CN1075347A - The job practices of mud anti-seepage underground diaphragm wall - Google Patents

The job practices of mud anti-seepage underground diaphragm wall Download PDF

Info

Publication number
CN1075347A
CN1075347A CN 92111016 CN92111016A CN1075347A CN 1075347 A CN1075347 A CN 1075347A CN 92111016 CN92111016 CN 92111016 CN 92111016 A CN92111016 A CN 92111016A CN 1075347 A CN1075347 A CN 1075347A
Authority
CN
China
Prior art keywords
mud
diaphragm wall
underground diaphragm
seepage
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 92111016
Other languages
Chinese (zh)
Inventor
张春元
雷茂辉
龚昌永
张继良
赵长宽
安成林
曹晓强
范金香
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Nuclear Industry Corp Great Wall Corporation
Drilling Team Of Qinhuangdao Water Conservancy Bureau
Qinhuangdao No2 Construction Engrg Co
Original Assignee
China National Nuclear Industry Corp Great Wall Corporation
Drilling Team Of Qinhuangdao Water Conservancy Bureau
Qinhuangdao No2 Construction Engrg Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Nuclear Industry Corp Great Wall Corporation, Drilling Team Of Qinhuangdao Water Conservancy Bureau, Qinhuangdao No2 Construction Engrg Co filed Critical China National Nuclear Industry Corp Great Wall Corporation
Priority to CN 92111016 priority Critical patent/CN1075347A/en
Publication of CN1075347A publication Critical patent/CN1075347A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention discloses a kind of job practices of mud anti-seepage underground diaphragm wall.This method is applicable to the underground engineering construction of deep excavation, high water level.Concrete grammar is the periphery in underground construction, excavates out closed trenches one, adds mud then in groove, quiet the stopping through 2-8 days, therefore mud form the anti-seepage underground diaphragm wall of flexible together and weak water permeability, and its impervious coefficient is 1-8m/d, can the fine needs that satisfy general underground engineering construction.

Description

The job practices of mud anti-seepage underground diaphragm wall
The present invention relates to a kind of construction foundation working method that stops the underground water circulation, particularly a kind of mud anti-seepage underground diaphragm wall that is applicable to high water level, deep excavation project.
The practice of existing anti-seepage underground diaphragm wall is: excavate out a long and narrow deep trouth on ground along the periphery of need open excavation with plant equipment, put into reinforcing bar in the groove, penetration concrete then, build up one section reinforced concrete wall, carry out so piecemeal, and every section body of wall is linked to each other with certain joint style, form continuous steel concrete anti-seepage underground diaphragm wall one.This impervious diaphragm wall that is built up by steel concrete, its impervious effect is fine.But this wall of constructing needs higher technology, more plant equipment, complex process, cost height.
Purpose of the present invention is exactly that the mud anti-seepage underground diaphragm wall that a kind of cheap, technology is simple, be applicable to high water level, deep excavation project will be provided.
The present invention is achieved in that the periphery along deep excavation project, excavates out long and narrow closed trenches one on ground, adds in the digging time groove by water, swell soil and or the mud formed of clay.Mud can play the protection cell wall, prevent the effect of caving in the grooving process.Groove construction finishes, and allows mud in groove the quiet 2-8 of stopping days, slurry curing and form the anti-seepage underground diaphragm wall of one flexibility, weak water permeability.The content of swell soil and/or clay is generally the 15-40% of mud total weight in the mud.The transmission coefficient of this wall is 1-8m/d.The excavation width of groove should be determined according to geological condition, is generally 150mm-1000mm, and cutting depth should enter the rock stratum or more than the aquitard 50mm.
Method of the present invention, technology is simple, and the duration is short, and its cost only is equivalent to about 1/3 of concrete anti-seepage underground diaphragm wall, and technical performance can finely satisfy general underground engineering construction needs.

Claims (1)

1, a kind of job practices of anti-seepage underground diaphragm wall, it is characterized in that: the groove that excavates a closure on ground, add the mud of forming by water, swell soil and/or clay in the groove, through quiet stopping 2-8 days, slurry curing forms the anti-seepage underground diaphragm wall of flexible weak water permeability, the content of swell soil and/or clay accounts for the 15-40% of mud total weight in the mud, and the excavation width of groove is 150mm-1000mm, and cutting depth should enter the rock stratum or more than the aquitard 50mm.
CN 92111016 1992-09-28 1992-09-28 The job practices of mud anti-seepage underground diaphragm wall Pending CN1075347A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 92111016 CN1075347A (en) 1992-09-28 1992-09-28 The job practices of mud anti-seepage underground diaphragm wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 92111016 CN1075347A (en) 1992-09-28 1992-09-28 The job practices of mud anti-seepage underground diaphragm wall

Publications (1)

Publication Number Publication Date
CN1075347A true CN1075347A (en) 1993-08-18

Family

ID=4945104

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 92111016 Pending CN1075347A (en) 1992-09-28 1992-09-28 The job practices of mud anti-seepage underground diaphragm wall

Country Status (1)

Country Link
CN (1) CN1075347A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102852158A (en) * 2012-09-25 2013-01-02 浙江省地质矿产工程公司 Construction method for nonstandard diaphragm wall
CN103526768A (en) * 2013-11-01 2014-01-22 科达集团股份有限公司 Construction method for partitioning strong permeable stratum

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102852158A (en) * 2012-09-25 2013-01-02 浙江省地质矿产工程公司 Construction method for nonstandard diaphragm wall
CN103526768A (en) * 2013-11-01 2014-01-22 科达集团股份有限公司 Construction method for partitioning strong permeable stratum

Similar Documents

Publication Publication Date Title
CN106013052B (en) The construction method of steel sheet pile and open caisson Combined type underground garage parking
CN108442943A (en) A kind of branch-cut bridge section tunnel and Double side heading method construction method
CN107023300A (en) A kind of use canopy, which is defended the doctrine, builds the construction method of subway station
CN110424434B (en) Stirring pile waterproof curtain for sea filling deep block stone area and construction method
CN114233385B (en) Treatment method for mud-bursting water of inclined shaft
CN108517877A (en) Miscellaneous fill ultra-deep foundation pit consolidates slip casting combination double-row steel pipe stake supporting construction method
CN101775810A (en) Underground water control construction method in foundation pit dewatering project
CN107489158A (en) A kind of spiral-digging pore stirs the construction method of water spray soil occlusion curtain pile
CN203229955U (en) Foundation pit enclosure structure allowing supporting while excavating
CN107012871A (en) A kind of suspension type goes along with sb. to guard him the deep reversed construction method for greatly enhancing foundation ditch fabricated construction
CN105909265A (en) Heaving-prevention retrusive deep-hole grouting system and method for passing through existing shield tunnel
CN105672327B (en) A kind of design and construction method of minor diameter vertical shaft high polymer grouting excavation supporting structure
CN208441084U (en) Coercion underground continuous wall
CN109339079A (en) A kind of foundation pit water-stopping system and its construction technology close to river permeable stratum
CN209260739U (en) A kind of foundation pit water-stopping system close to river permeable stratum
CN1075347A (en) The job practices of mud anti-seepage underground diaphragm wall
CN110512649A (en) The excavating construction method of basement and communication channel structure is added under existing building
CN102678127B (en) Method for constructing weakly consolidated non-stratified sandstone tunnel
CN208294522U (en) Waterproof of man in a kind of pilot tunnel of rich water sand-pebble layer
JPH02200917A (en) Landslide suppressing well cylinder and its building method
CN210636441U (en) Guide partition wall
CN209687506U (en) Wear river shallow buried covered excavation electric power tunnel constructing structure
CN205805553U (en) Pass through existing shield tunnel anti-protuberance retrusive deep hole grouting system
CN216198097U (en) U-shaped double-layer totally-enclosed grouting water stopping device for water-rich sand layer tunnel construction
CN110424488A (en) A kind of construction method of diaphram wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C01 Deemed withdrawal of patent application (patent law 1993)
WD01 Invention patent application deemed withdrawn after publication