CN107526804A - A kind of railway investment project data statistics system and method - Google Patents

A kind of railway investment project data statistics system and method Download PDF

Info

Publication number
CN107526804A
CN107526804A CN201710722598.9A CN201710722598A CN107526804A CN 107526804 A CN107526804 A CN 107526804A CN 201710722598 A CN201710722598 A CN 201710722598A CN 107526804 A CN107526804 A CN 107526804A
Authority
CN
China
Prior art keywords
project
sub
subsystem
node
library
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710722598.9A
Other languages
Chinese (zh)
Other versions
CN107526804B (en
Inventor
张锦超
孙晶
刘承亮
贺晓玲
陈翠杰
陈浩
李纪铀
史维峰
张永华
刘之源
任艳方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Institute of Computing Technologies of CARS
Beijing Jingwei Information Technology Co Ltd
Original Assignee
Institute of Computing Technologies of CARS
Beijing Jingwei Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institute of Computing Technologies of CARS, Beijing Jingwei Information Technology Co Ltd filed Critical Institute of Computing Technologies of CARS
Priority to CN201710722598.9A priority Critical patent/CN107526804B/en
Publication of CN107526804A publication Critical patent/CN107526804A/en
Application granted granted Critical
Publication of CN107526804B publication Critical patent/CN107526804B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2455Query execution
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/22Indexing; Data structures therefor; Storage structures
    • G06F16/2228Indexing structures
    • G06F16/2246Trees, e.g. B+trees
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Strategic Management (AREA)
  • Data Mining & Analysis (AREA)
  • Human Resources & Organizations (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Computational Linguistics (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Software Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

It is to include the multi-layer system that first order root node subsystem, intergrade intermediate node subsystem and project make a report on unit level leaf segment point subsystem that the present invention, which provides a kind of railway investment project data statistics system and method, the system,;Root node subsystem is used to import capital construction project project documentation, is sub-project by root node Project decomposition, and root node project and sub-project auto-associating are encoded, the project library of current sub-system is updated and compartition issues project library dictionary file;Intermediate node subsystem is used to receive and import the project library dictionary file from even higher level of node subsystem, it is sub-project by present node Project decomposition, to sub-project autocoding with associated with his father's project code, update the project library of current sub-system and compartition issues project library dictionary file;Leaf segment point subsystem is used to receive and import from project library dictionary file, carries out typing to the project data including index according to project investment schedule, and upload project data.

Description

A kind of railway investment project data statistics system and method
Technical field
The present invention relates to railway investment project administrative skill field, more particularly to a kind of railway investment project data statistics system System and method.
Background technology
Railway fixed assets investment statistics is the important component of national investment in fixed assets statistics, including builds substantially If, renovate, rolling stock purchases three business.As the fast development of Chinese society doctrine market economy, China are original Railway transport capacity can not meet the passenger and freight transportation demand of rapid growth, in order to alleviate railway transport capacity and the market demand Between imbalance between supply and demand, in recent years railway parent company accelerate the paces of capital construction investment, investment projects of capital assets are more next It is more.The annual plan that railway fixed assets investment project is assigned from planning authorities mostly, due to its number of entry is various, Hierarchical relationship is complicated, can not directly apply to existing statistical system.Therefore, every time plan assign after, statistician be required for into The substantial amounts of manual typing matching work of row, not only waste of manpower but also easily cause project and fail to report or other error in data.In addition, Because investment subject improves constantly to the demand for investing progress msg, objectively railway fixed assets investment statistics is proposed more High requirement.
Problems be present in existing railway fixed assets investment statistics system:(1) need the project of manual typing more, wave Take manpower and easily error;(2) coverage is small, is mainly used in railway parent company statistics center and each road bureau, basic-level stations and depots, Headquarter use less;(3) historical data can not be recalled, limited by existing system item coded system etc., and same project The investment data of different report periods is mutually isolated in the form of a file, can not realize the Archival Management of project and full Life Cycle Period management;(4) lack information sharing, the interconnection and interflow with the information such as investment plan, engineering management construction can not be realized.Obviously, With the continuous development of railway construction, existing railway fixed assets investment statistics system can not due to the limitation of itself Meet existing business in railway parent company, Railway Bureau, basic-level stations and depots, headquarter, joint local railway, railway parent company directly under enterprise The different levels such as industry unit and the actual requirement of department.
In order to preferably serve railway fixed assets investment construction, statistics central tissue of railway parent company revises《Iron Road investment in fixed assets statistical rules》(hereinafter referred to as system rule).The issue of new edition system rule takes into full account in investment statistics business Railway accelerates the new problem occurred after capital construction, has adapted to the change and progress of statistical service, also to build one complete The system of whole, comprehensive reaction railway fixed assets investment statistics correlation circumstance is possibly realized.
But how to establish a kind of railway fixed assets investment statistics for the demand that disclosure satisfy that existing all departments of the railway system Analysis system, being one has the problem of to be solved.
The content of the invention
In consideration of it, the embodiments of the invention provide a kind of railway investment project data statistics system and method, to eliminate or Improve one or more defects present in prior art.
Technical scheme is as follows:
A kind of railway investment project data statistics system, the system are to include first order root node subsystem, intergrade Intermediate node subsystem and project make a report on the tree-shaped multi-layer system of unit level leaf segment point subsystem;
The first order root node subsystem is used to import capital construction project project documentation, for intermediate node by root section Point Project decomposition is sub-project, and sub-project coding and root node project code are caused to root node project and sub-project autocoding It is associated, update the project library of current sub-system and compartition project library forms project library dictionary file corresponding to each sub-project and issued To corresponding intergrade intermediate node subsystem;
The intergrade intermediate node subsystem is used to receive and import the project library word from even higher level of node subsystem Allusion quotation file, by present node Project decomposition it is the sub-project with associated coding for next stage node, updates current subsystem The project library and compartition project library of system form project library dictionary file corresponding to each sub-project and are handed down to corresponding next stage node Subsystem;
The project makes a report on unit level leaf segment point subsystem and is used to receive and import the item from even higher level of node subsystem Mesh storehouse dictionary file, typing is carried out to the project data including index according to project investment schedule, and to upper level Node subsystem uploads project data.
A kind of railway investment project data statistical approach performed by railway investment project data statistics system, the system are The tree-shaped of unit level leaf segment point subsystem is made a report on including first order root node subsystem, intergrade intermediate node subsystem and project Multi-layer system, this method comprise the following steps:
Capital construction project project documentation is imported by the first order root node subsystem, for intermediate node by root node Project decomposition is sub-project, and sub-project coding and root node project code phase are caused to root node project and sub-project autocoding Association, updates the project library of current sub-system and compartition project library forms project library dictionary file corresponding to each sub-project and is handed down to Corresponding intergrade intermediate node subsystem;
Received by the intergrade intermediate node subsystem and import the project library dictionary from even higher level of node subsystem File, by present node Project decomposition it is the sub-project with associated coding for next stage node, updates current sub-system Project library and compartition project library form project library dictionary file corresponding to each sub-project and be handed down to corresponding next stage node System;
Unit level leaf segment point subsystem is made a report on by the project to receive and import the project from even higher level of node subsystem Storehouse dictionary file, typing is carried out to the project data including index according to project investment schedule, and to upper level section Point subsystem uploads project data.
In one embodiment, the intergrade point subsystem also receives and collects the item from next stage node subsystem Mesh number evidence, carry out project data and put in detention, generate statistical tables and reports, and the project data collected is uploaded to even higher level of node subsystem;It is described First order root node subsystem is additionally operable to receive and collects the project data from its next stage node subsystem, carries out item number According to putting in detention, statistical tables and reports are generated.
In one embodiment, the intergrade intermediate node subsystem also imports the project file that renovates, pin By present node Project decomposition it is sub-project to next stage node, sub-project is encoded the sub-project autocoding decomposited Associated with his father's project code, the project library and compartition project library for updating current sub-system form project corresponding to each sub-project Storehouse dictionary file is handed down to corresponding next stage node subsystem.
In one embodiment, the intergrade intermediate node is construction unit level intermediate node.
In one embodiment, believe in the project data that the intergrade point subsystem collects comprising project construction unit Breath, project category information and project provinces and regions information, the intermediate node subsystem save according to construction unit, project category or project Area's information generation form.
In one embodiment, comprising root node Item number and associated in the capital construction project project documentation Sub-project sequence number, the first order root node subsystem are identified based on root node Item number and associated sub-project sequence number Root Element and sub-project.
In one embodiment, the first order root node subsystem and the intergrade intermediate node subsystem are to subitem Purpose coded system is:Additional character forms sub-project code after father's item code.
Railway investment project data statistics system and the method design that embodiments of the present invention provide, which are known clearly, meets investment Coding scheme that statistical work requires, being easy to extension, realizes the Back ground Informations such as the project plan by different levels (as by portion The different levels such as (railway parent company), office, section) distribute step by step from top to bottom, invest and complete what data reported step by step from bottom to top Specification operation flow, so as to provide bi-directional synchronization mechanism of the business datum between different levels make a report on unit, finish to invest Statistics only has the history of unidirectional delivery from bottom to top.Using brand-new project code mechanism, specified from ministerial level step by step by upper And lower distribution, under the premise of ensuring that project code is unique, coding is run through project whole life cycle, realize truly Archival Management, embody the historical variations track of project, be also the returns of investment comprehensive statistics analysis of investment project, realize Comprehensive analysis aggregate query provides strong foundation.
Attendant advantages, the purpose of the present invention, and feature will will be partly illustrated by the following description, and will be right Partly become obvious after research hereafter in those of ordinary skill in the art, or can be obtained according to the practice of the present invention Know.Objectives and other advantages of the present invention can be by specifically noting in written explanation and its claims and accompanying drawing Structure is realized and obtained.
It will be appreciated by those skilled in the art that it is specific to be not limited to the above with the objects and advantages that the present invention realizes It is described, and according to the above and other purpose described further below that the present invention will be more clearly understood and can realize.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, forms the part of the application, not Form limitation of the invention.In the accompanying drawings:
Fig. 1 is railway fixed assets investment statistics business all departments post and the signal of functional level of the embodiment of the present invention Figure.
Fig. 2 be the embodiment of the present invention railway investment project data statistics system in multi-level structure schematic diagram.
Fig. 3 is the schematic diagram of the network architecture of the railway investment project data statistics system of the embodiment of the present invention.
Fig. 4 is the operation flow schematic diagram of the railway investment project data statistics system of the embodiment of the present invention.
Fig. 5 is the schematic flow sheet of railway investment project data statistical approach in the embodiment of the present invention.
Embodiment
It is right with reference to embodiment and accompanying drawing for the object, technical solutions and advantages of the present invention are more clearly understood The present invention is described in further details.Here, the exemplary embodiment of the present invention and its illustrate to be used to explain the present invention, but simultaneously It is not as a limitation of the invention.
Here, it should also be noted that, in order to avoid having obscured the present invention because of unnecessary details, in the accompanying drawings only Show and according to the solution of the present invention closely related structure and/or processing step, and eliminate little with relation of the present invention Other details.
Railway fixed assets investment statistics business is related to railway parent company, Railway Bureau, basic-level stations and depots, headquarter, joint The unit of the different levels such as square iron road, subsidiary enterprise of railway parent company and department, while railway fixed assets investment statistics business And by capital construction, renovate, rolling stock purchases three different types of service compositions, that is to say, that railway fixed assets The unit level and type of service that investment statistics is related to are a lot.According to the general requirement of railway parent company and State Statistics Bureau, iron Road investment in fixed assets statistical work counts center by railway parent company and is totally responsible for, and form is formulated at railway parent company statistics center Form and requirements is filled and presented, filled and presented by collection, examination & verification and the form of grass-roots unit's progress railway investment project statistical report form data, then Report, collect step by step.The present invention takes into full account the different demands of not commensurate to different service types in system, according to project meter Draw import, project library imports, project library compartition issues, project data uploads, project data such as puts in detention at the combination of difference in functionality will The post of railway fixed assets investment statistics business and function are defined as three levels substantially, as shown in Figure 1.
First level:Railway parent company counts highest layer-management list of the center as investment in fixed assets statistic analysis Position, and the highest level of post and function, mainly it is responsible for capital construction project plan importing, project library compartition issues, project Data are put in detention, and the project data that renovates is put in detention, and rolling stock project data is put in detention, to works such as State Statistics Bureau's reported datas Make.
Second level:The construction list of each Railway Bureau, Zhong Tie investment companies, the subordinate unit etc. of railway parent company as project Position, local railway association are post and second functional level, are mainly responsible for capital construction project as trade management unit Storehouse is received, project library compartition is issued, project data is put in detention, project data uploads, project plan importing of renovating, project library point Split issue, the function such as project data is put in detention, project data uploads.
Third level:Station section, co-partnership company, project management department and headquarter, local railway companies are as item in each Railway Bureau's pipe Purpose makes a report on unit, is the third level of post and function, and mainly responsible capital construction project storehouse receives, renovate project library The functions such as reception, project data typing upload.In third level user as needed (as under road bureau engineering management institute according to Domain sets situations such as point institute) work such as compartition can also be carried out to project, issues, put in detention.
In order to meet the requirements of new edition railway fixed assets statistical rules, while meet that existing business is always public in railway Different levels unit and the departments such as department, Railway Bureau, basic-level stations and depots, headquarter, joint local railway, subsidiary enterprise of railway parent company Actual requirement, and cover capital construction that railway fixed assets investment statistics field is related to, renovate, rolling stock purchase Three basic services are put, the present invention provides a kind of railway investment project number based on the post shown in Fig. 1 and functional hierarchical relationship System and its corresponding railway investment project data statistical approach according to statistics.The system be include first order root node subsystem, The tree-shaped multi-layer system that intergrade intermediate node subsystem and project make a report on unit level leaf segment point subsystem (is three layers in example Level system), distribute step by step from top to bottom by portion, office, section three-level using by Back ground Informations such as the project plans, investment completes data certainly The business datum reported step by step on down uses brand-new project code method by level bi-directional synchronization mechanism, utilizes project The investment statistics archives that each investment project establishes complete set are encoded to, to realize Whole Life Cycle of Projects management and look into Ask.
Fig. 2 show the signal of the multi-level structure of the railway investment project data statistics system of one embodiment of the invention Figure.Fig. 3 is the schematic diagram of the network architecture of railway investment project data statistics system in the embodiment of the present invention.It is this shown in Fig. 4 The operation flow schematic diagram of the railway investment project data statistics system of inventive embodiments.As in Figure 2-4, the system is to include First order root node subsystem, intergrade intermediate node subsystem and project make a report on the tree-shaped multilayer of unit level leaf segment point subsystem Level structure, although only illustrating 3 levels in figure, the present invention is not limited thereto.For example, first order root node subsystem is served as reasons The root node subsystem (or being railway parent company level root node subsystem) that railway parent company level uses, it performs right in Fig. 1 The Position Responsibility at the railway parent company statistics center answered.Each intermediate node subsystem is between root node and leaf segment point subsystem Intergrade subsystem, the subsystem of each intergrade construction unit (including local railway association) e.g. shown in Fig. 1, It performs the Position Responsibility of each intergrade unit of the second level corresponding in Fig. 1.Each leaf segment point subsystem is to make a report on unit Level (or grass-roots unit's level) subsystem, e.g. each interior section, co-partnership company, project management department and headquarter, place of standing of Railway Bureau's pipe The subsystem of railroad etc., the main Position Responsibility for respectively making a report on unit for performing corresponding third level in Fig. 1.
As shown in figure 3, root node subsystem can include user equipment, database server and WEB server, wherein data Storehouse server is used for the capital construction project data at whole railway parent company statistics center, renovate project data and locomotive Vehicle purchases the storage of data, to realize overall management.WEB server is used to provide WEB inquiries etc..Intermediate node subsystem bag Containing user equipment and database server, capital construction project data corresponding to database server present node subsystem, more New transformation project data and rolling stock purchase the storage of data.The user of grass-roots unit's level leaf segment point subsystem can use all User equipment such as computer by railway Office Network passage download items storehouse or uploads project data.Handled official business for no railway The user in Netcom road, it can use the user equipment of computer, intelligent terminal etc to pass through in the modes such as internet, Email Transmitting file or reception, lead-in item storehouse.Each level subsystem is fitted with railway investment project Software of Data Statistics, different levels Different user can show different operation interfaces based on different user rights and manage different data contents.
The user equipment or server memory of railway investment project data statistics system contain railway investment project data system Software is counted, according to the business demand of railway investment project data statistics system, statistical software can include plan import modul, report Table computing module, project management module, basic maintenance module, data inputting template, authority management module, project library issue guided mode Block, project data report and put module in detention, renovate machine account interactive module, rolling stock purchase the process modules such as module and project The various dictionary datas such as dictionary, user dictionary, provinces and regions dictionary, form dictionary, regular expression dictionary, completed with accessory system total The statistics of body investment project data.
Hierarchical structure based on Fig. 2, railway investment project data statistics system of the invention also divide operation flow For operation flow corresponding to the subsystem of each level, as shown in figure 4, the operation flow of system includes:
Root node service of subsystem flow:Railway parent company statistics receives Item announcements (railway centrally through the subsystem Capital construction project plan), by capital construction project planning data import railway investment project data statistics system database, (Project decomposition) is decomposed according to construction unit etc. to whole capital construction projects, builds project library (formation or renewal item storehouse Dictionary), compartition project library and be distributed to each construction unit (project is assigned).In addition, railway parent company statistics center receives and built The project data (construction unit need to be replaced to carry out data inputting for local railway) that unit reports, audits simultaneously combined data (Fig. 4 In data put in detention and data summarization) after according to system rule requirement form investment statistics form and card, finally according to national statistics The form that office requires is to State Statistics Bureau's reported data.
Intermediate node service of subsystem flow:The item that each construction unit is issued by respective subsystem reception superior unit Mesh storehouse dictionary (Item announcements from superior unit), while the project file that renovates that can import our unit (comes from The Item announcements of our unit), project transprovincially can be decomposed, be further continued for being decomposed according to making a report on unit, formed this grade and throw Provide statistical item storehouse (building project library), compartition project library is simultaneously distributed to and respectively makes a report on unit (project is assigned).In addition, construction unit connects Receive the project data for making a report on unit or replace construction unit to complete the typing of data, then handled by data summarization, by system Rule requirement forms card and form, most backward railway parent company statistics center reported data.
Leaf node service of subsystem flow:Make a report on the project library that unit is issued by respective subsystem reception superior unit Dictionary (Item announcements from superior unit), complete actual progress according to project investment and collect typing achievement data etc., finally Finished item data report.
Below in conjunction with Fig. 5, the Railway Investment item performed by the railway investment project data statistics system of the present invention is described Mesh data statistical approach.As shown in figure 5, this method includes:
Step S310, capital construction project project documentation is imported by first order root node subsystem, based on capital construction item Root node Project decomposition is sub-project for intermediate node by mesh project documentation, and root node project and sub-project autocoding are made It is associated with root node project code to obtain sub-project coding, updates the project library of current sub-system and is based on sub-project compartition project Storehouse forms project library dictionary file corresponding to each sub-project and is handed down to corresponding intergrade intermediate node subsystem.
In this step, it is (including every that capital construction project by portion's statistics centre punch one imports the plan of system-wide capital construction project Secondary plan for adjustment) file, project library is then introduced into, each road bureau is handed down in the form of project library dictionary file after compartition.
Capital construction project project documentation is the planning data assigned by planning department, and the present invention has customized project documentation importing Standard interface, as long as project documentation is that (file type, file designation and file format meet predetermined want for making as requested Ask), it is possible to the file that realizes a plan is automatically imported, and overcomes the defects of plan information relies on manual entry for a long time.
Preferably, project name, Item number, associated sub-project sequence number can be included in project documentation (can embody item The relation of mesh and sub-project), project makes a report on unit (can be Unit code or organization), item types code, builds substantially If the information such as project this year investment plan.Because for different road bureaus, the source of capital construction project project documentation is different, meter Draw file in project or sub-project sequence number be difficult to have unified regulation, now preferably, before project documentation is imported, ensureing Succession or incidence relation between Item number, first layer Item number, second layer Item number, third layer Item number ... On the basis of, it is the Item number and sub-project sequence in capital construction project project documentation in the regular expression dictionary of system Number define regular expression.That is, the relation in capital construction project project documentation between Item number and sub-project sequence number is preferred Regular expression specification defined in regular expression dictionary according to system represents.So, by capital construction project meter Draw during file imported into the project library of system, root node subsystem can be according to the regular expressions pre-set in system Formula distinguishes the hierarchical relationship of (identification) construction project, that is, identifies root Element and sub-project.
The expression example of Item number and sub-project sequence number is listed below, but the present invention is not limited thereto, and can be with There are other representations:
" 1 " represents Item number;
" (1) " represents first layer sub-project sequence number;
" 1) " represents second layer sub-project sequence number;
" 1)) " represent third layer sub-project sequence number.
First order root node subsystem can be encoded for project automatically according to the sequence number of project in project documentation, and base The relation of project and sub-project is that sub-project is encoded in project documentation, establishes between project and sub-project and associates pass System.As an example, root node subsystem is to the coded system of sub-project:Additional character forms sub-project after father's item code Code, as shown in Table 1 below.
Table 1.
In the example of table 1, the root Element code formed after coding is 6 bit digitals, and wherein front two represents project first Year is assigned in plan, and the new plan of such as 2017, front two is " 17 ", and latter four are annual project serial number;Plan importing During, root Element code is automatically generated by system, and user can modify in project management.Such as capital construction project " the long Handan Ji multiple line in Handan " is " 170058 " in the root Element code of railway parent company.
The coded system of sub-project code can be the additional character after root Element code, and every two represent one-level, letter Or numeral.Equally by taking the long Handan Ji multiple line in Handan as an example, the project compartition goes out two sub-projects, respectively by Beijing office and Jinan office Make a report on, then Beijing police station item code available " 17005801", Jinan police station item code available " 17005802”;Beijing office after Continuous " the long Handan Ji multiple line Beijing office in Handan " made a report on to it is divided into " long Handan Ji Hebei province of office, multiple line Beijing, Handan " by progress compartition is saved " the long Handan Ji multiple line Beijing Shanxi Province of office in Handan ", then the code of two sub-projects can be set to " 17005801 respectively01" and “1700580102”。
Coded system listed above is merely illustrative, and the present invention is not limited thereto, and can also be other appropriate codings Mode, as long as the incidence relation between project and sub-project can be set up.
It is also possible in capital construction project project documentation only comprising Item number without sub-project, now, root node The user of subsystem can (addition) sub-project newly-built according to actual conditions and autocoding, as several sub-projects of project addition Afterwards, then by project library dictionary it is handed down to different subordinate's subsystems.When adding sub-project, current sub-system can be for sub-project certainly Dynamic addition subcode, user can modify to subcode.If it is more sub-projects that a project, which needs compartition, sub-project Code can not repeat.
In the above example, project category code is no longer included in coding rule, such as 1114,121, therefore in the system Relation between project and sub-project can be determined not merely by code.Collect and generate form in subsequent project of the present invention When, can be by item types (capital construction or the project that renovates), item code, project management unit (when importing is planned certainly Dynamic generation) etc. carry out synthetic determination and generate corresponding project data and form.
In addition, in the present invention, root node subsystem can be intended to project library existing in the project and system in file Matched, so as to identify in project documentation with match in existing project library project, new projects are (in project documentation The project listed but be not present in existing project library) and project to be deleted it is (unlisted in project documentation but existing Project present in project library).Based on matching result, can further it be verified by user, so as to increase (establishment), change, delete Remove or close respective item, and corresponding renewal item storehouse.
Behind renewal item storehouse, root node subsystem compartition project library forms project library dictionary text corresponding to each intergrade node Part is simultaneously handed down to each intergrade intermediate node subsystem.For example, root node subsystem to whole capital construction projects according to construction Unit is decomposed, and forms project library dictionary corresponding to each intermediate node subsystem (such as each construction unit's subsystem) of next stage And it is distributed to each intermediate node subsystem (construction unit's level subsystem).
Step S330, received by intermediate node subsystem and import the project library dictionary text from even higher level of node subsystem Part, it is the subitem with associated coding to be directed to next stage node by present node Project decomposition based on project library dictionary file Mesh, updates the project library of current sub-system and compartition project library forms project library dictionary file corresponding to each sub-project and is handed down to phase The next stage node subsystem answered.
It is also possible to only include the project of current sub-system in project library dictionary file from even higher level of node subsystem Sequence number is without sub-project, now, the user of present node subsystem can (addition) sub-project newly-built according to actual conditions simultaneously Coding, i.e., after being several sub-projects (fractionation project) by project compartition, then different subordinate's are handed down to by project library dictionary System.
Outside, in embodiments of the present invention, intermediate node subsystem (each Railway Bureau's level unit) can also be imported voluntarily more New transformation project project documentation (including portion's pipe project documentation drawn game pipe project documentation), based on renovating, project file will Present node Project decomposition is sub-project, and sub-project coding and his father's project code are caused to the sub-project autocoding decomposited It is associated, update the project library of current sub-system and compartition project library forms project library dictionary file corresponding to each next stage node It is handed down to each next stage node subsystem.
In embodiments of the present invention, between root node subsystem and leaf segment point subsystem, there may also be multi-layer Intermediate node subsystem, project are distributed to subordinate's intermediate node subsystem after compartition by higher level's intermediate node subsystem.
Step S350, unit level leaf segment point subsystem is made a report on by project and receives and imports from even higher level of node subsystem Project library dictionary file, typing is carried out to the project data including index and ability according to project investment schedule, and Project data is uploaded to even higher level of node subsystem.
Project data typing is the most important function of data acquisition, mainly there is index typing and ability typing two Main program module composition.Index recording program module realizes the typing work of basic index, including capital construction monthly magazine, the moon Index in bulletin, annual report, and the monthly magazine that renovates, moon bulletin, the medium index of annual report of the machine account that renovates is not used.Energy Power recording program module realizes the typing work of project capacity data, the mainly record of capital construction annual report GL index Enter.
Make a report on unit level subsystem can enter according to the index typing template in system and ability typing template row index and The typing of ability.
After the completion of project typing, projects make a report on the user of unit i.e. using user equipmenies such as computers to upper level section Point subsystem reports project data or comprehensive storehouse data (combined data for making a report on unit all items), above gives the correct time to enter data Row encryption.
Step S370, received by intergrade point subsystem and collect the project data from each downstream site subsystem, Carry out project data to put in detention, generate card and statistical tables and reports (can further printing reports), and upload and converge to even higher level of node subsystem Total project data.
After superior unit receives the reporting file of subordinate unit, file can be checked, file can also be carried out Put in detention or column catalogue is entered to the file where file and put in detention, ensure only to put the number of oneself subordinate unit in detention during putting in detention According to.
Step S390, received by first order root node subsystem and collect the item number from its next stage node subsystem According to progress project data is put in detention, can generate card and form, and printable form.
When making a report on unit typing project data towards be after compartition layer by layer, positioned at the sub-project of project tree bottom Not data storage in (leaf node project), root Element and intermediate node project at different levels, for ease of statistical summaries and report generation, System carries out successively data summarization, and summarized results is saved in the item record of respective nodes to whole projects.
Project construction unit information, project category information and item can be included in the project data that node subsystems at different levels collect Mesh provinces and regions information, node subsystems at different levels can generate report data according to construction unit, project category or project provinces and regions information.
The project data reported based on node subsystems at different levels, node subsystems at different levels can be formed《Railway fixed assets is thrown Provide statistical rules》Defined capital construction, renovate, rolling stock purchase correlation investment performance, fully funded feelings Condition, quantity of goods produced performance, investment construction scale and newly-increased productivity capabilities might monthly magazine, year bulletin, year bulletin;Secondly according to The different dimensions of business need such as report period, form unit, project category, province where project filtered to investment project, Collect and analysis forms all kinds of consolidated statements.Realize inquiry, printing, export and the impression block of capital construction mega project card The flexible setting of plate.
The form that first order root node subsystem can require according to State Statistics Bureau, is State Statistics Bureau's investment statistics information System provides corresponding data.
In addition, center can establish WEB Query Subsystems in railway parent company counts, realize to investment statistics historical data Comprehensive analysis inquiry and utilize.
Railway parent company is every year in the capital construction project built about at 400 or so at present, and these projects will also be according to Make a report on unit and place province decomposed, therefore road bureau's project and sub-project are total up to 1000, if road bureau according still further to Headquarter, bid section are decomposed, should be more than 5000 in the total maximum of basic unit's project and sub-project.By capital construction monthly 100 indexs are averagely reported to calculate, the achievement data that system-wide capital construction statistics is monthly related to is at 500,000 or so.Each road Project is renovated about at 1000 or so in office, and system-wide has 18000 projects that renovate, and these projects are according to making a report on Unit, section carry out Project decomposition, more than substantially reachable 50000 projects.20 indexs are reported by every monthly average that renovates Calculate, system-wide, which renovates, counts the achievement data being monthly related at 1,000,000 or so.Pass through the railway of the trial operation present invention Investment project data statistics system finds that capital goods project statistical efficiency and accuracy are obtained for and significantly improved.
Above-mentioned to understand, the present invention is changed capital construction for a long time, renovated using brand-new investment project coding The situation that project is separately encoded, independently collected, change what is be difficult to comprehensive statistics and the project indicator is inquired about across the report period History;So that whole life cycle of the project code through project, it is capable of the historical variations of loyal reaction project, to invest item Mesh statistics, analysis of Investment Benefit are laid a good foundation, and improve statistical work accuracy, enrich statistical content, reduce work Intensity, cost of labor is saved.
In addition, the present invention use unit between bi-directional synchronization mechanism realize project plan data issue step by step from top to bottom, Project is completed data and collected step by step from bottom to top, meets requirement of the statistical departments at different levels to project and sub-project accurate perception, It effectively prevent and the statistical error that human factor is brought such as fail to report.
The present invention perfect railway parent company, Railway Bureau (construction unit), section of standing (headquarter) three-level investment in fixed assets Statistical informationization architecture, it is possible to achieve the centralized management of roadbed, can be by big station management small station;General Promotion investment system Work quality and efficiency are counted, enhances the clothes that timely, accurate, efficient investment statistics information is provided for leaders and decision-making section Business ability.
Further, the present invention provides more comprehensive, timely, accurate investment statistics for management units at different levels and completes letter Breath, be advantageous to the scheduling that investment planning and management department plans as a whole railway fixed assets investment comprehensively, optimize railway construction fund Use.
Obviously, those skilled in the art should be understood that each module of the above-mentioned embodiment of the present invention or each step can be with Realized with general computing device, they can be concentrated on single computing device, or are distributed in multiple computing devices On the network formed, alternatively, they can be realized with the program code that computing device can perform, it is thus possible to by it Store and performed in the storage device by computing device, and in some cases, can be to be held different from order herein They, are either fabricated to each integrated circuit modules or will be multiple in them by the shown or described step of row respectively Module or step are fabricated to single integrated circuit module to realize.So, the embodiment of the present invention is not restricted to any specific hard Part and software combine.
, can be in one or more other realities for an embodiment description and/or the feature illustrated in the present invention Apply in mode and use in the same manner or in a similar manner, and/or be combined or instead of other with the feature of other embodiment The feature of embodiment.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the embodiment of the present invention can have various modifications and variations.Within the spirit and principles of the invention, made Any modification, equivalent substitution and improvements etc., should be included in the scope of the protection.

Claims (10)

  1. A kind of 1. railway investment project data statistics system, it is characterised in that the system be include first order root node subsystem, The intermediate node subsystem and project of intergrade make a report on the tree-shaped multi-layer system of unit level leaf segment point subsystem;
    The first order root node subsystem is used to import capital construction project project documentation, for intermediate node by root node item Mesh is decomposed into sub-project, causes that sub-project coding is related to root node project code to root node project and sub-project autocoding Connection, updates the project library of current sub-system and compartition project library forms project library dictionary file corresponding to each sub-project and is handed down to phase The intergrade intermediate node subsystem answered;
    The intergrade intermediate node subsystem is used to receive and import the project library dictionary text from even higher level of node subsystem Part, by present node Project decomposition it is the sub-project with associated coding for next stage node, updates current sub-system Project library and compartition project library form project library dictionary file corresponding to each sub-project and are handed down to corresponding next stage node subsystem System;
    The project makes a report on unit level leaf segment point subsystem and is used to receive and import the project library from even higher level of node subsystem Dictionary file, typing is carried out to the project data including index according to project investment schedule, and to even higher level of node Subsystem uploads project data.
  2. 2. system according to claim 1, it is characterised in that:
    The intergrade point subsystem is additionally operable to receive and collects the project data from next stage node subsystem, carries out project Data are put in detention, generate statistical tables and reports, and the project data collected is uploaded to even higher level of node subsystem;
    The first order root node subsystem is additionally operable to receive and collects the project data from its next stage node subsystem, enters Row project data is put in detention, generates statistical tables and reports.
  3. 3. system according to claim 1 or 2, it is characterised in that:
    The intergrade intermediate node subsystem is additionally operable to importing and renovated project file, ought for next stage node Front nodal point Project decomposition is sub-project, and sub-project coding and his father's project code phase are caused to the sub-project autocoding decomposited Association, updates the project library of current sub-system and compartition project library forms project library dictionary file corresponding to each sub-project and is handed down to Corresponding next stage node subsystem.
  4. 4. system according to claim 1, it is characterised in that:
    The intergrade intermediate node is construction unit level intermediate node;
    Project construction unit information, project category information and project are included in the project data that the intergrade point subsystem collects Provinces and regions information, the intermediate node subsystem generate form according to construction unit, project category or project provinces and regions information.
  5. 5. system according to claim 1, it is characterised in that:
    Comprising root node Item number and associated sub-project sequence number in the capital construction project project documentation, described first Level root node subsystem identifies root Element and sub-project based on root node Item number and associated sub-project sequence number.
  6. 6. system according to claim 1, it is characterised in that:
    The first order root node subsystem and the intergrade intermediate node subsystem are to the coded system of sub-project:In father Additional character forms sub-project code after item code.
  7. 7. a kind of railway investment project data statistical approach performed by railway investment project data statistics system, its feature exist In the system is to include first order root node subsystem, the intermediate node subsystem of intergrade and project to make a report on unit level leaf segment The tree-shaped multi-layer system of point subsystem, this method comprise the following steps:
    Capital construction project project documentation is imported by the first order root node subsystem, for intermediate node by root node project Sub-project is decomposed into, causes that sub-project coding is related to root node project code to root node project and sub-project autocoding Connection, updates the project library of current sub-system and compartition project library forms project library dictionary file corresponding to each sub-project and is handed down to phase The intergrade intermediate node subsystem answered;
    Received by the intergrade intermediate node subsystem and import the project library dictionary file from even higher level of node subsystem, By present node Project decomposition it is the sub-project with associated coding for next stage node, updates the project of current sub-system Storehouse and compartition project library form project library dictionary file corresponding to each sub-project and are handed down to corresponding next stage node subsystem;
    Unit level leaf segment point subsystem is made a report on by the project to receive and import the project library word from even higher level of node subsystem Allusion quotation file, typing is carried out to the project data including index according to project investment schedule, and it is sub to even higher level of node System uploads project data.
  8. 8. according to the method for claim 7, it is characterised in that methods described also includes:
    Received by the intergrade point subsystem and collect the project data from next stage node subsystem, carry out project data Put in detention, generate statistical tables and reports, and the project data collected is uploaded to even higher level of node subsystem;
    Received by the first order root node subsystem and collect the project data from its next stage node subsystem, carry out item Mesh number generates statistical tables and reports according to putting in detention.
  9. 9. according to the method for claim 7, it is characterised in that methods described also includes:
    The project file that renovates is imported by the intergrade intermediate node subsystem, will work as prosthomere for next stage node Point Project decomposition is sub-project, causes that sub-project coding is related to his father's project code to the sub-project autocoding decomposited Connection, updates the project library of current sub-system and compartition project library forms project library dictionary file corresponding to each sub-project and is handed down to phase The next stage node subsystem answered.
  10. 10. according to the method for claim 7, it is characterised in that:
    The first order root node subsystem and the intergrade intermediate node subsystem are to the coded system of sub-project:In father Additional character forms sub-project code after item code.
CN201710722598.9A 2017-08-22 2017-08-22 Railway investment project data statistics system and method Active CN107526804B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710722598.9A CN107526804B (en) 2017-08-22 2017-08-22 Railway investment project data statistics system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710722598.9A CN107526804B (en) 2017-08-22 2017-08-22 Railway investment project data statistics system and method

Publications (2)

Publication Number Publication Date
CN107526804A true CN107526804A (en) 2017-12-29
CN107526804B CN107526804B (en) 2020-09-01

Family

ID=60681776

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710722598.9A Active CN107526804B (en) 2017-08-22 2017-08-22 Railway investment project data statistics system and method

Country Status (1)

Country Link
CN (1) CN107526804B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110378670A (en) * 2019-07-17 2019-10-25 重庆大学 A kind of spatial network technology model and its construction method and application
CN112070464A (en) * 2020-08-25 2020-12-11 英运物流(上海)有限公司 Project management method, device, equipment and storage medium thereof
CN114004603A (en) * 2021-11-16 2022-02-01 南方电网能源发展研究院有限责任公司 Automatic statistical method and device for fixed asset investment and computer equipment
CN115147062A (en) * 2021-12-19 2022-10-04 中国铁道科学研究院集团有限公司电子计算技术研究所 Railway engineering management method and system
CN115994516A (en) * 2023-03-24 2023-04-21 中国石油天然气集团有限公司 Supply chain data braiding method and system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102592195A (en) * 2011-12-28 2012-07-18 Tcl集团股份有限公司 Project control system and method based on development of products
WO2015110022A1 (en) * 2014-01-22 2015-07-30 李振华 Personal work system capable of dynamic combination and adjustment
CN105809367A (en) * 2016-03-29 2016-07-27 上海赞越软件服务中心 Trans-organization project splitting mechanism
CN105956777A (en) * 2016-05-03 2016-09-21 深圳科眸网络科技有限公司 Scientific and technological innovation product cooperative exploitation management method and device based on Internet
CN106096905A (en) * 2016-05-31 2016-11-09 北京诚公通信工程监理股份有限公司 A kind of project management method and system
CN106203956A (en) * 2016-07-05 2016-12-07 吴本刚 Project management system based on cloud computing

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102592195A (en) * 2011-12-28 2012-07-18 Tcl集团股份有限公司 Project control system and method based on development of products
WO2015110022A1 (en) * 2014-01-22 2015-07-30 李振华 Personal work system capable of dynamic combination and adjustment
EP3156881A1 (en) * 2014-01-22 2017-04-19 Li, Zhenhua Personal work system capable of dynamic combination and adjustment
CN105809367A (en) * 2016-03-29 2016-07-27 上海赞越软件服务中心 Trans-organization project splitting mechanism
CN105956777A (en) * 2016-05-03 2016-09-21 深圳科眸网络科技有限公司 Scientific and technological innovation product cooperative exploitation management method and device based on Internet
CN106096905A (en) * 2016-05-31 2016-11-09 北京诚公通信工程监理股份有限公司 A kind of project management method and system
CN106203956A (en) * 2016-07-05 2016-12-07 吴本刚 Project management system based on cloud computing

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
丰华: "《职业生涯历练和建设工程项目施工实践》", 31 December 2013 *
张真: "基于多维矩阵WBS的城市轨道交通项目集成管理研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110378670A (en) * 2019-07-17 2019-10-25 重庆大学 A kind of spatial network technology model and its construction method and application
CN112070464A (en) * 2020-08-25 2020-12-11 英运物流(上海)有限公司 Project management method, device, equipment and storage medium thereof
CN112070464B (en) * 2020-08-25 2021-05-14 英运物流(上海)有限公司 Project management method, device, equipment and storage medium thereof
CN114004603A (en) * 2021-11-16 2022-02-01 南方电网能源发展研究院有限责任公司 Automatic statistical method and device for fixed asset investment and computer equipment
CN115147062A (en) * 2021-12-19 2022-10-04 中国铁道科学研究院集团有限公司电子计算技术研究所 Railway engineering management method and system
CN115147062B (en) * 2021-12-19 2024-04-30 中国铁道科学研究院集团有限公司电子计算技术研究所 Railway engineering management method and system
CN115994516A (en) * 2023-03-24 2023-04-21 中国石油天然气集团有限公司 Supply chain data braiding method and system

Also Published As

Publication number Publication date
CN107526804B (en) 2020-09-01

Similar Documents

Publication Publication Date Title
CN107526804A (en) A kind of railway investment project data statistics system and method
CN109376210A (en) A kind of intelligence pollution sources dynamic management system and method
CN107330593A (en) A kind of traffic monitoring inspection and credit worthiness management system
CN109636443A (en) The deep learning method and device of customer churn prediction
CN106408095A (en) System and method of ship equipment spare part management
CN102208057A (en) Method, platform and system for processing audit information
CN112883310A (en) Multi-level comprehensive community service platform and equipment based on big data
CN108090684A (en) Insurance premium appraisal procedure, device, terminal device and storage medium
CN111144589A (en) Maintenance equipment management system
CN108305152A (en) A kind of remote control and the instrument of surveying and mapping management of leasing platform for collecting distant control function
CN110796427A (en) BIM technology-based full-process control method for physical assets of power distribution network
CN106485604A (en) A kind of data processing method of topological structure of electric and device
CN102043986A (en) Online processing system for abnormal electricity information transferring and application method of system
CN113610595B (en) Report and examination price informatization management method and system
CN107679702A (en) A kind of enterprise's big data intellectual analysis manages method
CN107609750A (en) A kind of information assets account card thing updates inventory management system
DE102007013340A1 (en) System and method for managing environmental impacts of companies
CN112508381A (en) Computing system for project cost of mechanical industry and implementation method thereof
CN107464123A (en) One kind formula batch tracking system and its operation method
CN115545663B (en) Urban rail transit asset information matching method based on contract asset mapping model
Krambeck et al. Toward an open transit service data standard in developing Asian countries
CN115775188A (en) Asset financial integrated system
CN109308294A (en) Point of interest input system and method
CN104463428B (en) Electric Power Network Planning data processing method
CN114077986A (en) Material plan full-process control method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 100081 Beijing city Haidian District Daliushu Road No. 2

Applicant after: INSTITUTE OF COMPUTING TECHNOLOGIES, CARS

Applicant after: BEIJING JINGWEI INFORMATION TECHNOLOGY Co.,Ltd.

Address before: 100081 Beijing city Haidian District Daliushu Road No. 2

Applicant before: INSTITUTE OF COMPUTING TECHNOLOGY, CHINA ACADEMY OF RAILWAY SCIENCES

Applicant before: BEIJING JINGWEI INFORMATION TECHNOLOGY Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant