CN107504946A - The Excavation Settlement real-time monitoring system and monitoring method of wisdom building site control platform - Google Patents
The Excavation Settlement real-time monitoring system and monitoring method of wisdom building site control platform Download PDFInfo
- Publication number
- CN107504946A CN107504946A CN201710736922.2A CN201710736922A CN107504946A CN 107504946 A CN107504946 A CN 107504946A CN 201710736922 A CN201710736922 A CN 201710736922A CN 107504946 A CN107504946 A CN 107504946A
- Authority
- CN
- China
- Prior art keywords
- data
- real
- time
- building site
- monitoring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 119
- 238000009412 basement excavation Methods 0.000 title claims abstract description 67
- 238000000034 method Methods 0.000 title claims abstract description 21
- 238000004458 analytical method Methods 0.000 claims abstract description 65
- 230000008447 perception Effects 0.000 claims abstract description 32
- 230000005540 biological transmission Effects 0.000 claims abstract description 19
- 238000001514 detection method Methods 0.000 claims abstract description 5
- 238000006073 displacement reaction Methods 0.000 claims description 8
- 230000008859 change Effects 0.000 claims description 7
- 238000004062 sedimentation Methods 0.000 claims description 5
- 239000003673 groundwater Substances 0.000 claims description 4
- 239000002689 soil Substances 0.000 claims description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 4
- 230000002706 hydrostatic effect Effects 0.000 claims description 3
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 230000001360 synchronised effect Effects 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 6
- 238000013461 design Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 238000005259 measurement Methods 0.000 description 3
- 238000013480 data collection Methods 0.000 description 2
- 235000013399 edible fruits Nutrition 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000009467 reduction Effects 0.000 description 2
- 230000001953 sensory effect Effects 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 1
- 230000002547 anomalous effect Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 229910052799 carbon Inorganic materials 0.000 description 1
- 239000003086 colorant Substances 0.000 description 1
- 238000011157 data evaluation Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 230000001747 exhibiting effect Effects 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000003550 marker Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C5/00—Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01D—MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
- G01D21/00—Measuring or testing not otherwise provided for
- G01D21/02—Measuring two or more variables by means not covered by a single other subclass
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- Alarm Systems (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention provides a kind of Excavation Settlement real-time monitoring system of wisdom building site control platform, including:Excavation Settlement monitor terminal is connected with wisdom building site management Platform communication;Wisdom building site management platform receives and stores the real-time detector data information of Excavation Settlement monitor terminal, synchronized upload to high in the clouds management platform;Wherein, Excavation Settlement monitor terminal includes:Data perception system, data collecting system, data transmission system and control analysis system, data perception system are used for real-time perception foundation pit deformation Monitoring Data;Data collecting system is carried out data transmission by data transmission system and control analysis system;Analysis system and the database and server wireless connection of wisdom building site management platform are controlled, for sending warning when wisdom building site management detection of platform goes out data exception.The present invention also provides a kind of Excavation Settlement method of real-time of wisdom building site control platform.The present invention has data sharing and the beneficial effect of foundation ditch remote real-time monitoring is carried out according to actual conditions.
Description
Technical field
The invention belongs to technical field of building construction, and in particular to a kind of Excavation Settlement of wisdom building site control platform is real-time
Monitoring system and monitoring method.
Background technology
The high speed development of Chinese Urbanization construction is faced with many stern challenges:Shortage of land resource, greenery area subtract
Less, the problems such as the quick-fried increasing of urban population, traffic jam, energy resource consumption increase, environmental pollution, rising of housing price, these all cause energetically
Utilization Underground Space Resource, expansion mankind's activity space are more and more urgent.Therefore, the cutting depth of base pit engineering is increasingly
Deeply, scale is increasing, technical difficulty also constantly rise therewith.
In recent years, there are many security incidents in work progress in some underground engineerings and foundation ditch, cause different journeys
The people life property loss of degree.It is therefore desirable to the engineering safety prison of science is established during foundation ditch and Underground Engineering Excavation
Examining system, the potential safety hazard occurred with early warning foundation ditch and underground engineering during construction and use, avoids the generation of accident.
The deeply mixing cement-soil pile and Vertical Settlement of foundation pit side-wall are the important indicators of foundation ditch and underground engineering stability, but mesh
Preceding wide variety of foundation pit deformation monitoring method automaticity is low, labor intensity is high, it is difficult to realizes monitoring in real time, deep horizontal
Displacement is different with the monitoring method settled vertically, reduce further monitoring efficiency, adds monitoring cost.For deep horizontal
Displacement, presently mainly using inclinometer pipe and inclinometer carry out manual measurement, reading is reported again, data hysteresis is obvious;If
Though automatic measurement can be realized using multiple inclinometers are distributed along inclinometer pipe, mean that the several times of monitoring expense increase.For depth
Layer vertical displacement, is presently mainly measured using total powerstation and level meter, is equally faced with the data hysteresis of manual measurement
Or the problem of monitoring the growth of expense.
The content of the invention
It is an object of the present invention to provide Excavation Settlement real-time monitoring system and the monitoring side of a kind of wisdom building site control platform
Method, it can realize data sharing, data exhibiting and carry out real-time remote monitoring Excavation Settlement situation with terminal device.
Thus, the present invention provides a kind of Excavation Settlement real-time monitoring system of wisdom building site control platform, including foundation ditch sinks
Monitor terminal, wisdom building site management platform and high in the clouds management platform drop,
The Excavation Settlement monitor terminal is communicated with the wisdom building site management platform by wired or wireless network
Connection, by PC ends or the remote monitoring of cell phone application;
The wisdom building site management platform is previously stored with the master data information of Excavation Settlement, and receives and store institute
The real-time detector data information of Excavation Settlement monitor terminal is stated, while real-time detector data synchronizing information is uploaded to the high in the clouds
Management platform;
Wherein, the Excavation Settlement monitor terminal includes:Data perception system, data collecting system, data transmission system
With controlling analysis system,
The data perception system is for the deformation monitoring in real-time perception foundation ditch, groundwater monitoring, neighboring buildings monitoring
Monitored with ess-strain;
The data collecting system gathers the real-time detector data that the data perception system obtains in real time, and the data are adopted
Collecting system is carried out data transmission by the data transmission system and the control analysis system;
The database and server wireless connection of control analysis system and the wisdom building site management platform, for
The wisdom building site management detection of platform sends warning when going out data exception, and is controlled according to the master data information
The real-time change curve map of each monitoring point of Excavation Settlement is obtained after analysis, and knot is analyzed into the control of each monitoring point respectively
Fruit is sent to user terminal with form or graphics mode, and each monitoring point Comprehensive analysis results are sent to user terminal.
It is preferred that the control analysis system also includes:
Data presetting module, for presetting the secure threshold of each monitoring point, including sedimentation deformation threshold value, ess-strain value
Threshold value or horizontal displacement threshold value.
It is preferred that the control analysis system also includes:
Alarm module, for receiving the secure threshold of each monitoring point, and when the data perception system detects in real time
When at least one of data exceed the secure threshold of each monitoring point, the control analysis system can pass through short message, mail, report
Table, figure or curve notice user terminal.
It is preferred that the control analysis system also includes:
Data setup module, for setting the different brackets secure threshold of each monitoring point, and when the data acquisition
After system real-time detector data carries out com-parison and analysis with the different brackets secure threshold, the control analysis system can be sent not
The information warning notice user terminal of same level.
It is preferred that the control analysis system also includes:
Alert level setup module, for according to different brackets secure threshold set corresponding to different brackets information warning,
The information warning carries out warning user terminal by way of voice, light and/or figure.
The present invention also provides a kind of Excavation Settlement method of real-time of wisdom building site control platform, including:
Each monitoring point data perception system being arranged in foundation ditch, for the deformation monitoring in real-time perception foundation ditch,
Groundwater monitoring, neighboring buildings monitoring monitor with ess-strain;
Data collecting system gathers the real-time detector data that the data perception system obtains in real time, and passes through data transfer
System carries out data transmission with control analysis system;
The control analysis system and the database and server wireless connection of wisdom building site management platform, for described
Wisdom building site management detection of platform sends warning when going out data exception, and is controlled according to the master data information of Excavation Settlement
The real-time change curve map of each monitoring point of Excavation Settlement is obtained after system analysis, and respectively analyzes the control of each monitoring point
As a result sent with form or figure to user terminal, and each monitoring point Comprehensive analysis results are sent to user terminal;
Excavation Settlement monitor terminal is used to perceive, gathers the real-time detector data that each monitoring point in foundation ditch is analyzed with control
Information, and be communicatively coupled with the wisdom building site management platform by wired or wireless network, and by PC ends or hand
Machine APP remote monitoring;
The wisdom building site management platform is previously stored with the master data information of Excavation Settlement, and receives and store institute
Excavation Settlement monitor terminal real-time detector data information is stated, while real-time detector data synchronizing information is uploaded to the high in the clouds and managed
Platform.
It is preferred that the data perception system by GPS, hydrostatic level, stationary slope level, ooze
Meter, slit gauge, strain gauge, reinforcing rib meter, soil pressure meter, rope meter or axle power meter is pressed to carry out real-time perception Excavation Settlement data.
It is preferred that the data collecting system is carried out in fact by vibrating wire acquirer, digital collection instrument or hub
When data acquisition.
It is preferred that the secure threshold of each monitoring point is preset in the control analysis system, including sedimentation deformation
Threshold value, ess-strain value threshold value and horizontal displacement threshold value.
It is preferred that data inquiry module is provided with the wisdom building site management platform, the data query mould
Block includes real-time data base and historical data base, and the real-time data base can be regularly by the data syn-chronization gathered in real time to server
The historical data base in.
The Excavation Settlement real-time monitoring system of the wisdom building site control platform of the present invention has beneficial below with monitoring method
Technique effect:
1st, the present invention can realize real-time collection, transmission, calculating, the analysis to the important service data of foundation ditch, display directly perceived
Every Monitoring Data, the historical variations process and current state of Monitoring Data, once being in an emergency, system can timely be sent out
Go out warning information, the multi-level sharing of safety monitoring information can be achieved, the issue of safe early warning information can be achieved.
2nd, the present invention has the characteristics of system composition is simple, clear in structure, stable, easy to maintenance, additionally it is possible to automatic
Generate various forms, curve, picture, convenient monitoring foundation ditch data in real time, preliminary analysis and simple can be carried out to Monitoring Data
Evaluation, and can be alarmed according to the early warning value being previously set, alarm and SMS, mail, audible-visual annunciator etc. can be achieved
Mode.
3rd, the Excavation Settlement real-time monitoring system of wisdom building site control platform of the invention and monitoring method can be with PC ends
Or cell phone application carries out Collaborative Control, with realizing the wisdom chemical industry of data sharing.
Brief description of the drawings
Accompanying drawing used in this application is will be briefly described below, it should be apparent that, these accompanying drawings are only used for explaining the present invention
Design.
Fig. 1 is the circuit theory schematic diagram of the Excavation Settlement real-time monitoring system of the wisdom building site control platform of the present invention.
Reference collects:
1st, Excavation Settlement monitor terminal 11, data perception system
12nd, data collecting system 13, data transmission system
14th, analysis system 141, data presetting module are controlled
142nd, alarm module 143, data setup module
144th, alert level setup module 2, wisdom building site management platform
21st, data inquiry module 3, high in the clouds management platform
Embodiment
Hereinafter, the Excavation Settlement real-time monitoring system of the wisdom building site control platform of the present invention is described with reference to the accompanying drawings
With the embodiment of monitoring method.
The embodiment recorded herein is specific embodiment of the invention, for illustrating the design of the present invention,
It is explanatory and exemplary, should not be construed as the limitation to embodiment of the present invention and the scope of the invention.Except what is recorded herein
Outside embodiment, those skilled in the art can also be based on the application claims and specification disclosure of that using aobvious and
The other technical schemes being clear to, these technical schemes include making the embodiment recorded herein it is any it is obvious replace and
The technical scheme of modification.
The accompanying drawing of this specification is schematic diagram, aids in illustrating the design of the present invention, it is schematically indicated the shape of each several part
And its correlation.It note that for the ease of clearly showing the structure of each several part of the embodiment of the present invention, between each accompanying drawing
Not necessarily drawn according to identical ratio.Same or analogous reference marker is used to represent same or analogous part.
Wisdom building site is concrete embodiment of the smart city theory in architectural engineering industry, is a kind of full life of brand-new engineering
Cycle management theory.
Wisdom building site, the advanced technologies such as Internet of Things, cloud computing, mobile Internet are exactly relied on, take interconnection collaboration, safety
The means such as monitoring, intelligent production, establish the project information ecosphere, change interactive mode, the work side of job site each side
Formula and management mode, realize that green construction and ecology are built.
Fig. 1 is the circuit theory schematic diagram of the Excavation Settlement real-time monitoring system of the wisdom building site control platform of the present invention,
As shown in figure 1, the present invention proposes a kind of Excavation Settlement real-time monitoring system of wisdom building site control platform, including Excavation Settlement prison
Control terminal 1, wisdom building site management platform 2 and high in the clouds management platform 3.
In Excavation Settlement real-time monitoring system, Excavation Settlement monitor terminal 1 is with wisdom building site management platform 2 by wired
Or wireless network is communicatively coupled, and the Excavation Settlement monitor terminal 1 can be by PC ends or the remote monitoring of cell phone application.
Remote real time monitoring can be realized by so setting, backstage multiple terminal inquiry, as long as there is network to understand whenever and wherever possible currently
Situation.Wisdom building site management platform 2 is previously stored with the master data information of Excavation Settlement, and receives and store Excavation Settlement
The real-time detector data information of monitor terminal 1, while real-time detector data synchronizing information is uploaded to high in the clouds management platform 3.This
Sample can realize that job site can perceive, visualize, and really realize and build authorities, owner, design, management to engineering construction
Comprehensive, overall process, round-the-clock and multiple views, multi-angle, multifaceted monitoring in real time, make all departments manager to engineering construction
The middle various problems occurred accomplish " very first time finds that very first time disposal, the very first time solves ", exclude safe mass in time
Hidden danger, promote green, intensive, lean management, and then reduce resource loss and reduce carbon emission, reduce cost, reduce waste,
Reduction is done over again, and realizes that Project Benefit maximizes, and finally realizes the wisdom, green, the construction target of collaboration of building-site.
Wherein, wisdom building site APP is the more applicating cooperations provided for building enterprise's decision-making layer and project management department's management level
Work, the mobile phone application of information sharing, APP are connected with wisdom building site cloud platform by mobile Internet, are integrated with personnel, set
The various data such as standby, environment, engineering survey, safety alarm and message.In addition, wisdom building site APP provide Android system version and
IPhone versions, installation can be downloaded automatically by platform.
Excavation Settlement monitor terminal 1 in the present invention includes:Data perception system 11, data collecting system 12, data pass
Defeated system 13 and control analysis system 14.Wherein, data perception system 11 is for the deformation monitoring in real-time perception foundation ditch, underground
Water monitoring, neighboring buildings monitoring monitor with ess-strain;What the real-time data collection sensory perceptual system 11 of data collecting system 12 obtained
Real-time detector data, data collecting system 12 are carried out data transmission by data transmission system 13 and control analysis system 14;Control
Analysis system 14 processed and the database and server wireless connection of wisdom building site management platform 2, for being put down in wisdom building site management
Platform 2 detects to send warning during data exception, and is controlled after analysis according to master data information that to obtain Excavation Settlement each
The real-time change curve map of individual monitoring point, and respectively send out the control analysis result of each monitoring point with form or graphics mode
User terminal is delivered to, and each monitoring point Comprehensive analysis results are sent to user terminal.The Excavation Settlement prison so set
Control terminal 1 has the characteristics of system composition is simple, clear in structure, stable, easy to maintenance, additionally it is possible to automatically generates various reports
Table, curve, picture, convenient monitoring foundation ditch data in real time, preliminary analysis and simple evaluation can be carried out to Monitoring Data.Separately
Outside, each monitoring point progress Comprehensive analysis results are sent to user terminal, so setting can allow user to see simple and understandable
Monitoring result, have a clear understanding of it is each monitoring item whether safety, owner can check simultaneously it is each monitoring item security situation, one
There is exception in denier, and the very first time finds out source.
In further embodiment of the present invention, data collecting system 12 passes through wireless network or cable network and control point
Analysis system 14 carries out data transmission.
In further embodiment of the present invention, data collecting system 12 passes through WiFi/G/GPRS/Zigbee and control point
Analysis system 14 carries out data transmission.Preferably, the data collecting system 12 in the present invention includes vibrating wire acquirer, digital collection instrument
Or hub, you can to carry out the collection of Real-time Monitoring Data by vibrating wire acquirer, digital collection instrument or hub, and then will
Real-time Monitoring Data is transmitted to control analysis system 14 by netting twine or finite element network.
In further embodiment of the present invention, data perception system 11 includes GPS, hydrostatic level, fixation
Formula inclinometer, osmometer, slit gauge, strain gauge, reinforcing rib meter, soil pressure meter, rope meter or axle power meter.It is it should be noted that above-mentioned
Data perception system 11 proves stable sensor using domestic and international prolonged application, so as to ensure the precision of Monitoring Data.
In further embodiment of the present invention, control analysis system 14 can also include data presetting module 141, the number
It is used for the secure threshold for presetting each monitoring point, including sedimentation deformation threshold value, ess-strain value threshold value and water according to presetting module 141
Flat displacement threshold value.It is in order to which each monitoring item all carries out safe early warning in being monitored to Excavation Settlement so to set, and then is prevented
With the generation of the accident of reduction.
In further embodiment of the present invention, control analysis system 14 also includes alarm module 142, the alarm module
142 secure threshold for receiving each monitoring point, and when at least one of real-time detector data of data perception system 11 exceeds
During the secure threshold of each monitoring point, control analysis system 14 can notify user by short message, mail, form, figure or curve
Terminal.
In further embodiment of the present invention, control analysis system 14 also includes data setup module 143, and the data are set
The different brackets secure threshold that module 143 is used to set each monitoring point is put, and when 12 real-time testing number of data collecting system
After com-parison and analysis is carried out with different brackets secure threshold, control analysis system 14 can send the information warning notice of different stage
User terminal.
In further embodiment of the present invention, control analysis system 14 also includes alert level setup module 144, the police
Show that rank setup module 144 is used for the different brackets information warning according to corresponding to being set different brackets secure threshold, information warning
Warning user terminal is carried out by way of voice, light and/or figure.It should be noted that difference in information warning etc.
Level information warning can be set as follows, and phonetic warning can set the phonetic warning of different frequency or varying strength, and light can
To set the light of different colours to correspond to different grades of information warning, figure can be come with different warning pictures generally in the art
Corresponding different grades of information warning, can either use voice, light or figure in these three any two kinds of combination or
Information warning can be set using voice, light or figure common combination.
In further embodiment of the present invention, data inquiry module 21 is provided with wisdom building site management platform 2, the number
Include real-time data base and historical data base according to enquiry module 21, real-time data base regularly can arrive the data syn-chronization gathered in real time
In the historical data base of server.That is, real-time data base only keeps the data in the range of certain time, time range by
User determines.Certainly, wisdom building site management platform 2 can also provide the inquiry of historical data function, can temporally, monitor etc.
Condition query data history records, when there is anomalous event, original record can be traced.
In addition, the present invention also provides a kind of Excavation Settlement method of real-time of wisdom building site control platform, including:
Each monitoring point data perception system 11 being arranged in foundation ditch, for the deformation prison in real-time perception foundation ditch
Survey, groundwater monitoring, neighboring buildings monitoring monitor with ess-strain;
The real-time detector data that the real-time data collection sensory perceptual system 11 of data collecting system 12 obtains, and pass through data transfer
System 13 carries out data transmission with control analysis system 14;
Analysis system 14 and the database and server wireless connection of wisdom building site management platform 2 are controlled, in wisdom
Building site management platform 2 detects to send warning during data exception, and is controlled according to the master data information of Excavation Settlement
The real-time change curve map of each monitoring point of Excavation Settlement is obtained after analysis, and knot is analyzed into the control of each monitoring point respectively
Fruit is sent to user terminal with form or figure, and each monitoring point Comprehensive analysis results are sent to user terminal;
Excavation Settlement monitor terminal 1 is used to perceive, gathers the real-time testing number that each monitoring point in foundation ditch is analyzed with control
It is believed that breath, and be communicatively coupled with wisdom building site management platform 2 by wired or wireless network, and by PC ends or mobile phone
APP remote monitoring;
Wisdom building site management platform 2 is previously stored with the master data information of Excavation Settlement, and receives and store foundation ditch
The real-time detector data information of subsidence monitoring terminal 1, while real-time detector data synchronizing information is uploaded to high in the clouds management platform 3.
For the present invention wisdom building site control platform Excavation Settlement real-time monitoring system with it is specific in monitoring method
Feature can carry out specific design such as shape, size, quantity and position according to the effect of the feature disclosed in above-mentioned, and these designs are equal
It is that those skilled in the art can realize.Moreover, each technical characteristic of above-mentioned disclosure is not limited to disclosed and other spies
The combination of sign, those skilled in the art can also carry out other combinations between each technical characteristic according to the purpose of the present invention, with reality
The purpose of the existing present invention is defined.
Claims (10)
1. the Excavation Settlement real-time monitoring system of a kind of wisdom building site control platform, it is characterised in that monitored including Excavation Settlement
Terminal, wisdom building site management platform and high in the clouds management platform,
The Excavation Settlement monitor terminal is communicatively coupled with the wisdom building site management platform by wired or wireless network,
By PC ends or the remote monitoring of cell phone application;
The wisdom building site management platform is previously stored with the master data information of Excavation Settlement, and receives and store the base
The real-time detector data information of subsidence monitoring terminal is cheated, while real-time detector data synchronizing information is uploaded to the high in the clouds and managed
Platform;
Wherein, the Excavation Settlement monitor terminal includes:Data perception system, data collecting system, data transmission system and control
Analysis system processed,
The data perception system is for the deformation monitoring in real-time perception foundation ditch, groundwater monitoring, neighboring buildings monitoring and answers
Stress-strain monitors;
The data collecting system gathers the real-time detector data that the data perception system obtains, the data acquisition system in real time
System is carried out data transmission by the data transmission system and the control analysis system;
The control analysis system and the database and server wireless connection of the wisdom building site management platform, for described
Wisdom building site management detection of platform sends warning when going out data exception, and is controlled analysis according to the master data information
Obtain the real-time change curve map of Excavation Settlement each monitoring point afterwards, and respectively by the control analysis result of each monitoring point with
Form or graphics mode are sent to user terminal, and each monitoring point Comprehensive analysis results are sent to user terminal.
2. the Excavation Settlement real-time monitoring system of wisdom building site according to claim 1 control platform, it is characterised in that institute
Stating control analysis system also includes:
Data presetting module, for presetting the secure threshold of each monitoring point, including sedimentation deformation threshold value, ess-strain value threshold value
Or horizontal displacement threshold value.
3. the Excavation Settlement real-time monitoring system of wisdom building site according to claim 1 control platform, it is characterised in that institute
Stating control analysis system also includes:
Alarm module, for receiving the secure threshold of each monitoring point, and when the data perception system real-time detector data
At least one of exceed each monitoring point secure threshold when, it is described control analysis system can by short message, mail, form,
Figure or curve notice user terminal.
4. the Excavation Settlement real-time monitoring system of wisdom building site according to claim 1 control platform, it is characterised in that institute
Stating control analysis system also includes:
Data setup module, for setting the different brackets secure threshold of each monitoring point, and when the data collecting system
After real-time detector data carries out com-parison and analysis with the different brackets secure threshold, the control analysis system can send not at the same level
Other information warning notifies user terminal.
5. the Excavation Settlement real-time monitoring system of wisdom building site according to claim 4 control platform, it is characterised in that institute
Stating control analysis system also includes:
Alert level setup module, it is described for the different brackets information warning according to corresponding to the setting of different brackets secure threshold
Information warning carries out warning user terminal by way of voice, light and/or figure.
A kind of 6. Excavation Settlement method of real-time of wisdom building site control platform, it is characterised in that including:
Each monitoring point data perception system being arranged in foundation ditch, for the deformation monitoring in real-time perception foundation ditch, underground
Water monitoring, neighboring buildings monitoring monitor with ess-strain;
Data collecting system gathers the real-time detector data that the data perception system obtains in real time, and passes through data transmission system
Carry out data transmission with control analysis system;
The control analysis system and the database and server wireless connection of wisdom building site management platform, in the wisdom
Building site management detection of platform sends warning when going out data exception, and is controlled point according to the master data information of Excavation Settlement
The real-time change curve map of each monitoring point of Excavation Settlement is obtained after analysis, and respectively by the control analysis result of each monitoring point
Sent with form or figure to user terminal, and each monitoring point Comprehensive analysis results are sent to user terminal;
Excavation Settlement monitor terminal is used to perceive, gathers and believe with the real-time detector data of each monitoring point in control analysis foundation ditch
Breath, and be communicatively coupled with the wisdom building site management platform by wired or wireless network, and by PC ends or mobile phone
APP remote monitoring;
The wisdom building site management platform is previously stored with the master data information of Excavation Settlement, and receives and store the base
Subsidence monitoring terminal real-time detector data information is cheated, while real-time detector data synchronizing information is uploaded to the high in the clouds management and put down
Platform.
7. the Excavation Settlement method of real-time of wisdom building site according to claim 6 control platform, it is characterised in that institute
State data perception system and pass through GPS, hydrostatic level, stationary slope level, osmometer, slit gauge, strain gauge, reinforcing bar
Meter, soil pressure meter, rope meter or axle power meter carry out real-time perception Excavation Settlement data.
8. the Excavation Settlement method of real-time of wisdom building site according to claim 6 control platform, it is characterised in that institute
State data collecting system and real-time data acquisition is carried out by vibrating wire acquirer, digital collection instrument or hub.
9. the Excavation Settlement method of real-time of wisdom building site according to claim 6 control platform, it is characterised in that institute
State the secure threshold that each monitoring point is preset in control analysis system, including sedimentation deformation threshold value, ess-strain value threshold value and water
Flat displacement threshold value.
10. the Excavation Settlement method of real-time of wisdom building site according to claim 6 control platform, it is characterised in that
Data inquiry module is provided with the wisdom building site management platform, the data inquiry module includes real-time data base and history
Database, the real-time data base can be regularly by the historical data bases of the data syn-chronization gathered in real time to server.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710736922.2A CN107504946A (en) | 2017-08-24 | 2017-08-24 | The Excavation Settlement real-time monitoring system and monitoring method of wisdom building site control platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710736922.2A CN107504946A (en) | 2017-08-24 | 2017-08-24 | The Excavation Settlement real-time monitoring system and monitoring method of wisdom building site control platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107504946A true CN107504946A (en) | 2017-12-22 |
Family
ID=60692728
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710736922.2A Pending CN107504946A (en) | 2017-08-24 | 2017-08-24 | The Excavation Settlement real-time monitoring system and monitoring method of wisdom building site control platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107504946A (en) |
Cited By (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108413880A (en) * | 2018-01-31 | 2018-08-17 | 乐清市建设监理有限公司 | A kind of foundation pit displacement automatic monitoring system and its method |
CN108776453A (en) * | 2018-05-30 | 2018-11-09 | 济源职业技术学院 | A kind of computer based building safety monitoring system |
CN108867608A (en) * | 2018-07-03 | 2018-11-23 | 深圳众厉电力科技有限公司 | Building foundation pit settles real-time monitoring system |
CN108914985A (en) * | 2018-07-03 | 2018-11-30 | 深圳大图科创技术开发有限公司 | Building foundation pit settles intelligent monitor system |
CN109041000A (en) * | 2018-07-25 | 2018-12-18 | 深圳智达机械技术有限公司 | Building foundation pit settles wireless monitor system |
CN109067875A (en) * | 2018-08-02 | 2018-12-21 | 深圳市创艺工业技术有限公司 | Building foundation pit settles wisdom and monitors system |
CN109183859A (en) * | 2018-08-22 | 2019-01-11 | 河南蓝特电子科技有限公司 | A kind of foundation pit real-time monitoring system |
CN109302487A (en) * | 2018-10-30 | 2019-02-01 | 广西交投科技有限公司 | Highway project quality administration information system based on cloud platform |
CN109556567A (en) * | 2018-10-26 | 2019-04-02 | 浙江海岸岩土工程技术有限公司 | A kind of seawall sedimentation safety monitoring method based on GIS technology |
CN110821922A (en) * | 2019-11-14 | 2020-02-21 | 江苏万川液压机械设备有限公司 | Sensitive servo monitoring compensation system for foundation pit horizontal supporting axial force and displacement load |
CN110880096A (en) * | 2019-11-20 | 2020-03-13 | 广西越知网络股份有限公司 | Multi-party cooperative office system for constructional engineering |
CN111779042A (en) * | 2020-07-20 | 2020-10-16 | 杭州市城市建设基础工程有限公司 | Intelligent foundation pit measuring method and intelligent data management system thereof |
CN111926795A (en) * | 2020-08-13 | 2020-11-13 | 上海宝冶集团有限公司 | Foundation and foundation monitoring method and system |
CN112085523A (en) * | 2020-08-26 | 2020-12-15 | 河南祥辰工程管理有限公司 | BIM engineering information management method and system |
CN112344990A (en) * | 2020-10-21 | 2021-02-09 | 平安国际智慧城市科技股份有限公司 | Environmental anomaly monitoring method, device, equipment and storage medium |
CN112832303A (en) * | 2020-12-31 | 2021-05-25 | 山东明嘉勘察测绘有限公司 | Vertical displacement monitoring system in top of slope based on construction of piping lane foundation ditch |
CN112878333A (en) * | 2021-01-04 | 2021-06-01 | 中冶南方武汉建筑设计有限公司 | Intelligent support system and method integrating monitoring and early warning |
CN112902913A (en) * | 2021-01-13 | 2021-06-04 | 中国矿业大学(北京) | Goaf settlement monitoring system and method |
CN113433914A (en) * | 2021-07-06 | 2021-09-24 | 山东电力工程咨询院有限公司 | Intelligent construction site management and control platform and monitoring method thereof |
CN113485217A (en) * | 2021-07-28 | 2021-10-08 | 厦门市政智慧城市科技有限公司 | Construction site safety management monitoring platform and monitoring method |
CN113642859A (en) * | 2021-07-28 | 2021-11-12 | 厦门市政智慧城市科技有限公司 | Detection management system and management method for intelligent construction site |
CN113639651A (en) * | 2021-08-24 | 2021-11-12 | 煤炭科学研究总院 | Strip mine slope stability prediction device and prediction method thereof |
CN113884135A (en) * | 2021-09-28 | 2022-01-04 | 曹县东合新能源有限公司 | Gas delivery monitoring method, system and device |
CN114485580A (en) * | 2020-10-27 | 2022-05-13 | 罗曦明 | Underground region subsides and slope on-line monitoring system |
CN116007576A (en) * | 2023-02-14 | 2023-04-25 | 成都建工第三建筑工程有限公司 | Road settlement detection system and method based on artificial intelligence analysis |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104616433A (en) * | 2015-02-04 | 2015-05-13 | 清华大学 | Real-time monitoring and early warning system for foundation pit engineering |
-
2017
- 2017-08-24 CN CN201710736922.2A patent/CN107504946A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104616433A (en) * | 2015-02-04 | 2015-05-13 | 清华大学 | Real-time monitoring and early warning system for foundation pit engineering |
Cited By (31)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108413880A (en) * | 2018-01-31 | 2018-08-17 | 乐清市建设监理有限公司 | A kind of foundation pit displacement automatic monitoring system and its method |
CN108776453A (en) * | 2018-05-30 | 2018-11-09 | 济源职业技术学院 | A kind of computer based building safety monitoring system |
CN108867608A (en) * | 2018-07-03 | 2018-11-23 | 深圳众厉电力科技有限公司 | Building foundation pit settles real-time monitoring system |
CN108914985A (en) * | 2018-07-03 | 2018-11-30 | 深圳大图科创技术开发有限公司 | Building foundation pit settles intelligent monitor system |
CN109041000A (en) * | 2018-07-25 | 2018-12-18 | 深圳智达机械技术有限公司 | Building foundation pit settles wireless monitor system |
CN109067875A (en) * | 2018-08-02 | 2018-12-21 | 深圳市创艺工业技术有限公司 | Building foundation pit settles wisdom and monitors system |
CN109183859A (en) * | 2018-08-22 | 2019-01-11 | 河南蓝特电子科技有限公司 | A kind of foundation pit real-time monitoring system |
CN109556567A (en) * | 2018-10-26 | 2019-04-02 | 浙江海岸岩土工程技术有限公司 | A kind of seawall sedimentation safety monitoring method based on GIS technology |
CN109302487A (en) * | 2018-10-30 | 2019-02-01 | 广西交投科技有限公司 | Highway project quality administration information system based on cloud platform |
CN110821922A (en) * | 2019-11-14 | 2020-02-21 | 江苏万川液压机械设备有限公司 | Sensitive servo monitoring compensation system for foundation pit horizontal supporting axial force and displacement load |
CN110821922B (en) * | 2019-11-14 | 2020-10-30 | 江苏万川液压机械设备有限公司 | Sensitive servo monitoring compensation system for foundation pit horizontal supporting axial force and displacement load |
CN110880096A (en) * | 2019-11-20 | 2020-03-13 | 广西越知网络股份有限公司 | Multi-party cooperative office system for constructional engineering |
CN110880096B (en) * | 2019-11-20 | 2023-10-31 | 广西越知网络股份有限公司 | Multi-party collaborative office system for building engineering |
CN111779042A (en) * | 2020-07-20 | 2020-10-16 | 杭州市城市建设基础工程有限公司 | Intelligent foundation pit measuring method and intelligent data management system thereof |
CN111926795A (en) * | 2020-08-13 | 2020-11-13 | 上海宝冶集团有限公司 | Foundation and foundation monitoring method and system |
CN112085523A (en) * | 2020-08-26 | 2020-12-15 | 河南祥辰工程管理有限公司 | BIM engineering information management method and system |
CN112344990B (en) * | 2020-10-21 | 2024-05-31 | 平安国际智慧城市科技股份有限公司 | Environment anomaly monitoring method, device, equipment and storage medium |
CN112344990A (en) * | 2020-10-21 | 2021-02-09 | 平安国际智慧城市科技股份有限公司 | Environmental anomaly monitoring method, device, equipment and storage medium |
CN114485580A (en) * | 2020-10-27 | 2022-05-13 | 罗曦明 | Underground region subsides and slope on-line monitoring system |
CN112832303A (en) * | 2020-12-31 | 2021-05-25 | 山东明嘉勘察测绘有限公司 | Vertical displacement monitoring system in top of slope based on construction of piping lane foundation ditch |
CN112878333A (en) * | 2021-01-04 | 2021-06-01 | 中冶南方武汉建筑设计有限公司 | Intelligent support system and method integrating monitoring and early warning |
CN112902913B (en) * | 2021-01-13 | 2022-04-19 | 中国矿业大学(北京) | Goaf settlement monitoring system and method |
CN112902913A (en) * | 2021-01-13 | 2021-06-04 | 中国矿业大学(北京) | Goaf settlement monitoring system and method |
CN113433914A (en) * | 2021-07-06 | 2021-09-24 | 山东电力工程咨询院有限公司 | Intelligent construction site management and control platform and monitoring method thereof |
CN113642859A (en) * | 2021-07-28 | 2021-11-12 | 厦门市政智慧城市科技有限公司 | Detection management system and management method for intelligent construction site |
CN113485217A (en) * | 2021-07-28 | 2021-10-08 | 厦门市政智慧城市科技有限公司 | Construction site safety management monitoring platform and monitoring method |
CN113639651A (en) * | 2021-08-24 | 2021-11-12 | 煤炭科学研究总院 | Strip mine slope stability prediction device and prediction method thereof |
CN113884135A (en) * | 2021-09-28 | 2022-01-04 | 曹县东合新能源有限公司 | Gas delivery monitoring method, system and device |
CN113884135B (en) * | 2021-09-28 | 2023-11-03 | 曹县东合新能源有限公司 | Method, system and device for monitoring gas delivery |
CN116007576A (en) * | 2023-02-14 | 2023-04-25 | 成都建工第三建筑工程有限公司 | Road settlement detection system and method based on artificial intelligence analysis |
CN116007576B (en) * | 2023-02-14 | 2023-06-09 | 成都建工第三建筑工程有限公司 | Road settlement detection system and method based on artificial intelligence analysis |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107504946A (en) | The Excavation Settlement real-time monitoring system and monitoring method of wisdom building site control platform | |
CN207300215U (en) | The Excavation Settlement real-time monitoring system of wisdom building site control platform | |
CN107817744B (en) | Communal facility safety monitoring system | |
CN107479466A (en) | The high-supported formwork deformation real-time monitoring system and monitoring method of wisdom building site control platform | |
CN107195164B (en) | Mountain flood on-line monitoring identification method for early warning and its early warning system | |
CN102943459B (en) | Remote smart monitoring and three-dimensional early warning method and system for deformation stability of deep foundation pit | |
CN103743441B (en) | The polynary of a kind of side slope safety is coupling in line monitoring system and method | |
CN207301752U (en) | The high-supported formwork deformation real-time monitoring system of wisdom building site control platform | |
US20220066058A1 (en) | landslide Deep Displacement Remote Visual Monitoring System | |
CN113110200A (en) | Urban waterlogging early warning system based on weather and rainfall flood model | |
CN102915619A (en) | Intelligent landslide monitoring and pre-warning system for multielement detection | |
CN205582211U (en) | Integration disconnection warning automatic monitoring station | |
CN102979071B (en) | Remote intelligent monitoring and three-dimensional early warning method and system for stress stability of deep foundation pit | |
CN102968884B (en) | Slide-face type remote three-dimensional digital pre-warning method for stability of high slope | |
CN111915847A (en) | Refined rainfall forecasting system and early warning method thereof | |
CN202969361U (en) | Remote intelligent monitoring and three-dimensional pre-warning system for deformation stability of deep foundation pit | |
CN104200614A (en) | County-scale geological disaster fine early-warning system | |
CN113593191A (en) | Visual urban waterlogging monitoring and early warning system based on big data | |
CN102829759A (en) | Remote intelligent three-dimensional digital early warning method and system for subgrade surface settlement | |
CN202382814U (en) | Water level monitoring and early warning system | |
CN103046525A (en) | Facility and method for mechanical stability remote intelligent monitoring and three-dimensional early warning of deep foundation pit | |
CN110307036B (en) | Variable cross-section tunnel structure full-life monitoring and early warning method | |
CN107367309A (en) | A kind of overpass waterlogging early-warning and predicting and pumping station automatization control system | |
CN108364129A (en) | A kind of region ecology safety early alarming and forecasting method based on remote sensing big data | |
CN204881693U (en) | Intelligent monitoring system is rolled on road surface |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |