CN107288035B - A kind of bridge Green protection fence structure - Google Patents

A kind of bridge Green protection fence structure Download PDF

Info

Publication number
CN107288035B
CN107288035B CN201710746448.1A CN201710746448A CN107288035B CN 107288035 B CN107288035 B CN 107288035B CN 201710746448 A CN201710746448 A CN 201710746448A CN 107288035 B CN107288035 B CN 107288035B
Authority
CN
China
Prior art keywords
planting board
pallet
bridge
guardrail
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710746448.1A
Other languages
Chinese (zh)
Other versions
CN107288035A (en
Inventor
李红星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Xiangjian Creative Design Co., Ltd.
Original Assignee
Shanghai Xiangjian Creative Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Xiangjian Creative Design Co Ltd filed Critical Shanghai Xiangjian Creative Design Co Ltd
Priority to CN201710746448.1A priority Critical patent/CN107288035B/en
Publication of CN107288035A publication Critical patent/CN107288035A/en
Application granted granted Critical
Publication of CN107288035B publication Critical patent/CN107288035B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/103Parapets, railings ; Guard barriers or road-bridges
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The present invention provides a kind of bridge Green protection fence structures, belong to field of bridge construction, including guardrail and the greening plate being connected on guardrail;The greening plate is in rectangular configuration, and interconnecting piece is formed on the top for afforesting plate, and the interconnecting piece, which is connected at the top of guardrail, is arranged greening plate vertically downward;The greening plate has the connecting hole of rectangular configuration, is connected with Planting board at the top of the connecting hole, the Planting board can be flipped up to horizontal position and can place potting.The two sides of bridge are set, potting can be placed after Planting board is opened, so that no matter bridge is far seen or closely see very beautiful, and bridge ambient air quality can be improved.It can be applied not only to the bridge of vehicle pass-through, also can be applied to humanoid bridge.

Description

A kind of bridge Green protection fence structure
Technical field
The present invention relates to field of bridge construction, in particular to a kind of bridge Green protection fence structure.
Background technique
Greening structure is set in bridge structure less at present, so that bridge is not beautiful enough, is visually easy to produce fatigue, and Bridge periphery exhaust emissions causes bridge ambient air contamination, is unfavorable for environmental protection.
Summary of the invention
The present invention provides a kind of bridge Green protection fence structures, it is intended to solve the above problem in the prior art.
The present invention is implemented as follows:
A kind of bridge Green protection fence structure, including guardrail and the greening plate being connected on guardrail;The greening plate is in rectangle Interconnecting piece is formed on structure, the top for afforesting plate, and the interconnecting piece, which is connected at the top of guardrail, is arranged greening plate vertically downward;
The greening plate has the connecting hole of rectangular configuration, is connected with Planting board, the plantation at the top of the connecting hole Plate can be flipped up to horizontal position and can place potting.
Still optionally further, the outer profile of the Planting board is in rectangular configuration, and the inside of Planting board forms circular through-hole, Pallet is provided on the inside of the Planting board, the pallet is circle, harness is connected between pallet and the hole wall of through-hole, so that institute Stating pallet when Planting board is horizontally arranged can hang down to lower than the location of Planting board.
Still optionally further, the periphery wall of the pallet is connected with the diaphragm seal of tubular, the inside edge of the diaphragm seal It is tightly connected with the outer ledge of pallet, so that forming water storage between the pallet and diaphragm seal after the Planting board is horizontal positioned Slot;The outer ledge of the diaphragm seal is circumferentially arranged multiple connection rings, and one end of each harness is connected to described The hole wall of through-hole, the other end of harness are connected to the connection ring;
Multiple caging bolts are provided on the Planting board, the caging bolt is arranged along the radial direction of through-hole, and limits The end of position bolt, which extends on the outside of the pallet, is limited in the pallet between caging bolt and guardrail.
Still optionally further, the bottom flexural pivot of the Planting board is connected with support rod, and the length direction of the support rod hangs down Directly in the axis direction of the Planting board;One end of the support rod forms the clamping joint of U-shaped structure, the lower part of the connecting hole Edge is formed down card slot, and the side of the support rod is downwardly protrude to form fixture block, and the fixture block is connected in the card slot;It is described The length of Planting board is greater than its height, so that the end of the support rod is supported in the Planting board when card slot and is in level Position.
Still optionally further, there are four the caging bolts;The harness has at least six roots of sensation.
Still optionally further, the guardrail includes the more columns being vertically arranged, and is connected between adjacent every two root posts It is connected to more cross bars;The greening plate is connected to the cross bar, and the pallet is bonded with the cross bar;It is provided on the guardrail Multiple greening plates.
Still optionally further, the greening plate is connect by clip with cross bar, and a part of the clip is connected to cross bar, Another part of the clip is connected to the interconnecting piece.
Bridge Green protection fence structure provided by the invention, is arranged in the two sides of bridge, can place after Planting board is opened Potting and can improve bridge ambient air quality so that no matter bridge is far seen or closely see very beautiful.It can not only answer For the bridge of vehicle pass-through, humanoid bridge also can be applied to.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is the structural schematic diagram of bridge Green protection fence structure provided in an embodiment of the present invention;
Fig. 2 is the structural schematic diagram that plate is individually afforested in bridge Green protection fence structure provided in an embodiment of the present invention;
Fig. 3 is the side view signal that bridge Green protection fence structure provided in an embodiment of the present invention individually afforests that plate is connect with guardrail Figure, Planting board is packed up at this time;
Fig. 4 is the side view signal that bridge Green protection fence structure provided in an embodiment of the present invention individually afforests that plate is connect with guardrail Figure, Planting board is opened at this time;
Fig. 5 is that the structure of placement flowerpot after Planting board opening in bridge Green protection fence structure provided in an embodiment of the present invention is shown It is intended to.
Appended drawing reference summarizes: guardrail 11, greening plate 12, interconnecting piece 13, connecting hole 14, Planting board 15, through-hole 16, pallet 17, harness 18, diaphragm seal 19, catch basin 20, connection ring 21, caging bolt 22, support rod 23, clamping joint 24, card slot 25, fixture block 26, column 27, cross bar 28, clip 29, potting 40.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Embodiment please refers to Fig. 1-5.
A kind of bridge Green protection fence structure is present embodiments provided, the two sides of bridge are set, after Planting board 15 is opened Potting 40 can be placed, so that no matter bridge is far seen or closely see very beautiful, and bridge ambient air quality can be improved. It can be applied not only to the bridge of vehicle pass-through, also can be applied to humanoid bridge.
As shown in Figure 1, this bridge Green protection fence structure includes guardrail 11 and the greening plate 12 being connected on guardrail 11;Institute State that greening plate 12 is in rectangular configuration, interconnecting piece 13 is formed on the top of greening plate 12, and the interconnecting piece 13 is connected to the top of guardrail 11 Greening plate 12 is arranged vertically downward in portion;
The greening plate 12 has the connecting hole 14 of rectangular configuration, and the top of the connecting hole 14 is connected with Planting board 15, The Planting board 15 can be flipped up to horizontal position and can place potting 40.
Bridge can be the main bridge for motor vehicles traveling, be also possible to for the small of people and lesser vehicle travels Bridge.The two sides of bridge are arranged in guardrail 11, play the role of protection.Greening plate 12 is arranged in the outside of guardrail 11 simultaneously, is made It obtains after Planting board 15 is opened and is opened to the outside of bridge, traffic pressure will not be generated to natively crowded bridge, while also not Vehicle or pedestrian can be touched.
Greening plate 12 is arranged downward vertically, is steadily connected on guardrail 11.When in use, keep greening plate 12 vertical Position, and Planting board 15 is flipped up, it is in a horizontal position Planting board 15, makes that potting 40 can be placed on Planting board 15. After placing potting 40 on multiple Planting boards 15, it is capable of forming greenbelt landscape, it is very beautiful.
As shown in Fig. 2, the outer profile of the Planting board 15 is in rectangular configuration, the inside of Planting board 15 forms circular through-hole 16, pallet 17 is provided on the inside of the Planting board 15, the pallet 17 is circle, is connected between pallet 17 and the hole wall of through-hole 16 There is harness 18, pallet 17 is hung down to lower than the location of Planting board 15 when the Planting board 15 is horizontally arranged.
The Planting board 15 of rectangular configuration is conveniently connected in the connecting hole 14 of rectangular configuration, while also facilitating processing.It is round Through-hole 16 convenient be adapted to the pallet 17 of circular configuration.Since most flowerpots are circle, by through-hole 16 and pallet 17 It is provided in round.In the greening plate 12 of this structure, pallet 17 is flexibly connected with Planting board 15, and pallet 17 is facilitated Ground changes position.When Planting board 15 is in a horizontal position, pallet 17 can vertical subsidence, be in lower position so that support Difference in height is formed between disk 17 and Planting board 15, potting 40 is placed on pallet 17, Planting board 15 is from side is to potting 40 To protective effect, enable potting 40 steadily in the position.It, will not be from so that the outside of bridge is arranged in potting 40 It is fallen on pallet 17, play the role of protecting potting 40 and protects bridge underlying object.
As shown in figures 2 and 5, the periphery wall of the pallet 17 is connected with the diaphragm seal 19 of tubular, the diaphragm seal 19 The outer ledge of inside edge and pallet 17 is tightly connected, so that the pallet 17 and sealing after the Planting board 15 is horizontal positioned Catch basin 20 is formed between piece 19;The outer ledge of the diaphragm seal 19 is circumferentially arranged multiple connection rings 21, each institute The one end for stating harness 18 is connected to the hole wall of the through-hole 16, and the other end of harness 18 is connected to the connection ring 21;
Multiple caging bolts 22 are provided on the Planting board 15, the caging bolt 22 is set along the radial direction of through-hole 16 Set, and the end of caging bolt 22 extend to the pallet 17 outside make the pallet 17 be limited in caging bolt 22 with Between guardrail 11.
In this structure, connected between pallet 17 and Planting board 15 by double structure.Diaphragm seal 19 is tubular after opening, It is flexible material, e.g. polyethylene, can be retracted to lesser state, and pallet 17 is move freely.Diaphragm seal 19 sides are connect with 17 side seal of pallet, and the storage of side and sealed bottom is capable of forming after opening pallet 17 and diaphragm seal 19 Sink 20 can store a certain amount of water in catch basin 20.19 outer ledge of diaphragm seal (when diaphragm seal 19 open after the position Set be diaphragm seal 19 top edge) be provided with connection ring 21, the inside of connection ring 21 and Planting board 15 is connected by harness 18 It picks up and.The length of harness 18 is consistent, so that Planting board 15 is in a horizontal position after the opening of horizontality lower tray 17.
Potting 40 selects bottom with water hole, and above-mentioned this set makes that a certain amount of water can be stored in catch basin 20, After potting 40 is placed, catch basin 20 can collect rainwater, and when the water poured in potting 40 is more, ponding can be leaked out along water hole And it is stored in catch basin 20.Enable when soil is dry in potting 40 and absorb water out of catch basin 20, reduces the dimension of potting 40 The period is protected, maintenance cost is reduced.The set-up mode for encrypting mounting 19 by harness 18 simultaneously, allows to using less sealing 19 material of piece, so that cost is relatively low, while making difference in height between pallet 17 and Planting board 15 larger again, potting 40 can be placed It is deeper, it is more stable.And harness 18 is easier to bend, after so that pallet 17 is accepted harness 18 and diaphragm seal 19 more from So, fold is less.
It is provided with link block in the plate face of Planting board 15, there is threaded hole, the setting of caging bolt 22 is even on link block It connects on block, and is connected in threaded hole.Link block is extended in the end of caging bolt 22, and extends to the outside of pallet 17, will Pallet 17 limits.When the vertical placement of Planting board 15 and pallet 17, caging bolt 22 is screwed, pallet 17 is limited in limit spiral shell Between bolt 22 and guardrail, so that pallet 17 will not shake.When using Planting board 15 and pallet 17, pallet 17 is settled downwards, instead Increase the opening of through-hole 16 to caging bolt 22 is screwed, so that potting 40 can be placed in through-hole 16 and be placed on pallet 17 On, screwing caging bolt 22 later contradicts its end and potting 40, and so that caging bolt 22 is played fixed effect to potting 40, Potting 40 is set to be connected on pallet 17 more stablely.
As shown in Figures 2 and 4, the bottom flexural pivot of the Planting board 15 is connected with support rod 23, the length of the support rod 23 Direction is spent perpendicular to the axis direction of the Planting board 15;One end of the support rod 23 forms the clamping joint 24 of U-shaped structure, institute The lower edge for stating connecting hole 14 is formed down card slot 25, and the side of the support rod 23 is downwardly protrude to form fixture block 26, described Fixture block 26 is connected in the card slot 25;The length of the Planting board 15 is greater than its height, so that the end branch of the support rod 23 The Planting board 15 when the card slot 25 is supportted to be in a horizontal position.
Support rod 23 has dual connection function, can steadily connect Planting board 15 when Planting board 15 is placed vertically On greening plate 12, also Planting board 15 can steadily be connected when Planting board 15 is horizontally arranged.
When Planting board 15 is placed vertically, support rod 23 is located at the bottom position of Planting board 15, the branch when Planting board 15 is laid flat Strut 23 is located at the side of Planting board 15.The bottom of Planting board 15 is provided with bulb, is provided with ball on support rod 23, makes It obtains support rod 23 to connect with 15 flexural pivot of Planting board, the rotation for enabling support rod 23 multi-faceted.It is set in the bottom of support rod 23 Fixture block 26 is set, the position that 14 bottom margin of connecting hole is located on greening plate 12 is provided with card slot 25, by the card of support rod 23 Block 26 is connected in the card slot 25 of greening plate 12, and Planting board 15 is steadily connected on greening plate 12;Pass through limit again Position bolt 22 limits pallet 17, so that Planting board 15 and pallet 17 can be stablized.
When Planting board 15 is horizontally arranged, rotary supporting rod 23, since the end of support rod 23 is provided with the card of U-shaped structure Connector 24 can be steadily connected in card slot 25, and the length of Planting board 15 is greater than its height, so that 15 level of Planting board is put The clamping joint 24 of support rod 23 can be connected in card slot 25 when setting, and Planting board 15 is made to be stably positioned in horizontal position.
As shown in Fig. 2, there are four the caging bolts 22;The harness 18 has at least six roots of sensation.This setup makes Planting board 15 being capable of steadily connecting trays 17.
As shown in Figure 1, the guardrail 11 includes the more columns 27 being vertically arranged, between adjacent every two root posts 27 It is connected with more cross bars 28;The greening plate 12 is connected to the cross bar 28, and the pallet 17 is bonded with the cross bar 28;It is described Multiple greening plates 12 are provided on guardrail 11.The simple easily construction of the guardrail 11 of this structure, it is convenient that greening plate 12 is carried out Support.
As shown in Figure 1, the greening plate 12 is connect by clip 29 with cross bar 28, a part of the clip 29 is connected to Cross bar 28, another part of the clip 29 are connected to the interconnecting piece 13.It can be conveniently and efficiently by greening by clip 29 Plate 12 is connected on guardrail 11, and is readily disassembled.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.

Claims (6)

1. a kind of bridge Green protection fence structure, which is characterized in that including guardrail and the greening plate being connected on guardrail;The greening Plate is in rectangular configuration, and interconnecting piece is formed on the top for afforesting plate, and the interconnecting piece, which is connected at the top of guardrail, makes greening plate vertical It is down-set;
The greening plate has the connecting hole of rectangular configuration, is connected with Planting board, the Planting board energy at the top of the connecting hole It is enough flipped up to horizontal position and potting can be placed;
The outer profile of the Planting board is in rectangular configuration, and the inside of Planting board forms circular through-hole, sets on the inside of the Planting board It is equipped with pallet, the pallet is circle, harness is connected between pallet and the hole wall of through-hole, so that the Planting board is horizontal positioned When pallet can hang down to lower than the location of Planting board.
2. bridge Green protection fence structure according to claim 1, which is characterized in that the periphery wall of the pallet is connected with cylinder The diaphragm seal of shape, the inside edge of the diaphragm seal and the outer ledge of pallet are tightly connected, so that the Planting board level is put It postpones and forms catch basin between the pallet and diaphragm seal;The outer ledge of the diaphragm seal is circumferentially arranged multiple connections Ring, one end of each harness are connected to the hole wall of the through-hole, and the other end of harness is connected to the connection ring;
Multiple caging bolts are provided on the Planting board, the caging bolt is arranged along the radial direction of through-hole, and limits spiral shell The end of bolt, which extends on the outside of the pallet, is limited in the pallet between caging bolt and guardrail.
3. bridge Green protection fence structure according to claim 2, which is characterized in that the bottom flexural pivot of the Planting board connects There is a support rod, the axis direction of the length direction of the support rod perpendicular to the Planting board;One end of the support rod forms U The clamping joint of type structure, the lower edge of the connecting hole are formed down card slot, and the side of the support rod is downwardly protrude to form Fixture block, the fixture block are connected in the card slot;The length of the Planting board is greater than its height, so that the end branch of the support rod The Planting board when card slot is supportted to be in a horizontal position.
4. bridge Green protection fence structure according to claim 3, which is characterized in that there are four the caging bolts;It is described Harness has at least six roots of sensation.
5. bridge Green protection fence structure according to claim 3, which is characterized in that the guardrail includes more and vertically sets The column set is connected with more cross bars between adjacent every two root posts;The greening plate is connected to the cross bar, the pallet It is bonded with the cross bar;Multiple greening plates are provided on the guardrail.
6. bridge Green protection fence structure according to claim 5, which is characterized in that the greening plate passes through clip and cross bar Connection, a part of the clip are connected to cross bar, and another part of the clip is connected to the interconnecting piece.
CN201710746448.1A 2017-08-27 2017-08-27 A kind of bridge Green protection fence structure Active CN107288035B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710746448.1A CN107288035B (en) 2017-08-27 2017-08-27 A kind of bridge Green protection fence structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710746448.1A CN107288035B (en) 2017-08-27 2017-08-27 A kind of bridge Green protection fence structure

Publications (2)

Publication Number Publication Date
CN107288035A CN107288035A (en) 2017-10-24
CN107288035B true CN107288035B (en) 2019-03-29

Family

ID=60107159

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710746448.1A Active CN107288035B (en) 2017-08-27 2017-08-27 A kind of bridge Green protection fence structure

Country Status (1)

Country Link
CN (1) CN107288035B (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000116484A (en) * 1998-10-13 2000-04-25 Takeshi Ito Flower stand
CN204762413U (en) * 2015-06-12 2015-11-18 上海茵能节能环保科技有限公司 Hang and put formula flowerpot
CN105178807B (en) * 2015-07-15 2017-01-18 重庆联汇生态农业发展有限公司 Turnover type plant window
CN205105756U (en) * 2015-10-28 2016-03-30 湖州妙峰园林工程有限公司 City guardrail is fixed with flower groove
CN205223916U (en) * 2015-12-21 2016-05-11 浙江湖州环天交通工程有限公司 Road partition fence
CN206371180U (en) * 2016-12-15 2017-08-04 盐城林一森花木有限公司 A kind of graden machine arranging apparatus

Also Published As

Publication number Publication date
CN107288035A (en) 2017-10-24

Similar Documents

Publication Publication Date Title
JP2007274948A (en) System and method for greening wall surface
CN104363751A (en) Vertical landscaping system
CN107288035B (en) A kind of bridge Green protection fence structure
KR20150055370A (en) Protection Plate for Roadside Trees
ES1068642U (en) Provision for the foundation of a solar collector. (Machine-translation by Google Translate, not legally binding)
JP5631245B2 (en) Tree growth protection unit
CN107503288B (en) A kind of method for bridge construction with greening structure
CN207099802U (en) A kind of overhead viaduct bridge guardrail greening flowerpot structure
JP5623257B2 (en) Folded roof support structure
CN204753449U (en) Municipal administration rail guard
CN206136814U (en) Tree supporting device for landscaping
CN205455001U (en) Snake gourd shed frame
KR100846722B1 (en) Flowerpot for flower tower
CN210247657U (en) Ecological flower planting device
KR100753956B1 (en) Support fence structure for new town of landscape architecture
EP1825745A2 (en) Plant container assembly
CN214430412U (en) Support is bred to afforestation tendril
CN205611374U (en) Plant climbing rack
CN203321070U (en) Guardrail
CN206035087U (en) Novel afforestation guardrail
CN211790211U (en) Bury formula power equipment protection component
CN215800776U (en) Stone-imitated concrete tree pit stone
CN216567250U (en) Vertical greening grid structure
CN103410367B (en) Landscape style small station
TWM444709U (en) Architecture structure with greening effect and its greening frame

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190214

Address after: Room 357, 3-storey V District, Building 6-7, 8300 Lane 6-7, Yinggang East Road, Qingpu District, Shanghai, 201700

Applicant after: Shanghai Xiangjian Creative Design Co., Ltd.

Address before: 474350 No. 450 Yalu, Chengguanzhen, Neixiang County, Nanyang City, Henan Province

Applicant before: Li Hongxing

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant