CN110424488A - A kind of construction method of diaphram wall - Google Patents

A kind of construction method of diaphram wall Download PDF

Info

Publication number
CN110424488A
CN110424488A CN201910631737.6A CN201910631737A CN110424488A CN 110424488 A CN110424488 A CN 110424488A CN 201910631737 A CN201910631737 A CN 201910631737A CN 110424488 A CN110424488 A CN 110424488A
Authority
CN
China
Prior art keywords
wall
hole
diaphragm wall
diaphram
diaphragm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910631737.6A
Other languages
Chinese (zh)
Inventor
王欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Sui Shi Civil Polytron Technologies Inc
Original Assignee
Guangzhou Sui Shi Civil Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Sui Shi Civil Polytron Technologies Inc filed Critical Guangzhou Sui Shi Civil Polytron Technologies Inc
Priority to CN201910631737.6A priority Critical patent/CN110424488A/en
Publication of CN110424488A publication Critical patent/CN110424488A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/02Dredgers or soil-shifting machines for special purposes for digging trenches or ditches

Abstract

The invention discloses a kind of construction methods of diaphram wall, specifically includes the following steps: S1, by trench machine carrying out grooving, after grooving, it needs to be purged by mud and residue of the cleaning equipment to slot bottom, prefabricated prestressed underground continuous wall component is transferred to mixed in the geosyncline of clay hardening agent by lifting appliance, it transfers in prefabricated prestressed underground continuous wall building course, mud containing clay hardening agent enters in the hollow via-hole of wall, the mud of argillaceous curing agent is full of in hollow via-hole, the present invention relates to Diaphragm Wall fields.The construction method of the diaphram wall, it can be achieved to increase the tight type connected between two neighboring diaphram wall, maintain the integral strength of the diaphragm wall, and substantially increase its antiseep effect, reduce some potential safety problems, construction is simple is realized under the basis for guaranteeing construction quality and shortens the purpose of construction period, meets actual construction needs.

Description

A kind of construction method of diaphram wall
Technical field
The present invention relates to Diaphragm Wall field, specially a kind of construction method of diaphram wall.
Background technique
Diaphram wall is that foundation engineering uses a kind of trench machine on the ground, along all side axis of deep excavation project Line excavates out a long and narrow deep trouth under the conditions of mud off, after clear slot, steel reinforcement cage is hung in slot, then uses tremie method Underwater concreting with tremie method builds up a unit groove section, so carries out paragraph by paragraph, builds up continuous reinforced concrete wall together in underground Wall, as intercept water, antiseepage, load-bearing and water-retaining structure, wall stiffness is big, when being used for excavation of foundation pit, very big soil pressure can be born, It is few that settlement of foundation or cave in accident occurs, have become essential soil-baffling structure in Deep Foundation Pit Supporting Project, is suitable for A variety of foundation conditions, diaphram wall are very wide to the scope of application of ground, from weak alluvial formation stratum hard in, closely knit Sandy gravel stratum, all grounds such as various soft rocks and hard rock can build diaphram wall, and work efficiency height, short time limit, quality can It leans on and high financial profit, with small vibration, low noise when construction is very suitable in municipal construction, land occupation is few, can make full use of building Limited ground and space within red line give full play to returns of investment, and barrier performance is good, due to wall joint form and construction party The improvement of method keeps diaphram wall almost waterproof, can be used as rigid foundation, it is anti-that diaphram wall is no longer purely by way of antiseepage Water, deep base pit enclosure wall, and pile foundation, open caisson or caisson foundation are replaced with diaphram wall more and more, it bears bigger Load, work efficiency height, short time limit, reliable in quality and high financial profit.
Joint bonding strength there are two now between diaphram wall is inadequate, and is easy to produce certain gap, thus So that the diaphragm wall is easy to appear leakage phenomenon in the subsequent use process, while resistance to compression reinforcing is ineffective, is easy to make At certain construction hidden danger, the practicability of the diaphragm wall is greatly reduced,
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides a kind of construction methods of diaphram wall, solve existing two Joint bonding strength between a diaphram wall is inadequate, and is easy to appear leakage phenomenon and resistance to compression reinforcing is ineffective The problem of.
(2) technical solution
In order to achieve the above object, the present invention is achieved by the following technical programs: a kind of construction party of diaphram wall Method, specifically includes the following steps:
S1, grooving is carried out by trench machine, after grooving, needs the mud and residue by cleaning equipment to slot bottom It is purged, is transferred prefabricated prestressed underground continuous wall component to mixed with the geosyncline of clay hardening agent by lifting appliance In, it transfers in prefabricated prestressed underground continuous wall building course, the mud containing clay hardening agent enters the hollow via-hole of wall In, it is full of the mud of argillaceous curing agent in hollow via-hole, can be used as the permanent filler in hollow via-hole after slurry curing, Next prefabricated prestressed underground continuous wall component is lifted by crane by lifting appliance again, will be inserted between two adjacent connection wall members Enter steel reinforcement cage and steel column, and pass through placing installation casting concrete wherein, is tied between concrete curing rear formation wall member It is fit;
The position of S2, the position for positioning preparation joint and connector reserved steel bar, and lift and install in two sides, binding connector is pre- Reinforcing bar is stayed, it is made to form reinforced mesh with wall reserved steel bar, the casting concrete between two preparation joints forms and is located at top Cast-in-place diaphragm wall;
S3, the assembled work for completing the prefabricated diaphragm wall in first segment slot section hang in first piece continuously in slot section first Wall unit, fixes, and then in vertical direction, hangs in second piece of diaphragm wall unit, on horizontal contact face, passes through preset hole Hole and embedded bar make two sections of diaphragm wall unit mountings, and keep the two fixed by casing;In order to guarantee the waterproof of contact surface, In It is provided with steel plate composite water-stop item at contact surface, then hangs in third block diaphragm wall unit, passes through hole, embedded bar, sealing Item completes assembled work;
S4, first concrete cushion is broken with drill bit and pore-forming is to 8m hole depth, hole depth is less than the height of steel pipe, and steel pipe is made Then 12m long hangs in steel pipe access aperture and transfers to the bottom hole i.e. position 8m, revealed section 4m is pushed using drill power head, pressure Drilling soil digging is carried out out of steel pipe using drill bit after motionless, then proceedes to push, until steel pipe is transferred to designed elevation;
S5, it completes in the first slot section after diaphram wall, in reserved capillary groove, installation expansion water-proof strip excavates the Two sections of slot sections hang in first piece of prefabricated continuous wall element in the slot section, by the yin-yang interface of diaphragm wall unit two sides, with The mounting of first piece hangs in first slot section diaphragm wall unit is in place, the anti-slurry item of expansion by the way that joint is arranged in make the two at It is integrated, then lifts subsequent prefabricated diaphragm wall, complete the assembly of diaphragm wall in the second slot section, in the same way, by It constructs fastly remaining wall element, until completing all assembled work.
Preferably, the trench machine in the S1 is using hydraulic grab machine.
Preferably, the cleaning equipment in the S1 is using chute forming machine.
Preferably, the bit diameter in the S4 is 1.5m.
Preferably, the lifting appliance in the S1 is using crane.
(3) beneficial effect
The present invention provides a kind of construction methods of diaphram wall.Have following the utility model has the advantages that the diaphram wall Construction method carries out grooving by S1, by trench machine, after grooving, needs the mud by cleaning equipment to slot bottom It is purged with residue, is transferred prefabricated prestressed underground continuous wall component to mixed with clay hardening agent by lifting appliance In geosyncline, transfer in prefabricated prestressed underground continuous wall building course, the mud containing clay hardening agent enters the hollow of wall In through-hole, it is full of the mud of argillaceous curing agent in hollow via-hole, can be used as permanently filling out in hollow via-hole after slurry curing Object is filled, then next prefabricated prestressed underground continuous wall component is lifted by crane by lifting appliance, by two adjacent connection wall members Between be inserted into steel reinforcement cage and steel column, and wall structure is formed after concrete curing by placing installation casting concrete wherein Combination between part;The position of S2, the position for positioning preparation joint and connector reserved steel bar, and lift and install in two sides, binding connects Head reserved steel bar, makes it form reinforced mesh, the casting concrete between two preparation joints with wall reserved steel bar, and formation is located at The cast-in-place diaphragm wall on top;S3, the assembled of prefabricated diaphragm wall completed in first segment slot section work, and in slot section, hang in first First piece of diaphragm wall unit, fixes, and then in vertical direction, hangs in second piece of diaphragm wall unit, on horizontal contact face, leads to Crossing preset hole and embedded bar makes two sections of diaphragm wall unit mountings, and keeps the two fixed by casing;In order to guarantee to contact The waterproof in face is provided with steel plate composite water-stop item at contact surface, then hangs in third block diaphragm wall unit, by hole, in advance Bury reinforcing bar, sealing rod completes assembled work;S4, first with drill bit by concrete cushion break and pore-forming to 8m hole depth, hole depth is less than 12m long is made in the height of steel pipe, steel pipe, then hangs in steel pipe access aperture and transfers to the bottom hole i.e. position 8m, revealed section 4m is adopted It is pushed with drill power head, drilling soil digging is carried out out of steel pipe using drill bit after pressure is motionless, then proceedes to push, until under steel pipe It puts to designed elevation;S5, it completes in the first slot section after diaphram wall, in reserved capillary groove, installation expansion water-proof strip is opened Second segment slot section is dug, first piece of prefabricated continuous wall element in the slot section is hung in, is connect by the yin-yang of diaphragm wall unit two sides Mouthful, in place with first piece in the first slot section diaphragm wall unit hung in mounting, the anti-slurry item of expansion by the way that joint is arranged in makes The two is integrally formed, and then lifts subsequent prefabricated diaphragm wall, is completed the assembly of diaphragm wall in the second slot section, is passed through identical side Formula, by remaining wall element of constructing fastly, until complete all assembled work, it can be achieved that increase two neighboring diaphram wall it Between the tight type that connects, maintain the integral strength of the diaphragm wall, and substantially increase its antiseep effect, reduce certain Security risk, construction is simple is realized under the basis for guaranteeing construction quality and shortens the purpose of construction period, is met real The construction on border needs.
Specific embodiment
The technical scheme in the embodiments of the invention will be clearly and completely described below, it is clear that described implementation Example is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is common Technical staff's every other embodiment obtained without making creative work belongs to the model that the present invention protects It encloses.
The embodiment of the present invention provides a kind of technical solution: a kind of construction method of diaphram wall is, it can be achieved that increase phase The tight type connected between adjacent two diaphram walls, maintains the integral strength of the diaphragm wall, and substantially increases the anti-of it Effect is leaked, some potential safety problems is reduced, construction is simple is realized under the basis for guaranteeing construction quality and is shortened and is applied The purpose of work duration meets actual construction needs, specifically includes the following steps:
S1, grooving is carried out by trench machine, after grooving, needs the mud and residue by cleaning equipment to slot bottom It is purged, is transferred prefabricated prestressed underground continuous wall component to mixed with the geosyncline of clay hardening agent by lifting appliance In, it transfers in prefabricated prestressed underground continuous wall building course, the mud containing clay hardening agent enters the hollow via-hole of wall In, it is full of the mud of argillaceous curing agent in hollow via-hole, can be used as the permanent filler in hollow via-hole after slurry curing, Next prefabricated prestressed underground continuous wall component is lifted by crane by lifting appliance again, will be inserted between two adjacent connection wall members Enter steel reinforcement cage and steel column, steel reinforcement cage primarily function is similarly, mainly to play tension and make with the stress of pillar longitudinal reinforcement With the compression strength of, concrete, high but tensile strength is very low, plays the role of constraint to pile concrete, makes it receiving one Fixed horizontal force, and combination between wall member is formed after concrete curing by placing installation casting concrete wherein;
The position of S2, the position for positioning preparation joint and connector reserved steel bar, and lift and install in two sides, binding connector is pre- Reinforcing bar is stayed, it is made to form reinforced mesh with wall reserved steel bar, the casting concrete between two preparation joints forms and is located at top Cast-in-place diaphragm wall;
S3, the assembled work for completing the prefabricated diaphragm wall in first segment slot section hang in first piece continuously in slot section first Wall unit, fixes, and then in vertical direction, hangs in second piece of diaphragm wall unit, on horizontal contact face, passes through preset hole Hole and embedded bar make two sections of diaphragm wall unit mountings, and keep the two fixed by casing, in order to guarantee the waterproof of contact surface, In Steel plate composite water-stop item is provided at contact surface, sealing rod is formed by the inorganic water uptake expansion material of macromolecule and compounding rubber , it is that the block coagulations such as engineering, hydraulic engineering, traffic tunnel engineering, power plant cooling tower, municipal plumbing are constructed in various hypogees Then the material of the geotechnological anti-leak-stopping of journey construction joint hangs in third block diaphragm wall unit, complete by hole, embedded bar, sealing rod It works at assembly;
S4, first concrete cushion is broken with drill bit and pore-forming is to 8m hole depth, hole depth is less than the height of steel pipe, and steel pipe is made Then 12m long hangs in steel pipe access aperture and transfers to the bottom hole i.e. position 8m, revealed section 4m is pushed using drill power head, pressure Drilling soil digging is carried out out of steel pipe using drill bit after motionless, then proceedes to push, until steel pipe is transferred to designed elevation;
S5, it completes in the first slot section after diaphram wall, in reserved capillary groove, installation expansion water-proof strip excavates the Two sections of slot sections hang in first piece of prefabricated continuous wall element in the slot section, by the yin-yang interface of diaphragm wall unit two sides, with The mounting of first piece hangs in first slot section diaphragm wall unit is in place, the anti-slurry item of expansion by the way that joint is arranged in make the two at It is integrated, then lifts subsequent prefabricated diaphragm wall, complete the assembly of diaphragm wall in the second slot section, in the same way, by It constructs fastly remaining wall element, until completing all assembled work.
In the present invention, the trench machine in S1 is using hydraulic grab machine.
In the present invention, the cleaning equipment in S1 is using chute forming machine.
In the present invention, the bit diameter in S4 is 1.5m.
In the present invention, the lifting appliance in S1 is using crane.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (5)

1. a kind of construction method of diaphram wall, it is characterised in that: specifically includes the following steps:
S1, grooving is carried out by trench machine, after grooving, needs to carry out by mud and residue of the cleaning equipment to slot bottom It removes, is transferred prefabricated prestressed underground continuous wall component to mixed in the geosyncline of clay hardening agent by lifting appliance, under It puts in prefabricated prestressed underground continuous wall building course, the mud containing clay hardening agent enters in the hollow via-hole of wall, in It is full of the mud of argillaceous curing agent in empty through-hole, can be used as the permanent filler in hollow via-hole after slurry curing, then lead to It crosses lifting appliance and lifts by crane next prefabricated prestressed underground continuous wall component, steel will be inserted between two adjacent connection wall members Muscle cage and steel column, and combination between wall member is formed after concrete curing by placing installation casting concrete wherein;
The position of S2, the position for positioning preparation joint and connector reserved steel bar, and lift and install in two sides, binding connector reserves steel Muscle, makes it form reinforced mesh with wall reserved steel bar, and the casting concrete between two preparation joints is formed superposed existing Pour diaphragm wall;
S3, the assembled of prefabricated diaphragm wall completed in first segment slot section work, and in slot section, hang in first piece of diaphragm wall list first Member fixes, and then in vertical direction, hangs in second piece of diaphragm wall unit, on horizontal contact face, by preset hole and Embedded bar makes two sections of diaphragm wall unit mountings, and keeps the two fixed by casing;In order to guarantee the waterproof of contact surface, contacting It is provided with steel plate composite water-stop item at face, then hangs in third block diaphragm wall unit, it is complete by hole, embedded bar, sealing rod It works at assembly;
S4, first concrete cushion is broken with drill bit and pore-forming is to 8m hole depth, hole depth is less than the height of steel pipe, and 12m is made in steel pipe It is long, it then hangs in steel pipe access aperture and transfers to the bottom hole i.e. position 8m, revealed section 4m is pushed using drill power head, is pressed motionless Drilling soil digging is carried out out of steel pipe using drill bit afterwards, then proceedes to push, until steel pipe is transferred to designed elevation;
S5, it completes in the first slot section after diaphram wall, in reserved capillary groove, installation expansion water-proof strip excavates second segment Slot section hangs in first piece of prefabricated continuous wall element in the slot section, by the yin-yang interface of diaphragm wall unit two sides, with first The diaphragm wall unit mounting that first piece hangs in slot section is in place, and the anti-slurry item of expansion by the way that joint is arranged in makes the two become one Body, then lifts subsequent prefabricated diaphragm wall, completes the assembly of diaphragm wall in the second slot section, in the same way, by applying fastly Remaining wall element of work, until completing all assembled work.
2. a kind of construction method of diaphram wall according to claim 1, it is characterised in that: the groover in the S1 Tool is using hydraulic grab machine.
3. a kind of construction method of diaphram wall according to claim 1, it is characterised in that: the cleaning in the S1 is set For using chute forming machine.
4. a kind of construction method of diaphram wall according to claim 1, it is characterised in that: the drill bit in the S4 is straight Diameter is 1.5m.
5. a kind of construction method of diaphram wall according to claim 1, it is characterised in that: the lifting in the S1 is set For using crane.
CN201910631737.6A 2019-07-12 2019-07-12 A kind of construction method of diaphram wall Withdrawn CN110424488A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910631737.6A CN110424488A (en) 2019-07-12 2019-07-12 A kind of construction method of diaphram wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910631737.6A CN110424488A (en) 2019-07-12 2019-07-12 A kind of construction method of diaphram wall

Publications (1)

Publication Number Publication Date
CN110424488A true CN110424488A (en) 2019-11-08

Family

ID=68409351

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910631737.6A Withdrawn CN110424488A (en) 2019-07-12 2019-07-12 A kind of construction method of diaphram wall

Country Status (1)

Country Link
CN (1) CN110424488A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115142400A (en) * 2022-08-03 2022-10-04 南京航空航天大学 Underground continuous wall groove wall stabilizing device and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101319498A (en) * 2008-07-17 2008-12-10 万勇 Lattice type prefabricated prestressed underground continuous wall and its construction method
CN108193667A (en) * 2018-01-09 2018-06-22 上海应用技术大学 A kind of water proof type spelling dress list three Room thin wall-type continuous underground wall structure of case and construction method
CN108221959A (en) * 2018-01-09 2018-06-29 上海应用技术大学 Vertical spliced diaphram wall and its construction method
CN108625356A (en) * 2018-05-07 2018-10-09 河南城建学院 A kind of prefabricated prestressed underground continuous wall and its construction method
CN108677925A (en) * 2018-07-01 2018-10-19 沈阳建筑大学 Half coercion underground continuous wall structure and its construction method
CN109723055A (en) * 2019-01-21 2019-05-07 北京建工四建工程建设有限公司 A kind of diaphram wall bottom ruggedized construction and its construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101319498A (en) * 2008-07-17 2008-12-10 万勇 Lattice type prefabricated prestressed underground continuous wall and its construction method
CN108193667A (en) * 2018-01-09 2018-06-22 上海应用技术大学 A kind of water proof type spelling dress list three Room thin wall-type continuous underground wall structure of case and construction method
CN108221959A (en) * 2018-01-09 2018-06-29 上海应用技术大学 Vertical spliced diaphram wall and its construction method
CN108625356A (en) * 2018-05-07 2018-10-09 河南城建学院 A kind of prefabricated prestressed underground continuous wall and its construction method
CN108677925A (en) * 2018-07-01 2018-10-19 沈阳建筑大学 Half coercion underground continuous wall structure and its construction method
CN109723055A (en) * 2019-01-21 2019-05-07 北京建工四建工程建设有限公司 A kind of diaphram wall bottom ruggedized construction and its construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115142400A (en) * 2022-08-03 2022-10-04 南京航空航天大学 Underground continuous wall groove wall stabilizing device and construction method
CN115142400B (en) * 2022-08-03 2023-03-28 南京航空航天大学 Underground continuous wall groove wall stabilizing device and construction method

Similar Documents

Publication Publication Date Title
CN106013052B (en) The construction method of steel sheet pile and open caisson Combined type underground garage parking
CN108677924B (en) Double-row miniature steel pipe pile grouting wall-forming partition structure and method
CN204491626U (en) The foundation pit enclosure structure that Larsen steel sheet pile and prestressed anchor combine
CN108086328A (en) A kind of dynamic sealing, assembled building enclosure and its construction method from recharge
CN103422510B (en) Steel pipe frame type cofferdam structure and construction method
CN110004991B (en) Underground structure anti-floating system based on convex wing foot plate and construction method
CN104532957B (en) Existing building sets up basement reversed construction method
CN102359112A (en) Method for bracing foundation pit by using steel box piles
CN106065628B (en) Based on the major diameter running water pipe security protection construction method faced forever with reference to theory
CN101838957A (en) Integral type T-shaped outer cantilever roads and construction method thereof
CN105040707B (en) Combine the construction method of close pile deep foundation pit support building enclosure
CN207512777U (en) Assembled underground pipe gallery
CN109610473A (en) A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration
CN205382942U (en) Multilayer underground space curtain posture subsurface excavated construction's supporting construction under existing facility
CN205669211U (en) A kind of prefabricated Gravity Retaining Wall
CN110424488A (en) A kind of construction method of diaphram wall
CN110258526A (en) The method of prefabricated diaphram wall and construct outer wall of basement and floor
KR100948060B1 (en) Constructing method for arranging river bank using steel casing retaining wall
CN103866787A (en) Process for constructing impervious concrete wall by using open excavation and inverted construction method
CN210507517U (en) Combined member suitable for retaining wall heightening
CN210315908U (en) Immersed tube type inspection well
CN210636441U (en) Guide partition wall
CN209687506U (en) Wear river shallow buried covered excavation electric power tunnel constructing structure
CN209620049U (en) A kind of pin-connected panel anchor bolt frame girder construction
CN106498951A (en) A kind of shaft excavation construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20191108