CN107503288B CN201710746463.6A CN201710746463A CN107503288B CN 107503288 B CN107503288 B CN 107503288B CN 201710746463 A CN201710746463 A CN 201710746463A CN 107503288 B CN107503288 B CN 107503288B
Authority
CN
China
Prior art keywords
planting board
pallet
bridge
plate
potting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710746463.6A
Other languages
Chinese (zh)
Other versions
CN107503288A (en
Inventor
李红星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaxi Engineering Design & Construction Co Ltd
Original Assignee
Huaxi Engineering Design & Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaxi Engineering Design & Construction Co Ltd filed Critical Huaxi Engineering Design & Construction Co Ltd
Priority to CN201710746463.6A priority Critical patent/CN107503288B/en
Publication of CN107503288A publication Critical patent/CN107503288A/en
Application granted granted Critical
Publication of CN107503288B publication Critical patent/CN107503288B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/04Flower-pot saucers
    • A01G9/045Trays for receiving multiple pots
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/103Parapets, railings ; Guard barriers or road-bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The present invention provides a kind of method for bridge construction with greening structure, belong to field of bridge construction, comprising the following steps: construct a bridge main structure;In the two sides of bridge, guardrail is set;The setting greening plate on guardrail, and make to afforest the outside that plate is located at bridge;Afforest plate it is in rectangular configuration, afforest at the top of plate be connected to the top of guardrail cross bar make afforest plate be arranged vertically downward;The connecting hole that plate has rectangular configuration is afforested, is connected with Planting board at the top of connecting hole, Planting board can be flipped up;Planting board is overturn to horizontal position and fixation, and places potting on Planting board.Enable the two sides of bridge that greening structure is set, no matter bridge is far seen or closely see very beautiful, and can improve bridge ambient air quality.It can be applied not only to the bridge of vehicle pass-through, also can be applied to humanoid bridge.Its construction technology is simple simultaneously, and the later period, improvable space was larger.

Description

A kind of method for bridge construction with greening structure
Technical field
The present invention relates to field of bridge construction, in particular to a kind of method for bridge construction with greening structure.
Background technique
Greening structure is set in bridge structure less at present, so that bridge is not beautiful enough, is visually easy to produce fatigue, and Bridge periphery exhaust emissions causes bridge ambient air contamination, is unfavorable for environmental protection.
Summary of the invention
The present invention provides a kind of method for bridge construction with greening structure, it is intended to solve in the prior art above-mentioned ask Topic.
The present invention is implemented as follows:
A kind of method for bridge construction with greening structure, comprising the following steps:
Construct a bridge main structure;
Bridge two sides be arranged guardrail, guardrail includes the more columns being vertically arranged, adjacent every two root posts it Between be connected with more cross bars;
The setting greening plate on guardrail, and make to afforest the outside that plate is located at bridge;It is in rectangular configuration to afforest plate, afforests plate Greening plate is arranged vertically downward in the cross bar that top is connected to the top of guardrail;The connecting hole that plate has rectangular configuration is afforested, Planting board is connected at the top of connecting hole, Planting board can be flipped up;
Planting board is overturn to horizontal position and fixation, and places potting on Planting board.
Preferably, interconnecting piece is formed on the top for afforesting plate, and the interconnecting piece is connect by clip with cross bar;The clip A part is connected to cross bar, and another part of the clip is connected to the interconnecting piece.
Preferably, the outer profile of the Planting board is in rectangular configuration, and the inside of Planting board forms circular through-hole, and described kind It plants and is provided with pallet on the inside of plate, the pallet is circle, is connected with harness between pallet and the hole wall of through-hole;
When Planting board is overturn to horizontal position, hang down to pallet lower than Planting board present position, it will when placing potting Potting bottom passes through through-hole and the bottom of potting is placed on pallet, so that Planting board is located at the side of potting.
Preferably, the periphery wall of the pallet is connected with the diaphragm seal of tubular, the inside edge of the diaphragm seal and pallet Outer ledge be tightly connected;The outer ledge of the diaphragm seal is circumferentially arranged multiple connection rings, each harness One end be connected to the hole wall of the through-hole, the other end of harness is connected to the connection ring;It is located on the Planting board The edge of through-hole is provided with multiple link blocks, a caging bolt is bolted on each link block, the caging bolt is along logical The radial direction in hole is arranged;
It overturns by Planting board to horizontal position, screwing caging bolt makes caging bolt be detached from the limitation to pallet;It will Planting board is overturn to horizontal position, and diaphragm seal and harness is unfolded, so that pallet is sunk, so that being formed between pallet and diaphragm seal Catch basin, and pour water in catch basin, potting is placed on pallet later, and screwing caging bolt makes caging bolt resist basin Potting is fixed in the side of cultivation;Potting bottom has outlet hole structure.
Preferably, at the both ends of the bottom of Planting board, symmetrically flexural pivot is connected with a support rod, the length of the support rod Direction is spent perpendicular to the axis direction of the Planting board;Support rod is tube-in-tube structure, and support rod includes the interior bar to socket-connect and outer Cylinder, is provided with the fastening bolt for fixing interior bar in the side of outer cylinder;
The outboard end of the interior bar forms the clamping joint of U-shaped structure, and the lower edge of the connecting hole is formed down card slot, The side of the outer cylinder is downwardly protrude to form fixture block, and the fixture block is connected in the card slot;
When overturning Planting board to horizontal position, fixture block is taken out from card slot, rotary supporting rod simultaneously adjusts support rod Length, be clamped Planting board clamping joint in card slot when being in a horizontal position.
Preferably, after potting being removed, clamping joint is removed from card slot and shortens support rod, support rod is overturn to vertical In the position of plantation plate axis;Planting board is overturn to vertical position, is clamped fixture block in card slot;Screwing caging bolt makes to limit The end of position bolt extends to the edge of pallet, so that pallet is limited between caging bolt and guardrail by caging bolt.
Method for bridge construction provided by the invention with greening structure enables the two sides of bridge that greening knot is arranged No matter structure, bridge are far seen or closely see very beautiful, and can improve bridge ambient air quality.It can be applied not only to vehicle Current bridge, also can be applied to humanoid bridge.Its construction technology is simple simultaneously, and the later period, improvable space was larger.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is that the structure of the bridge after the method for bridge construction construction provided in an embodiment of the present invention with greening structure is shown It is intended to;
Fig. 2 is individually to afforest the structure of plate in the method for bridge construction provided in an embodiment of the present invention with greening structure to show It is intended to;
Fig. 3 is that the method for bridge construction provided in an embodiment of the present invention with greening structure is individually afforested plate and connect with guardrail Schematic side view, Planting board is packed up at this time;
Fig. 4 is that the method for bridge construction provided in an embodiment of the present invention with greening structure is individually afforested plate and connect with guardrail Schematic side view, at this time Planting board open;
Fig. 5 is to place flower after Planting board opening in the method for bridge construction provided in an embodiment of the present invention with greening structure The structural schematic diagram of basin;
Fig. 6 is the structural representation of support rod in the method for bridge construction provided in an embodiment of the present invention with greening structure Figure.
Appended drawing reference summarizes: guardrail 11, greening plate 12, interconnecting piece 13, connecting hole 14, Planting board 15, through-hole 16, pallet 17, harness 18, diaphragm seal 19, catch basin 20, connection ring 21, caging bolt 22, support rod 23, clamping joint 24, card slot 25, fixture block 26, column 27, cross bar 28, clip 29, link block 30, interior bar 31, outer cylinder 32, fastening bolt 33, potting 40.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Embodiment please refers to Fig. 1-6.
A kind of method for bridge construction with greening structure is present embodiments provided, the two sides of bridge are arranged green Change structure, no matter bridge is far seen or closely see very beautiful, and can improve bridge ambient air quality.It can not only apply In the bridge of vehicle pass-through, humanoid bridge also can be applied to.Simultaneously its construction technology it is simple, the later period improvable space compared with Greatly.
As shown in Figure 1, this method for bridge construction with greening structure the following steps are included:
Construct a bridge main structure;
Guardrail 11 is set in the two sides of bridge, guardrail 11 includes the more columns 27 being vertically arranged, at adjacent every two More cross bars 28 are connected between column 27;
The setting greening plate 12 on guardrail 11, and make to afforest the outside that plate 12 is located at bridge;It is in rectangular configuration to afforest plate 12, Greening plate 12 is arranged vertically downward in the cross bar 28 at the top that the top of greening plate 12 is connected to guardrail 11;Greening plate 12 has The connecting hole 14 of rectangular configuration, the top of connecting hole 14 are connected with Planting board 15, and Planting board 15 can be flipped up;
By the overturning of Planting board 15 to horizontal position and fixation, and potting 40 is placed on Planting board 15.
Bridge can be the main bridge for motor vehicles traveling, be also possible to for the small of people and lesser vehicle travels Bridge.The two sides of bridge are arranged in guardrail 11, play the role of protection.Greening plate 12 is arranged in the outside of guardrail 11 simultaneously, is made It obtains after Planting board 15 is opened and is opened to the outside of bridge, traffic pressure will not be generated to natively crowded bridge, while also not Vehicle or pedestrian can be touched.
It sets guardrail 11 to the structure of column 27 and cross bar 28, so that 11 structure of guardrail is simple, is easy to construct, while side Just being affiliated to for plate 12 is afforested.
Greening plate 12 is arranged downward vertically, is steadily connected on guardrail 11.When in use, keep greening plate 12 vertical Position, and Planting board 15 is flipped up, it is in a horizontal position Planting board 15, makes that potting 40 can be placed on Planting board 15. After placing potting 40 on multiple Planting boards 15, it is capable of forming greenbelt landscape, it is very beautiful.
As shown in Figures 1 and 2, interconnecting piece 13 is formed on the top for afforesting plate 12, and the interconnecting piece 13 passes through clip 29 and cross Bar 28 connects;A part of the clip 29 is connected to cross bar 28, and another part of the clip 29 is connected to the interconnecting piece 13.Conveniently and efficiently greening plate 12 can be connected on guardrail 11 by clip 29, and be readily disassembled.
As shown in Fig. 2, the outer profile of the Planting board 15 is in rectangular configuration, the inside of Planting board 15 forms circular through-hole 16, pallet 17 is provided on the inside of the Planting board 15, the pallet 17 is circle, is connected between pallet 17 and the hole wall of through-hole 16 There is harness 18;
When by the overturning of Planting board 15 to horizontal position, hangs down to pallet 17 lower than 15 present position of Planting board, place basin 40 bottom of potting is passed through into through-hole 16 when planting 40 and the bottom of potting 40 is placed on pallet 17, so that Planting board 15 is located at basin Plant 40 side.
This set is conducive to potting 40 and is placed on Planting board 15 more stablely, it is not easy to take off from Planting board 15 It falls.
The Planting board 15 of rectangular configuration is conveniently connected in the connecting hole 14 of rectangular configuration, while also facilitating processing.It is round Through-hole 16 convenient be adapted to the pallet 17 of circular configuration.Since most flowerpots are circle, by through-hole 16 and pallet 17 It is provided in round.In the greening plate 12 of this structure, pallet 17 is flexibly connected with Planting board 15, and pallet 17 is facilitated Ground changes position.When Planting board 15 is in a horizontal position, pallet 17 can vertical subsidence, be in lower position so that support Difference in height is formed between disk 17 and Planting board 15, potting 40 is placed on pallet 17, Planting board 15 is from side is to potting 40 To protective effect, enable potting 40 steadily in the position.It, will not be from so that the outside of bridge is arranged in potting 40 It is fallen on pallet 17, play the role of protecting potting 40 and protects bridge underlying object.
As shown in Figures 4 and 5, the periphery wall of the pallet 17 is connected with the diaphragm seal 19 of tubular, the diaphragm seal 19 The outer ledge of inside edge and pallet 17 is tightly connected;The outer ledge of the diaphragm seal 19 is circumferentially arranged multiple connections Ring 21, one end of each harness 18 are connected to the hole wall of the through-hole 16, and the other end of harness 18 is connected to an institute State connection ring 21;Edge on the Planting board 15 positioned at through-hole 16 is provided with multiple link blocks 31, on each link block 31 It is bolted with a caging bolt 22, the caging bolt 22 is arranged along the radial direction of through-hole 16;
Before by the overturning to horizontal position of Planting board 15, screwing caging bolt 22 is detached from caging bolt 22 to pallet 17 Limitation;After the overturning to horizontal position of Planting board 15, diaphragm seal 19 and harness 18 is unfolded, so that pallet 17 is sunk, so that pallet Catch basin 20 is formed between 17 and diaphragm seal 19, and is poured water in catch basin 20, and potting 40 is placed on pallet 17 later, and Screw the side that caging bolt 22 makes caging bolt 22 resist potting 40 potting 40 is fixed;It is tied with water hole 40 bottom of potting Structure.
In this structure, connected between pallet 17 and Planting board 15 by double structure.Diaphragm seal 19 is tubular after opening, It is flexible material, e.g. polyethylene, can be retracted to lesser state, and pallet 17 is move freely.Diaphragm seal 19 sides are connect with 17 side seal of pallet, and the storage of side and sealed bottom is capable of forming after opening pallet 17 and diaphragm seal 19 Sink 20 can store a certain amount of water in catch basin 20.19 outer ledge of diaphragm seal (when diaphragm seal 19 open after the position Set be diaphragm seal 19 top edge) be provided with connection ring 21, the inside of connection ring 21 and Planting board 15 is connected by harness 18 It picks up and.The length of harness 18 is consistent, so that Planting board 15 is in a horizontal position after the opening of horizontality lower tray 17.
Potting 40 selects bottom with water hole, and above-mentioned this set makes that a certain amount of water can be stored in catch basin 20, After potting 40 is placed, catch basin 20 can collect rainwater, and when the water poured in potting 40 is more, ponding can be leaked out along water hole And it is stored in catch basin 20.Enable when soil is dry in potting 40 and absorb water out of catch basin 20, reduces the dimension of potting 40 The period is protected, maintenance cost is reduced.The set-up mode for encrypting mounting 19 by harness 18 simultaneously, allows to using less sealing 19 material of piece, so that cost is relatively low, while making difference in height between pallet 17 and Planting board 15 larger again, potting 40 can be placed It is deeper, it is more stable.And harness 18 is easier to bend, after so that pallet 17 is accepted harness 18 and diaphragm seal 19 more from So, fold is less.
It is provided with link block 31 in the plate face of Planting board 15, there is threaded hole on link block 31, caging bolt 22 is arranged On link block 31, and it is connected in threaded hole.Link block 31 is extended in the end of caging bolt 22, and extends to pallet 17 Outside limits pallet 17.When the vertical placement of Planting board 15 and pallet 17, caging bolt 22 is screwed, pallet 17 is limited Between caging bolt 22 and guardrail 11, so that pallet 17 will not shake.When using Planting board 15 and pallet 17, pallet 17 to Lower sedimentation, reversely screwing caging bolt 22 increases the opening of through-hole 16, so that potting 40 can be placed in through-hole 16 and place On pallet 17, screwing caging bolt 22 later contradicts its end and potting 40, plays caging bolt 22 to potting 40 solid Fixed effect enables potting 40 be connected on pallet 17 more stablely.
As shown in Fig. 4 and Fig. 6, at the both ends of the bottom of Planting board 15, symmetrically flexural pivot is connected with a support rod 23, institute State axis direction of the length direction perpendicular to the Planting board 15 of support rod 23;Support rod 23 is tube-in-tube structure, support rod 23 Including the interior bar 32 to socket-connect and outer cylinder 33, the side of outer cylinder 33 is provided with the fastening bolt 34 for fixing interior bar 32;
The outboard end of the interior bar 32 forms the clamping joint 24 of U-shaped structure, the downward shape of lower edge of the connecting hole 14 At card slot 25, the side of the outer cylinder 33 is downwardly protrude to form fixture block 26, and the fixture block 26 is connected in the card slot 25;
When by the overturning of Planting board 15 to horizontal position, fixture block 26 is taken out from card slot 25, rotary supporting rod 23 is simultaneously adjusted The length for saving support rod 23, is clamped Planting board 15 in card slot 25 clamping joint 24 when being in a horizontal position.
Support rod 23 has dual connection function, can steadily connect Planting board 15 when Planting board 15 is placed vertically On greening plate 12, also Planting board 15 can steadily be connected when Planting board 15 is horizontally arranged.
When Planting board 15 is placed vertically, support rod 23 is located at the bottom position of Planting board 15, the branch when Planting board 15 is laid flat Strut 23 is located at the side of Planting board 15.The bottom of Planting board 15 is provided with bulb, is provided with ball on support rod 23, makes It obtains support rod 23 to connect with 15 flexural pivot of Planting board, the rotation for enabling support rod 23 multi-faceted.It is set in the bottom of support rod 23 Fixture block 26 is set, the position that 14 bottom margin of connecting hole is located on greening plate 12 is provided with card slot 25, by the card of support rod 23 Block 26 is connected in the card slot 25 of greening plate 12, and Planting board 15 is steadily connected on greening plate 12;Pass through limit again Position bolt 22 limits pallet 17, so that Planting board 15 and pallet 17 can be stablized.
It is respectively provided with a support rod 23 in the two sides of 15 bottom of Planting board, so that when two support rods 23 spend Planting board simultaneously Support plate can be more stable when 15 support.Support rod 23 is set as stretching structure, its length is changed, and facilitating will prop up Fagging is stablely supported at horizontal position.
As shown in fig. 6, being provided with fastening bolt 34 in the side of outer cylinder 33, fastening bolt 34 supports interior bar 32 after tightening Firmly, so that interior bar 32 can not change position, so that the length of support rod 23 is fixed;In fastening bolt 34 can be adjusted after unscrewing The position of bar 32, and then adjust the length of support rod 23.
When Planting board 15 is turned to horizontal position, rotary supporting rod 23, and the length of support rod 23 is adjusted, by support rod The clamping joint 24 of the U-shaped structure of 23 end setting is connected in card slot 25, and Planting board 15 is made to be stably positioned in horizontal position It sets.
After potting 40 is removed, clamping joint 24 is removed from card slot 25 and shortens support rod 23, extremely by the overturning of support rod 23 Perpendicular to the position of 15 axis of Planting board;Planting board 15 is overturn to vertical position, is clamped fixture block 26 in card slot 25;It screws Caging bolt 22 makes the end of caging bolt 22 extend to the edge of pallet 17, so that pallet 17 is limited in by caging bolt 22 Between position bolt 22 and guardrail 11.
In this way, make the greening structures such as greening plate 12, Planting board 15 that can be fitted in guardrail 11 when not in use Side so that entire bridge is more neat and artistic, and the structures such as pallet 17 will not shake everywhere, so that the safety of bridge More preferably.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.

Claims (4)

1. a kind of method for bridge construction with greening structure, which comprises the following steps:
Construct a bridge main structure;
Guardrail is set in the two sides of bridge, guardrail includes the more columns being vertically arranged, and is connected between adjacent every two root posts It is connected to more cross bars;
The setting greening plate on guardrail, and make to afforest the outside that plate is located at bridge;It is in rectangular configuration to afforest plate, afforests the top of plate Greening plate is arranged vertically downward in the cross bar for being connected to the top of guardrail;The connecting hole that plate has rectangular configuration is afforested, connection Planting board is connected at the top of hole, Planting board can be flipped up;
Planting board is overturn to horizontal position and fixation, and places potting on Planting board;
Interconnecting piece is formed on the top for afforesting plate, and the interconnecting piece is connect by clip with cross bar;A part connection of the clip In cross bar, another part of the clip is connected to the interconnecting piece;
The outer profile of the Planting board is in rectangular configuration, and the inside of Planting board forms circular through-hole, sets on the inside of the Planting board It is equipped with pallet, the pallet is circle, is connected with harness between pallet and the hole wall of through-hole;
When Planting board is overturn to horizontal position, hang down to pallet lower than Planting board present position, by potting when placing potting Bottom passes through through-hole and the bottom of potting is placed on pallet, so that Planting board is located at the side of potting.
2. the method for bridge construction according to claim 1 with greening structure, which is characterized in that the periphery of the pallet Wall is connected with the diaphragm seal of tubular, and the inside edge of the diaphragm seal and the outer ledge of pallet are tightly connected;The diaphragm seal Outer ledge it is circumferentially arranged have multiple connection rings, one end of each harness is connected to the hole wall of the through-hole, line The other end of beam is connected to the connection ring;Edge on the Planting board positioned at through-hole is provided with multiple link blocks, often A caging bolt is bolted on one link block, the caging bolt is arranged along the radial direction of through-hole;
It overturns by Planting board to horizontal position, screwing caging bolt makes caging bolt be detached from the limitation to pallet;It will plantation Plate is overturn to horizontal position, and diaphragm seal and harness is unfolded, so that pallet is sunk, so that forming water storage between pallet and diaphragm seal Slot, and pour water in catch basin, potting is placed on pallet later, and screwing caging bolt makes caging bolt resist potting Potting is fixed in side;Potting bottom has outlet hole structure.
3. the method for bridge construction according to claim 2 with greening structure, which is characterized in that in the bottom of Planting board Symmetrically flexural pivot is connected with a support rod at both ends, the axis side of the length direction of the support rod perpendicular to the Planting board To;Support rod is tube-in-tube structure, and support rod includes the interior bar to socket-connect and outer cylinder, is provided in for fixing in the side of outer cylinder The fastening bolt of bar;
The outboard end of the interior bar forms the clamping joint of U-shaped structure, and the lower edge of the connecting hole is formed down card slot, described The side of outer cylinder is downwardly protrude to form fixture block, and the fixture block is connected in the card slot;
When overturning Planting board to horizontal position, fixture block is taken out from card slot, rotary supporting rod and the length for adjusting support rod Degree, is clamped Planting board in card slot clamping joint when being in a horizontal position.
4. the method for bridge construction according to claim 3 with greening structure, which is characterized in that after potting is removed, Clamping joint is removed from card slot and shortens support rod, and support rod is overturn to the position perpendicular to plantation plate axis;By Planting board Overturning is clamped fixture block in card slot to vertical position;Screw the side that caging bolt makes the end of caging bolt extend to pallet Edge, so that pallet is limited between caging bolt and guardrail by caging bolt.
CN201710746463.6A 2017-08-27 2017-08-27 A kind of method for bridge construction with greening structure Active CN107503288B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710746463.6A CN107503288B (en) 2017-08-27 2017-08-27 A kind of method for bridge construction with greening structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710746463.6A CN107503288B (en) 2017-08-27 2017-08-27 A kind of method for bridge construction with greening structure

Publications (2)

Publication Number Publication Date
CN107503288A CN107503288A (en) 2017-12-22
CN107503288B true CN107503288B (en) 2019-05-31

Family

ID=60692752

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710746463.6A Active CN107503288B (en) 2017-08-27 2017-08-27 A kind of method for bridge construction with greening structure

Country Status (1)

Country Link
CN (1) CN107503288B (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101127629B1 (en) * 2007-11-02 2012-03-23 박병훈 Architecture for Preventing Jaywalking
KR101391999B1 (en) * 2010-12-01 2014-05-27 박병훈 Guard rail
CN205223916U (en) * 2015-12-21 2016-05-11 浙江湖州环天交通工程有限公司 Road partition fence
CN205617285U (en) * 2016-05-13 2016-10-05 南阳市市政工程总公司 Road guardrail
CN206371180U (en) * 2016-12-15 2017-08-04 盐城林一森花木有限公司 A kind of graden machine arranging apparatus
CN206408563U (en) * 2017-01-11 2017-08-15 闫连军 A kind of highway safety protection guardrail of band greening platform

Also Published As

Publication number Publication date
CN107503288A (en) 2017-12-22

Similar Documents

Publication Publication Date Title
CN109122011B (en) Multifunctional windproof support
CN207476312U (en) A kind of folding town road flowerpot rack
CN107503288B (en) A kind of method for bridge construction with greening structure
CN203872693U (en) Kiwi fruit planting protection screen convenient to move and fix
CN107288035B (en) A kind of bridge Green protection fence structure
CN207099802U (en) A kind of overhead viaduct bridge guardrail greening flowerpot structure
CN206698955U (en) A kind of municipal ornamental trees and shrubs support frame
CN206136814U (en) Tree supporting device for landscaping
CN210610440U (en) Flower box with supporting structure
CN204753449U (en) Municipal administration rail guard
CN107114205A (en) A kind of method of arbor support and support regulation
CN107447703B (en) A kind of green way construction method
CN207812332U (en) A kind of municipal works overturning-preventing construction Warning frame
KR200469664Y1 (en) Climbing guide apparatus for vine crops
JP2010148406A (en) Greening curtain wall
JP2008142044A (en) Greening panel
CN214548510U (en) Material display device for garden design
CN211573351U (en) Multi-functional afforestation ladder structure
CN203166364U (en) Landscape-type pole-hanging transformer apparatus
JP2014001622A (en) Universal weight set
CN207284464U (en) A kind of new nursery stock decoration fence
CN218550733U (en) Adjustable greening frame
CN210870762U (en) Telescopic display board frame based on scissor fork mechanism
CN203748320U (en) Novel assembling type ecological planting tank
CN216601053U (en) Municipal afforestation trees anti-toppling device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190505

Address after: 610036 One Unit, Fourth to Sixth Floors, Century California, No. 1 Shawan East Second Road, Jinniu District, Chengdu, Sichuan Province

Applicant after: Huaxi Engineering Design & Construction Co Ltd

Address before: 474350 No. 450 Yalu, Chengguanzhen, Neixiang County, Nanyang City, Henan Province

Applicant before: Li Hongxing

TA01 Transfer of patent application right
GR01 Patent grant