CN107489158A - A kind of spiral-digging pore stirs the construction method of water spray soil occlusion curtain pile - Google Patents

A kind of spiral-digging pore stirs the construction method of water spray soil occlusion curtain pile Download PDF

Info

Publication number
CN107489158A
CN107489158A CN201710870695.2A CN201710870695A CN107489158A CN 107489158 A CN107489158 A CN 107489158A CN 201710870695 A CN201710870695 A CN 201710870695A CN 107489158 A CN107489158 A CN 107489158A
Authority
CN
China
Prior art keywords
pile
water
stirs
hole
spiral
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710870695.2A
Other languages
Chinese (zh)
Inventor
何世鸣
李江
田震远
周与诚
张明中
陈辉
贾城
司呈庆
巫冬妹
李长生
梁成华
王建明
黄鑫峰
洪伟
王海宁
刘志刚
郁河坤
郭跃龙
陈鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Science And Technology Promotion Association
Co Ltd Of Sinoma Geological Engineering Survey Institute
Beijing Building Materials Geological Engineering Co Ltd
Original Assignee
Beijing Urban Construction Science And Technology Promotion Association
Co Ltd Of Sinoma Geological Engineering Survey Institute
Beijing Building Materials Geological Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Science And Technology Promotion Association, Co Ltd Of Sinoma Geological Engineering Survey Institute, Beijing Building Materials Geological Engineering Co Ltd filed Critical Beijing Urban Construction Science And Technology Promotion Association
Priority to CN201710870695.2A priority Critical patent/CN107489158A/en
Publication of CN107489158A publication Critical patent/CN107489158A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/0023Slurry

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention discloses the construction method that a kind of spiral-digging pore stirs water spray soil occlusion curtain pile.Its drip irrigation device is to include following construction procedure:Surveying and locating, rotary drilling rig is in place, water-seal pile drilling, is banketed in hole, pulping outside hole, and long-auger jet-grouting agitation driller is in place, sealing pile driving construction, support pile drilling and the construction of support pile pile body.The perpendicularity of water-seal pile can be improved with this method, forms preferably occlusion water-stagnating effect;The water-seal pile being constructed into is evenly closely knit, and pile quality is good;It can be used in hard stratum, sand pebble layer and have in the stratum of boulder to construct.

Description

A kind of spiral-digging pore stirs the construction method of water spray soil occlusion curtain pile
Technical field
The present invention relates to foundation pit waterproof curtain engineering field, more particularly to a kind of construction method of water-stop curtain stake.
Background technology
As shown in figure 1, water-stop curtain refers to be arranged on the periphery of building foundation pit 1, for ensureing that foundation ditch 1 excavates, prevent or subtract The continuous water-stop body that few foundation pit side-wall and foundation ditch bottom underground water flow into foundation ditch and taken.The conventional structure of water-stop curtain is by supporting Stake 2 and the consecutive intervals of water-seal pile 3 arrangement, it is in one line and overlap to form bite 4 between each other.Support pile 2 is led Play a part of earth-retaining, water-seal pile 3 plays a part of blocking the water layer outside foundation ditch to flow into foundation ditch.Support pile 2 typically uses steel Reinforced concrete bored concrete pile or the strong pile body of other rigidity, water-seal pile 3 are that the soil body in hole and cement mortar are stirred or in the soil body The cement earth pile that inner high voltage injection cement mortar forms, typically with rotary churning pile machine, mixing pile machine or long-auger jet-grouting agitation driller etc. Mechanical execution forms.
Although with the soil cement rotary churning pile that rotary churning pile machine is constructed at Soft Deep Foundation Pit supporting, water-stop curtain and ground There is good application in the fields such as reason, but when construction is compared with hard stratum, is then extremely restricted, especially runs into layer of sand or sand pebble layer When, churning effect weakens significantly, can not implement.And in the long pile driving construction of deep basal pit curtain, churning that rotary churning pile machine is constructed into Pile verticality cannot be guaranteed that the purpose for tending not to reach design causes sealing to fail.
With the cement mixing method that mixing pile machine is constructed because its easy construction, cost are cheap, and it is widely used in base The fields such as supporting, water-stop curtain and basement process are cheated, but traditional mixing pile is extremely restricted, especially when construction is compared with hard stratum It is even more to implement that it, which stirs layer of sand or sand pebble layer,.
Although the cement earth pile constructed with long-auger jet-grouting mixing pile machine preferably resolves pan soil area pore-forming and asked Topic, but because long-auger jet-grouting mixing pile machine perpendicularity can only achieve 1%, in the longer pile driving construction of deep basal pit, the branch of bottom of foundation ditch Fender pile and water-seal pile can not be often engaged, and formed " horn mouth ", caused drainage so that curtain water stop can not reach design Requirement.In addition, when running into big boulder and cobble, block stone, the easy bit freezing of long spire stake machine, or even can not creep into.
The content of the invention
It is an object of the invention to provide the construction method that a kind of spiral-digging pore stirs water spray soil occlusion curtain pile, this method energy The perpendicularity of water-seal pile is improved, forms preferably occlusion water-stagnating effect;The water-seal pile being constructed into is evenly closely knit, pile quality It is good;It can be used in hard stratum, sand pebble layer and have in the stratum of boulder to construct.
The present invention above-mentioned technical purpose technical scheme is that:A kind of spiral-digging pore stirs spraying cement The construction method of soil occlusion curtain pile, including following construction procedure:
Step a, surveying and locating:The stake position of water-seal pile and support pile is gone out according to design surveying and locating, and carries out mark;
Step b, rotary drilling rig is in place:Rig is in place, drill bit alignment water-seal pile stake position center, adjusts the horizontal and vertical degree of rig;
Step c, water-seal pile drills:Drilled according to intended diameter and projected depth;
Step d, banketed in hole, pulping outside hole:Soil is inserted in the hole being drilled, mixing cement in stock tank is mixed outside hole Slurry;
Step e, long-auger jet-grouting agitation driller is in place:Rig is in place, connects high-pressure pump and high-voltage tube;
Step f, sealing pile driving construction:High-pressure pump is opened, starts long-auger jet-grouting agitation driller, carries out low pressure rotary-spraying stirring drilling; After drill bit reaches bottom hole, high-pressure rotary-spray cement mortar is carried out, while cement mortar and the soil in hole are stirred, and at the uniform velocity lifting is bored Head, design stake top absolute altitude is sprayed onto until stirring;
Step g, support pile drills:After the rising of water-seal pile intensity, rotary drilling rig carries out support pile drilling, while cuts adjacent stop A part for water stake, the support pile after the completion of construction is set to be engaged with water-seal pile formation;
Step h, support pile pile body is constructed:Tripping in steel reinforcement cage in supporting stake holes, concrete perfusion, form armored concrete supporting Stake, is mutually twisted to form continuous water-stop curtain with water-seal pile.
By using above-mentioned technical proposal, rotary drilling rig can be such that the perpendicularity deviation of water-seal pile controls in 0.3%, be formed Preferably occlusion water-stagnating effect;Because the good soil backfilled in hole can stir more abundant, construction compared to original place layer soil stone with cement mortar Into water-seal pile it is evenly closely knit, pile quality is good;Because the rotary drilling rig of use has stronger drilling force than twist bit, so This method can be used in hard stratum, sand pebble layer and have in the stratum of boulder to construct.
Preferably, sandy soil or silt are filled out in hole in step d.
By using above-mentioned technical proposal, sandy soil or silt preferably can be stirred with cement mortar, be formed closely knit Du Genggao water-seal pile, increase water-stagnating effect.
Preferably, in step f mesolows jet mixing drilling process, grouting pressure is controlled in 0.5~1.0MPa.
By using above-mentioned technical proposal, cement mortar is constantly sprayed in drill bit drilling process, mouth spray is not easy to result in blockage, The pressure limit will not cause the waste of cement mortar simultaneously.
Preferably, in step f mesohighs jet mixing at the uniform velocity lifting process, grouting pressure is controlled in 20~30MPa.
By using above-mentioned technical proposal, grouting pressure can meet the water-seal pile in general stake footpath, cement mortar energy in the range of this Enough to carry out effectively cutting infiltration to the soil body in the range of design stake footpath, when pressure is excessive, cement mortar can project a footpath scope, cause not Necessary waste.
Preferably, in step f mesohighs jet mixing lifting process, the 2m models below stake bottom above 2m and stake top Enclose that planted agent is repeated multiple times to stir spray.
It is key position to pile crown and stake bottom by using above-mentioned technical proposal, and the easy leakiness of pile crown backfill, It is sprayed with so the two positions are carried out with reinforcement and is stirred beneficial to pile quality is improved, the possibility of leak occurs in the reduction later stage.
Preferably, it is 0.5~1.0m/min to lift speed.
By using above-mentioned technical proposal, disposable pile can be realized substantially in the speed, if lifting too fast, pile body meeting Leakiness secondary need to stir spray, and lifting is too slow then to be influenceed efficiency of construction and cause the waste of cement mortar.
Preferably, armored concrete support pile is replaced with to the cement earth pile of interpolation shaped steel, its construction party in step h Method is to insert soil in the supporting stake holes being drilled, and preventing slurry injection is stirred in hole with long-auger jet-grouting agitation driller, forms soil cement Stake, shaped steel is inserted in the cement earth pile, form support pile;Shaped steel is pulled out after the backfill of foundation ditch fertilizer groove, is recycled.
By using above-mentioned technical proposal, more economical environmental protection, and also support pile front portion division technique is identical with water-seal pile, carries High efficiency of construction, saves the duration.
Preferably, shaped steel is H profile steel.
By using above-mentioned technical proposal, H profile steel has more preferable lateral stressed effect compared to other shaped steel, can mitigate type Steel weight, material is saved, under the premise that security is guaranteed, improve efficiency of construction.
In summary, the invention has the advantages that:
1st, rotary drilling rig can be such that the perpendicularity deviation of water-seal pile controls in 0.3%, improve the perpendicularity of water-seal pile, be formed more Good occlusion water-stagnating effect;
2nd, the water-seal pile being constructed into is evenly closely knit, reduces undergauge phenomenon, improves the reliability of water-stop curtain;
3rd, it can be used in hard stratum, sand pebble layer and have in the stratum of boulder to construct;
4th, cut and be easier because the water-seal pile intensity first constructed is not high, when support pile drills;
5th, support pile using the method for insertion shaped steel in cement earth pile, more economical environmental protection, and support pile front portion division technique with Water-seal pile is identical, improves efficiency of construction, saves the duration.
Brief description of the drawings
Fig. 1 is water stop curtain structure schematic diagram;
Fig. 2 is that spiral-digging pore stirs water spray soil occlusion curtain pile construction flow chart.
In figure, 1, foundation ditch;2nd, support pile;3rd, water-seal pile;4th, bite.
Embodiment
The present invention is described in further detail below in conjunction with accompanying drawing.Wherein identical parts identical reference Represent.It should be noted that below in description the word "front", "rear", "left", "right", the "up" and "down" that use refer to it is attached Direction in figure, word " bottom surface " and " top surface ", " interior " and " outer " are referred respectively to towards or away from particular elements geometric center Direction.
Embodiment one:
As shown in Fig. 2 a kind of spiral-digging pore stirs the construction method of water spray soil occlusion curtain pile, including following construction procedure:
Step a, surveying and locating:The surveying setting-out on smooth location, plug waddy at the stake position of releasing or reinforcing rod enters rower Know;Make to draw stake by stake position in addition, checked at any time when there is deviation so as to stake position;Draw stake and be centrally formed one with stake position for two The identification pile of straight line, it is to make a call to a deep hole on the ground with drill rod or card punch to draw a common practice, pours into albarium powder;
Step b, rotary drilling rig is in place:Operating personnel control the movement of rig according to the stake position of releasing, it is ensured that drilling axle center is in place Not partially, carry device leveling using rotary drilling rig and adjust that drilling rod is vertical, the perpendicularity deviation of drilling tool is controlled in 0.3% scope Within;
Step c, water-seal pile drills:Drilled according to intended diameter and projected depth, lower drilling depth is monitored in drilling process, is kept away Exempt from outdrill, whether the depth of measured hole meets design requirement during whole hole;Due to the rotary drilling rig of use have than twist bit it is stronger Drilling force, so it can be used in hard stratum, sand pebble layer and have in the stratum of boulder to construct;
Step d, banketed in hole, pulping outside hole:After rotary drilling rig pore-forming, good soil is backfilled in hole;Implement for the ease of stirring spray, return Banket preferred sandy soil or silt or other soil, but can not be the high soil of the content of organic matter, can not especially use peat soil; During backfill too dry, water should be added to moisten;Backfill overhead height should be higher 0.5m than design stake top position;
The preparation of cement mortar is carried out in change-can mixer, the general ratio of mud can use 1.3~1.5, stir afterwards 60 mesh of mistake with thin vibratory sieve, It is stored in pulp storage tank;Cement must possess outgoing certificate, and be sampled detection by batch;
Step e, long-auger jet-grouting agitation driller is in place:Rig is in place, bit central alignment hole position center, jelly suction pipe is put for one Enter pulp storage tank, other end is connected with high-pressure pump, and high-pressure pump is attached with rig with high-voltage tube;
Step f, sealing pile driving construction:High-pressure pump is opened, Stress control is opened in 0.5~1.0MPa, long-auger jet-grouting agitation driller Dynamic, average rate pierces bottom hole, the jet mixing when piercing;After drill bit reaches bottom hole, high-pressure rotary-spray cement mortar is carried out, while by cement Slurry is stirred to form water-seal pile with the soil in hole;The Stress control of high-pressure rotary-spray cement mortar is in 20~30MPa;High-pressure rotary-spray stirs During mixing, drill bit at the uniform velocity being lifted, raised speed using Frequency Converter Control, lifting speed should be controlled in 0.5~1.0m/min, until Stir and be sprayed onto design stake top absolute altitude;In lifting process repeated multiple times stir is answered in the range of the above 2m of stake bottom and below pile crown in the range of 2m Spray, make the backfill at the position and cement mortar stirring more abundant;Such as drill bit, when being promoted to bottom hole above 2m, rig is again to hole Subdrilling enters, while enters horizontal high voltage and stir spray, after circulating 2 times, continues up lifting;Tripping in certain depth it can carry out again if necessary Partly or wholly stir water-spray type slurry;Because the good soil backfilled in hole can be more abundant with cement mortar stirring compared to original place layer soil stone, apply Work into water-seal pile it is evenly closely knit, pile quality is good;
Step g, support pile drills:After the rising of water-seal pile intensity, usually after water-seal pile is completed 3~5 days, rotary drilling rig is just Position, carry out leveling using own device and adjust the perpendicularity of drilling rod, drilled by the support pile hole position center of design, simultaneously A part for adjacent water-seal pile is cut, the support pile after the completion of construction is engaged with water-seal pile formation;Reach projected depth Afterwards, drill bit is extracted, rig displacement;
Step h, support pile pile body is constructed:The steel reinforcement cage processed in advance is hung in support pile stake holes, irrigated into hole mixed Solidifying soil, forms armored concrete support pile, is mutually twisted to form continuous water-stop curtain with water-seal pile.
Embodiment two:
It is with the difference of embodiment one:Armored concrete support pile replaces with the cement earth pile of interpolation shaped steel, type in step h Steel can be H profile steel.
Soil is inserted in the supporting stake holes being drilled, preventing slurry injection is stirred in hole with long-auger jet-grouting agitation driller, forms water Soil stake, shaped steel is inserted in the cement earth pile.Mould oil is smeared on the outside of shaped steel, shaped steel is sling with crane gear, utilizes it Deadweight is sunk, it is impossible to when reaching projected depth, is vibrated shaped steel using machine of extricating oneself from a predicament and brace oneself up to action and is inserted, form support pile.
After the completion for the treatment of foundation ditch backfill, shaped steel is risen with special pulling and lifting machine and pulls out recovery, the cavity left on cement earth pile, uses water Mud or cement grout are filled, and use bod.
This specific embodiment is only explanation of the invention, and it is not limitation of the present invention, people in the art Member can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but as long as at this All protected in the right of invention by Patent Law.

Claims (8)

1. a kind of spiral-digging pore stirs the construction method of water spray soil occlusion curtain pile, it is characterised in that including following construction procedure:
Step a, surveying and locating:The stake position of water-seal pile and support pile is gone out according to design surveying and locating, and carries out mark;
Step b, rotary drilling rig is in place:Rig is in place, drill bit alignment water-seal pile stake position center, adjusts the horizontal and vertical degree of rig;
Step c, water-seal pile drills:Drilled according to intended diameter and projected depth;
Step d, banketed in hole, pulping outside hole:Soil is inserted in the hole being drilled, mixing cement in stock tank is mixed outside hole Slurry;
Step e, long-auger jet-grouting agitation driller is in place:Rig is in place, connects high-pressure pump and high-voltage tube;
Step f, sealing pile driving construction:High-pressure pump is opened, starts long-auger jet-grouting agitation driller, carries out low pressure rotary-spraying stirring drilling; After drill bit reaches bottom hole, high-pressure rotary-spray cement mortar is carried out, while cement mortar and the soil in hole are stirred, and at the uniform velocity lifting is bored Head, design stake top absolute altitude is sprayed onto until stirring;
Step g, support pile drills:After the rising of water-seal pile intensity, rotary drilling rig carries out support pile drilling, while cuts adjacent stop A part for water stake, the support pile after the completion of construction is set to be engaged with water-seal pile formation;
Step h, support pile pile body is constructed:Tripping in steel reinforcement cage in supporting stake holes, concrete perfusion, form armored concrete supporting Stake, is mutually twisted to form continuous water-stop curtain with water-seal pile.
2. a kind of spiral-digging pore according to claim 1 stirs the construction method of water spray soil occlusion curtain pile, its feature exists In:Sandy soil or silt are filled out in step d in hole.
3. a kind of spiral-digging pore according to claim 1 stirs the construction method of water spray soil occlusion curtain pile, its feature exists In:In step f mesolow jet mixing drilling processes, grouting pressure is controlled in 0.5~1.0MPa.
4. a kind of spiral-digging pore according to claim 1 stirs the construction method of water spray soil occlusion curtain pile, its feature exists In:In step f mesohighs jet mixing at the uniform velocity lifting process, grouting pressure is controlled in 20~30MPa.
5. a kind of spiral-digging pore according to claim 1 stirs the construction method of water spray soil occlusion curtain pile, its feature exists In:In step f mesohigh jet mixing lifting process, repeated multiple times stir is answered in the range of the 2m below stake bottom above 2m and stake top Spray.
6. a kind of spiral-digging pore according to claim 1 stirs the construction method of water spray soil occlusion curtain pile, its feature exists In:Lifting speed is 0.5~1.0m/min.
7. a kind of spiral-digging pore according to claim 1 stirs the construction method of water spray soil occlusion curtain pile, its feature exists In:Armored concrete support pile is replaced with to the cement earth pile of interpolation shaped steel, its construction method is, in the branch being drilled in step h Soil is inserted in fender pile hole, preventing slurry injection is stirred in hole with long-auger jet-grouting agitation driller, cement earth pile is formed, in the cement earth pile Interior insertion shaped steel, form support pile;Shaped steel is pulled out after the backfill of foundation ditch fertilizer groove, is recycled.
8. a kind of spiral-digging pore according to claim 7 stirs the construction method of water spray soil occlusion curtain pile, its feature exists In:Shaped steel is H profile steel.
CN201710870695.2A 2017-09-23 2017-09-23 A kind of spiral-digging pore stirs the construction method of water spray soil occlusion curtain pile Pending CN107489158A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710870695.2A CN107489158A (en) 2017-09-23 2017-09-23 A kind of spiral-digging pore stirs the construction method of water spray soil occlusion curtain pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710870695.2A CN107489158A (en) 2017-09-23 2017-09-23 A kind of spiral-digging pore stirs the construction method of water spray soil occlusion curtain pile

Publications (1)

Publication Number Publication Date
CN107489158A true CN107489158A (en) 2017-12-19

Family

ID=60651926

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710870695.2A Pending CN107489158A (en) 2017-09-23 2017-09-23 A kind of spiral-digging pore stirs the construction method of water spray soil occlusion curtain pile

Country Status (1)

Country Link
CN (1) CN107489158A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589715A (en) * 2018-05-10 2018-09-28 周同和 One kind fetches earth Jet-Mixing Cement-Soil construction method
CN108842789A (en) * 2018-08-31 2018-11-20 中建四局第四建筑工程有限公司 A kind of support pile and the two-in-one constructing structure of water-stop curtain
CN110055934A (en) * 2018-11-21 2019-07-26 中铁十一局集团第六工程有限公司 A kind of high water level earth and rockfill dam Construction of plastic concrete cut-off wall method
CN112323560A (en) * 2020-11-19 2021-02-05 中电建路桥集团有限公司 Roadbed construction settlement control system and method under complex soft foundation environment
CN112459045A (en) * 2020-12-01 2021-03-09 南京深地智能建造技术研究院有限公司 Construction process of rotary digging hole-forming construction method pile
CN113136885A (en) * 2021-04-02 2021-07-20 远强地基工程(天津)股份有限公司 Cement soil waterproof curtain construction process with desulfurized gypsum cement as curing agent
CN113653083A (en) * 2021-08-16 2021-11-16 北京市市政一建设工程有限责任公司 Construction process of grouting waterproof curtain

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000008372A (en) * 1998-06-25 2000-01-11 Marutoku Kigyo:Kk Underground wall constructing method
CN101591914A (en) * 2009-06-25 2009-12-02 江苏华东建设基础工程有限公司 A kind of job practices of using the foundation pit supporting construction of castinplace pile and agitation pile interlock
CN103015429A (en) * 2012-12-04 2013-04-03 北京建材地质工程公司 Long auger rotary-jet mixing steel reinforced cement-soil pile foundation pit water-resisting and supporting method
CN103243740A (en) * 2013-05-20 2013-08-14 马春根 Construction method of rotary excavating and long spiral combination bored concrete pressure grouting secant pile continuous wall
CN104818713A (en) * 2015-02-26 2015-08-05 武汉中力岩土工程有限公司 Profile steel cement soil pile construction method adaptive to various stratums
CN105926626A (en) * 2016-05-04 2016-09-07 北京建材地质工程公司 Construction process for super-long vibration jet-grouting pile of pneumatic down-the-hole hammer, and equipment thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000008372A (en) * 1998-06-25 2000-01-11 Marutoku Kigyo:Kk Underground wall constructing method
CN101591914A (en) * 2009-06-25 2009-12-02 江苏华东建设基础工程有限公司 A kind of job practices of using the foundation pit supporting construction of castinplace pile and agitation pile interlock
CN103015429A (en) * 2012-12-04 2013-04-03 北京建材地质工程公司 Long auger rotary-jet mixing steel reinforced cement-soil pile foundation pit water-resisting and supporting method
CN103243740A (en) * 2013-05-20 2013-08-14 马春根 Construction method of rotary excavating and long spiral combination bored concrete pressure grouting secant pile continuous wall
CN104818713A (en) * 2015-02-26 2015-08-05 武汉中力岩土工程有限公司 Profile steel cement soil pile construction method adaptive to various stratums
CN105926626A (en) * 2016-05-04 2016-09-07 北京建材地质工程公司 Construction process for super-long vibration jet-grouting pile of pneumatic down-the-hole hammer, and equipment thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
郝长伟等: "长螺旋搅拌止水帷幕咬合桩及其施工工艺应用实例分析", 《北京水务》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589715A (en) * 2018-05-10 2018-09-28 周同和 One kind fetches earth Jet-Mixing Cement-Soil construction method
CN108842789A (en) * 2018-08-31 2018-11-20 中建四局第四建筑工程有限公司 A kind of support pile and the two-in-one constructing structure of water-stop curtain
CN110055934A (en) * 2018-11-21 2019-07-26 中铁十一局集团第六工程有限公司 A kind of high water level earth and rockfill dam Construction of plastic concrete cut-off wall method
CN112323560A (en) * 2020-11-19 2021-02-05 中电建路桥集团有限公司 Roadbed construction settlement control system and method under complex soft foundation environment
CN112323560B (en) * 2020-11-19 2022-03-01 中电建路桥集团有限公司 Roadbed construction settlement control system in complex soft foundation environment
CN112459045A (en) * 2020-12-01 2021-03-09 南京深地智能建造技术研究院有限公司 Construction process of rotary digging hole-forming construction method pile
CN113136885A (en) * 2021-04-02 2021-07-20 远强地基工程(天津)股份有限公司 Cement soil waterproof curtain construction process with desulfurized gypsum cement as curing agent
CN113653083A (en) * 2021-08-16 2021-11-16 北京市市政一建设工程有限责任公司 Construction process of grouting waterproof curtain
CN113653083B (en) * 2021-08-16 2022-11-04 北京市市政一建设工程有限责任公司 Construction process of grouting waterproof curtain

Similar Documents

Publication Publication Date Title
AU2020103672A4 (en) Construction method of rotary drilling hole-forming and jet mixing cement-soil occlusion curtain piles
CN107489158A (en) A kind of spiral-digging pore stirs the construction method of water spray soil occlusion curtain pile
CN104499479B (en) It is a kind of to pass through the dug pile construction method that sand gravel backfills layer
CN102286984A (en) Water-stop curtain and construction method thereof
CN105714772B (en) Karst area embedded rock pile pore-forming bores concrete dado method again
CN100501011C (en) Hole drilling mudjack pile construction method
CN105464074B (en) A kind of artificial digging pile high polymer grouting safeguard structure and its construction method
CN102286981A (en) Waterproof curtain and construction method thereof
CN202194148U (en) Waterproof curtain
CN202194149U (en) Water-proof curtain
CN107747312A (en) A kind of method of sand and gravel stratum well cementing construction
CN105442532A (en) Construction method for pile-head-expanded bored pile
CN108086342A (en) The construction method of karst strata pile foundation
CN203403404U (en) High-efficiency cast-in-place pile device
CN106677166A (en) Flow construction method for forming cast-in-place bored pile for gravel-decomposed rock stratum in double-machine combined mode
CN107587502A (en) A kind of spiral-digging pore pressure pour water soil occlusion curtain pile construction method
CN107653889A (en) A kind of shaped steel pressure is poured water the construction method of soil curtain support pile
CN108049397A (en) The construction method of Karst Geological Landscape drilled pile
CN107700508A (en) A kind of shaped steel stirs the construction method of water spray soil curtain support pile
CN110685272A (en) Method for treating soft foundation settlement overrun by utilizing inclined-hole cloth bag pile
CN206800431U (en) A kind of sealing bottom type caisson wall
CN104775412B (en) Stratum reinforcement PSC construction method
CN109440757A (en) A kind of foundation reinforcement method for karst region
CN105350544B (en) For water-stop curtain and its construction method containing block stone region
CN111561262A (en) Hole forming method of rotary drilling rig for large-size pile hole in karst area

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171219