CN107532271A - The manufacture device and manufacture method of hot-dip metal plated steel band - Google Patents

The manufacture device and manufacture method of hot-dip metal plated steel band Download PDF

Info

Publication number
CN107532271A
CN107532271A CN201680022555.3A CN201680022555A CN107532271A CN 107532271 A CN107532271 A CN 107532271A CN 201680022555 A CN201680022555 A CN 201680022555A CN 107532271 A CN107532271 A CN 107532271A
Authority
CN
China
Prior art keywords
steel band
gas
temperature
hot
metal plated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201680022555.3A
Other languages
Chinese (zh)
Other versions
CN107532271B (en
Inventor
寺崎优
高桥秀行
三宅胜
小山琢实
安福悠祐
稻叶淳史
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
JFE Engineering Corp
Original Assignee
NKK Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NKK Corp filed Critical NKK Corp
Publication of CN107532271A publication Critical patent/CN107532271A/en
Application granted granted Critical
Publication of CN107532271B publication Critical patent/CN107532271B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/003Apparatus
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/14Removing excess of molten coatings; Controlling or regulating the coating thickness
    • C23C2/16Removing excess of molten coatings; Controlling or regulating the coating thickness using fluids under pressure, e.g. air knives
    • C23C2/18Removing excess of molten coatings from elongated material
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/14Removing excess of molten coatings; Controlling or regulating the coating thickness
    • C23C2/16Removing excess of molten coatings; Controlling or regulating the coating thickness using fluids under pressure, e.g. air knives
    • C23C2/18Removing excess of molten coatings from elongated material
    • C23C2/20Strips; Plates
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/34Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor characterised by the shape of the material to be treated
    • C23C2/36Elongated material
    • C23C2/40Plates; Strips
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/50Controlling or regulating the coating processes
    • C23C2/51Computer-controlled implementation
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/50Controlling or regulating the coating processes
    • C23C2/52Controlling or regulating the coating processes with means for measuring or sensing

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Materials Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Computer Hardware Design (AREA)
  • Coating With Molten Metal (AREA)

Abstract

The present invention provides the generation that can also suppress the coating surface defect caused by splash, top layer scum silica frost in the case that various changes occur for operating condition so as to stably manufacture the manufacture device of the hot-dip metal plated steel band of the hot-dip metal plated steel band of high-quality.The manufacture device (100) of the hot-dip metal plated steel band of the present invention is characterised by having:A pair of the gas wiping nozzles (20A) being adjusted to the coating adhesion amount on the two sides of steel band (P), (20B), gas supply mechanism (22), gas temperature adjustment mechanism (24), configure the baffle plate (26) in the steel band elongated surfaces near the width end of steel band (P), it is arranged on its temperature sensor (28) at least on one side and the control unit of gas temperature adjustment mechanism (24) (30) is controlled based on the output of the temperature sensor (28).

Description

The manufacture device and manufacture method of hot-dip metal plated steel band
Technical field
The present invention relates to the manufacture device of hot-dip metal plated steel band and manufacture method, more particularly to the coating to steel strip surface The airblast that adhesion amount is adjusted.
Background technology
In continuously dip coat Metal Production line, as shown in figure 4, the steel band after being annealed in the continuous annealing furnace of reducing atmosphere P is out of stove nose 10 by being continuously directed into the bath of molten metal 14 in coating bath 12.Then, by steel band P via melting Sinking roller 16, the top of backing roll 18 to bath of molten metal 14 in metal bath 14 are mentioned, using gas wiping nozzle 20A, 20B is adjusted to predetermined thickness of coating, cooling, is directed to subsequent handling.Gas wiping nozzle 20A, 20B are on coating bath 12 Side clips steel band P to being configured to ground, from its jet to steel band P two sides blowing gas.By the airblast, unnecessary is molten Melt metal to be scraped, be adjusted the coating adhesion amount of steel strip surface, and the molten metal for being attached to steel strip surface is existed Become uniform on plate width direction and plate length direction.Gas wiping nozzle 20A, 20B are corresponding with diversified width of steel band, And the position skew of width when lifting with steel band etc. is corresponding, and therefore, typically comprising must be longer than width of steel band, extension To the outside of the width end of steel band.
In such airblast mode, there are the following problems:Produce the disorder of the gas jet because being collided with steel band And falling molten metal and to below steel band, the so-called splash that disperses, it is attached to steel strip surface and causes plating steel The decline of the surface quality of band.Pressure of the raising from gas wiping nozzle injection to the gas of steel strip surface is (hreinafter referred to as " gas pressure ") when, the splash produce the problem of it is more notable.In addition, there is a problem in that:The splash to disperse is fallen Into coating bath, top layer scum silica frost (top dross) is formed, thus, causes the decline of the surface quality of coated steel strip, and need to make Industry personnel remove top layer scum silica frost.
In the continuously manufacturing of steel band, in order that output increases, steel band plate speed (linear velocity) can be increased. But in the case of being adjusted in continuously dip coat technique using airblast mode to coating adhesion amount, if increase line Speed, then cause the firm adhesion amount increase at initial stage by after plating bath of steel band because of the viscosity of molten metal.Therefore, for general Coating adhesion amount is adjusted to, it is necessary to which gas pressure to be set as to higher pressure, thus, splash significantly increases in certain limit Add.
In addition, in the case where intending to reduce coating adhesion amount, it is also effective, but such case to improve gas pressure Under, splash is also significantly increased.
In order to solve the problems, such as above-mentioned generation splash, it is proposed that make the gas from gas wiping nozzle injection to steel strip surface Body high temperature is so as to improving the technology of wiping ability.A kind of manufacture method of hot-dip metal plated steel band has been recorded in patent document 1, Wherein, using by main burner and the airblast formed in its a pair of auxiliary jet setting up and down, the gas that will be sprayed from auxiliary jet The temperature of body is set as the temperature of high more than 50 DEG C of the temperature of less than 500 DEG C and the gas than being sprayed from main burner.In patent A kind of hot-dip coating attachment amount control method has been recorded in document 2, wherein, the burning comprising the inside by wiping nozzle is produced Burning gases exit of the gas to make wiping nozzle gas temperature be more than 300 DEG C in a manner of be blown.
Prior art literature
Patent document
Patent document 1:Japanese Unexamined Patent Publication 2009-203500 publications
Patent document 2:Japanese Unexamined Patent Publication 2009-263698 publications
The content of the invention
Invent problem to be solved
If improving wiping ability using the technology of patent document 1,2, gas pressure need not be correspondingly improved, therefore, It can help to the reduction of splash.But it is the gas temperature to the exit of gas wiping nozzle in patent document 1,2 Degree Ty provided, present inventors have recognized that it is in this case caused as described below the problem of.That is, sprayed from gas wiping nozzle The gas gone out mixes with the air of surrounding and temperature gradually reduces.Therefore, in the remote feelings of the distance of gas wiping nozzle and steel band Under condition, the gas temperature T at the steel band point of impingement (stationary point (shallow lake body point)) place is reduced to close to normal temperature, by being heated and band to gas The effect come disappears.In addition, the temperature reductions of gas depend not only upon nozzle-steel spacing interval between shelterbelt, also rely on gas pressure, The conditions such as nozzle angle, these operating conditions change sometimes according to product.Therefore, even if gas by nozzle exit Temperature Ty is set as predetermined temperature, and the gas temperature at stationary point is different also according to operating condition, as a result, splash Yield and top layer scum silica frost yield are also different.In addition, even if the gas temperature Ty of nozzle exit is set as into predetermined temperature, Accurately predict that the gas temperature T at stationary point is also extremely difficult.
Therefore, in view of the above problems, it is an object of the invention to provide the situation that various changes occur even in operating condition Under can also suppress the coating surface defect caused by splash, top layer scum silica frost generation so as to stably manufacture high-quality heat The manufacture device and manufacture method of the hot-dip metal plated steel band of metal coated steel strip.
For solving the method for problem
Manufacture device and manufacture in the hot-dip metal plated steel band for the adjustment that coating adhesion amount is carried out using gas wiping nozzle In method, in order to solve the above problems, inventors believe that needing accurately to predict the gas temperature T at stationary point and being managed Reason is within the preferred predetermined temperature range.Therefore, it is contemplated that configured in the steel band elongated surfaces near the width end of steel band Baffle plate, temperature sensor is configured thereon.Temperature T ' using the temperature sensor measurement on the baffle plate and the gas at stationary point Temperature T is substantially equal, and the gas temperature T at stationary point is accurately predicted therefore, it is possible to live (in-situ).And it was found that Based on measurement temperature T ', to the temperature (that is, the gas temperature determined after just being come out from gas-heating apparatus) of the gas of injection Feedback control is carried out so as to which the gas temperature T (being the temperature T ' using temperature sensor measurement for strict) at stationary point be managed Within the preferred predetermined temperature range, thus, it is possible to solve the above problems.
The present invention is completed by above-mentioned opinion, and its purport forms as described below.
(1) a kind of manufacture device of hot-dip metal plated steel band, it is characterised in that have:
Clip from the steel band that bath of molten metal is continuously mentioned to being configured to ground, from outlet to above-mentioned steel band blowing gas And to a pair of gas wiping nozzles that the coating adhesion amount on the two sides of above-mentioned steel band is adjusted;
Above-mentioned gas are wiped with the feed mechanism of nozzle supply above-mentioned gas;
The gas temperature that the temperature of the gas supplied from above-mentioned feed mechanism to above-mentioned gas wiping nozzle can be changed is adjusted Complete machine structure;
Configuration avoids wiping from above-mentioned a pair of gas in the steel band elongated surfaces near the width end of above-mentioned steel band Wipe the baffle plate of the collision between the gas of nozzle injection;
It is arranged on the temperature sensor at least on one side of above-mentioned baffle plate;With
Exporting to control the control unit of above-mentioned gas temperature adjusting mechanism based on said temperature sensor.
(2) manufacture device of the hot-dip metal plated steel band described in (1) as described above, wherein, above-mentioned control unit is utilizing above-mentioned temperature Control above-mentioned gas temperature adjusting mechanism in the case of the temperature departure preset range set in advance of degree sensor measure and change Become supply to above-mentioned gas wiping nozzle gas temperature, make using said temperature sensor measure temperature fall into it is above-mentioned pre- Determine in scope.
(3) manufacture device of the hot-dip metal plated steel band described in (1) or (2) as described above, wherein, above-mentioned baffle plate and above-mentioned steel band Width end beeline for 1mm less than 10mm.
(4) manufacture device of the hot-dip metal plated steel band any one of (1)~(3) as described above, wherein, have make it is above-mentioned Movable agency of the baffle plate apart from the alterable height in the bath face of above-mentioned bath of molten metal.
(5) manufacture device of the hot-dip metal plated steel band any one of (1)~(4) as described above, wherein, above-mentioned baffle plate by Thermal conductivity is 1Wm-1·K-1Following material is formed.
(6) manufacture device of the hot-dip metal plated steel band any one of (1)~(5) as described above, wherein, in above-mentioned baffle plate Heat-insulating material is configured between said temperature sensor.
(7) a kind of manufacture method of hot-dip metal plated steel band, it uses the hot dip gold any one of above-mentioned (1)~(6) Belonging to the manufacture device of steel band, the manufacture method is characterised by,
Supply is controlled to the temperature of the gas of above-mentioned gas wiping nozzle in the output based on said temperature sensor Meanwhile above-mentioned gas are blown to the steel band continuously mentioned from above-mentioned bath of molten metal from above-mentioned a pair of gas wiping nozzles, The coating adhesion amount on the two sides of above-mentioned steel band is adjusted.
Invention effect
Even in operating condition various changes occur for the manufacture device and manufacture method of the hot-dip metal plated steel band of the present invention In the case of can also suppress the generation of the coating surface defect caused by splash, top layer scum silica frost so as to stably manufacture high-quality Hot-dip metal plated steel band.
Brief description of the drawings
Fig. 1 is the composition for the manufacture device 100 for representing the hot-dip metal plated steel band based on an embodiment of the invention Schematic diagram.
Fig. 2 is the solid for representing the composition near in the manufacture device 100 shown in Fig. 1, steel band P width end Figure.
Fig. 3 is the amplification of in the manufacture device 100 shown in Fig. 1, gas wiping nozzle 20A leading section and baffle plate 26 Figure.
Fig. 4 is the schematic diagram of the composition for the manufacture device for representing existing hot-dip metal plated steel band.
Fig. 5 is the figure for representing splash generation rate and its standard deviation in comparative example and example.
Fig. 6 is the figure for representing top layer scum silica frost yield and its standard deviation in comparative example and example.
Embodiment
With reference to figure 1~3, to the manufacture device 100 of the hot-dip metal plated steel band based on an embodiment of the invention (with Under, also referred to as " manufacture device ") and manufacture method illustrate.
With reference to figure 1, the manufacture device 100 of present embodiment has stove nose 10, coating bath 12, sinking roller 16 and backing roll 18. Stove nose 10 is the component of rectangular cross-section divided to the steel band P spaces passed through, vertical with steel band direct of travel, its Front end is impregnated in the bath of molten metal 14 formed in coating bath 12.In one embodiment, in the continuous annealing of reducing atmosphere Steel band P after being annealed in stove is out of stove nose 10 by being continuously directed into the bath of molten metal 14 in coating bath 12.Then, Steel band P is mentioned via the sinking roller 16 in bath of molten metal 14, the top of backing roll 18 to bath of molten metal 14, utilizes one Gas wiping nozzle 20A, 20B are adjusted to predetermined thickness of coating, cools down, is directed to subsequent handling.
A pair of gas wiping nozzle 20A, 20B (hereinafter also referred to as " nozzle ") clipped above coating bath 12 steel band P to Ground configures.With reference to figure 3, nozzle 20A exports (jet 34) to steel band P blowing gas from it, attached to the coating on the surface of steel band The amount of wearing is adjusted.Another nozzle 20B is also same, using such a pair of nozzles 20A, 20B, by unnecessary molten metal Wipe off, be adjusted the coating adhesion amount on steel band P two sides, and become uniform on plate width direction and plate length direction.
As shown in Fig. 2 nozzle 20A, 20B are corresponding with diversified width of steel band, and width when lifting with steel band The position skew in degree direction etc. is corresponding, and therefore, typically comprising must be longer than width of steel band, extends to the width end of steel band Outside.In addition, as shown in figure 3, nozzle 20A has top nozzle component 32A and lower nozzle arrangement 32B, such nozzle up and down The jet 34 (nozzle slot) of gas is formed between component 32A, 32B front end.Jet 34 prolongs on the plate width direction of steel band Stretch presence.Nozzle 20A vertical sectional shape turns into the conical by its shape to attenuate towards front end.Before upper and lower nozzle arrangement 32A, 32B The thickness of end can be set as about 1mm~about 3mm.In addition, the A/F (slit separation) of jet is not particularly limited, It can be set as about 0.5mm~about 2.5mm.From gas supply mechanism 22 described later supply gas from upper and lower nozzle arrangement 32A, The gas flow path that 32B is divided from jet 34 by spraying, the surface of injection to steel band P.Another nozzle 20B also has Same composition.
Then, gas supply mechanism 22 and gas temperature adjustment mechanism 24 are illustrated.Gas supply mechanism 22 is to spray Mouth 20A, 20B supply gas.Gas temperature adjustment mechanism 24 has to change to be supplied to nozzle 20A, 20B from feed mechanism 22 Gas temperature function.In one embodiment, gas supply mechanism 22 has the pipe arrangement that gas passed through of normal temperature There is heat exchanger with by the air blower of the gas pressurized to predetermined pressure, gas temperature adjustment mechanism 24.In this case, will Gas after being pressurizeed using air blower is heated to predetermined temperature using heat exchanger, supplies to nozzle 20A, 20B.
As long as the supply of gas and the adjustment of gas temperature can change gas temperature without delay, then it is not limited to State example.For example, can be the method for being mixed the burning waste gas of annealing furnace with air.In this case, by air profit Predetermined pressure is forced into air blower, then, the air is mixed with burning waste gas and makes mixed gas, by the mixed gas Supply to nozzle 20A, 20B.The adjustment of gas temperature is carried out by making the blending ratio of burning waste gas change.That is, exist In the case of raising gas temperature, increase the ratio of burning waste gas.In this case, gas supply mechanism 22 has normal temperature The pipe arrangement and the air blower by the air pressurized to predetermined pressure that air passed through, gas temperature adjustment mechanism 24 have make burning The mechanism that the blending ratio of waste gas and air changes.
With reference to figure 2, in the present embodiment, gear is configured in the steel band elongated surfaces near steel band P width end Plate 26.The baffle plate 26 is configured between a pair of nozzles 20A, 20B, is avoided between the gas of a pair of nozzles 20A, 20B injection Collision, thus, contributes to the reduction of splash.In Fig. 2, it is illustrated that configuration is near steel band P width one side end Baffle plate 26, but in the present embodiment, baffle plate is each configured near the end of the both sides in width of steel band direction, from avoiding gas From the viewpoint of the collision of body, preferred which.
