CN107489282B - A kind of the old and new's flat-top cracked concrete construction method - Google Patents

A kind of the old and new's flat-top cracked concrete construction method Download PDF

Info

Publication number
CN107489282B
CN107489282B CN201710602518.6A CN201710602518A CN107489282B CN 107489282 B CN107489282 B CN 107489282B CN 201710602518 A CN201710602518 A CN 201710602518A CN 107489282 B CN107489282 B CN 107489282B
Authority
CN
China
Prior art keywords
flat
concrete
black mark
cracking
old
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710602518.6A
Other languages
Chinese (zh)
Other versions
CN107489282A (en
Inventor
马明才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710602518.6A priority Critical patent/CN107489282B/en
Publication of CN107489282A publication Critical patent/CN107489282A/en
Application granted granted Critical
Publication of CN107489282B publication Critical patent/CN107489282B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses a kind of the old and new's flat-top cracked concrete construction method, processing method is comprised the steps of: being checked, is made marks, preparing waterproof material and construction, checking whether leak after construction.Construction method disclosed by the invention has good leakproofness and globality, and flat-top is avoided to crack from the negative again in the future.

Description

A kind of the old and new's flat-top cracked concrete construction method
Technical field
The present invention relates to the realm of building construction, and in particular to a kind of the old and new's flat-top cracked concrete construction method.
Background technique
The method of the bottom plate of traditional flat roof, top plate and exterior wall crack resistence is divided into post-cast strip in conjunction with the seamed of deformation joint Formula design method and post-cast strip or reinforcing strip combination concrete add two kinds of gapless design method of swelling agent, and cracking is necessarily brought The problem of leak.Thus waterproof is exactly a fresh topic always, whether tunnel, bridge, road, build or our days The house often lived, waterproof all can not be ignored.Construction method of the present invention is suitable for: new flat-top cracks, old flat-top cracking does not drop, Old flat top surface aging is serious but situations such as tenesmus.
Summary of the invention
To overcome above-mentioned deficiency, the object of the invention provides a kind of the old and new's flat-top cracked concrete construction method.
The solution of the present invention is as follows: a kind of the old and new's flat-top cracked concrete construction method, the construction method includes following Step:
(1) polish: casting concrete flat-top checks whether there is cracking phenomena to the comprehensive polishing of flat-top after demoulding;
(2) it marks: 6-8 long drill bit is installed on electric hammer, cracking point both ends are up punched from the negative, according to bit model Difference at most makes a call to three eyes, is then penetrated in eye, marked with 7 word steel;
(3) preparation waterproof material: cement, thick sub- sand and old stone are mixed into concrete by 1:3:3;
(4) telescopic steel pipe, jack and jump frame are put up at flat-top reverse side cracking, is cracked with black mark-line in reverse side flat-top Point locates two black mark-lines of bullet toward each 12cm in both sides, long to be no more than 3.26m, black mark-line bullet well total 24cm wide;
(5) blade is controlled in 5mm depth with machine for cutting floor bricks, is then cut from two black mark-lines toward centre, cuts one layer of electricity consumption Light one layer of the shovel of shovel, the most 3cm of reverse side flat-top cut-in groove are deep, and when cutting places a high-power hair dryer simultaneously and siphons away dust;
(6) toward each 25cm in both sides, two black mark-lines of bullet, each long 3.5m of two black mark-lines are positive again at the flat-top cracking of front Cracking point groove is cut in the presence of water, and after positive 3cm depth concrete is cut, 7cm is recycled after cleaning out, is continued down 3cm depth is cut, and slightly spade is fallen with tool, washes that open washing is straight, and cracking point is straight toward both sides difference 25cm black mark-line in front It is access at lower 6cm, cutting machine-cut slightly shovels less than 6cm depth with tool, and 6cm deep shovels oblique groove at an oblique groove When, power shovel toward at recycling 7cm sideling toward shoveling at 25cm black mark-line;
(7) with electric hammer by upper drill bit on collar tie beam down symmetrically bore four drilling eyes, eye depth 2cm, slightly by flat steel reinforcement cage Curve half-moon-shaped, the drilling eye that both ends are respectively aligned to collar tie beam both ends is inserted into, and some arches is played, above and below upper and lower 6 screw-thread steels It hooks, one is hooked in the main reinforcement of flat-roofed house, and one is hooked on the flat steel reinforcement cage of arch, according to the orientation of main reinforcement, sets at every 10cm One is set, the position of 50cm wide puts in after being placed on that flat-top is suitable for reading with 6 screw-thread steels and cutting through, by hand hammer jail, often One is arranged at 15cm, forms a steel mesh;
(8) band steel muscle cage bottom lower template is made with jack in reverse side, template gap is filled up with weaved cotton cloth, with big function Rate hair dryer blows away dust, and concrete is stirred, and dilutes after-pouring at flat-top tieing, and slurry concrete pours small with 220v afterwards Type vibrating head shakes concrete tightly, is polished concrete with nog plate;
(9) after concreting is good, naturally dry;
(10) Fang Chi that a wide 70cm, high 10cm, long 4m are built at concreting fills water to beat tide and inspection It tests.
A kind of above-mentioned the old and new's flat-top cracked concrete construction method, tool in the step (6) by hand chisel or Power shovel.
Beneficial effects of the present invention: it is positive and negative to solve flat-top for a kind of the old and new's flat-top cracked concrete construction method of the present invention The problem of leak is cracked repeatedly in face, entire waterproof work have good leakproofness and globality, flat-top reverse side are avoided to crack.
Specific embodiment
The technical solution of the patent is explained in further detail With reference to embodiment.
The solution of the present invention is as follows: a kind of the old and new's flat-top cracked concrete construction method, the construction method includes following Step:
(1) polish: casting concrete flat-top checks whether there is cracking phenomena to the comprehensive polishing of flat-top after demoulding;
(2) it marks: 6-8 long drill bit is installed on electric hammer, cracking point both ends are up punched from the negative, according to bit model Difference at most makes a call to three eyes, is then penetrated in eye, marked with 7 word steel;
(3) preparation waterproof material: cement, thick sub- sand and old stone are mixed into concrete by 1:3:3;
(4) telescopic steel pipe, jack and jump frame are put up at flat-top reverse side cracking, is cracked with black mark-line in reverse side flat-top Point locates two black mark-lines of bullet toward each 12cm in both sides, long to be no more than 3.26m, black mark-line bullet well total 24cm wide;
(5) blade is controlled in 5mm depth with machine for cutting floor bricks, is then cut from two black mark-lines toward centre, cuts one layer of electricity consumption Light one layer of the shovel of shovel, the most 3cm of reverse side flat-top cut-in groove are deep, and when cutting places a high-power hair dryer simultaneously and siphons away dust;
(6) toward each 25cm in both sides, two black mark-lines of bullet, each long 3.5m of two black mark-lines are positive again at the flat-top cracking of front Cracking point groove is cut in the presence of water, and after positive 3cm depth concrete is cut, 7cm is recycled after cleaning out, is continued down 3cm depth is cut, and slightly spade is fallen with tool, washes that open washing is straight, and cracking point is straight toward both sides difference 25cm black mark-line in front It is access at lower 6cm, cutting machine-cut slightly shovels less than 6cm depth with tool, and 6cm deep shovels oblique groove at an oblique groove When, power shovel toward at recycling 7cm sideling toward shoveling at 25cm black mark-line;
(7) with electric hammer by upper drill bit on collar tie beam down symmetrically bore four drilling eyes, eye depth 2cm, slightly by flat steel reinforcement cage Curve half-moon-shaped, the drilling eye that both ends are respectively aligned to collar tie beam both ends is inserted into, and some arches is played, above and below upper and lower 6 screw-thread steels It hooks, one is hooked in the main reinforcement of flat-roofed house, and one is hooked on the flat steel reinforcement cage of arch, according to the orientation of main reinforcement, sets at every 10cm One is set, the position of 50cm wide puts in after being placed on that flat-top is suitable for reading with 6 screw-thread steels and cutting through, by hand hammer jail, often One is arranged at 15cm, forms a steel mesh;
(8) band steel muscle cage bottom lower template is made with jack in reverse side, template gap is filled up with weaved cotton cloth, with big function Rate hair dryer blows away dust, and concrete is stirred, and dilutes after-pouring at flat-top tieing, and slurry concrete pours small with 220v afterwards Type vibrating head shakes concrete tightly, is polished concrete with nog plate;
(9) after concreting is good, naturally dry;
(10) Fang Chi that a wide 70cm, high 10cm, long 4m are built at concreting fills water to beat tide and inspection It tests.
A kind of above-mentioned the old and new's flat-top cracked concrete construction method, tool in the step (6) by hand chisel or Power shovel, when construction can not it is overweight firmly.
Although the detailed description and description of the specific embodiments of the present invention are given above, it should be noted that We can carry out various equivalent changes and modification to above embodiment according to the concept of the present invention, and generated function is made It, should all be within protection scope of the present invention when with the spirit still covered without departing from specification and attached drawing.

Claims (2)

1. a kind of the old and new's flat-top cracked concrete construction method, which is characterized in that the construction method the following steps are included:
(1) polish: casting concrete flat-top checks whether there is cracking phenomena to the comprehensive polishing of flat-top after demoulding;
(2) it marks: 6-8 long drill bit is installed on electric hammer, cracking point both ends are up punched from the negative, not according to bit model Together, three eyes at most are made a call to, is then penetrated in eye, is marked with 7 word steel;
(3) preparation waterproof material: cement, thick sub- sand and old stone are mixed into concrete by 1:3:3;
(4) telescopic steel pipe, jack and jump frame are put up at flat-top reverse side cracking, it is past in reverse side flat-top cracking point with black mark-line Two black mark-lines of bullet at each 12cm in both sides, long to be no more than 3.26m, black mark-line bullet well total 24cm wide;
(5) blade is controlled in 5mm depth with machine for cutting floor bricks, then cuts, cuts one layer light with power shovel from two black mark-lines toward centre One layer of shovel, the most 3cm of reverse side flat-top cut-in groove are deep, and when cutting places a high-power hair dryer simultaneously and siphons away dust;
(6) toward each 25cm in both sides, two black mark-lines of bullet, each long 3.5m of two black mark-lines, front are cracked again at the flat-top cracking of front Point groove is cut in the presence of water, and after positive 3cm depth concrete is cut, 7cm is recycled after cleaning out, and is continued toward incision 3cm is deep, and slightly spade is fallen with tool, washes that open washing is straight, and cracking point is direct toward both sides difference 25cm black mark-line in front Down at 6cm, cutting machine-cut slightly can shovel less than 6cm depth with tool, and 6cm deep shovels oblique groove at an oblique groove When, power shovel toward at recycling 7cm sideling toward shoveling at 25cm black mark-line;
(7) four drilling eyes are symmetrically bored down on collar tie beam by upper drill bit with electric hammer, eye depth 2cm slightly curves flat steel reinforcement cage Half-moon-shaped, both ends are respectively aligned to the drilling eye insertion at collar tie beam both ends, play some arches, are hooked up and down with upper and lower 6 screw-thread steels, one Head is hooked in the main reinforcement of flat-roofed house, and one is hooked on the flat steel reinforcement cage of arch, and according to the orientation of main reinforcement, one is arranged at every 10cm, The position of 50cm wide puts in after being placed on that flat-top is suitable for reading with 6 screw-thread steels and cutting through, by hand hammer jail, sets at every 15cm One is set, a steel mesh is formed;
(8) band steel muscle cage bottom lower template is made with jack in reverse side, template gap is filled up with weaved cotton cloth, with high-power electricity Dust is blown away, concrete is stirred, dilutes after-pouring at flat-top tieing, slurry concrete pours afterwards with the small-sized vibration of 220v Dynamic stick shakes concrete tightly, is polished concrete with nog plate;
(9) after concreting is good, naturally dry;
(10) Fang Chi that a wide 70cm, high 10cm, long 4m are built at concreting fills water to beat tide and examine.
2. a kind of the old and new's flat-top cracked concrete construction method according to claim 1, it is characterised in that: the step (6) tool in chisel or power shovel by hand.
CN201710602518.6A 2017-07-21 2017-07-21 A kind of the old and new's flat-top cracked concrete construction method Expired - Fee Related CN107489282B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710602518.6A CN107489282B (en) 2017-07-21 2017-07-21 A kind of the old and new's flat-top cracked concrete construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710602518.6A CN107489282B (en) 2017-07-21 2017-07-21 A kind of the old and new's flat-top cracked concrete construction method

Publications (2)

Publication Number Publication Date
CN107489282A CN107489282A (en) 2017-12-19
CN107489282B true CN107489282B (en) 2019-11-29

Family

ID=60644080

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710602518.6A Expired - Fee Related CN107489282B (en) 2017-07-21 2017-07-21 A kind of the old and new's flat-top cracked concrete construction method

Country Status (1)

Country Link
CN (1) CN107489282B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100718649B1 (en) * 2006-08-28 2007-05-15 삼성물산 주식회사 Construction method for preventing a leak through crack of concrete structure
JP2014163169A (en) * 2013-02-27 2014-09-08 Hikari Kensetsu Kogyo Kk Cross section repair method of concrete structure
CN104100102A (en) * 2014-06-26 2014-10-15 马明才 Waterproof comprehensive treatment method for flat tops
JP2016186158A (en) * 2015-03-27 2016-10-27 太平洋セメント株式会社 Repair method for concrete

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100718649B1 (en) * 2006-08-28 2007-05-15 삼성물산 주식회사 Construction method for preventing a leak through crack of concrete structure
JP2014163169A (en) * 2013-02-27 2014-09-08 Hikari Kensetsu Kogyo Kk Cross section repair method of concrete structure
CN104100102A (en) * 2014-06-26 2014-10-15 马明才 Waterproof comprehensive treatment method for flat tops
JP2016186158A (en) * 2015-03-27 2016-10-27 太平洋セメント株式会社 Repair method for concrete

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
平顶保温屋面渗漏治理分析;祁抓琴;《科技信息》;20090315(第08期);284 *
混凝土平顶屋面渗漏原因及处理方法;晏学明;《四川电力技术》;19960415(第02期);50-52 *
玉树灾后重建项目平顶保温屋面渗漏处理分析;李和平等;《企业科技与发展》;20120305(第05期);38-39 *

Also Published As

Publication number Publication date
CN107489282A (en) 2017-12-19

Similar Documents

Publication Publication Date Title
CN206189647U (en) Novel infilled wall brickwork drawknot muscle structure
CN106801517A (en) A kind of schoolhouse surface consolidation of Prefabricated porous plate brick mixed structure strengthens method
CN106401205A (en) Construction method for reinforcement of externally bonded profile steel of reinforced concrete structure
CN108166771A (en) Steel reinforced concrete pool structural reform makes construction method
CN105970916A (en) Construction method for plain concrete underground diaphragm wall of deep foundation pit
CN105369826A (en) Basement bearing platform side mold construction method
CN105862897B (en) Sandy Silt ground shallow foundation original groove pouring construction engineering method
CN107489282B (en) A kind of the old and new's flat-top cracked concrete construction method
CN207553505U (en) Assembled wall anchoring assembly
CN213927071U (en) Simple and easy angle steel lintel strutting arrangement
CN203782577U (en) Template assembly for anti-collision wall settlement joint construction
CN107237330A (en) A kind of reinforced concrete inner support beam construction method without bed die
CN104763158B (en) Tenon joint type light-weight aggregate chained block construction method
CN105332386A (en) Structure construction method for tower crane foundation serving as basement bottom plate
CN213389771U (en) Road and bridge crack repairing and fixing structure
CN109403632A (en) A kind of ground-connecting-wall crown beam and superstructure connection construction method
CN109056702A (en) The construction method of coercion underground continuous wall
CN109339083A (en) Utilize the open caisson construction method of twisting sucker head
CN206467697U (en) Column foot and raft plate junction integrated water-proof structure
CN206189449U (en) Integrated wood formwork system of foundation slab and guide wall
CN105863665B (en) A kind of processing method of stone matter tunnel inverted arch scum silica frost
CN214006543U (en) Side wall, roof beam upper shed leak protection water and mould that rises reinforcement system
CN207999065U (en) A kind of 3.5 meters of height internal shear force wall form composite structures
CN207484281U (en) A kind of stress relief construction for local concrete connection
JPH01125472A (en) Method of crushing construction of reinforced concrete

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191129

CF01 Termination of patent right due to non-payment of annual fee