CN205455001U - Snake gourd shed frame - Google Patents

Snake gourd shed frame Download PDF

Info

Publication number
CN205455001U
CN205455001U CN201521123658.8U CN201521123658U CN205455001U CN 205455001 U CN205455001 U CN 205455001U CN 201521123658 U CN201521123658 U CN 201521123658U CN 205455001 U CN205455001 U CN 205455001U
Authority
CN
China
Prior art keywords
crossbeam
main beam
frame
montant
melon
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521123658.8U
Other languages
Chinese (zh)
Inventor
方美玲
许方铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suiyang Zhaofu Agricultural Science & Technology Co ltd
Original Assignee
Suiyang Zhaofu Agricultural Science & Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suiyang Zhaofu Agricultural Science & Technology Co ltd filed Critical Suiyang Zhaofu Agricultural Science & Technology Co ltd
Priority to CN201521123658.8U priority Critical patent/CN205455001U/en
Application granted granted Critical
Publication of CN205455001U publication Critical patent/CN205455001U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Plants (AREA)

Abstract

This patent belongs to the agricultural equipment field, especially relates to a snake gourd shed frame. It includes 3 piece at least stands and 2 piece at least crossbeams, and the stand top is equipped with the shrinkage pool that is used for installing the crossbeam. The crossbeam includes 1 main beam and 1 piece at least auxiliary cross beam, and the main beam both ends all are equipped with the lug, and auxiliary cross beam one end is equipped with the lug, and the other end is equipped with the shrinkage pool, and the lug agrees with with the shrinkage pool mutually. All be equipped with 2 at least perpendicular to main beams and auxiliary cross beam and array alignment's montant hole, montant hole fixedly connected with montant on main beam and the auxiliary cross beam. Being fixed with at least 1 between crossbeam and the ground and climbing the rattan pole, per 4 stands have 1 stand and are connected with and place the pipe. This patent through provide one kind can the independent assortment snake gourd shed frame, solved the problem of how to build large -scale snake gourd shed frame.

Description

Hang melon frame
Technical field
This utility model belongs to agricultural equipment field, particularly relates to one and hangs melon frame.
Background technology
Hang melon, have another name called Fructus Trichosanthis, it is thin pulp therefore another name dung Fructus Benincasae because being that yellow is internal after its maturation, for Cucurbitaceae herbaceous perennial vine plant, it is grown in the gentle mountain valley thick forest of 100 1800 meters of weathers of height above sea level and hillside fields shrubbery, widely collect scenery with hills and waters it " anima ", be a kind of famous and precious Chinese crude drug, there is medical and consumption simultaneously.
Using frame to be easy to hang the climbing of melon when hanging melon plantation, hang melon frame and be mainly made up of concrete column, steel wire and nylon rope net, such structure can prevent from being blown down by strong wind hanging melon production period frame.But hang melon frame area can be affected by the size of nylon rope net, peasant builds and hangs the area of melon frame and do not have large-scale nylon rope net, it is impossible to builds and large-scale hangs melon frame.That is prior art cannot solve to build the large-scale problem hanging melon frame.
Utility model content
This utility model is intended to provide one to hang melon frame, in order to solve how to build the large-scale problem hanging melon frame.
In order to solve above technical problem, this utility model realizes by the following technical solutions:
This utility model provides one and hangs melon frame, including at least 3 root posts and at least 2 crossbeams, it is characterised in that: described column top is provided with the shrinkage pool for installing crossbeam;Described crossbeam includes 1 main beam and at least 1 secondary crossbeam, and main beam two ends are equipped with projection, and secondary crossbeam one end is provided with projection, and the other end is provided with shrinkage pool, and projection agrees with mutually with shrinkage pool;Being equipped with at least 2 on described main beam and secondary crossbeam and be perpendicular to main beam and secondary crossbeam and the montant hole of array arrangement, montant hole is fixedly connected with montant;Being fixed with at least 1 akala bar between described crossbeam and ground, every 4 root posts just have 1 root post to connect and have placement pipe.
Operation principle of the present utility model and beneficial effect:
Install this utility model time, column be embedded in ground the end part be generally 0.5 ~ 0.7 meter, column top distance 1.5 ~ 2.0 meters of ground, this be in order to prevent column loosen, the height of column can not be the highest, it is to avoid have influence on peasant to the plantation hanging melon;Fixedly mounting a crossbeam between two root posts, crossbeam includes a main beam and at least secondary crossbeam;Main beam can synthesize the crossbeam of an appropriate length with secondary crossbeam according to the requirement groups of peasant;Main beam and secondary crossbeam are equipped with montant hole, be provided with some of the identical montant of spacing by corresponding montant hole, and two are all installed with some akala bars between crossbeam and ground between two crossbeams combined;Every four root posts there is a connection have placement pipe, place pipe for placing the lamp bracket of trapping lamp;By main beam and the independent assortment of secondary crossbeam, peasant can build the large-scale melon frame that hangs, or the various areas oneself liked hang melon frame.
This utility model can hang melon frame with independent assortment by providing a kind of, solves and how to build the large-scale problem hanging melon frame.
Optimize further, described in hang melon frame and include 4 root posts and 2 crossbeams;Such structural nexus is tight, can prevent hanging melon booth and surprisingly collapse.
Optimizing further, the described spacing between montant is 0.2 meter;The spacing of 0.2 meter can conveniently be hung melon and be sought connections with growth on melon frame hanging, the closeest cost increase hanging melon frame that manufactures, and the most sparse then hang melon and is inconvenient to seek connections with growth.
Optimizing further, described pipe of placing is steel pipe;The service life of steel pipe is long, is hardly damaged.
Optimize further, the length of described crossbeam reaches 7 ~ 8 meters, because having akala bar and upright supports crossbeam, the length that can make crossbeam is more longer than the spacing distance 5 ~ 6 meters that prior art uses, making the area hanging melon frame add, one is hung melon frame and can plant than in the past and more hang melon.
Accompanying drawing explanation
Fig. 1 is the structural representation that this utility model embodiment 1 hangs melon frame;
Fig. 2 is the structural representation of this utility model embodiment 1 main beam;
Fig. 3 is the structural representation of the secondary crossbeam of this utility model embodiment 1.
Detailed description of the invention
Below by detailed description of the invention, this utility model is described in further detail:
Reference in Figure of description includes: column 1, crossbeam 2, main beam 21, secondary crossbeam 22, projection 23, shrinkage pool 24, montant hole 25, montant 3, and pipe 5 placed by akala bar 4.
Embodiment 1:
The melon frame that hangs as shown in Figure 1 includes 4 root posts 1 and 2 crossbeams 2, and such structural nexus is tight, can prevent hanging melon booth and surprisingly collapse.Column 1 top is provided with the shrinkage pool 24 for installing crossbeam 2.
Crossbeam 2 includes 1 main beam 21 and 5 secondary crossbeams 22 as shown in Figures 2 and 3, and main beam 21 two ends are equipped with projection 23, and secondary crossbeam 22 one end is provided with projection 23, and the other end is provided with shrinkage pool 24, and projection 23 agrees with shrinkage pool 24 phase.Main beam 21 and secondary crossbeam 22 remove projection 23, and length is consistent, is 1.2 meters.5 montant holes 25 being perpendicular to crossbeam 2 and array arrangement it are equipped with on main beam 21 and secondary crossbeam 22.
Montant hole 25 is fixedly connected with montant 3, employs altogether 20 montants 3.Being fixed with 6 akala bars 4 between crossbeam 2 and ground, every 4 root posts 1 just have 1 root post to connect and have placement pipe 5.Placing pipe 5 is steel pipe, and the service life of steel pipe is long, is hardly damaged.The effect placing pipe 5 is the lamp bracket for placing deinsectization lamp, and such trapping lamp is directly installed on the lamp bracket of steel pipe, for eliminating the insect hanging melon.Column 1, crossbeam 2 and montant 3 can be used armored concrete to be poured by grinding tool and form, and can save and build cost.
Build hang melon frame time, column 1 be embedded in ground the end part be generally 0.5 ~ 0.7 meter, column 1 top distance 1.5 ~ 2.0 meters of ground, this be in order to prevent column loosen, the height of column 1 can not be the highest, it is to avoid have influence on peasant to the plantation hanging melon.
Spacing between montant 3 is 0.2 meter.The spacing of 0.2 meter can conveniently be hung melon and be sought connections with growth on melon frame hanging, the closeest cost increase hanging melon frame of building, and the most sparse then hang melon and is inconvenient to seek connections with growth.
Embodiment 2:
Peasant builds and large-scale hangs melon frame, and including 4 root posts 1 and 2 crossbeams 2, crossbeam 2 is made up of the secondary crossbeam 22 of 1 main beam 21 and 7, and main beam 21 and secondary crossbeam 22 remove projection 23, and length is consistent, is 1.2 meters.Therefore the length of crossbeam 2 reaches 9.6 meters, and has 8 akala bars 4 and column 1 to support crossbeam 2 so that the length of crossbeam 2 is more longer than the spacing distance 5 ~ 6 meters that prior art uses, the possibility also do not collapsed.Making the area hanging melon frame add, one is hung melon frame and can plant than in the past and more hang melon, install in farmland before making to hang melon frame quantity less, decrease and build cost.
By main beam 21 and the independent assortment of secondary crossbeam 22, peasant can build the large-scale melon frame that hangs, or the various areas oneself liked hang melon frame.
Above-described is only embodiment of the present utility model, and in scheme, the known general knowledge such as concrete structure and characteristic too much describes at this.Should be understood that; for a person skilled in the art, on the premise of without departing from this utility model structure, it is also possible to make some deformation and improvement; these also should be considered as protection domain of the present utility model, and these are all without affecting effect and the practical applicability that this utility model is implemented.The protection domain that this application claims should be as the criterion with the content of its claim, and the detailed description of the invention in description etc. records the content that may be used for explaining claim.

Claims (5)

1. hang a melon frame, including at least 3 root posts and at least 2 crossbeams, it is characterised in that: described column top is provided with the shrinkage pool for installing crossbeam;Described crossbeam includes 1 main beam and at least 1 secondary crossbeam, and main beam two ends are equipped with projection, and secondary crossbeam one end is provided with projection, and the other end is provided with shrinkage pool, and projection agrees with mutually with shrinkage pool;Being equipped with at least 2 on described main beam and secondary crossbeam and be perpendicular to main beam and secondary crossbeam and the montant hole of array arrangement, montant hole is fixedly connected with montant;Being fixed with at least 1 akala bar between described crossbeam and ground, every 4 root posts just have 1 root post to connect and have placement pipe.
The most according to claim 1 hang melon frame, it is characterised in that hang melon frame described in: and include 4 root posts and 2 crossbeams.
The most according to claim 2 hang melon frame, it is characterised in that: the spacing between two adjacent montants is 0.2 meter.
The most according to claim 3 hang melon frame, it is characterised in that: described pipe of placing is for steel pipe.
The most according to claim 4 hang melon frame, it is characterised in that: a length of 7 ~ 8 meters of described crossbeam.
CN201521123658.8U 2015-12-31 2015-12-31 Snake gourd shed frame Expired - Fee Related CN205455001U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521123658.8U CN205455001U (en) 2015-12-31 2015-12-31 Snake gourd shed frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521123658.8U CN205455001U (en) 2015-12-31 2015-12-31 Snake gourd shed frame

Publications (1)

Publication Number Publication Date
CN205455001U true CN205455001U (en) 2016-08-17

Family

ID=56661965

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521123658.8U Expired - Fee Related CN205455001U (en) 2015-12-31 2015-12-31 Snake gourd shed frame

Country Status (1)

Country Link
CN (1) CN205455001U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106256189A (en) * 2016-08-31 2016-12-28 宿州市埇桥区九里梦种植专业合作社 A kind of Fruit Cucumber plantation frame
CN109105043A (en) * 2018-05-02 2019-01-01 何中华 A kind of Scattered bamboos fast obstacle device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106256189A (en) * 2016-08-31 2016-12-28 宿州市埇桥区九里梦种植专业合作社 A kind of Fruit Cucumber plantation frame
CN109105043A (en) * 2018-05-02 2019-01-01 何中华 A kind of Scattered bamboos fast obstacle device

Similar Documents

Publication Publication Date Title
CN204697642U (en) A kind of grape support
CN104542085A (en) Novel crop support
CN205455001U (en) Snake gourd shed frame
CN204560410U (en) Bine cultivation frame
CN104303890B (en) A kind of quick combined type ramping constraints stereo greening apparatus and its application method
CN204191281U (en) A kind of grape rain shelter cultivation frame
CN205511251U (en) Build lew device convenient and low cost
CN204762463U (en) Climb up by holding on to big rack of plant
CN204837276U (en) Watermelon cultivation support
CN206227130U (en) A kind of detachable and reusable tomato cultivation frame
CN109874566A (en) Arch flower stand device
CN204796323U (en) Dragon fruit cultivation frame
CN213296226U (en) Green protective structure of reservoir side slope
CN104871871A (en) Pitaya planting frame
CN208317555U (en) Tree support combination potted device
CN205567251U (en) Assembled bow member is used in horticulture cultivation
CN202931861U (en) Garden plant growing support
CN104542086A (en) Planting frame for greenhouse
CN104563141B (en) Protecting structure for big-gradient stone slope
CN203646185U (en) Novel crop support
CN205491895U (en) Three -dimensional vegetation planting system
CN203152121U (en) Support rod for planting vine crops
CN204888132U (en) Perpendicular planting technique device
CN207686576U (en) A kind of plantable anti-theft net
CN210685583U (en) Fence

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817

Termination date: 20171231

CF01 Termination of patent right due to non-payment of annual fee