The shape of baffle plate 26 is not particularly limited, preferred rectangle as shown in Figure 2, preferably wherein two sides and steel band P width The bearing of trend of degree direction end abreast configures.On the thickness of slab of baffle plate 26, baffle plate is set to shake from preventing gas from colliding It is dynamic etc. to ensure suitably to determine from the viewpoint of rigidity, for example, it can be set to in the range of 4~10mm.
Baffle plate 26 is set to prevent performance from more improving closer to steel band P, splash.From this viewpoint, baffle plate 26 and steel band P The beeline D1 of width end, which greatly influences splash, prevents performance, is preferably set to 1mm less than 10mm. When D1 is more than 10mm, the beginning of dispersing of splash is drastically obvious.When D1 is less than 1mm, the possibility that baffle plate contacts with steel band be present Property.In addition, baffle plate 26 extends upwardly to the outside of nozzle 20A, 20B end in width of steel band side.
With reference to figure 1 and Fig. 2, in the present embodiment, temperature sensor 28A, 28B are provided with the two sides of baffle plate 26. In addition, it is also equipped with temperature sensor on the two sides of another baffle plate (not shown).The form of temperature sensor is not special Limit, such as the contact tehermometers such as thermocouple can be used.Using each temperature sensor, injection can be continuously determined to respectively The temperature T ' of the gas of temperature sensor.Measurement temperature T ' is substantially equal with the gas temperature T at stationary point, therefore, it is possible to Live (in-situ) accurately predicts the gas temperature T at stationary point.Each temperature sensor is by gas obtained from METHOD FOR CONTINUOUS DETERMINATION Temperature T ' information is exported to control unit 30.
Control unit 30 receives the input of the information of the gas temperature T ' from the output of each temperature sensor, and gas temperature is adjusted Mechanism 24 is controlled.Namely based on measurement temperature T ', feedback control is carried out to the temperature of the gas of injection, so as to by stationary point Gas temperature T (for strict for utilize the temperature T ' of temperature sensor measurement) management is within the preferred predetermined temperature range. The form of control unit 30 is not particularly limited, such as can be by the central operation processing unit (CPU) of computer-internal come real It is existing.
Specifically, control unit 30 based on from temperature sensor transmission come measurement temperature T ' information, in the following manner Gas temperature adjustment mechanism 24 is controlled, feedback control is carried out so as to the temperature of the gas to injection.
First, in control, using 4 measurement temperatures come from the transmission of 4 temperature sensors altogether it is average (for example, Arithmetic average) it is used as measurement temperature T '.
In the present embodiment, from the viewpoint of splash and top layer scum silica frost is suppressed, it is important that by the gas at stationary point Temperature T (that is, measurement temperature T ') is managed within the scope of preferred temperature.Preferable temperature range is set as bath of molten metal Fusing point ± 100 DEG C.In the case where manufacturing hot-galvanized steel band, gas temperature T (that is, measurement temperature the T ') management at stationary point is existed The scope of scope, i.e. 320 DEG C~520 DEG C of 420 DEG C ± 100 DEG C of the fusing point of zinc.
Therefore, the first case as control, the control that can be listed below:In order that measurement temperature T ' is all the time close to above-mentioned Predetermined temperature (such as median) in preferred range, make gas temperature in the case where measurement temperature T ' is less than median Degree uprises, and does not change gas temperature in the case where measurement temperature T ' is median, is higher than the feelings of median in measurement temperature T ' Make gas temperature step-down under condition.
In addition, the second case as control, the control that can be listed below:Above-mentioned preferable temperature is fallen into measurement temperature T ' In the range of when without gas temperature change, only in the case where deviateing predetermined temperature range carry out gas temperature change. Specifically, in the case where measurement temperature T ' is less than the lower limit of preferred range, uprise gas temperature, in measure temperature In the case of spending the upper limit that T ' exceedes preferred range, make gas temperature step-down.In this way, make to utilize temperature sensor measurement Temperature is fallen into above-mentioned preferred range.
The interval for carrying out feedback control is not particularly limited.For example, it can continuously be passed all the time using temperature in operation Sensor determines gas temperature, all the time by the information transmission of its measurement temperature to control unit, carries out feedback control all the time.In addition, The measure of gas temperature can be intermittently carried out, by the information transmission of its measurement temperature to control unit, intermittently carries out feedback control System.From more accurately manage stationary point at gas temperature T from the viewpoint of, preferably the former.
As described above as middle detailed description, supplied based on the output of temperature sensor to control to gas wiping nozzle Gas temperature (that is, just from gas-heating apparatus come out after the gas temperature that determines) while, from a pair of nozzles 20A, 20B To the steel band P blowing gas continuously mentioned from bath of molten metal 14, the coating adhesion amount on steel band P two sides is adjusted It is whole.Thereby, it is possible to accurately predict the gas temperature T at stationary point, it can be maintained all the time, managed in preferable pre- constant temperature In the range of degree.Therefore, it is possible to suppress the generation of the coating surface defect caused by splash, top layer scum silica frost, so as to stably make The hot-dip metal plated steel band of high-quality is made, the effect is also same in the case that various changes occur for operating condition.
It should be noted that in the above-described embodiment, show and amount to 4 on the two sides of two baffle plates using configuration The example of individual temperature sensor, but the quantity of temperature sensor can be 1,2, any of 3.In addition, in baffle plate In the case of for 1,1 temperature sensor can be set in its one side, each 1 can also be set on its two sides, amounts to 2 temperature Spend sensor.Using in the case of multiple temperature sensors, using each temperature sensor measurement temperature it is average (for example, Arithmetic average) it is used as measurement temperature T '.
The manufacture device 100 of present embodiment preferably have so that the vertical direction position of baffle plate 26 follow nozzle 20A, The mode that 20B is highly moved up and down makes baffle plate 26 apart from the movable agency of the alterable height in the bath face of bath of molten metal.Thus, Even if changing the height of nozzle, also gas temperature can be measured to steel band P maximum crash pressure using gas all the time, because This, can accurately control the temperature of the gas of injection.Specifically, baffle plate 26 be fixed on wipe nozzle support (do not scheme Show).As movable agency, air compressor machine can be used as one.
Additionally, it is preferred that the edge sensor measured in the distance D1 of the installation pair of the top of baffle plate and steel band.Utilizing Edge sensor makes baffle plate be moved up in width of steel band side while being measured to the distance untill steel band, thus, with Reaching target interval D1 mode positions baffle plate 26.
In the present embodiment, heat-insulating material is configured preferably between baffle plate 26 and temperature sensor 28A, 28B (not scheme Show).This is can not to determine gas temperature exactly to prevent heat to be transferred to temperature sensor from baffle plate.Heat-insulating material Species can enumerate mineral wool, cellulose fibre, but be not particularly limited to this.
In addition, replacing configuration heat-insulating material or on the basis of heat-insulating material, the material for making baffle plate 26 is low heat conductivity Material also there is same effect.From this viewpoint, baffle plate is 1Wm preferably by thermal conductivity-1·K-1Following material structure Into.For example, the material of low heat conductivity can enumerate the ceramics such as aluminum oxide, carborundum, but it is not particularly limited to this.
With reference to figure 3, the distance D2 of spray nozzle front end and steel strip surface is preferably set to 3~40mm scope.D2 is more than 3mm When, the spray nozzle clogging caused by splash is not likely to produce, when being below 40mm, the gas for realizing target adhesion amount can be reduced Body pressure, as a result, the heating amount of gas can be cut down.
With reference to figure 3, the center of the jet 34 of nozzle is preferred with the distance H of the central vertical direction of temperature sensor 28 It is set as 0~5mm scope.When H is below 5mm, injection can be more accurately determined to the temperature of the gas of temperature sensor T’。
The hot-dip metal plated steel band manufactured as the manufacture device by the present invention and manufacture method, can enumerate hot-galvanized steel Plate, this includes being not carried out the coated steel sheet (GI) of Alloying Treatment and the coated steel sheet of implementation Alloying Treatment after galvanizing is handled Any of (GA).
Embodiment
In the production line of hot-galvanized steel band, the manufacture experiment of hot-galvanized steel band is carried out.In example 1~5, figure is used Manufacture device shown in 1~Fig. 3, in a comparative example, use the manufacture device shown in Fig. 4.Gas wiping nozzle is used between slit It is divided into 1.2mm nozzle.Gas injection direction setting is at a right angle with steel strip surface, the nozzle height in face will be bathed apart from galvanizing It is set as the various height of 250~400mm scope, the distance D2 of spray nozzle front end and steel strip surface is set as 0~25mm's The various distances of scope, by various speed of thickness of slab 0.8mm × wide 1000mm of the plate steel band using linear velocity as 120~180m/ minutes Degree carries out logical plate, and gas pressure is set as to the various pressure of 50~100kPa scope, entered in the case where adding up to 10 kinds of operating conditions Row experiment.Under any operating condition, so that coating adhesion amount reaches about 50g/m2The mode of steady state value set linear speed Degree, gas pressure and distance D2.
The gas of normal temperature is utilized heat exchanger by the adjustment of method for supplying gas and gas temperature to nozzle using supply The method for being heated to predetermined temperature and the gas after predetermined pressure being forced into using air blower.
In a comparative example, do not possess baffle plate, possess temperature sensor in jet expansion, nozzle outlet temperature Ty is maintained Mode in the range of 320~520 DEG C is controlled to implement to test.
In example 1~5, each 1 is configured near the end of the both sides in width of steel band direction, amounts to 2 baffle plates. Central part on its two sides is configured with each 1, amounts to 4 temperature sensors (sheath K thermocouples).The size of baffle plate is set as height Spend (steel band direct of travel size) 50mm, width (width of steel band direction size) 200mm, thickness 5mm.The width of baffle plate and steel band The distance D1 of direction end is set as 10mm in example 1, is set as 5mm in example 2~5.Based on by TEMP The measurement temperature that device obtains, the gas temperature T at stationary point is predicted, feedback control is carried out to the temperature of the gas of injection.It is specific and Speech, measurement temperature T ' is used as using the arithmetic average from 4 measurement temperatures that 4 temperature sensor transmission come altogether.Also, survey Constant temperature degree T ' fall into 320~520 DEG C in the range of when do not change gas temperature, measurement temperature T ' be less than 320 DEG C in the case of Gas temperature is uprised, makes gas temperature step-down in the case where measurement temperature T ' is more than 520 DEG C.Continuously carried out in operation Above-mentioned control.
In example 1,2, it is SUS304 systems (thermal conductivity 17Wm to make baffle plate-1·K-1).In example 3, Mineral wool is configured with as heat-insulating material between SUS304 baffle plate and temperature sensor.In example 4, make baffle plate for heat Low oxidation aluminum (the thermal conductivity 0.20Wm of conductance-1·K-1), mineral wool work is configured between the baffle plate and temperature sensor For heat-insulating material.In example 5, baffle plate is set to match somebody with somebody for the low oxidation aluminum of thermal conductivity between the baffle plate and temperature sensor Mineral wool is equipped with as heat-insulating material, further using the movable agency for the alterable height for making baffle plate distance bath face.
In each example and comparative example, splash generation rate and top layer scum silica frost yield are evaluated.Splashing produce Raw rate is set as that the steel band length for being determined to have splash defect in inspection operation passes through relative under each manufacturing condition Steel band length ratio, including unquestioned slight splash defect in practical.Top layer scum silica frost yield is by 1 The top layer scum silica frost in bath face is floated on during hour logical plate to be picked up with handle spoon and weight obtained from being measured.In addition, on experiment When hot dip zinc bath temperature, implement at 460 DEG C.
Splash generation rate under the conditions of will be each is shown in Figure 5.In Fig. 5, by under 10 kinds of operating conditions in comparative example Being averaged for splash generation rate is set as 100, by being averaged for the splash generation rate under 10 kinds of operating conditions in each example It is standardized to represent.In addition, it is also shown that the standard deviation of the splash generation rate in comparative example and each example.In addition, Top layer scum silica frost yield and standard deviation under the conditions of will be each is shown in Figure 6.
Compared with comparative example, splash generation rate reduces example 1.In addition, standard deviation is also reduced to from 0.26 0.088, splash generation rate can be stably reduced under various operating conditions.In addition, top layer scum silica frost yield is similarly, with Comparative example is compared, and example 1 reduces.
For example 2 compared with example 1, splash generation rate and its standard deviation and top layer scum silica frost yield are further Reduce.It is thought that because shortening distance D1 compared with example 1, therefore, splash prevents effect from further improving.
Example 3,4 can further reduce splash yield and its standard deviation and top layer compared with example 1 Scum silica frost yield.It is thought that because injection can accurately be determined to the temperature T ' of the gas of temperature sensor.
In example 5, compared with example 3,4, can further reduce splash yield and its standard deviation and Top layer scum silica frost yield.It is thought that because,, can by moving up and down baffle plate on the basis of the effect of heat-insulating material Accurately temperature T ' of the measure injection to the gas of temperature sensor.
Industrial applicability
The manufacture device and manufacture method of the hot-dip metal plated steel band of the present invention, various changes occur even in operating condition In the case of, it can also suppress the generation of the coating surface defect caused by splash, top layer scum silica frost, so as to stably manufacture Gao Pin The hot-dip metal plated steel band of matter.
Symbol description
The manufacture device of 100 hot-dip metal plated steel bands
10 stove noses
12 coating baths
14 bath of molten metal
16 sinking rollers
18 backing rolls
20A, 20B gas wiping nozzle
22 gas supply mechanisms
24 gas temperature adjustment mechanisms
26 baffle plates
28A, 28B temperature sensor
30 control units
32A top nozzle components
Nozzle arrangement under 32B
34 jets (outlet)
P steel bands

Claims (7)

1. a kind of manufacture device of hot-dip metal plated steel band, it is characterised in that have:
Clip from the steel band that bath of molten metal is continuously mentioned to being configured to ground, it is right from outlet to the steel band blowing gas A pair of gas wiping nozzles that the coating adhesion amount on the two sides of the steel band is adjusted;
The feed mechanism of the gas is supplied to the gas wiping nozzle;
The gas temperature adjustment machine of the temperature of the gas supplied from the feed mechanism to the gas wiping nozzle can be changed Structure;
Configuration avoids spraying from the pair of airblast in the steel band elongated surfaces near the width end of the steel band The baffle plate of collision between the gas of mouth injection;
It is arranged on the temperature sensor at least on one side of the baffle plate;With
Exporting to control the control unit of the gas temperature adjustment mechanism based on the temperature sensor.
2. the manufacture device of hot-dip metal plated steel band as claimed in claim 1, wherein, the control unit is passed using the temperature Control the gas temperature adjustment mechanism in the case of the temperature departure preset range set in advance of sensor measure and change confession To the temperature of the gas to the gas wiping nozzle, make to fall into the predetermined model using the temperature of the temperature sensor measurement In enclosing.
3. the manufacture device of hot-dip metal plated steel band as claimed in claim 1 or 2, wherein, the width of the baffle plate and the steel band The beeline for spending direction end is 1mm less than 10mm.
4. such as manufacture device of hot-dip metal plated steel band according to any one of claims 1 to 3, wherein, having makes the baffle plate Apart from the movable agency of the alterable height in the bath face of the bath of molten metal.
5. such as manufacture device of hot-dip metal plated steel band according to any one of claims 1 to 4, wherein, the baffle plate is by thermal conductivity Rate is 1Wm-1·K-1Following material is formed.
6. such as manufacture device of hot-dip metal plated steel band according to any one of claims 1 to 5, wherein, in the baffle plate and institute State and be configured with heat-insulating material between temperature sensor.
7. a kind of manufacture method of hot-dip metal plated steel band, the hot-dip metal plated steel band any one of its usage right requirement 1~6 Manufacture device, the manufacture method is characterised by,
While the output based on the temperature sensor is supplied to the temperature of the gas of the gas wiping nozzle to control, The gas is blown to the steel band continuously mentioned from the bath of molten metal from the pair of gas wiping nozzle, to described The coating adhesion amount on the two sides of steel band is adjusted.
CN201680022555.3A 2015-04-20 2016-04-13 Apparatus and method for manufacturing hot-dip metal coated steel strip Active CN107532271B (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2015086079A JP6044669B2 (en) 2015-04-20 2015-04-20 Manufacturing apparatus and manufacturing method for molten metal plated steel strip
JP2015-086079 2015-04-20
PCT/JP2016/002007 WO2016170757A1 (en) 2015-04-20 2016-04-13 Production apparatus and production method for molten metal plated steel strip

Publications (2)

Publication Number Publication Date
CN107532271A true CN107532271A (en) 2018-01-02
CN107532271B CN107532271B (en) 2020-09-22

Family

ID=57143788

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201680022555.3A Active CN107532271B (en) 2015-04-20 2016-04-13 Apparatus and method for manufacturing hot-dip metal coated steel strip

Country Status (6)

Country Link
EP (1) EP3287541B1 (en)
JP (1) JP6044669B2 (en)
CN (1) CN107532271B (en)
AU (1) AU2016252193B2 (en)
MX (1) MX2017013462A (en)
WO (1) WO2016170757A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109777979A (en) * 2019-02-19 2019-05-21 中南大学 A method of regulation ultra-wide aluminum alloy plate materials cross section structural homogenity

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6697418B2 (en) * 2017-05-31 2020-05-20 Jfeスチール株式会社 High temperature gas wiping device
KR102471806B1 (en) * 2018-08-22 2022-11-28 제이에프이 스틸 가부시키가이샤 Manufacturing method of hot-dip metal plating steel strip and continuous hot-dip metal plating equipment
MX2021002036A (en) * 2018-08-22 2021-04-28 Jfe Steel Corp Method for manufacturing hot-dip metal plated steel strip, and continuous hot-dip metal plating facility.
CN112481573B (en) * 2020-12-18 2023-02-17 江阴市华达机械科技有限公司 Air knife edge baffle plate assembly

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06116698A (en) * 1992-10-06 1994-04-26 Sumitomo Metal Ind Ltd Continuous hot-dip metal plating device of steel sheet
JPH06172955A (en) * 1992-12-01 1994-06-21 Sumitomo Metal Ind Ltd Plating thickness control device and method for hot-dip coated metallic sheet
JPH09195023A (en) * 1996-01-11 1997-07-29 Sumitomo Metal Ind Ltd Gap variable type gas wiping nozzle device
JP2005256050A (en) * 2004-03-10 2005-09-22 Nisshin Steel Co Ltd Method and apparatus for adjusting surface appearance of hot-dipped steel sheet
CN101443471A (en) * 2006-05-12 2009-05-27 杰富意钢铁株式会社 Method for manufacturing molten-metal plated steel band
CN101796209A (en) * 2007-09-05 2010-08-04 杰富意钢铁株式会社 Apparatus for manufacturing hot-dip metal plated steel band
CN101821420A (en) * 2007-10-09 2010-09-01 杰富意钢铁株式会社 Apparatus for producing molten metal plated steel strip and process for producing molten metal plated steel strip
CN102985580A (en) * 2010-07-13 2013-03-20 钢铁普蓝特克股份有限公司 Baffle plate unit and gas wiping device using same

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06116698A (en) * 1992-10-06 1994-04-26 Sumitomo Metal Ind Ltd Continuous hot-dip metal plating device of steel sheet
JPH06172955A (en) * 1992-12-01 1994-06-21 Sumitomo Metal Ind Ltd Plating thickness control device and method for hot-dip coated metallic sheet
JPH09195023A (en) * 1996-01-11 1997-07-29 Sumitomo Metal Ind Ltd Gap variable type gas wiping nozzle device
JP2005256050A (en) * 2004-03-10 2005-09-22 Nisshin Steel Co Ltd Method and apparatus for adjusting surface appearance of hot-dipped steel sheet
CN101443471A (en) * 2006-05-12 2009-05-27 杰富意钢铁株式会社 Method for manufacturing molten-metal plated steel band
CN101796209A (en) * 2007-09-05 2010-08-04 杰富意钢铁株式会社 Apparatus for manufacturing hot-dip metal plated steel band
CN101821420A (en) * 2007-10-09 2010-09-01 杰富意钢铁株式会社 Apparatus for producing molten metal plated steel strip and process for producing molten metal plated steel strip
CN102985580A (en) * 2010-07-13 2013-03-20 钢铁普蓝特克股份有限公司 Baffle plate unit and gas wiping device using same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109777979A (en) * 2019-02-19 2019-05-21 中南大学 A method of regulation ultra-wide aluminum alloy plate materials cross section structural homogenity

Also Published As

Publication number Publication date
JP2016204694A (en) 2016-12-08
AU2016252193A1 (en) 2017-10-26
CN107532271B (en) 2020-09-22
EP3287541A4 (en) 2018-04-04
JP6044669B2 (en) 2016-12-14
MX2017013462A (en) 2017-12-07
EP3287541B1 (en) 2019-07-24
AU2016252193B2 (en) 2018-10-18
WO2016170757A1 (en) 2016-10-27
EP3287541A1 (en) 2018-02-28

Similar Documents

Publication Publication Date Title
CN107532271A (en) The manufacture device and manufacture method of hot-dip metal plated steel band
CN106795614B (en) The continuous coating method of molten metal and molten zinc plating steel band and the continuous plating equipment of molten metal
EP1586672B9 (en) Liquid wiping apparatus
KR20180061275A (en) Hot melt galvanized layer thickness control system and method for continuous thickness-variable strip material
CN112513313B (en) Method for producing molten metal coated steel strip and continuous molten metal coating apparatus
JP6500846B2 (en) Method of manufacturing hot-dip metallized steel strip and continuous hot-dip metal plating equipment
JP5928412B2 (en) Steel plate vertical cooling device and method for producing hot dip galvanized steel plate using the same
KR20190094384A (en) Method and section for rapid cooling of continuous lines for processing metal sheets
JP5167895B2 (en) Method for producing hot-dip steel strip
JP5962209B2 (en) Method for producing hot-dip galvanized steel sheet
JP2003013193A (en) Method for manufacturing hot-dip galvanized steel sheet
JP6772930B2 (en) Manufacturing method of hot-dip galvanized steel sheet and hot-dip galvanized steel sheet
JP2015188897A (en) Cooling method of steel plate
KR20070030631A (en) Liquid wiping apparatus
JP2003193215A (en) Method and device for manufacturing hot-dip galvanized steel strip
JP2014162987A (en) Method of producing molten metal plated steel sheet and continuous molten metal plating apparatus
EP4368741A1 (en) Molten metal-plated steel strip production method
JP6635086B2 (en) Manufacturing method of hot-dip galvanized steel strip
KR20150024678A (en) Plating strip manufacturing apparatus
JP3650802B2 (en) Gas wiping nozzle
CN110418854A (en) The manufacturing method of hot-dip steel strip
JP2012250281A (en) Method of cooling hot-rolled steel plate
TH179848A (en) A set of machines and methods for producing hot-dip coated steel strips.
JP2014088584A (en) Continuous molten metal plating apparatus and method of manufacturing molten metal plated steel sheet
KR20130075439A (en) Nozzle for supplying molten metal of metal strip casting process

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant