企业供应链管理系统 Download PDFInfo
- Publication number
- CN107516149A CN107516149A CN201710739796.6A CN201710739796A CN107516149A CN 107516149 A CN107516149 A CN 107516149A CN 201710739796 A CN201710739796 A CN 201710739796A CN 107516149 A CN107516149 A CN 107516149A
- Authority
- CN
- China
- Prior art keywords
- month
- machine
- product
- line
- capacity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/067—Enterprise or organisation modelling
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Physics & Mathematics (AREA)
- Game Theory and Decision Science (AREA)
- Marketing (AREA)
- Development Economics (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Theoretical Computer Science (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Life Sciences & Earth Sciences (AREA)
- Biodiversity & Conservation Biology (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
Abstract
本发明公开了一种企业供应链管理系统中企业运营控制方法,包括以下步骤:将企业资源进行数学建模;创建决策变量,根据创建的决策变量,以主计划为基准,创建有约束的产能目标函数和无约束的产能目标函数,根据不同的产能目标函数构建相应的约束条件;调整求解参数得到满足企业运营计划的资源分配方式或者需求资源。能妥善、有效的规划企业资源﹝如机器、人员、工具、物料等﹞来满足顾客需求,达到最大产出量、瓶颈资源使用率最高及前置时间最短等生产策略,并能协助管理人员找出实际可行的企业信息。
Description
技术领域
本发明属于企业供应链管理系统中企业运营管理技术领域,具体地涉及一种企业供应链管理系统中企业运营控制方法及系统。
背景技术
中国智能制造处于初级发展阶段,同样也是大部分处于研发阶段,仅16%的企业进入智能制造应用阶段;从智能制造的经济效益来看,52%的企业其智能制造收入贡献率低于10%,60%的企业其智能制造利润贡献低于10%。而90%的中小企业智能制造实现程度较低的原因在于,智能化升级成本抑制了企业需求,其中缺乏融资渠道影响最大。
对于物料及产能规划与现场详细作业排程而言,企业常因无法确实掌握生产制造现场实际的产能状况及物料进货时程,而采取有单就接的接单政策与粗估产能的生产排程方式,但又在提高对顾客的服务水平及允诺交期的基本前提下,导致生产车间常以加班或外包来满足订单交期。此外,由于物料规划无法考虑产能的限制,又可能造成原料/零组件的采购计划无法配合生产计划,以致影响既定生产进度,而造成无法满足顾客交期或成本过高的恶性循环。也因此,无法达到快速响应顾客﹝Quick Response﹞的需求与有效益的可允订货数量/时间﹝Available-to-Promise;ATP或Capable To Promise;CTP﹞的目标。
发明内容
针对上述存在的技术问题,本发明目的是:提供了一种企业供应链管理系统中企业运营控制方法及系统,能妥善、有效的规划企业资源﹝如机器、人员、工具、物料等﹞来满足顾客需求,达到最大产出量、瓶颈资源使用率最高及前置时间最短等生产策略,并能协助生产管理人员找出实际可行的企业信息。
本发明的技术方案是:
一种企业供应链管理系统中企业运营控制方法,包括以下步骤:
S01:将企业资源进行数学建模;
S02:创建决策变量,根据创建的决策变量,以主生产计划为基准,创建有约束的产能目标函数和无约束的产能目标函数,根据不同的产能目标函数构建相应的约束条件;
S03:调整求解参数得到满足企业运营计划的资源分配方式或者需求资源。
优选的,所述步骤S01中数学建模包括构建集合和参数,所述集合包括,产品列表集合P,产线列表集合S,机器列表集合M,工具列表集合T,工艺路线列表集合R,计划周期列表集合B;
所述参数包括,产品P在第B个月的计划BP(p,b),产品P在第B个月的计划产率BPRatio(p,b),产品P在第B个月在产线S的机器M上的产率UPH(p,m,s,b),产线S在第B个月的生产效率OEE(m,s,b),产品P在第B个月在产线S产出率Yield(p,m,s,b),第B个月机器M的库存数量MQty(m,b),机器M的价格UMPrice(m),工具T在第B个月在产线S的机器M上的数量TQty(t,m,s,b),第B个月的工作日数量WDays(b)。
优选的,所述步骤S02的决策变量包括:
ProdIn(p,m,s,r,b):产品P通过工艺路线R在第B个月在产线S,机器M上的生产数量;
UnderBP(p,b):在第B个月,产品P没有满足计划的数量;
OverBP(p,b):在第B个月,产品P超过计划的数量;
UnderBPRatio(p,b):在第B个月,产品P相对于计划的负偏移;
OverBPRatio(p,b):在第B个月,产品P相对于计划的正偏移;
UnderMHrs(m,b):在第B个月,机器M空闲小时数;
AddMQty(m,b):在第B个月需要添加的机器M的数量;
UnderTHrs(t,m,s,b):在第B个月产线S上机器M中工具T的空闲小时数;
AddTQty(t,m,s,b):在第B个月产线S上机器M中工具T需要添加的机器T的数量;
WeightUnderBPp,b:为UnderBP(p,b)的权重参数;
WeightOverBPp,b:为OverBP(p,b)的权重参数;
WeigthUnderBPRatiop,b:为UnderBPRatio(p,b)的权重参数;
WeightOverBPRatiop,b:为OverBPRatio(p,b)的权重参数。
优选的,所述步骤S02中有约束的产能目标函数为:
所述无约束的产能目标函数为:
优选的,所述有约束的产能目标函数的约束条件包括:
物料流平衡约束,支持运营计划约束,平衡运营计划混合约束,机器产能约束,工具产能约束;
所述无约束的产能目标函数的约束条件包括:
机器产能约束和工具产能约束。
优选的,所述步骤S03还包括,以表格的形式输出计算后的每月各个产线的机器的产能信息、资源约束、最小投资建议。
本发明还公开了一种企业供应链管理系统中企业运营控制系统,包括:
企业资源建模模块,用于将企业资源进行数学建模;
目标函数构建模块,用于创建决策变量,根据创建的决策变量,以主计划为基准,创建有约束的产能目标函数和无约束的产能目标函数,根据不同的产能目标函数构建相应的约束条件;
求解模块,用于调整求解参数得到满足企业运营计划的资源分配方式或者需求资源。
与现有技术相比,本发明的优点是:
1、能妥善、有效的规划企业资源﹝如机器、人员、工具、物料等﹞来满足顾客需求,达到最大产出量、瓶颈资源使用率最高及前置时间最短等生产策略,并能协助生产管理人员找出实际可行的企业信息。
2、支持Excel格式的数据导入,可以选取特定版本的基础数据组成优化方案,在指定计划月运行产能计划模型,为用户预制多种报表信息,比如Top 5资源约束,最小投资建议等报表。
附图说明
下面结合附图及实施例对本发明作进一步描述:
图1为本发明企业供应链管理系统中企业运营控制方法的流程图;
图2为本发明输出的资源约束报表;
图3为本发明输出的最小投资建议报表。
具体实施方式
以下结合具体实施例对上述方案做进一步说明。应理解,这些实施例是用于说明本发明而不限于限制本发明的范围。实施例中采用的实施条件可以根据具体厂家的条件做进一步调整,未注明的实施条件通常为常规实验中的条件。
实施例:
如图1所示,一种企业供应链管理系统中企业运营控制方法,包括以下步骤:
S01:将企业资源进行数学建模;
S02:创建决策变量,根据创建的决策变量,以主生产计划的月度计划为基准,按月度创建有约束的产能目标函数和无约束的产能目标函数,根据不同的产能目标函数构建相应的约束条件;
S03:调整求解参数得到满足企业运营计划的资源分配方式或者需求资源。
步骤S01中,对工厂相关生产要素与资源,比如设备数据,产品数据,工序数据,产能数据,产品-工序-设备数据,产品良率等,进行数学建模,数学建模包括构建集合和参数,所述集合包括,产品列表集合P,产线列表集合S,机器列表集合M,工具列表集合T,工艺路线列表集合R,计划周期列表集合B;
参数包括,产品P在第B个月的计划BP(p,b),产品P在第B个月的计划产率BPRatio(p,b),产品P在第B个月在产线S的机器M上的产率UPH(p,m,s,b),产线S在第B个月的生产效率OEE(m,s,b),产品P在第B个月在产线S产出率Yield(p,m,s,b),第B个月机器M的库存数量MQty(m,b),机器M的价格UMPrice(m),工具T在第B个月在产线S的机器M上的数量TQty(t,m,s,b),第B个月的工作日数量WDays(b)。
根据工厂生产要素和资源的数学模型,根据运筹学创建相关的运筹学优化模型。首先,创建了策变量,根据创建的决策变量,创建有约束的产能目标函数和无约束的产能目标函数,在每个目标函数中创建多个约束。其中,有约束的产能目标函数的目标为如何分配有限资源去尽可能满足企业运营计划,无约束的产能目标函数的目标为需要多少资源才能够满足企业运营计划。
以主计划的月度计划为基准,按月计算及输出各月产能,具体输出数量可通过参数变更方进行调整,单次最大输出12个月数据。当然还可以为周计划及日计划。
决策变量包括:
ProdIn(p,m,s,r,b):产品P通过工艺路线R在第B个月在产线S,机器M上的生产数量;
UnderBP(p,b):在第B个月,产品P没有满足计划的数量;
OverBP(p,b):在第B个月,产品P超过计划的数量;
UnderBPRatio(p,b):在第B个月,产品P相对于计划的负偏移;
OverBPRatio(p,b):在第B个月,产品P相对于计划的正偏移;
UnderMHrs(m,b):在第B个月,机器M空闲小时数;
AddMQty(m,b):在第B个月需要添加的机器M的数量;
UnderTHrs(t,m,s,b):在第B个月产线S上机器M中工具T的空闲小时数;
AddTQty(t,m,s,b):在第B个月产线S上机器M中工具T需要添加的数量;
UTPrice(t,m,s,,b):在第B个月产线S上机器M中工具T的价格;
WeightUnderBPp,b:为UnderBP(p,b)的权重参数;
WeightOverBPp,b:为OverBP(p,b)的权重参数;
WeigthUnderBPRatiop,b:为UnderBPRatio(p,b)的权重参数;
WeightOverBPRatiop,b:为OverBPRatio(p,b)的权重参数;
WeightAddMachinem,b:为添加机器M数量权重参数;
WeightAddToolingt,m,s,b:为添加工具T产量权重参数。
一、有约束的产能目标函数为:
参数关系
WeightUnderBP=WeightOverBP>>WeightUnderBPRatio=WeightOverBPRatio。
目标函数的意义:
最小化在第B个月,产品P没有满足计划的数量+在第B个月,产品P超过计划的数量+在第B个月+产品P产出率相对于计划的负偏移+在第B个月,产品P产出率相对于计划的正偏移。
约束条件包括:
(1)物料流平衡约束
物料流出:
物料流入:
约束的意义:
产线流出:
在第B个月,产品P在产线S的机器M上根据工艺R的输出数量等于产品P在产线S的机器M上根据工艺R的输入数量*在第B个月,产品P在产线S的机器M的产率。
产线流入:
从一个产线的流出等于到另一个产线的流入。
(2)支持运营计划约束:
支持运营计划约束的意义:
产品P在产线S的机器M上根据工艺R的输出数量的总和+在第B个月,产品P没有满足计划的数量-在第B个月,产品P超过计划的数量=在第B个月产品P的运营计划数量。
(3)平衡运营计划混合约束:
平衡运营计划混合约束的意义:
产品P在产线S的机器M上根据工艺R的输出数量的总和+在第B个月,产品P相对于计划的正偏移-在第B个月,产品P相对于计划的负偏移=产品P在产线S的机器M上根据工艺R的输出数量的总和*运营计划的产率。
(4)机器产能约束:
机器产能约束的意义:
产品P在产线S的机器M上根据工艺R的运行时间+在第B个月,机器M空闲小时数=24*工作日数量*在第B个月,机器M的数量。
(5)工具产能约束:
工具产能约束的意义:
产品P在产线S的机器M上根据工艺R的工具的运行时间+在第B个月,机器M上工具空闲小时数=24*工作日数量*在第B个月,机器M上工具T的数量。
产品的最大机器产能可以用如下公式表示:
Top 5产能约束可以用∑mcalMCapm,s,b根据降序来表示。
二、无约束的产能目标函数为:
参数关系
WeightUnderBP=WeightOverBP>>WeightAddMachine
目标函数的意义:
最小化在第B个月,产品P没有满足计划的数量,在第B个月,产品P超过计划的数量,机器的价格*需要新增的机器数量+工具的价格*需要新增的工具的数量。
约束包括:
(1)机器产能约束:
机器产能约束的意义:
产品P在产线S的机器M上根据工艺R的运行时间+在第B个月,机器M空闲小时数=24*工作日数量*在第B个月,(机器M+需要添加的机器的)的数量。
(2)工具产能约束:
工具产能约束的意义:
产品P在产线S的机器M上根据工艺R的工具的运行时间+在第B个月,机器M上工具空闲小时数=24*工作日数量*在第B个月,(机器M上工具T+新增工具)的数量。
产品的最大机器产能可以用如下公式表示:
Top 5产能约束可以用∑mcalMCapm,s,b根据降序来表示。
除了可以上传excel数据,还可以搜索,编辑单个数据,模拟各种what-if场景,选取特定版本的基础数据组成优化方案,在指定计划月运行产能计划模型。
以表格的形式输出计算后的每月各个产线的机器的产能信息,资源约束报表如图2所示,最小投资建议报表如图3所示等等。
上述实例只为说明本发明的技术构思及特点,其目的在于让熟悉此项技术的人是能够了解本发明的内容并据以实施,并不能以此限制本发明的保护范围。凡根据本发明精神实质所做的等效变换或修饰,都应涵盖在本发明的保护范围之内。
Claims (10)
1.一种企业供应链管理系统中企业运营控制方法,其特征在于,包括以下步骤:
S01:将企业资源进行数学建模;
S02:创建决策变量,根据创建的决策变量,以主计划为基准,创建有约束的产能目标函数和无约束的产能目标函数,根据不同的产能目标函数构建相应的约束条件;
S03:调整求解参数得到满足企业运营计划的资源分配方式或者需求资源。
2.根据权利要求1所述的企业供应链管理系统中企业运营控制方法,其特征在于,所述步骤S01中数学建模包括构建集合和参数,所述集合包括,产品列表集合P,产线列表集合S,机器列表集合M,工具列表集合T,工艺路线列表集合R,计划周期列表集合B;
所述参数包括,产品P在第B个月的计划BP(p,b),产品P在第B个月的计划产率BPRatio(p,b),产品P在第B个月在产线S的机器M上的产率UPH(p,m,s,b),产线S在第B个月的生产效率OEE(m,s,b),产品P在第B个月在产线S产出率Yield(p,m,s,b),第B个月机器M的库存数量MQty(m,b),机器M的价格UMPrice(m),工具T在第B个月在产线S的机器M上的数量TQty(t,m,s,b),第B个月的工作日数量WDays(b)。
3.根据权利要求1所述的企业供应链管理系统中企业运营控制方法,其特征在于,所述步骤S02的决策变量包括:
ProdIn(p,m,s,r,b):产品P通过工艺路线R在第B个月在产线S,机器M上的生产数量;
UnderBP(p,b):在第B个月,产品P没有满足计划的数量;
OverBP(p,b):在第B个月,产品P超过计划的数量;
UnderBPRatio(p,b):在第B个月,产品P相对于计划的负偏移;
OverBPRatio(p,b):在第B个月,产品P相对于计划的正偏移;
UnderMHrs(m,b):在第B个月,机器M空闲小时数;
AddMQty(m,b):在第B个月需要添加的机器M的数量;
UnderTHrs(t,m,s,b):在第B个月产线S上机器M中工具T的空闲小时数;
AddTQty(t,m,s,b):在第B个月产线S上机器M中工具T需要添加的数量;
UTPrice(t,m,s,,b):在第B个月产线S上机器M中工具T的价格;
WeightUnderBPp,b:为UnderBP(p,b)的权重参数;
WeightOverBPp,b:为OverBP(p,b)的权重参数;
WeighthUnderBPRatiop,b:为UnderBPRatio(p,b)的权重参数;
WeightOverBPRatiop,b:为OverBPRatio(p,b)的权重参数;
WeightAddMachinem,b:为添加机器M数量权重参数;
WeightAddToolingt,m,s,b:为添加工具T产量权重参数。
4.根据权利要求1所述的企业供应链管理系统中企业运营控制方法,其特征在于,所述步骤S02中有约束的产能目标函数为:
<mfenced open = "" close = "">
<mtable>
<mtr>
<mtd>
<mrow>
<mi>M</mi>
<mi>i</mi>
<mi>n</mi>
<munder>
<mi>&Sigma;</mi>
<mrow>
<mi>p</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
</munder>
<mrow>
<mo>(</mo>
<mrow>
<msub>
<mi>WeightUnderBP</mi>
<mrow>
<mi>p</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
</msub>
<mo>&times;</mo>
<mi>U</mi>
<mi>n</mi>
<mi>d</mi>
<mi>e</mi>
<mi>r</mi>
<mi>B</mi>
<mi>P</mi>
<mrow>
<mo>(</mo>
<mrow>
<mi>p</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
<mo>)</mo>
</mrow>
<mo>+</mo>
<msub>
<mi>WeightOverBP</mi>
<mrow>
<mi>p</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
</msub>
<mo>&times;</mo>
<mi>O</mi>
<mi>v</mi>
<mi>e</mi>
<mi>r</mi>
<mi>B</mi>
<mi>P</mi>
<mrow>
<mo>(</mo>
<mrow>
<mi>p</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
<mo>)</mo>
</mrow>
</mrow>
<mo>)</mo>
</mrow>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<mo>+</mo>
<munder>
<mi>&Sigma;</mi>
<mrow>
<mi>p</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
</munder>
<mo>(</mo>
<msub>
<mi>WeigthUnderBPRatio</mi>
<mrow>
<mi>p</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
</msub>
<mo>&times;</mo>
<mi>U</mi>
<mi>n</mi>
<mi>d</mi>
<mi>e</mi>
<mi>r</mi>
<mi>B</mi>
<mi>P</mi>
<mi>R</mi>
<mi>a</mi>
<mi>t</mi>
<mi>i</mi>
<mi>o</mi>
<mrow>
<mo>(</mo>
<mrow>
<mi>p</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
<mo>)</mo>
</mrow>
<mo>+</mo>
<msub>
<mi>WeightOverBPRatio</mi>
<mrow>
<mi>p</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
</msub>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<mo>&times;</mo>
<mi>O</mi>
<mi>v</mi>
<mi>e</mi>
<mi>r</mi>
<mi>B</mi>
<mi>P</mi>
<mi>R</mi>
<mi>a</mi>
<mi>t</mi>
<mi>i</mi>
<mi>o</mi>
<mo>(</mo>
<mrow>
<mi>p</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
<mo>)</mo>
<mo>)</mo>
</mrow>
</mtd>
</mtr>
</mtable>
</mfenced>
所述无约束的产能目标函数为:
<mfenced open = "" close = "">
<mtable>
<mtr>
<mtd>
<mrow>
<mi>M</mi>
<mi>i</mi>
<mi>n</mi>
<munder>
<mi>&Sigma;</mi>
<mrow>
<mi>p</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
</munder>
<mrow>
<mo>(</mo>
<mrow>
<msub>
<mi>WeightUnderBP</mi>
<mrow>
<mi>p</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
</msub>
<mo>&times;</mo>
<mi>U</mi>
<mi>n</mi>
<mi>d</mi>
<mi>e</mi>
<mi>r</mi>
<mi>B</mi>
<mi>P</mi>
<mrow>
<mo>(</mo>
<mrow>
<mi>p</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
<mo>)</mo>
</mrow>
<mo>+</mo>
<msub>
<mi>WeightOverBP</mi>
<mrow>
<mi>p</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
</msub>
<mo>&times;</mo>
<mi>O</mi>
<mi>v</mi>
<mi>e</mi>
<mi>r</mi>
<mi>B</mi>
<mi>P</mi>
<mrow>
<mo>(</mo>
<mrow>
<mi>p</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
<mo>)</mo>
</mrow>
</mrow>
<mo>)</mo>
</mrow>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<mo>+</mo>
<munder>
<mi>&Sigma;</mi>
<mrow>
<mi>m</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
</munder>
<mrow>
<mo>(</mo>
<mrow>
<msub>
<mi>WeightAddMachine</mi>
<mrow>
<mi>m</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
</msub>
<mo>&times;</mo>
<mi>U</mi>
<mi>M</mi>
<mi>Pr</mi>
<mi>i</mi>
<mi>c</mi>
<mi>e</mi>
<mrow>
<mo>(</mo>
<mi>m</mi>
<mo>)</mo>
</mrow>
<mo>&times;</mo>
<mi>A</mi>
<mi>d</mi>
<mi>d</mi>
<mi>M</mi>
<mi>Q</mi>
<mi>t</mi>
<mi>y</mi>
<mrow>
<mo>(</mo>
<mrow>
<mi>m</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
<mo>)</mo>
</mrow>
</mrow>
<mo>)</mo>
</mrow>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<mo>+</mo>
<msub>
<mi>&Sigma;</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>m</mi>
<mo>,</mo>
<mi>s</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
</msub>
<mrow>
<mo>(</mo>
<mrow>
<msub>
<mi>WeightAddTooling</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>m</mi>
<mo>,</mo>
<mi>s</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
</msub>
<mo>&times;</mo>
<mi>U</mi>
<mi>T</mi>
<mi>Pr</mi>
<mi>i</mi>
<mi>c</mi>
<mi>e</mi>
<mrow>
<mo>(</mo>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>m</mi>
<mo>,</mo>
<mi>s</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
<mo>)</mo>
</mrow>
<mo>&times;</mo>
<mi>A</mi>
<mi>d</mi>
<mi>d</mi>
<mi>T</mi>
<mi>Q</mi>
<mi>t</mi>
<mi>y</mi>
<mrow>
<mo>(</mo>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>m</mi>
<mo>,</mo>
<mi>s</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
<mo>)</mo>
</mrow>
</mrow>
<mo>)</mo>
</mrow>
<mo>.</mo>
</mrow>
</mtd>
</mtr>
</mtable>
</mfenced>
5.根据权利要求4所述的企业供应链管理系统中企业运营控制方法,其特征在于,所述有约束的产能目标函数的约束条件包括:
物料流平衡约束,支持运营计划约束,平衡运营计划混合约束,机器产能约束,工具产能约束;
所述无约束的产能目标函数的约束条件包括:
机器产能约束和工具产能约束。
6.根据权利要求1所述的企业供应链管理系统中企业运营控制方法,其特征在于,所述步骤S03还包括,以表格的形式输出计算后的每月各个产线的机器的产能信息、资源约束、最小投资建议。
7.一种企业供应链管理系统中企业运营控制系统,其特征在于,包括:
企业资源建模模块,用于将企业资源进行数学建模;
目标函数构建模块,用于创建决策变量,根据创建的决策变量,以主计划为基准,创建有约束的产能目标函数和无约束的产能目标函数,根据不同的产能目标函数构建相应的约束条件;
求解模块,用于调整求解参数得到满足企业运营计划的资源分配方式或者需求资源。
8.根据权利要求7所述的企业供应链管理系统中企业运营控制系统,其特征在于,所述数学建模包括构建集合和参数,所述集合包括,产品列表集合P,产线列表集合S,机器列表集合M,工具列表集合T,工艺路线列表集合R,计划周期列表集合B;
所述参数包括,产品P在第B个月的计划BP(p,b),产品P在第B个月的计划产率BPRatio(p,b),产品P在第B个月在产线S的机器M上的产率UPH(p,m,s,b),产线S在第B个月的生产效率OEE(m,s,b),产品P在第B个月在产线S产出率Yield(p,m,s,b),第B个月机器M的库存数量MQty(m,b),机器M的价格UMPrice(m),工具T在第B个月在产线S的机器M上的数量TQty(t,m,s,b),第B个月的工作日数量WDays(b)。
9.根据权利要求7所述的企业供应链管理系统中企业运营控制系统,其特征在于,所述决策变量包括:
ProdIn(p,m,s,r,b):产品P通过工艺路线R在第B个月在产线S,机器M上的生产数量;
UnderBP(p,b):在第B个月,产品P没有满足计划的数量;
OverBP(p,b):在第B个月,产品P超过计划的数量;
UnderBPRatio(p,b):在第B个月,产品P相对于计划的负偏移;
OverBPRatio(p,b):在第B个月,产品P相对于计划的正偏移;
UnderMHrs(m,b):在第B个月,机器M空闲小时数;
AddMQty(m,b):在第B个月需要添加的机器M的数量;
UnderTHrs(t,m,s,b):在第B个月产线S上机器M中工具T的空闲小时数;
AddTQty(t,m,s,b):在第B个月产线S上机器M中工具T需要添加的数量;
UTPrice(t,m,s,,b):在第B个月产线S上机器M中工具T的价格;
WeightUnderBPp,b:为UnderBP(p,b)的权重参数;
WeightOverBPp,b:为OverBP(p,b)的权重参数;
WeigthUnderBPRatiop,b:为UnderBPRatio(p,b)的权重参数;
WeightOverBPRatiop,b:为OverBPRatio(p,b)的权重参数;
WeightAddMachinem,b:为添加机器M数量权重参数;
WeightAddToolingt,m,s,b:为添加工具T产量权重参数。
10.根据权利要求7所述的企业供应链管理系统中企业运营控制系统,其特征在于,所述有约束的产能目标函数为:
<mfenced open = "" close = "">
<mtable>
<mtr>
<mtd>
<mrow>
<mi>M</mi>
<mi>i</mi>
<mi>n</mi>
<munder>
<mi>&Sigma;</mi>
<mrow>
<mi>p</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
</munder>
<mrow>
<mo>(</mo>
<mrow>
<msub>
<mi>WeightUnderBP</mi>
<mrow>
<mi>p</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
</msub>
<mo>&times;</mo>
<mi>U</mi>
<mi>n</mi>
<mi>d</mi>
<mi>e</mi>
<mi>r</mi>
<mi>B</mi>
<mi>P</mi>
<mrow>
<mo>(</mo>
<mrow>
<mi>p</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
<mo>)</mo>
</mrow>
<mo>+</mo>
<msub>
<mi>WeightOverBP</mi>
<mrow>
<mi>p</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
</msub>
<mo>&times;</mo>
<mi>O</mi>
<mi>v</mi>
<mi>e</mi>
<mi>r</mi>
<mi>B</mi>
<mi>P</mi>
<mrow>
<mo>(</mo>
<mrow>
<mi>p</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
<mo>)</mo>
</mrow>
</mrow>
<mo>)</mo>
</mrow>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<mo>+</mo>
<munder>
<mi>&Sigma;</mi>
<mrow>
<mi>p</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
</munder>
<mo>(</mo>
<msub>
<mi>WeigthUnderBPRatio</mi>
<mrow>
<mi>p</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
</msub>
<mo>&times;</mo>
<mi>U</mi>
<mi>n</mi>
<mi>d</mi>
<mi>e</mi>
<mi>r</mi>
<mi>B</mi>
<mi>P</mi>
<mi>R</mi>
<mi>a</mi>
<mi>t</mi>
<mi>i</mi>
<mi>o</mi>
<mrow>
<mo>(</mo>
<mrow>
<mi>p</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
<mo>)</mo>
</mrow>
<mo>+</mo>
<msub>
<mi>WeightOverBPRatio</mi>
<mrow>
<mi>p</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
</msub>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<mo>&times;</mo>
<mi>O</mi>
<mi>v</mi>
<mi>e</mi>
<mi>r</mi>
<mi>B</mi>
<mi>P</mi>
<mi>R</mi>
<mi>a</mi>
<mi>t</mi>
<mi>i</mi>
<mi>o</mi>
<mo>(</mo>
<mrow>
<mi>p</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
<mo>)</mo>
<mo>)</mo>
</mrow>
</mtd>
</mtr>
</mtable>
</mfenced>
所述无约束的产能目标函数为:
<mfenced open = "" close = "">
<mtable>
<mtr>
<mtd>
<mrow>
<mi>M</mi>
<mi>i</mi>
<mi>n</mi>
<munder>
<mi>&Sigma;</mi>
<mrow>
<mi>p</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
</munder>
<mrow>
<mo>(</mo>
<mrow>
<msub>
<mi>WeightUnderBP</mi>
<mrow>
<mi>p</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
</msub>
<mo>&times;</mo>
<mi>U</mi>
<mi>n</mi>
<mi>d</mi>
<mi>e</mi>
<mi>r</mi>
<mi>B</mi>
<mi>P</mi>
<mrow>
<mo>(</mo>
<mrow>
<mi>p</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
<mo>)</mo>
</mrow>
<mo>+</mo>
<msub>
<mi>WeightOverBP</mi>
<mrow>
<mi>p</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
</msub>
<mo>&times;</mo>
<mi>O</mi>
<mi>v</mi>
<mi>e</mi>
<mi>r</mi>
<mi>B</mi>
<mi>P</mi>
<mrow>
<mo>(</mo>
<mrow>
<mi>p</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
<mo>)</mo>
</mrow>
</mrow>
<mo>)</mo>
</mrow>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<mo>+</mo>
<munder>
<mi>&Sigma;</mi>
<mrow>
<mi>m</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
</munder>
<mrow>
<mo>(</mo>
<mrow>
<msub>
<mi>WeightAddMachine</mi>
<mrow>
<mi>m</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
</msub>
<mo>&times;</mo>
<mi>U</mi>
<mi>M</mi>
<mi>Pr</mi>
<mi>i</mi>
<mi>c</mi>
<mi>e</mi>
<mrow>
<mo>(</mo>
<mi>m</mi>
<mo>)</mo>
</mrow>
<mo>&times;</mo>
<mi>A</mi>
<mi>d</mi>
<mi>d</mi>
<mi>M</mi>
<mi>Q</mi>
<mi>t</mi>
<mi>y</mi>
<mrow>
<mo>(</mo>
<mrow>
<mi>m</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
<mo>)</mo>
</mrow>
</mrow>
<mo>)</mo>
</mrow>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<mo>+</mo>
<msub>
<mi>&Sigma;</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>m</mi>
<mo>,</mo>
<mi>s</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
</msub>
<mrow>
<mo>(</mo>
<mrow>
<msub>
<mi>WeightAddTooling</mi>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>m</mi>
<mo>,</mo>
<mi>s</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
</msub>
<mo>&times;</mo>
<mi>U</mi>
<mi>T</mi>
<mi>Pr</mi>
<mi>i</mi>
<mi>c</mi>
<mi>e</mi>
<mrow>
<mo>(</mo>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>m</mi>
<mo>,</mo>
<mi>s</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
<mo>)</mo>
</mrow>
<mo>&times;</mo>
<mi>A</mi>
<mi>d</mi>
<mi>d</mi>
<mi>T</mi>
<mi>Q</mi>
<mi>t</mi>
<mi>y</mi>
<mrow>
<mo>(</mo>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>m</mi>
<mo>,</mo>
<mi>s</mi>
<mo>,</mo>
<mi>b</mi>
</mrow>
<mo>)</mo>
</mrow>
</mrow>
<mo>)</mo>
</mrow>
<mo>.</mo>
</mrow>
</mtd>
</mtr>
</mtable>
</mfenced>
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710739796.6A CN107516149B (zh) | 2017-08-25 | 2017-08-25 | 企业供应链管理系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710739796.6A CN107516149B (zh) | 2017-08-25 | 2017-08-25 | 企业供应链管理系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107516149A true CN107516149A (zh) | 2017-12-26 |
CN107516149B CN107516149B (zh) | 2021-05-14 |
Family
ID=60724251
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710739796.6A Active CN107516149B (zh) | 2017-08-25 | 2017-08-25 | 企业供应链管理系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107516149B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110223000A (zh) * | 2019-06-18 | 2019-09-10 | 中国环境科学研究院 | 一种环保企业评估服务系统及方法 |
CN112132546A (zh) * | 2020-09-25 | 2020-12-25 | 杉数科技(北京)有限公司 | 一种对生产进行排程的方法及装置 |
CN112200489A (zh) * | 2020-10-30 | 2021-01-08 | 中国科学院自动化研究所 | 有色金属冶炼产供销一体优化系统、方法、装置 |
CN113537847A (zh) * | 2021-09-17 | 2021-10-22 | 广州粤芯半导体技术有限公司 | 产能规划方法及可读存储介质 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030233290A1 (en) * | 2002-06-14 | 2003-12-18 | Yang Lou Ping | Buyer, multi-supplier, multi-stage supply chain management system with lot tracking |
CN103942609A (zh) * | 2014-03-28 | 2014-07-23 | 上海交通大学 | 产品服务供应链优化设计方法 |
CN104077633A (zh) * | 2014-06-27 | 2014-10-01 | 歌尔声学股份有限公司 | 基于瓶颈工序的排产方法 |
CN104375477A (zh) * | 2014-09-03 | 2015-02-25 | 浙江大学 | 一种基于生产系统与能量系统的集成优化的生产方法 |
-
2017
- 2017-08-25 CN CN201710739796.6A patent/CN107516149B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030233290A1 (en) * | 2002-06-14 | 2003-12-18 | Yang Lou Ping | Buyer, multi-supplier, multi-stage supply chain management system with lot tracking |
CN103942609A (zh) * | 2014-03-28 | 2014-07-23 | 上海交通大学 | 产品服务供应链优化设计方法 |
CN104077633A (zh) * | 2014-06-27 | 2014-10-01 | 歌尔声学股份有限公司 | 基于瓶颈工序的排产方法 |
CN104375477A (zh) * | 2014-09-03 | 2015-02-25 | 浙江大学 | 一种基于生产系统与能量系统的集成优化的生产方法 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110223000A (zh) * | 2019-06-18 | 2019-09-10 | 中国环境科学研究院 | 一种环保企业评估服务系统及方法 |
CN112132546A (zh) * | 2020-09-25 | 2020-12-25 | 杉数科技(北京)有限公司 | 一种对生产进行排程的方法及装置 |
CN112200489A (zh) * | 2020-10-30 | 2021-01-08 | 中国科学院自动化研究所 | 有色金属冶炼产供销一体优化系统、方法、装置 |
CN112200489B (zh) * | 2020-10-30 | 2023-06-23 | 中国科学院自动化研究所 | 有色金属冶炼产供销一体优化系统、方法、装置 |
CN113537847A (zh) * | 2021-09-17 | 2021-10-22 | 广州粤芯半导体技术有限公司 | 产能规划方法及可读存储介质 |
CN113537847B (zh) * | 2021-09-17 | 2021-12-17 | 广州粤芯半导体技术有限公司 | 产能规划方法及可读存储介质 |
Also Published As
Publication number | Publication date |
---|---|
CN107516149B (zh) | 2021-05-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Wang et al. | Framework for modeling operational uncertainty to optimize offsite production scheduling of precast components | |
CN107516149B (zh) | 企业供应链管理系统 | |
CN109359884B (zh) | 航空复杂装备结构件车间作业计划及重调度方法 | |
Rohani et al. | Production line analysis via value stream mapping: a lean manufacturing process of color industry | |
CN107464025B (zh) | 基于大数据的供应链需求预测与智能决策方法 | |
CN101261695A (zh) | 一种流程工业生产调度系统的实时动态再调度方法 | |
CN108053047A (zh) | 云生产资源调度方法、装置和系统 | |
CN114169766A (zh) | 一种工业产能分配的生产管理方法及系统 | |
JP2011065626A (ja) | プラントの建設計画支援装置及び方法 | |
CN112465333B (zh) | 一种基于多时间尺度的智能生产线调度优化方法 | |
JP2011170496A (ja) | プラントの工事計画支援装置及び方法 | |
CN1661609A (zh) | 钢铁生产计划中合同与库存联合优化管理方法 | |
CN117010613A (zh) | 智能生产规划及排程方法、系统、计算机设备及存储介质 | |
CN111415069B (zh) | 离散制造业工序级智能实时调度方法 | |
CN115907332A (zh) | 一种油气井维修任务调度的两层优化方法及装置 | |
JPH11328276A (ja) | スケジューリングシステム | |
CN102364510A (zh) | 流程制造业工序关系的表达方法 | |
CN114995329A (zh) | 一种基于多机动态调度的芯片封测线性规划排程方法 | |
CN116415780A (zh) | 一种智能排单的方法及系统 | |
CN100383914C (zh) | 决定机器派工顺序的方法以及使用该方法的制造系统 | |
Wikarek et al. | Model of decision support for the configuration of manufacturing system | |
De Carvalho et al. | Production scheduling on practical problems | |
Ighravwe et al. | Preventive maintenance task balancing with spare parts optimisation via big-bang big-crunch algorithm | |
JP2020140307A (ja) | 車両部品年次計画立案装置 | |
Toliušienė et al. | The study on implementation of agile manufacturing system in Lithuanian industry |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |