on the edge of foundation pit.If
After setting draft gear, the movement speed of supporting module can be effectively improved using draft gear, while can also be improved to branch
Support the flexibility of module position adjustment.
Description of the drawings
Fig. 1 is the diagrammatic top view of the double-deck foundation pit combined steel support.
Fig. 2 is the sectional perspective schematic diagram of the double-deck foundation pit combined steel support.
Fig. 3 is the structure diagram of support sector.
Fig. 4 is the diagrammatic top view completed after column and the installation of the first spreader beam.
Fig. 5 is the diagrammatic top view completed after the installation of first segment supporting module.
Fig. 6 is the diagrammatic top view completed after the second section supporting module installation.
Fig. 7 is diagrammatic top view of one first support after installation is complete.
Fig. 8 is diagrammatic top view of the upper layer support after installation is complete.
Fig. 9 is the elevational schematic view completed after column and the installation of the first spreader beam.
Figure 10 is the elevational schematic view completed after the installation of first segment supporting module.
Figure 11 is the elevational schematic view placed in first segment supporting module after the second section supporting module.
Figure 12 is the elevational schematic view after the second section supporting module is moved to above installation site.
Figure 13 is the elevational schematic view after the second section supporting module is lifted.
Figure 14 is the elevational schematic view after the second section supporting module is installed in place.
Figure 15 is elevational schematic view of the upper layer support with lower layer support after installation is complete.
Figure 16 is the schematic diagram that angle steel is equipped in first segment supporting module.
Figure 17 is in the schematic diagram for being equipped with channel steel in first segment supporting module.
Specific implementation mode
Herein, the both direction of horizontal plane is referred to as first direction and second direction, first direction and second
Direction is orthogonal, in Fig. 1, illustratively indicates that first direction, Y-axis indicate second direction with X-axis;It herein, will be towards foundation pit
Internal direction is known as inside, and the inside of fender post refers to just the side towards foundation pit internal direction of fender post.
Embodiment 1
A kind of bilayer foundation pit combined steel support, please refer to Fig. 1, Fig. 2 and Fig. 3, which is arranged in foundation pit 300
Interior, the foundation pit 300 is by 81 corrals of enclosure wall, and in the present embodiment, enclosure wall 81 is formed by steel sheet pile 811, i.e. fender post
Using steel sheet pile 811, first purlin 82 and the second purlin 83, i.e. the first purlin 82 and second are installed in the inside of enclosure wall 81
Purlin 83 is mounted on the inside of steel sheet pile.First purlin 82 and the second purlin 83 are formed by the H profile steel of Two bors d's oeuveres.
Bracing members include upper layer support 100, lower layer support 200, interlayer connection part and branch positioned at upper layer support lower section
Portion 30 is held, interlayer connection part is connected between upper layer support 100 and lower layer support 200, upper layer support 100 and lower layer support 200
It supports in support sector 30.
Upper layer support 100 includes four the first supports extended in parallel along first direction being arranged on first level face
10, it is provided with the first contact bar between two first adjacent supports 10;Each first support 10 includes two disposed in parallel
First level support 11 is fixedly connected with the first stull 12 between two first level supports 11;The both ends of first support 10 are fixed
It connects in the first purlin 82 in foundation pit.Wherein first level support 11 is made by H profile steel, and the edge of a wing of H profile steel is in the horizontal direction
Arrangement.First stull 12 equally also uses H profile steel to make, and the edge of a wing of H profile steel is also arranged in the horizontal direction.
Specifically in the present embodiment, the first contact bar includes the first straight connecting rod 15 extended in a second direction, and with the
First diagonal control arm 16 of one straight connecting rod, 15 arrangement at an angle.First diagonal control arm 16 is arranged in the first straight connecting rod 15 in splayed
Both sides, specifically in the present embodiment, the angle between the first diagonal control arm 16 and the first straight connecting rod 15 are 30 °, it will be understood that first
Angle between diagonal control arm 16 and the first straight connecting rod 15 can also be other angles, such as 25 °, 35 ° or 40 °.First straight connecting rod
15 and first diagonal control arm 16 equally made of H profile steel, for enhance bracing members horizontal direction intensity, in a second direction,
First straight connecting rod 15 is arranged along a straight line with first stull in the first support 10 being connect.
Lower layer support 200 includes four the second supports extended in parallel along first direction being arranged on the second horizontal plane
20, it is provided with the second contact bar between two second adjacent supports 20;Each second support 20 includes two disposed in parallel
Second horizontal brace 21 is fixedly connected with the second stull 22 between two second horizontal braces 21;The both ends of second support 20 are fixed
It connects in the second purlin 83 in foundation pit.Wherein the second horizontal brace 21 is made by H profile steel, and the edge of a wing of H profile steel is in the horizontal direction
Arrangement.Second stull 22 equally also uses H profile steel to make, and the edge of a wing of H profile steel is also arranged in the horizontal direction.Second straight connecting rod with
Second diagonal control arm equally uses H profile steel to make, and for the intensity of the horizontal direction of enhancing bracing members, in a second direction, second is straight
Connecting rod is arranged along a straight line with second stull in the second support being connect.
Specifically in the present embodiment, the second contact bar includes the second straight connecting rod extended in a second direction, and with second
Second diagonal control arm of straight connecting rod arrangement at an angle.The arrangement phase that the arrangement of second contact bar contacts bar with first
Together, the arrangement for specifically seeing the first above-mentioned contact bar, repeats no more.
It is respectively provided with there are one the second support corresponding to each first support, the second support is located at the first corresponding support
Underface.
Interlayer connection part includes the vertical brace 41 being connected between the first support 10 and the corresponding second support 20 and diagonal brace
42.Specifically in the present embodiment, the both ends of vertical brace 41 and the both ends of diagonal brace 42 are respectively connected to first level support 11 and second
On horizontal brace 21, vertical brace 41 and diagonal brace 42 are all made of H profile steel making.
10 and second support 20 of mutual corresponding first support up and down is one group of support, is both provided with corresponding to every group of support
One group of column, every group of column include a plurality of uprights 31, and a plurality of uprights in every group of column are arranged along first direction.Adjacent two
Column in group column is arranged in a second direction.
The column 31 that support sector 30 sinks under including in foundation pit and the supporter being fixed on column 31;First 10 Hes of support
Second support 20 is arranged on supporter.
Supporter includes the first supporter and the second supporter, wherein the first supporter is used to support the first support 10, the
Two supporters are for supporting the second support 20.
First supporter includes the first steel corbel 35 being fixed on column 31 and is horizontally set on the first steel corbel 36
The first spreader beam 32, the first support 10 is movably disposed on the first spreader beam 32.In the present embodiment, four first supports 10
It is divided into two groups, adjacent two first supports become one group, and every group first of correspondence, which supports, is provided with one group of first spreader beam 32, every
The both ends of first spreader beam 32 are fixed on the first steel corbel 35 in two root posts.First spreader beam 32 is arranged in a second direction.
Second supporter includes the second steel corbel 36 being fixed on column 31 and is horizontally set on the second steel corbel 35
The second spreader beam 33, the second support 20 is movably disposed on the second spreader beam 33.In the present embodiment, four second supports 20
It is divided into two groups, adjacent two second supports become one group, and every group second of correspondence, which supports, is provided with one group of second spreader beam 33, every
The both ends of second spreader beam 33 are fixed on the second steel corbel 36 in two root posts.Second spreader beam 33 is arranged in a second direction.
In the present embodiment, the first spreader beam 32 and the second spreader beam 33 are all made of H profile steel making.
It is appreciated that in other embodiments, according to the different number of the first support and the second support, every first spreader beam
32 and second spreader beam 33 can also be supported on three, four, or even on more root posts;Alternatively, every first spreader beam 32 or the
Two spreader beams 33 are arranged on all columns for being arranged in a row in a second direction.
To reduce the deformation of bracing members in a first direction, while can also stablize for the first support 10 and the second support 20
It is supported on column, in the present embodiment, in each first support, in the opposite side for being provided with the first spreader beam of column, if
It is equipped with first stull being resisted against on column;In each second support, in the opposite side for being provided with the second spreader beam of column,
It is provided with second stull being resisted against on column.
In the present embodiment, it is the first support 10 of enhancing and the support 20 of the first purlin 82 and second and the second purlin 83
Between bonding strength, it is each first support 10 horizontal direction both sides be respectively equipped with one first inclination support 13, each
The both sides of the horizontal direction of second support 20 are respectively equipped with one second inclination support 23.
Embodiment 2
The present embodiment is illustrated to the method for construction of the double-deck foundation pit combined steel support in embodiment 1,
In embodiment 1, the first support 10 includes several supporting modules for saving and being linked in sequence, referring to Fig. 1, in this implementation
In example, each first support 10 includes six section supporting modules, and six section supporting modules are sequentially known as first segment branch hold mode successively
Block 101, second saves supporting module 102,103, the 4th sections of supporting modules 104 of third section supporting module, Section of five supporting module
105, Section of six supporting module 106.
Each section supporting module include two first H profile steels 111,112 disposed in parallel, two first H profile steels it
Between first stull 12 is installed, the first H profile steels of adjacent two section supporting modules link together, when several sections prop up
When hold mode block is connected as one first support 10, the first H profile steel of interconnection forms first level support 11;First H profile steel 111,
112 edge of a wing is horizontally disposed.
Method of construction includes the following steps:
(1) refering to Fig. 4, steel sheet pile 811 and column 31 along setting position sinking as fender post, if making in same group
Dry column is arranged along first direction.
(2) Fig. 4 and Fig. 9 are please referred to, in the space of fender post institute corral, earth excavation is until upper layer support 100 is applied
Work absolute altitude suspends the excavation of the earthwork, then installs the first purlin 82 in the inside of fender post, the first steel ox is installed on column 31
Leg 35, sets up the first spreader beam 32 on the first steel corbel 35, and all first spreader beams 32 are arranged along same level.
(3) upper layer support 100 is set up:The first support 10 is set up first, is then installed between the first adjacent support 10
First contact bar, wherein set up first support 10 the step of include:
(31) Fig. 5 and Figure 10 are please referred to, first segment supporting module 101 is installed on corresponding first spreader beam 32, then
One end of first segment supporting module 101 is connected in the first purlin 82.In the present embodiment, it is to use crane by first segment branch
Hold mode block lifts in place.
(32) please continue to refer to Figure 10, temporary track 53 is installed in the other end of first segment supporting module 101, makes interim rail
The orbital plane 54 in road 53 is connected to the upper side 1011 of the upper side wing edge of the first H profile steel of first segment supporting module 101.
1 is please referred to Fig.1, then the second section supporting module 102 is placed into the first H profile steel of first segment supporting module 101
Upper side wing edge upper side 1011, please refer to Fig.1 2, push the second section supporting module 102 to move, make the second section supporting module
102 are moved on temporary track 53, please refer to Fig.1 3, then by second 102 pieces of liftings of section branch hold mode, make the second section supporting module
102 are detached from temporary track 53.
In the present embodiment, temporary track 53 is made of channel steel, makes the notch of channel steel upward, the bottom surface in the slot of channel steel
Orbital plane 45 is formed, to keep the second section supporting module relatively more steady when moving, the upper side wing edge of orbital plane 54 and the first H profile steel
Upper side 1011 it is contour.Simultaneously in order to more easily move the second section supporting module, in the bottom of the second section supporting module
It is removably installed the idler wheel 57 for being useful for walking on temporary track.It is appreciated that not influencing the second section supporting module peace
In the case of dress, idler wheel can also be fixedly mounted on the bottom of the second section supporting module.It is appreciated that temporary track can also be adopted
With H profile steel or I-steel with notch.
Please continue to refer to Figure 13, temporary track 53 is removed, Fig. 6 and Figure 14 are please referred to, the second section supporting module is declined simultaneously
It is placed on corresponding first spreader beam, one end of the second section supporting module 102 is connected to the another of first segment supporting module 101
End.
(33) referring to Fig. 7, according to step (32), supporting module is installed successively, supporting module is saved until completing inverse two,
The installation of i.e. Section five supporting module 105.
(34) referring to Fig. 7, installation final section supporting module, i.e., the 6th support section module 106, Section of six supporting module
106 one end is connected in Section of five supporting module 105, and the other end of Section of six supporting module 106 is connected in the first purlin.
Specifically in the present embodiment, Section of six supporting module 106 is lifted in place using crane.It is appreciated that the 6th
Section support module 106 can also use the mounting means of the second section supporting module 102 to be installed.
(35) referring to Fig. 8, according to step (31) to (34), the erection of the first all supports is completed.
After completing the erection of two adjacent first supports, i.e., installation includes between two adjacent first supports
The first contact bar including first straight connecting rod 15 and the first diagonal control arm 16, completes the erection of upper layer support;In fig. 8, it is simplification
Attached drawing does not show the first contact bar in Fig. 8, and the schematic diagram for being equipped with the first support of the first contact bar can be with reference chart 1.
It is appreciated that the installation of the first contact bar can the row installation again after the erection for completing the first all supports.
(4) 5 are please referred to Fig.1, continues earth excavation up to the construction elevation of lower layer support 200, suspends the excavation of the earthwork, so
The second purlin 83 is installed in the inside of fender post afterwards, the second steel corbel 36 is installed on column 31, in 36 restocking of the second steel corbel
If the second spreader beam 33, all second spreader beams are arranged along same level.
(5) lower layer support and interlayer connection part are installed:
(5.1) lower layer support is installed:
Please continue to refer to Figure 15, the second support 20 is set up on the second spreader beam, and the both ends of the second support 20 are fixed on the
In two purlins 83, installation the second contact bar completes the installation of lower layer support.
When installing the second support 20, due to the barrier of the first support, the installation of the second support still uses traditional installation
Method installs the second H profile steel 211,212 along first direction successively specifically, since the side of the second purlin, then
Second cross beam 22 is installed between two H profile steels 211 and the second H profile steel 212, until completing entire second support, is sequentially completed all
The second support, and the installation of the second straight connecting rod and the second diagonal control arm is synchronously completed, to complete the installation of entire lower layer support.
In the present embodiment, to accelerate the assembling speed of the second support, the second support starts simultaneously at assembling from the opposite both sides of purlin,
It is docked in the approximately mid way between of the second support.Certainly, second support can also gradually be assembled from the side of purlin until
The other side of purlin.
(5.2) interlayer interconnecting piece is installed:
After the erection for completing one second support, that is, start that corresponding vertical brace 41 and diagonal brace 42 are installed.It is appreciated that vertical
Support 41 and the installation of diagonal brace 42 can installed after completing the second all supports.
It is appreciated that in other embodiments, can first install vertical brace 41 and diagonal brace 42, then install the second support.
To prevent the second section supporting module from larger offset occurring when moving, in the present embodiment, installation is being completed
Supporting module the first H profile steel on the positive stop strip of supporting module offset for preventing from preparing to install is installed, positive stop strip exists
One is respectively disposed in two first H profile steels, idler wheel is arranged between two positive stop strips.It is appreciated that idler wheel can also be arranged
In the outside of two positive stop strips.6 are please referred to Fig.1, specifically in the present embodiment, positive stop strip is made of angle steel 62, in first segment
Be fixed by bolts angle steel 62 on the edge of a wing of the upside of two first H profile steels 111,112 of supporting module 101, angle steel 62 to
The side of upper extension can limit idler wheel 57 and shift when moving, and idler wheel 57 is limited between two angle steel 62, is installing
This method can also be used when other section supporting modules.It is appreciated that idler wheel can also be limited in the outside of two angle steel 62.
In other embodiments, 7 are please referred to Fig.1, it can also be in two first H profile steels of first segment supporting module 101
111, it is fixed by bolts installation channel steel 63 on the edge of a wing of 112 upside, and makes the notch of channel steel 63 upward, the side of channel steel 63
64 are formed as positive stop strip, and idler wheel 61, which is limited in the slot of channel steel 63, to be moved.
Along first direction, respectively pacify in the both sides of the edge of foundation pit in the present embodiment for convenience of mobile and adjustment supporting module
There are one the draft gears for drawing supporting module movement for dress, describe for convenience, two draft gears are referred to as first
Draft gear 51 and the second draft gear 52.It is appreciated that in the condition that can be accurately controlled, draft gear can supported only
Draft gear is installed in side on the moving direction of module, in the present embodiment, can be only if only retaining a draft gear
Retain the first draft gear 51.In the present embodiment, draft gear uses hoist engine.It can immediately, in other embodiments, also
Other equipment with traction function may be used.
In the present embodiment, the top end face 311 of column 31 and the upper side on the edge of a wing of the top of the first stull 12 are contour, can
To understand, in the case where not influencing supporting module installation, the top end face of column can be more than that first support 10 rising upwards.
In the present embodiment, supporting block 55 is installed on the first spreader beam 32, temporary track 53 is mounted in supporting block 55.
It is appreciated that above-mentioned supporting block can also be mounted on the bottom of foundation pit.
In the present embodiment, when being lifted to the second section supporting module and other modules, using the bottom for being supported on foundation pit
The jack 56 in portion is resisted against in the second stull at the top of jack.It is appreciated that can also use small-sized standard gantry crane or
The gantry crane apparatus such as homemade simple gantry crane can be in the crossbeam upper mounting jaw hook of gantry crane when using gantry crane apparatus, which can
To be held on the edge of a wing of the first H profile steel, to which supporting module be sling.
Claims (5)
1. the double-deck foundation pit combined steel support, is arranged in foundation pit, is characterized in that,
Including upper layer support, positioned at upper layer support lower section lower layer support, interlayer connection part and support sector, upper layer support and under
Layer support is supported in support sector;
The upper layer support includes the first support that at least two be arranged on first level face extend in parallel, adjacent two
It is provided with the first contact bar between a first support;Each first support includes two first level supports disposed in parallel, at two
It is fixedly connected with the first stull between first level support;The both ends of first support are fixedly connected in the first purlin in foundation pit;
The lower layer support includes the second support that at least two be arranged on the second horizontal plane extend in parallel, adjacent two
It is provided with the second contact bar between a second support;Each second support includes two second horizontal braces disposed in parallel, at two
The second stull is fixedly connected between second horizontal brace;The both ends of second support are fixedly connected in the second purlin in foundation pit;
Be respectively provided with there are one the second support corresponding to each first support, the second support be located at corresponding first support just under
Side;
The interlayer connection part includes the vertical brace being connected between the first support and the corresponding second support and diagonal brace;
The column that the support sector sinks under including in foundation pit and the supporter being fixed on column;First support and the second support
It is arranged on supporter.
2. bilayer foundation pit combined steel support according to claim 1, which is characterized in that
The first contact bar include along with vertical the first straight connecting rod of extending direction of the first support, and with the first straight connecting rod
First diagonal control arm of arrangement at an angle;The second contact bar includes straight along second vertical with the extending direction of the second support
Connecting rod, and the second diagonal control arm with the second straight connecting rod arrangement at an angle.
3. bilayer foundation pit combined steel support according to claim 1, which is characterized in that
Upper and lower mutual corresponding first support and the second support are one group of support, and being both provided with one group corresponding to every group of support stands
Column, every group of column includes a plurality of uprights;
The supporter includes the first supporter and the second supporter, wherein the first supporter is supported for support first, second
Supporter is for supporting the second support;
First supporter includes the first steel corbel being fixed on column and the first spreader beam being horizontally set on the first steel corbel,
First support is movably disposed on the first spreader beam;
Second supporter includes the second steel corbel being fixed on column and the second spreader beam being horizontally set on the second steel corbel,
Second support is movably disposed on the second spreader beam;
Every first spreader beam is at least supported on the first steel corbel on the column being distributed in two groups of columns at two;
Every second spreader beam is at least supported on the second steel corbel on the column being distributed in two groups of columns at two.
4. bilayer foundation pit combined steel support according to claim 3, which is characterized in that
First support is extended in a first direction with the second support;A plurality of uprights in every group of column are arranged along first direction;
Column in two adjacent groups column arranges that the first spreader beam is arranged in a second direction with the second spreader beam in a second direction;Described second
Direction is vertical with first direction.
5. bilayer foundation pit combined steel support according to claim 3, which is characterized in that
In each first support, in the opposite side for being provided with the first spreader beam of column, be provided with one be resisted against on column the
One stull;
In each second support, in the opposite side for being provided with the second spreader beam of column, be provided with one be resisted against on column the
Two stulls.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820336759.0U CN207974124U (en) | 2018-03-12 | 2018-03-12 | The double-deck foundation pit combined steel support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820336759.0U CN207974124U (en) | 2018-03-12 | 2018-03-12 | The double-deck foundation pit combined steel support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207974124U true CN207974124U (en) | 2018-10-16 |
Family
ID=63765380
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820336759.0U Active CN207974124U (en) | 2018-03-12 | 2018-03-12 | The double-deck foundation pit combined steel support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207974124U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108222023A (en) * | 2018-03-12 | 2018-06-29 | 江苏东合南岩土科技股份有限公司 | Double-deck foundation pit combined steel support and method of construction |
CN110359463A (en) * | 2019-06-24 | 2019-10-22 | 麦廊建设有限公司 | It tiltedly throws the construction method of support supporting and tiltedly throws support supporting |
-
2018
- 2018-03-12 CN CN201820336759.0U patent/CN207974124U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108222023A (en) * | 2018-03-12 | 2018-06-29 | 江苏东合南岩土科技股份有限公司 | Double-deck foundation pit combined steel support and method of construction |
CN108222023B (en) * | 2018-03-12 | 2024-04-05 | 江苏东合南岩土科技股份有限公司 | Double-layer foundation pit combined steel support and construction method |
CN110359463A (en) * | 2019-06-24 | 2019-10-22 | 麦廊建设有限公司 | It tiltedly throws the construction method of support supporting and tiltedly throws support supporting |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8584429B2 (en) | Tower erection system and method | |
CN104060844B (en) | Sliding device and lifting device for truss frame of steel structural transfer floor of the high-rise building and construction method thereof | |
CN106193055B (en) | A kind of subway foundation pit liftable support system and its lifting construction method | |
CN207974124U (en) | The double-deck foundation pit combined steel support | |
CN109057365A (en) | A kind of Node In Large-span Pipe Truss roof truss air translation installation method | |
US7337738B2 (en) | Gate type vertical elevated mast | |
CN108222023A (en) | Double-deck foundation pit combined steel support and method of construction | |
CN112695696A (en) | Integrated construction equipment for superstructure of high-pile wharf and construction method thereof | |
CN102433868B (en) | Insert plate device capable of walking on blown-filled mud soil | |
CN107587885A (en) | Two lining trolley structures and assembling method in a kind of standard cross-section of tunnel | |
CN216586578U (en) | Supporting structure in foundation | |
CN207228124U (en) | Lattice anchor structure for deep foundation pit support | |
CN106835984B (en) | The reverse construction method of installation of slug matching bridge Bridge Erector | |
CN215329670U (en) | Integrated construction equipment for superstructure of high-pile wharf | |
CN209873759U (en) | Portable pile foundation construction platform | |
CN111852516A (en) | Limiting jacking device for tunnel portal shed tunnel steel frame and construction method thereof | |
CN108840234B (en) | Hoisting device for prefabricated section and hoisting method thereof | |
JP2780571B2 (en) | Reinforcing cage construction equipment | |
CN205822282U (en) | Foundation pile dead load monitor station shifting machine | |
CN113047587B (en) | Liftable operation platform for soft soil foundation construction and building method | |
CN218150972U (en) | Temporary supporting structure for advanced tunnel primary corrugated plate | |
CN216640650U (en) | Rock-socketed construction platform of offshore wind power implanted high-rise pile cap foundation pile | |
CN203878956U (en) | Automatic lifting protection screen and construction platform combined system | |
CN219604133U (en) | Steel bridge platform between deep foundation pit supporting beam and tower crane foundation | |
CN215482341U (en) | Hydraulic jacking construction platform in cable area tower of cable-stayed bridge tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |