Prior art keywords
column
greening
footstock
drainpipe
greening box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720034104.3U
Other languages
Chinese (zh)
Inventor
闫连军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720034104.3U priority Critical patent/CN206408563U/en
Application granted granted Critical
Publication of CN206408563U publication Critical patent/CN206408563U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Guardrail is protected the utility model discloses a kind of highway safety of band greening platform, including the first column, cross bar, montant and the second column, cross bar is located between the first column and the second column, montant is located at the side of cross bar, the bottom of first column and the second column is provided with base, and first be provided with footstock at the top of column and the second column, the side of the first column is provided with switching door, and the side wall of the first column inner chamber is provided with control panel.The utility model is by setting collect cavity and header tank inside footstock, reach and rainwater has been collected, facilitate and the plant of greening box is poured, reduce the workload of staff, and then ensure that the advantage of plant growth, by setting control panel, humidity sensor, the first drainpipe, the second drainpipe and magnetic valve, reach and greening box inside soil moisture has been detected in real time, and then the plant of greening box is poured in real time, reduce the excessive or very few advantage of greening box internal moisture.

Description

A kind of highway safety protection guardrail of band greening platform
Technical field
The utility model is related to highway facilities technical field, the highway safety protection guardrail of specially a kind of band greening platform.
Background technology
Highway barrier is indispensable highway facilities, and it is to prevent haulage vehicle from being rolled away from from track or on bridge that it, which is acted on, is prevented Only vehicle crosses dividing strip and sails the automobile crash come with opposite, it is to avoid vehicle bumps against with the physical obstacles on dividing strip, curb Deng.
Highway barrier at this stage is normally only made up of several metallic rods, so that road does not have life, meanwhile, it can give The vision of driver causes certain fatigue, and some highway barriers can set up some greening platforms to increase some life, be driven to remind The person of sailing travels and alleviated driver's visual fatigue, but these greening platforms do not possess the performance of ponding, causes to be filled to greening platform , it is necessary to manually be poured when irrigating water source, it can thus increase the workload of road crews, and once staff does not have The growth that will influence to afforest platform plant is poured in time, and then is not had prompting driver traveling and alleviated driver's visual fatigue Advantage.
Utility model content
The purpose of this utility model is the highway safety protection guardrail for providing a kind of band greening platform, possesses good prompting Driver and alleviation driver's visual fatigue, possess ponding performance, facilitate the self water feeding of greening platform, it is ensured that the life of plant Long advantage, the highway barrier solved at this stage is normally only made up of several metallic rods, so that road does not have life, together When, certain fatigue can be caused to the vision of driver, some highway barriers can set up some greening platforms to increase some life, come Remind driver's traveling and alleviate driver's visual fatigue, but these greening platforms do not possess the performance of ponding, cause to give greening platform , it is necessary to manually be poured when carrying out iirigation water source, it can thus increase the workload of road crews, and once work people Member without in time pour will influence afforest platform plant growth, and then do not have prompting driver traveling and alleviation driver regard The problem of feeling fatigue.
To achieve the above object, the utility model provides following technical scheme:A kind of highway safety protection of band greening platform Guardrail, including the first column, cross bar, montant and the second column, cross bar are located between the first column and the second column, and montant is located at The side of cross bar, the bottom of first column and the second column is provided with base, and the top of the first column and the second column Portion is provided with footstock, and the side of first column is provided with switching door, and the side wall of the first column inner chamber is provided with control Panel, the bottom of the first column inner chamber is provided with battery, and the week side of boss of the footstock is provided with baffle plate, and the bottom on footstock surface Leaking hole is offered, the inside of the footstock offers collect cavity, and the surface of footstock is equipped with solar panel, the horizontal stroke Greening box is provided with the middle part of bar, the both sides of the greening box are connected by the bottom of the first drainpipe and footstock, the first row One end of pipe is socketed with the top of magnetic valve, the greening box and is provided with header tank, and the two ends of the header tank bottom pass through Two drainpipes are connected with the first drainpipe, and the inside of the greening box is disposed with plantation chamber and water storage cavity from top to bottom, should The inwall of plantation chamber side is provided with humidity sensor, and the bottom of plantation chamber is equipped with geotextiles, the plantation chamber and water storage Chamber is connected by permeable hole, and permeable hole is internally provided with water suction sliver, and the side of the greening box is provided with placement deckle board, The control panel electrical connection battery, solar panel, magnetic valve and humidity sensor.
It is preferred that, the greening box is connected in the top of cross bar, and header tank is connected in the top of greening box, header tank with The junction of greening box is provided with the standing groove being adapted.
It is preferred that, the quantity of the leaking hole is no less than five, and the equidistant surface being built at the top of footstock of leaking hole, Collect cavity is in communication with the outside by leaking hole.
It is preferred that, first drainpipe be L-shaped, and plantation chamber connected by the first drainpipe with collect cavity, first row Be connected with greening box one section of water pipe is skewed.
It is preferred that, the two ends of the water suction sliver are located at plantation chamber and water storage cavity, geotextiles and the company of water suction sliver respectively The place of connecing, which is provided with, is adapted through hole, and the size of geotextiles is adapted with planting the size at bottom of chamber end, and the quantity of permeable hole is many In three, and equidistant be built in of permeable hole is planted between chamber and water storage cavity.
Compared with prior art, the beneficial effects of the utility model are as follows:
The utility model has reached and rainwater has been collected by setting collect cavity and header tank inside footstock, convenient The plant of greening box is poured, the workload of staff is reduced, and then ensure that the advantage of plant growth, is passed through Control panel, humidity sensor, the first drainpipe, the second drainpipe and magnetic valve are set, reached in real time to greening box inside Soil moisture detected, and then the plant of greening box is poured in real time, reduces greening box internal moisture excessively or mistake Few advantage, by setting water storage cavity, water suction sliver, has reached that the water unnecessary to plantation chamber in the rainy day is collected, and lead to Cross water suction sliver and turn round again and give plantation chamber, and then ensure that the normal growth of plant, meanwhile, the advantage of rainwater is made full use of, is led to Cross and geotextiles and the bottom of plantation chamber are set, reached that the soil for preventing from planting intracavitary portion is entered in water storage cavity with current, protected The advantage of plant growth environment has been demonstrate,proved, by setting the placement deckle board on the outside of the warning tape and greening box on montant, increasing has been reached Plus the alarming effect of guardrail, the advantage that reduction traffic accident is produced.
Brief description of the drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is the utility model overlooking the structure diagram.
In figure:1 first column, 2 second columns, 3 bases, 4 switching doors, 5 control panels, 6 footstocks, 7 collect cavities, 8 baffle plates, 9 solar panels, 10 leaking holes, 11 cross bars, 12 montants, 13 warning tapes, 14 greening boxes, 15 first drainpipes, 16 magnetic valves, 17 header tanks, 18 standing grooves, 19 second drainpipes, 20 kinds plant chamber, it is 21 water storage cavities, 22 humidity sensors, 23 geotextiles, 24 permeable Deckle board, 27 batteries are placed in hole, 25 water suction slivers, 26.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
Refer to Fig. 1-2, a kind of highway safety protection guardrail of band greening platform, including the first column 1, cross bar 11, montant 12 and second column 2, cross bar 11 is located between the first column 1 and the second column 2, and montant 12 is located at the side of cross bar 11, first The bottom of the column 2 of column 1 and second is provided with base 3, and the top of the first column 1 and the second column 2 is provided with footstock 6, the side of the first column 1 is provided with switching door 4, and the side wall of the inner chamber of the first column 1 is provided with control panel 5, the first column 1 The bottom of inner chamber is provided with battery 27, and the week side of boss of footstock 6 is provided with baffle plate 8, and the bottom on the surface of footstock 6 offers leaking hole 10, the quantity of leaking hole 10 is no less than five, and the equidistant surface for being built in the top of footstock 6 of leaking hole 10, and collect cavity 7 passes through Leaking hole 10 is in communication with the outside, and the inside of footstock 6 offers collect cavity 7, and the surface of footstock 6 is equipped with solar panel 9, The middle part of cross bar 11 is provided with greening box 14, and the both sides of the greening box 14 are connected by the bottom of the first drainpipe 15 and footstock 6 Connect, one end of the first row pipe 15 is socketed with magnetic valve 16, and the top of greening box 14 is provided with header tank 17, the clamping of greening box 14 In the top of cross bar 11, and header tank 17 is connected in the top of greening box 14, and the junction of header tank 17 and greening box 14 is set There is the standing groove 18 being adapted, the two ends of the bottom of header tank 17 are connected by the second drainpipe 19 with the first drainpipe 15, The inside of greening box 14 is disposed with plantation chamber 20 and water storage cavity 21 from top to bottom, and the first drainpipe 5 is L-shaped, and plants chamber 20 are connected by the first drainpipe 15 with collect cavity 7, and the first drainpipe 15 be connected with greening box 14 one section is skewed, this kind The inwall for planting the side of chamber 20 is provided with humidity sensor 22, and the bottom of plantation chamber 20 is equipped with geotextiles 23, plants the He of chamber 20 Water storage cavity 21 is connected by permeable hole 24, and permeable hole 24 is internally provided with water suction sliver 25, the two ends point of water suction sliver 25 Chamber 20 and water storage cavity 21 Wei Yu not be planted, geotextiles 23 are provided with the junction for the sliver 25 that absorbs water and are adapted through hole, geotextiles 23 size is adapted with the size of plantation chamber 20 bottom, and the quantity of permeable hole 24 is no less than three, and permeable hole 24 is equidistant From being built between plantation chamber 20 and water storage cavity 21, the side of greening box 14 is provided with placement deckle board 26, and control panel 5 is electrically connected Battery 27, solar panel 9, magnetic valve 16 and humidity sensor 22, by setting collect cavity 7 and collection inside footstock 6 Water tank 17, has reached and rainwater has been collected, and facilitates and the plant of greening box 14 is poured, and reduces the work of staff Measure, and then ensure that the advantage of plant growth, by setting control panel 5, humidity sensor 22, the first drainpipe 15, Two drainpipes 19 and magnetic valve 16, have reached and the inside soil moisture of greening box 14 have been detected in real time, and then in real time to greening The plant of case 14 is poured, and reduces the excessive or very few advantage of the internal moisture of greening box 14, by setting water storage cavity 21, suction Water sliver 25, has reached that the water unnecessary to plantation chamber 20 in the rainy day is collected, and turn round again to kind by the sliver 25 that absorbs water Chamber 20 is planted, and then ensure that the normal growth of plant, meanwhile, the advantage of rainwater is made full use of, by setting geotextiles 23 and kind The bottom of chamber 20 is planted, having reached prevents the soil planted inside chamber 20 from being entered with current in water storage cavity 21, it is ensured that plant gives birth to The advantage of long environment, by setting the warning tape 13 on montant 12 and the placement deckle board 26 in the outside of greening box 14, has reached increase The alarming effect of guardrail, the advantage that reduction traffic accident is produced.
In use, rainwater is entered in collect cavity 7 by leaking hole 10, header tank 17 is collected to rainwater, falls into kind The water for planting chamber 20 is entered in water storage cavity 21 by permeable hole 24, during fine day, and solar panel 9 absorbs sunshine and sent out Electricity, and be transferred to battery 27 and stored, the water in water storage cavity 21 is planted in chamber 20 by the transmission belt of sliver 25 that absorbs water, to planting The soil planted in chamber 20 is humidified, and the humidity in 22 pairs of plantation chambers 20 of humidity sensor is monitored, and such as humidity not enough, will be believed Number it is delivered in control panel 5, the opens solenoid valve 16 of control panel 5, the water in collect cavity 7 and header tank 17 passes through first row Water pipe 15 is entered in plantation chamber 20, and humidity is much of that, and signal is passed to control panel 5 by humidity sensor 22, and control panel 5 is closed Magnetic valve 16 is closed, warning sign is positioned in placement deckle board 26, together driver warned with warning tape 13.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out in the case where not departing from principle of the present utility model and spirit a variety of changes, repaiies Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of highway safety protection guardrail of band greening platform, including the first column(1), cross bar(11), montant(12)With second Column(2), cross bar(11)Positioned at the first column(1)With the second column(2)Between, montant(12)Positioned at cross bar(11)Side, It is characterized in that:First column(1)With the second column(2)Bottom be provided with base(3), and the first column(1)With Second column(2)Top be provided with footstock(6), first column(1)Side be provided with switching door(4), and first Column(1)The side wall of inner chamber is provided with control panel(5), the first column(1)The bottom of inner chamber is provided with battery(27), it is described Footstock(6)The week side of boss be provided with baffle plate(8), and footstock(6)The bottom on surface offers leaking hole(10), the footstock(6)'s Inside offers collect cavity(7), and footstock(6)Surface be equipped with solar panel(9), the cross bar(11)Middle part set It is equipped with greening box(14), the greening box(14)Both sides pass through the first drainpipe(15)With footstock(6)Bottom connection, first Drainpipe(15)One end be socketed with magnetic valve(16), the greening box(14)Top be provided with header tank(17), this catchments Case(17)The two ends of bottom pass through the second drainpipe(19)With the first drainpipe(15)Connection, the greening box(14)Inside Plantation chamber is disposed with from top to bottom(20)And water storage cavity(21), the plantation chamber(20)The inwall of side is provided with humidity sensor Device(22), and plantation chamber(20)Bottom be equipped with geotextiles(23), the plantation chamber(20)And water storage cavity(21)By permeable Hole(24)Connection, and permeable hole(24)Be internally provided with water suction sliver(25), the greening box(14)Side be provided with and put Put deckle board(26), the control panel(5)Electrically connect battery(27), solar panel(9), magnetic valve(16)Passed with humidity Sensor(22).
2. a kind of highway safety protection guardrail of band greening platform according to claim 1, it is characterised in that:The greening box (14)It is connected in cross bar(11)Top, and header tank(17)It is connected in greening box(14)Top, header tank(17)With greening Case(14)Junction be provided with the standing groove being adapted(18).
3. a kind of highway safety protection guardrail of band greening platform according to claim 1, it is characterised in that:The leaking hole (10)Quantity be no less than five, and leaking hole(10)It is equidistant to be built in footstock(6)The surface at top, collect cavity(7)Pass through Leaking hole(10)It is in communication with the outside.
4. a kind of highway safety protection guardrail of band greening platform according to claim 1, it is characterised in that:The first row Water pipe(15)For L-shaped, and plantation chamber(20)Pass through the first drainpipe(15)With collect cavity(7)Connection, the first drainpipe(15)With Greening box(14)One section of connection is skewed.
5. a kind of highway safety protection guardrail of band greening platform according to claim 1, it is characterised in that:The absorbent wool Bar(25)Two ends respectively be located at plantation chamber(20)And water storage cavity(21), geotextiles(23)With water suction sliver(25)Junction set It is equipped with and is adapted through hole, geotextiles(23)Size with plantation chamber(20)The size of bottom is adapted, and permeable hole(24)Number Amount is no less than three, and permeable hole(24)It is equidistant to be built in plantation chamber(20)And water storage cavity(21)Between.
CN201720034104.3U 2017-01-11 2017-01-11 A kind of highway safety protection guardrail of band greening platform Expired - Fee Related CN206408563U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720034104.3U CN206408563U (en) 2017-01-11 2017-01-11 A kind of highway safety protection guardrail of band greening platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720034104.3U CN206408563U (en) 2017-01-11 2017-01-11 A kind of highway safety protection guardrail of band greening platform

Publications (1)

Publication Number Publication Date
CN206408563U true CN206408563U (en) 2017-08-15

Family

ID=59554340

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720034104.3U Expired - Fee Related CN206408563U (en) 2017-01-11 2017-01-11 A kind of highway safety protection guardrail of band greening platform

Country Status (1)

Country Link
CN (1) CN206408563U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107503288A (en) * 2017-08-27 2017-12-22 李红星 A kind of method for bridge construction with greening structure
CN110600225A (en) * 2019-10-21 2019-12-20 徐州市铜山区百恒电子厂 Rainwater cooling device for pole-mounted transformer
CN111576208A (en) * 2020-05-25 2020-08-25 浙江常青公路工程有限公司 Greening guardrail device for bridge

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107503288A (en) * 2017-08-27 2017-12-22 李红星 A kind of method for bridge construction with greening structure
CN110600225A (en) * 2019-10-21 2019-12-20 徐州市铜山区百恒电子厂 Rainwater cooling device for pole-mounted transformer
CN111576208A (en) * 2020-05-25 2020-08-25 浙江常青公路工程有限公司 Greening guardrail device for bridge

Similar Documents

Publication Publication Date Title
CN206408563U (en) A kind of highway safety protection guardrail of band greening platform
CN204573892U (en) Catchment street lamp
CN206835796U (en) Intelligent rainwater self power generation irrigation system
CN207969440U (en) A kind of Green Roof
CN210529817U (en) Sponge city construction is with recessed formula greenery patches rainwater collection device
CN204811233U (en) Concrete retaining wall outlet afforestation structure
WO2022053667A1 (en) Irrigation and drainage device and/or water storage device, preferably for managing water, in particular irrigation of (green) spaces and/or plants
CN206978286U (en) A kind of municipal urban green belts of energy timing automatically watering
CN107125106A (en) A kind of irrigation rig of utilization natural resources
CN206472529U (en) It is a kind of to prevent the sand-proof device of desertification
CN108934366A (en) A kind of intelligent collection rain Irrigation and fertilization system
CN207144007U (en) A kind of special Safety well cover device of town road
CN203388010U (en) Expressway green belt rainwater irrigation system
CN206428582U (en) A kind of bridge greening system
CN215483400U (en) Biological retention facility rainwater regulation and reuse system
CN205636885U (en) Constructed wetland monomer rainwater storage structure based on side slope
CN208540476U (en) A kind of road guard maintenance flower case with rainer
CN211482296U (en) Intelligent micro-seepage moisture-preserving water supply device in railway section greening
CN113359515A (en) Intelligent courtyard system
CN208106033U (en) A kind of anticollision electric pole of greening environment
CN208328686U (en) Bridge drainage structure
CN215683661U (en) Landfill closing and covering greening structure
CN219219196U (en) Rainwater collection vehicle for water quality detection
CN214628593U (en) Windproof structure of building outer wall greening landscape
CN205884112U (en) Roof greening partition board

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170815

Termination date: 20180111

CF01 Termination of patent right due to non-payment of annual fee