CN107558485A CN201710544922.2A CN201710544922A CN107558485A CN 107558485 A CN107558485 A CN 107558485A CN 201710544922 A CN201710544922 A CN 201710544922A CN 107558485 A CN107558485 A CN 107558485A
Authority
CN
China
Prior art keywords
foundation
cement
cement tank
mixing station
bias
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710544922.2A
Other languages
Chinese (zh)
Inventor
张馨
陈历珊
钟安德
张艺心
刘博凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENYANG RAILWAY BUREAU
China Railway 18th Bureau Group Co Ltd
Original Assignee
SHENYANG RAILWAY BUREAU
China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENYANG RAILWAY BUREAU, China Railway 18th Bureau Group Co Ltd filed Critical SHENYANG RAILWAY BUREAU
Priority to CN201710544922.2A priority Critical patent/CN107558485A/en
Publication of CN107558485A publication Critical patent/CN107558485A/en
Pending legal-status Critical Current

Links

Abstract

For the freeze proof anti-bias robust structure and construction method of mixing station foundation of cement tank, structure, which includes enclosing, is located at the filling bed set gradually inside and outside foundation of cement tank surrounding, insulation water blocking layer and frozen soil relief layer;The mixing material that filling bed is combined into using cement, flyash, clay, rubble;It is cystosepiment to be incubated the layer material that blocks water;It is salt fines that frozen soil, which alleviates layer material, and salt fines are covered in the outside of insulation water blocking layer.Construction method is:S1 mixing stations foundation of cement tank surrounding excavation pit;S2 respectively excavates a locating slot in four middle side edges of foundation ditch;Filled and process plate in tetra- locating slots of S3, the circle cystosepiment of excavation of foundation pit contour edge arrangement one, forms insulation water blocking layer;S4 covers salt fines on the outside of insulation water blocking layer, forms frozen soil relief layer;S5 fills the mixing material being combined into by cement, flyash, clay, rubble between insulation water blocking layer and foundation of cement tank, forms filling bed.This freeze proof anti-bias robust structure prevents frost heave to cause foundation of cement tank to offset.

Description

Freeze proof anti-bias robust structure and construction method for mixing station foundation of cement tank
Technical field
The invention belongs to construction of railways auxiliary facility technical field, more particularly to for the freeze proof of mixing station foundation of cement tank Anti-bias robust structure and construction method.
Background technology
In railway construction work progress is carried out, mixing station is that indispensable big machinery is set.It is crucial in mixing station Structure is cementing tank.The fixed form that cementing tank uses at present for:Mixing station foundation of cement tank, mixing station cementing tank are built first Basis is embedded in below ground in advance, and cementing tank tank pin is fixed on mixing station foundation of cement tank by built-in fitting.
When not grown in construction of railways plan time, and severe cold season will not be run into work progress, above-mentioned cementing tank is consolidated It is very stable to determine mode.But when railway construction plan time is longer, and railway construction is at the area of teletostage extreme cold, such as, Certain is located at Liaoning Province Benxi Huan Ren counties building railway, and plan time is 4 years, teletostage extreme cold, the depth of freezing energy of soil Reach 1.5m.In severe cold winter, railway, highway construction will be stopped work, but because construction does not terminate, mixing station is not removed typically, After weather turns warm, continue to construct.And due to serious Frozen soil problems, mixing station foundation of cement tank in severe cold area winter be present Surrounding occurs that frost-heave force is uneven, and so, mixing station foundation of cement tank can shift, and when serious, cementing tank can incline Cover.Therefore, it is necessary to design it is a kind of firm structure is carried out to foundation of cement tank, to solve winter Frozen soil problems to foundation of cement tank Caused by adverse effect.
The content of the invention
The present invention provides one kind for technical problem present in solution known technology prevents frost heave from causing foundation of cement tank The freeze proof anti-bias robust structure and construction method for mixing station foundation of cement tank for offseting and then causing cementing tank to topple.
The present invention is adopted the technical scheme that to solve technical problem present in known technology:
Freeze proof anti-bias robust structure for mixing station foundation of cement tank, it is characterised in that:Mixing station water is located at including enclosing Mud tank base surrounding surrounds the filling bed, insulation water blocking layer and frozen soil relief layer of setting, the depth of three layers successively from the inside to the outside More than the depth of mixing station foundation of cement tank;The filling bed is that cross section fills Rotating fields in the column of square frame-shaped, described to fill The material that packing course uses for:The mixing material that cement, flyash, clay, rubble (or cobblestone) are combined into;The insulation blocks water Layer is blocked water in the column insulation of square frame-shaped by cross section and main part and is separately positioned on column insulation and blocks water the four of main part Four overhanging position portions in the middle part of individual lateral surface are formed, and the insulation water blocking layer uses material as cystosepiment;The frozen soil delays Solution layer uses material as salt fines, and salt fines are covered in the outside of insulation water blocking layer.
Further:The thickness of filling bed is 1.56m, and cement, flyash, clay, the ratio of rubble (or cobblestone) For:0.5:2.5:5:2;The block water thickness of main part of column insulation is 4cm, and overhanging position portion is in flat column, overhanging positioning Partial length is 0.8m, width 0.5m.
Construction method for the freeze proof anti-bias robust structure of mixing station foundation of cement tank, it is characterised in that including as follows Construction procedure:
S1 outwards excavates the foundation ditch that lateral surface surrounds square column type in mixing station foundation of cement tank surrounding, and the depth of foundation ditch is more than The depth of mixing station foundation of cement tank;
S2 outwards excavates a locating slot in the medium position of each lateral surface of foundation ditch;
S3 filled and process plates in four locating slots, and cystosepiment is enclosed in excavation of foundation pit contour edge arrangement one, four are fixed Position groove in cystosepiment and be arranged on margin of foundation pit one circle cystosepiment form insulation water blocking layer;
The S4 films of the circle of winding one with glue on the outside of insulation water blocking layer, one layer of salt fines are spilt on the film with glue, is formed and frozen Native relief layer;
S5 between insulation water blocking layer and mixing station foundation of cement tank filling by cement, flyash, clay, rubble (or goose Cobble) mixing material that is combined into, filling bed is formed, is carried out when fill mixing material by the way of back-filling in layers is compacted.
Further:It is 1.6m that foundation ditch lateral distance mixing station foundation of cement tank, which corresponds to the distance between lateral surface, in S1.
Further:The cross section of locating slot is rectangle in S2, and its length is 0.8m, and its width is 0.5m
Further:The thickness for the circle cystosepiment arranged in S3 is 4cm.
Further:Cement, flyash, clay, the ratio of rubble (or cobblestone) are in S5:0.5:2.5:5:2.
The present invention has the advantages and positive effects of:
This freeze proof anti-bias robust structure is made up of inside and outside three functional layers set gradually, is arranged on outermost frozen soil Relief layer is made up of salt fines, plays a part of reducing the freezing point of water, so as to play a part of slow jelly;It is arranged on the insulation resistance of centre Water layer uses cystosepiment, both with heat insulation effect, can also block water, and is arranged on inner most filling bed and uses cement, flyash, sticks The mixing material of soil and rubble, the filling bed and cystosepiment material that cement, flyash, rubble, clay are formed are soft or hard suitable, rise The horizontal frost-heaving for alleviating ice is arrived, it is therefore prevented that basis shifts because surrounding frost-heave force is uneven, tilted, or even causes water The generation for the phenomenon that mud tank topples, so as to ensure that the stability of mixing station foundation of cement tank.This construction method forms one kind Effective freeze proof anti-bias robust structure, solves mixing station foundation of cement tank in the case of severe cold winter chance frozen soil, it may appear that partially Move, even result in the problem of cementing tank is tumbled.
Brief description of the drawings
Fig. 1 is the schematic diagram of the freeze proof anti-bias robust structure of the present invention.
In figure:1st, filling bed;2nd, it is incubated water blocking layer;2-1, column are incubated the main part that blocks water;2-2, overhanging position portion; 3rd, frozen soil relief layer;1 ', mixing station foundation of cement tank.
Embodiment
In order to further understand the content, features and effects of the present invention, following examples are hereby enumerated, and with reference to accompanying drawing Describe in detail as follows:
A kind of freeze proof anti-bias robust structure for mixing station foundation of cement tank, Fig. 1 is referred to, including enclose and be located at mixing station The surrounding of foundation of cement tank 1 ' and the filling bed 1, insulation water blocking layer 2 and frozen soil relief layer 3 for surrounding setting successively from the inside to the outside, three The depth of layer is more than the depth of mixing station foundation of cement tank, such as, mixing station foundation of cement tank is sized to long 4.0m × wide 4.0m × deep 1.7m, then the depth of three layers take 1.9m.The filling bed is the column filling bed knot that cross section is in square frame-shaped Structure, the filling bed use material for:The mixing material that cement, flyash, clay, rubble (or cobblestone) are combined into.It is described Insulation water blocking layer is incubated to block water main part 2-1 and be separately positioned on column by cross section in the column of square frame-shaped is incubated the master that blocks water Four overhanging position portion 2-2 in the middle part of four lateral surfaces of body portion are formed, wherein the effect of four overhanging position portions is: It is spacing in in-plane progress to whole freeze proof anti-bias robust structure.The insulation water blocking layer uses material as cystosepiment, foam Plate preferably uses zigzag cystosepiment, so can reach preferably insulation, block-water effect.The frozen soil relief layer use material for Salt fines, salt fines are covered on the belt glue film being fastened on the outside of insulation water blocking layer.
In above-mentioned freeze proof anti-bias robust structure:The thickness of the filling bed is 1.56m, forms cement, the fine coal of filling bed Ash, clay, the ratio of rubble (or cobblestone) are preferably:0.5:2.5:5:2.The block water thickness of main part of column insulation is 4cm, i.e., the thickness of the cystosepiment enclosed around insulation water blocking layer one is 4cm.Overhanging position portion is in flat column, overhanging position portion Length be 0.8m, width 0.5m.
A kind of construction method of freeze proof anti-bias robust structure for mixing station foundation of cement tank, including following construction step Suddenly:
S1 outwards excavates the foundation ditch that lateral surface surrounds square column type in mixing station foundation of cement tank surrounding, and the depth of foundation ditch is more than The depth of mixing station foundation of cement tank, in addition, it is necessary to which explanation is:Four lateral distance mixing station foundation of cement tank of foundation ditch The distance of corresponding side surface is equal.
S2 outwards excavates a locating slot in the medium position of each lateral surface of foundation ditch.
S3 filled and process plates in four locating slots, and cystosepiment is enclosed in excavation of foundation pit contour edge arrangement one, four are fixed Position groove in cystosepiment and be arranged on margin of foundation pit one circle cystosepiment form insulation water blocking layer.
The S4 films of the circle of winding one with glue on the outside of insulation water blocking layer, one layer of salt fines are spilt on the film with glue, is formed and frozen Native relief layer.
S5 between insulation water blocking layer and mixing station foundation of cement tank filling by cement, flyash, clay, rubble (or goose Cobble) mixing material that is combined into, filling bed is formed, is carried out when fill mixing material by the way of back-filling in layers is compacted.
In above-mentioned construction method:Foundation ditch lateral distance mixing station foundation of cement tank corresponds to the distance between lateral surface and is in S1 1.6m, marked in the accompanying drawings with H;
In above-mentioned implementation:The cross section of locating slot is rectangle in S2, and its length is 0.8m, is marked in the accompanying drawings with L Note, its width is 0.5m, is marked in the accompanying drawings with W.
In above-mentioned implementation:The thickness for the circle cystosepiment arranged in S3 is 4cm.
In above-mentioned implementation:Cement, flyash, clay, the ratio of rubble (or cobblestone) are preferably in S5:0.5: 2.5:5:2。
This freeze proof anti-bias robust structure is delayed by the inside and outside filling layer set gradually, insulation water blocking layer and frozen soil relief layer Frozen soil problems of the Xie Liao mixing stations foundation of cement tank surrounding in severe cold winter, it is therefore prevented that foundation of cement tank is uneven because of surrounding frost-heave force It is even and shift, the generation of inclined phenomenon.The construction method of this freeze proof anti-bias robust structure has simple, practical and efficient The advantages of.

Claims (7)

1. the freeze proof anti-bias robust structure for mixing station foundation of cement tank, it is characterised in that:Mixing station cement is located at including enclosing The filling bed, insulation water blocking layer and frozen soil relief layer, the depth of three layers that tank base surrounding surrounds setting successively from the inside to the outside are big In the depth of mixing station foundation of cement tank;The filling bed is that cross section fills Rotating fields, the filling in the column of square frame-shaped The material that uses of layer for:The mixing material that cement, flyash, clay, rubble (or cobblestone) are combined into;The insulation water blocking layer Blocked water by cross section in the column insulation of square frame-shaped and main part and be separately positioned on column insulation and block water four of main part Four overhanging position portions in the middle part of lateral surface are formed, and the insulation water blocking layer uses material as cystosepiment;The frozen soil is alleviated Layer uses material as salt fines, and salt fines are covered in the outside of insulation water blocking layer.
2. the freeze proof anti-bias robust structure according to claim 1 for mixing station foundation of cement tank, it is characterised in that:Fill The thickness of packing course is 1.56m, and cement, flyash, clay, the ratio of rubble (or cobblestone) are:0.5:2.5:5:2;Column The thickness for being incubated the main part that blocks water is 4cm, and overhanging position portion is in flat column, and the length of overhanging position portion is 0.8m, wide Spend for 0.5m.
3. the construction method of the freeze proof anti-bias robust structure for mixing station foundation of cement tank, it is characterised in that including applying as follows Work step is rapid:
S1 outwards excavates the foundation ditch that lateral surface surrounds square column type in mixing station foundation of cement tank surrounding, and the depth of foundation ditch is more than mix Stand the depth of foundation of cement tank;
S2 outwards excavates a locating slot in the medium position of each lateral surface of foundation ditch;
S3 filled and process plates in four locating slots, and in the circle cystosepiment of excavation of foundation pit contour edge arrangement one, four locating slots Interior cystosepiment and it is arranged on a circle cystosepiment of margin of foundation pit and forms insulation water blocking layer;
The S4 films of the circle of winding one with glue on the outside of insulation water blocking layer, spill one layer of salt fines on the film with glue, form frozen soil and delay Solve layer;
S5 is filled by cement, flyash, clay, rubble (or cobblestone) between insulation water blocking layer and mixing station foundation of cement tank The mixing material being combined into, filling bed is formed, carried out when filling mixing material by the way of back-filling in layers compacting.
4. the construction method of the freeze proof anti-bias robust structure according to claim 3 for mixing station foundation of cement tank, its It is characterised by:
It is 1.6m that foundation ditch lateral distance mixing station foundation of cement tank, which corresponds to the distance between lateral surface, in S1.
5. the construction method of the freeze proof anti-bias robust structure according to claim 3 for mixing station foundation of cement tank, its It is characterised by:The cross section of locating slot is rectangle in S2, and its length is 0.8m, and its width is 0.5m.
6. the construction method of the freeze proof anti-bias robust structure according to claim 3 for mixing station foundation of cement tank, its It is characterised by:The thickness for the circle cystosepiment arranged in S3 is 4cm.
7. the construction method of the freeze proof anti-bias robust structure according to claim 3 for mixing station foundation of cement tank, its It is characterised by:Cement, flyash, clay, the ratio of rubble (or cobblestone) are in S5:0.5:2.5:5:2.
CN201710544922.2A 2017-07-06 2017-07-06 Freeze proof anti-bias robust structure and construction method for mixing station foundation of cement tank Pending CN107558485A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710544922.2A CN107558485A (en) 2017-07-06 2017-07-06 Freeze proof anti-bias robust structure and construction method for mixing station foundation of cement tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710544922.2A CN107558485A (en) 2017-07-06 2017-07-06 Freeze proof anti-bias robust structure and construction method for mixing station foundation of cement tank

Publications (1)

Publication Number Publication Date
CN107558485A true CN107558485A (en) 2018-01-09

Family

ID=60973012

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710544922.2A Pending CN107558485A (en) 2017-07-06 2017-07-06 Freeze proof anti-bias robust structure and construction method for mixing station foundation of cement tank

Country Status (1)

Country Link
CN (1) CN107558485A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113585336A (en) * 2021-08-16 2021-11-02 中铁十五局集团第二工程有限公司 Quick construction method of sinking type concrete mixing station in soft foundation environment

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836314A (en) * 2016-12-24 2017-06-13 中铁十八局集团有限公司 A kind of freeze proof method for preventing skidding of wheels in severe cold area continuous beam straightway high trestle basis

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836314A (en) * 2016-12-24 2017-06-13 中铁十八局集团有限公司 A kind of freeze proof method for preventing skidding of wheels in severe cold area continuous beam straightway high trestle basis

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113585336A (en) * 2021-08-16 2021-11-02 中铁十五局集团第二工程有限公司 Quick construction method of sinking type concrete mixing station in soft foundation environment
CN113585336B (en) * 2021-08-16 2023-01-31 中铁十五局集团第二工程有限公司 Quick construction method of sinking type concrete mixing station in soft foundation environment

Similar Documents

Publication Publication Date Title
RU2379405C1 (en) Embankment on frozen soil
CN206784453U (en) The concrete foundation anti-freeze expansion structure of Frozen Ground Area
CN102660936A (en) Method for realizing seepage prevention of bridge wall by means of polyvinyl chloride film
CN204212018U (en) A kind of road structure preventing and treating the soft soil roadbed freeze thawing disease of high and cold mountain area cheuch section
Paterson The effects of frost action and solifluxion around Baffin Bay and in the Cambridge District
CN208701440U (en) A kind of antifreeze drainage system of seasonal frost region side slope of embankment
CN105088913B (en) A kind of permafrost area embankment structure
CN109695188A (en) A kind of subgrade in permafrost soil zone structure and its construction method based on hydro-thermal Transformation Principle
CN107558485A (en) Freeze proof anti-bias robust structure and construction method for mixing station foundation of cement tank
CN107100047A (en) Suitable for the rock salt bittern road structure and construction method in playa area
CN101418565A (en) Qinghai-tibet railway permafrost wetland ground treatment technique
CN107326765B (en) Lime pile for treating island-shaped frozen soil foundation and construction method thereof
CN205857136U (en) A kind of channel thermal-insulating leakage-resistant plate
CN103015283A (en) Novel roadbed structure for phreatic high inland sulphate salty soil
RU2274750C1 (en) Method for land reclamation in the case of land corruption by opened deposit development
CN207419174U (en) A kind of subgrade in permafrost soil zone structure based on hydro-thermal Transformation Principle
US3818712A (en) Frozen embankments
CN106049214B (en) Cold district bridges and culverts structures changeover portion anti-freeze expansion structure
CN205839512U (en) A kind of water conservation temperature reduction asphalt pavement structure being applicable to heavy traffic
SU841418A1 (en) Method of erecting embankment in permafrost environment
RU2393300C2 (en) Methods for erection of foundation and bottom of large reservoir and their design
CN102953367A (en) Saline soil foundation treatment method
CN114319003A (en) Construction process of high-load airport runway
CN206844174U (en) A kind of water seepage treatment structure on sole plate surface
Elliott Microfabric evidence for podzolic soil inversion by solifluction processes

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180109

RJ01 Rejection of invention patent application after publication