CN107489282B - A kind of the old and new's flat-top cracked concrete construction method - Google Patents
A kind of the old and new's flat-top cracked concrete construction method Download PDFInfo
- Publication number
- CN107489282B CN107489282B CN201710602518.6A CN201710602518A CN107489282B CN 107489282 B CN107489282 B CN 107489282B CN 201710602518 A CN201710602518 A CN 201710602518A CN 107489282 B CN107489282 B CN 107489282B
- Authority
- CN
- China
- Prior art keywords
- flat
- concrete
- black mark
- cracking
- old
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 241001270131 Agaricus moelleri Species 0.000 title claims abstract description 42
- 238000010276 construction Methods 0.000 title claims abstract description 20
- 239000000463 material Substances 0.000 claims abstract description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 24
- 239000010959 steel Substances 0.000 claims description 24
- 238000005336 cracking Methods 0.000 claims description 20
- 238000005520 cutting process Methods 0.000 claims description 12
- 230000002787 reinforcement Effects 0.000 claims description 12
- 238000005553 drilling Methods 0.000 claims description 6
- 239000000428 dust Substances 0.000 claims description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 6
- 229920000742 Cotton Polymers 0.000 claims description 3
- 239000011449 brick Substances 0.000 claims description 3
- 238000005266 casting Methods 0.000 claims description 3
- 239000004568 cement Substances 0.000 claims description 3
- 238000004140 cleaning Methods 0.000 claims description 3
- 230000005611 electricity Effects 0.000 claims description 3
- 239000004744 fabric Substances 0.000 claims description 3
- 210000003128 head Anatomy 0.000 claims description 3
- 210000003205 muscle Anatomy 0.000 claims description 3
- 238000005498 polishing Methods 0.000 claims description 3
- 238000002360 preparation method Methods 0.000 claims description 3
- 238000004064 recycling Methods 0.000 claims description 3
- 239000004576 sand Substances 0.000 claims description 3
- 239000002002 slurry Substances 0.000 claims description 3
- 239000004575 stone Substances 0.000 claims description 3
- 238000005406 washing Methods 0.000 claims description 3
- 238000003780 insertion Methods 0.000 claims 1
- 230000037431 insertion Effects 0.000 claims 1
- 238000003672 processing method Methods 0.000 abstract 1
- 238000000034 method Methods 0.000 description 4
- 238000007689 inspection Methods 0.000 description 2
- 206010057071 Rectal tenesmus Diseases 0.000 description 1
- 230000032683 aging Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000008961 swelling Effects 0.000 description 1
- 208000012271 tenesmus Diseases 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/66—Sealings
- E04B1/68—Sealings of joints, e.g. expansion joints
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
The invention discloses a kind of the old and new's flat-top cracked concrete construction method, processing method is comprised the steps of: being checked, is made marks, preparing waterproof material and construction, checking whether leak after construction.Construction method disclosed by the invention has good leakproofness and globality, and flat-top is avoided to crack from the negative again in the future.
Description
Technical field
The present invention relates to the realm of building construction, and in particular to a kind of the old and new's flat-top cracked concrete construction method.
Background technique
The method of the bottom plate of traditional flat roof, top plate and exterior wall crack resistence is divided into post-cast strip in conjunction with the seamed of deformation joint
Formula design method and post-cast strip or reinforcing strip combination concrete add two kinds of gapless design method of swelling agent, and cracking is necessarily brought
The problem of leak.Thus waterproof is exactly a fresh topic always, whether tunnel, bridge, road, build or our days
The house often lived, waterproof all can not be ignored.Construction method of the present invention is suitable for: new flat-top cracks, old flat-top cracking does not drop,
Old flat top surface aging is serious but situations such as tenesmus.
Summary of the invention
To overcome above-mentioned deficiency, the object of the invention provides a kind of the old and new's flat-top cracked concrete construction method.
The solution of the present invention is as follows: a kind of the old and new's flat-top cracked concrete construction method, the construction method includes following
Step:
(1) polish: casting concrete flat-top checks whether there is cracking phenomena to the comprehensive polishing of flat-top after demoulding;
(2) it marks: 6-8 long drill bit is installed on electric hammer, cracking point both ends are up punched from the negative, according to bit model
Difference at most makes a call to three eyes, is then penetrated in eye, marked with 7 word steel;
(3) preparation waterproof material: cement, thick sub- sand and old stone are mixed into concrete by 1:3:3;
(4) telescopic steel pipe, jack and jump frame are put up at flat-top reverse side cracking, is cracked with black mark-line in reverse side flat-top
Point locates two black mark-lines of bullet toward each 12cm in both sides, long to be no more than 3.26m, black mark-line bullet well total 24cm wide;
(5) blade is controlled in 5mm depth with machine for cutting floor bricks, is then cut from two black mark-lines toward centre, cuts one layer of electricity consumption
Light one layer of the shovel of shovel, the most 3cm of reverse side flat-top cut-in groove are deep, and when cutting places a high-power hair dryer simultaneously and siphons away dust;
(6) toward each 25cm in both sides, two black mark-lines of bullet, each long 3.5m of two black mark-lines are positive again at the flat-top cracking of front
Cracking point groove is cut in the presence of water, and after positive 3cm depth concrete is cut, 7cm is recycled after cleaning out, is continued down
3cm depth is cut, and slightly spade is fallen with tool, washes that open washing is straight, and cracking point is straight toward both sides difference 25cm black mark-line in front
It is access at lower 6cm, cutting machine-cut slightly shovels less than 6cm depth with tool, and 6cm deep shovels oblique groove at an oblique groove
When, power shovel toward at recycling 7cm sideling toward shoveling at 25cm black mark-line;
(7) with electric hammer by upper drill bit on collar tie beam down symmetrically bore four drilling eyes, eye depth 2cm, slightly by flat steel reinforcement cage
Curve half-moon-shaped, the drilling eye that both ends are respectively aligned to collar tie beam both ends is inserted into, and some arches is played, above and below upper and lower 6 screw-thread steels
It hooks, one is hooked in the main reinforcement of flat-roofed house, and one is hooked on the flat steel reinforcement cage of arch, according to the orientation of main reinforcement, sets at every 10cm
One is set, the position of 50cm wide puts in after being placed on that flat-top is suitable for reading with 6 screw-thread steels and cutting through, by hand hammer jail, often
One is arranged at 15cm, forms a steel mesh;
(8) band steel muscle cage bottom lower template is made with jack in reverse side, template gap is filled up with weaved cotton cloth, with big function
Rate hair dryer blows away dust, and concrete is stirred, and dilutes after-pouring at flat-top tieing, and slurry concrete pours small with 220v afterwards
Type vibrating head shakes concrete tightly, is polished concrete with nog plate;
(9) after concreting is good, naturally dry;
(10) Fang Chi that a wide 70cm, high 10cm, long 4m are built at concreting fills water to beat tide and inspection
It tests.
A kind of above-mentioned the old and new's flat-top cracked concrete construction method, tool in the step (6) by hand chisel or
Power shovel.
Beneficial effects of the present invention: it is positive and negative to solve flat-top for a kind of the old and new's flat-top cracked concrete construction method of the present invention
The problem of leak is cracked repeatedly in face, entire waterproof work have good leakproofness and globality, flat-top reverse side are avoided to crack.
Specific embodiment
The technical solution of the patent is explained in further detail With reference to embodiment.
The solution of the present invention is as follows: a kind of the old and new's flat-top cracked concrete construction method, the construction method includes following
Step:
(1) polish: casting concrete flat-top checks whether there is cracking phenomena to the comprehensive polishing of flat-top after demoulding;
(2) it marks: 6-8 long drill bit is installed on electric hammer, cracking point both ends are up punched from the negative, according to bit model
Difference at most makes a call to three eyes, is then penetrated in eye, marked with 7 word steel;
(3) preparation waterproof material: cement, thick sub- sand and old stone are mixed into concrete by 1:3:3;
(4) telescopic steel pipe, jack and jump frame are put up at flat-top reverse side cracking, is cracked with black mark-line in reverse side flat-top
Point locates two black mark-lines of bullet toward each 12cm in both sides, long to be no more than 3.26m, black mark-line bullet well total 24cm wide;
(5) blade is controlled in 5mm depth with machine for cutting floor bricks, is then cut from two black mark-lines toward centre, cuts one layer of electricity consumption
Light one layer of the shovel of shovel, the most 3cm of reverse side flat-top cut-in groove are deep, and when cutting places a high-power hair dryer simultaneously and siphons away dust;
(6) toward each 25cm in both sides, two black mark-lines of bullet, each long 3.5m of two black mark-lines are positive again at the flat-top cracking of front
Cracking point groove is cut in the presence of water, and after positive 3cm depth concrete is cut, 7cm is recycled after cleaning out, is continued down
3cm depth is cut, and slightly spade is fallen with tool, washes that open washing is straight, and cracking point is straight toward both sides difference 25cm black mark-line in front
It is access at lower 6cm, cutting machine-cut slightly shovels less than 6cm depth with tool, and 6cm deep shovels oblique groove at an oblique groove
When, power shovel toward at recycling 7cm sideling toward shoveling at 25cm black mark-line;
(7) with electric hammer by upper drill bit on collar tie beam down symmetrically bore four drilling eyes, eye depth 2cm, slightly by flat steel reinforcement cage
Curve half-moon-shaped, the drilling eye that both ends are respectively aligned to collar tie beam both ends is inserted into, and some arches is played, above and below upper and lower 6 screw-thread steels
It hooks, one is hooked in the main reinforcement of flat-roofed house, and one is hooked on the flat steel reinforcement cage of arch, according to the orientation of main reinforcement, sets at every 10cm
One is set, the position of 50cm wide puts in after being placed on that flat-top is suitable for reading with 6 screw-thread steels and cutting through, by hand hammer jail, often
One is arranged at 15cm, forms a steel mesh;
(8) band steel muscle cage bottom lower template is made with jack in reverse side, template gap is filled up with weaved cotton cloth, with big function
Rate hair dryer blows away dust, and concrete is stirred, and dilutes after-pouring at flat-top tieing, and slurry concrete pours small with 220v afterwards
Type vibrating head shakes concrete tightly, is polished concrete with nog plate;
(9) after concreting is good, naturally dry;
(10) Fang Chi that a wide 70cm, high 10cm, long 4m are built at concreting fills water to beat tide and inspection
It tests.
A kind of above-mentioned the old and new's flat-top cracked concrete construction method, tool in the step (6) by hand chisel or
Power shovel, when construction can not it is overweight firmly.
Although the detailed description and description of the specific embodiments of the present invention are given above, it should be noted that
We can carry out various equivalent changes and modification to above embodiment according to the concept of the present invention, and generated function is made
It, should all be within protection scope of the present invention when with the spirit still covered without departing from specification and attached drawing.
Claims (2)
1. a kind of the old and new's flat-top cracked concrete construction method, which is characterized in that the construction method the following steps are included:
(1) polish: casting concrete flat-top checks whether there is cracking phenomena to the comprehensive polishing of flat-top after demoulding;
(2) it marks: 6-8 long drill bit is installed on electric hammer, cracking point both ends are up punched from the negative, not according to bit model
Together, three eyes at most are made a call to, is then penetrated in eye, is marked with 7 word steel;
(3) preparation waterproof material: cement, thick sub- sand and old stone are mixed into concrete by 1:3:3;
(4) telescopic steel pipe, jack and jump frame are put up at flat-top reverse side cracking, it is past in reverse side flat-top cracking point with black mark-line
Two black mark-lines of bullet at each 12cm in both sides, long to be no more than 3.26m, black mark-line bullet well total 24cm wide;
(5) blade is controlled in 5mm depth with machine for cutting floor bricks, then cuts, cuts one layer light with power shovel from two black mark-lines toward centre
One layer of shovel, the most 3cm of reverse side flat-top cut-in groove are deep, and when cutting places a high-power hair dryer simultaneously and siphons away dust;
(6) toward each 25cm in both sides, two black mark-lines of bullet, each long 3.5m of two black mark-lines, front are cracked again at the flat-top cracking of front
Point groove is cut in the presence of water, and after positive 3cm depth concrete is cut, 7cm is recycled after cleaning out, and is continued toward incision
3cm is deep, and slightly spade is fallen with tool, washes that open washing is straight, and cracking point is direct toward both sides difference 25cm black mark-line in front
Down at 6cm, cutting machine-cut slightly can shovel less than 6cm depth with tool, and 6cm deep shovels oblique groove at an oblique groove
When, power shovel toward at recycling 7cm sideling toward shoveling at 25cm black mark-line;
(7) four drilling eyes are symmetrically bored down on collar tie beam by upper drill bit with electric hammer, eye depth 2cm slightly curves flat steel reinforcement cage
Half-moon-shaped, both ends are respectively aligned to the drilling eye insertion at collar tie beam both ends, play some arches, are hooked up and down with upper and lower 6 screw-thread steels, one
Head is hooked in the main reinforcement of flat-roofed house, and one is hooked on the flat steel reinforcement cage of arch, and according to the orientation of main reinforcement, one is arranged at every 10cm,
The position of 50cm wide puts in after being placed on that flat-top is suitable for reading with 6 screw-thread steels and cutting through, by hand hammer jail, sets at every 15cm
One is set, a steel mesh is formed;
(8) band steel muscle cage bottom lower template is made with jack in reverse side, template gap is filled up with weaved cotton cloth, with high-power electricity
Dust is blown away, concrete is stirred, dilutes after-pouring at flat-top tieing, slurry concrete pours afterwards with the small-sized vibration of 220v
Dynamic stick shakes concrete tightly, is polished concrete with nog plate;
(9) after concreting is good, naturally dry;
(10) Fang Chi that a wide 70cm, high 10cm, long 4m are built at concreting fills water to beat tide and examine.
2. a kind of the old and new's flat-top cracked concrete construction method according to claim 1, it is characterised in that: the step
(6) tool in chisel or power shovel by hand.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710602518.6A CN107489282B (en) | 2017-07-21 | 2017-07-21 | A kind of the old and new's flat-top cracked concrete construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710602518.6A CN107489282B (en) | 2017-07-21 | 2017-07-21 | A kind of the old and new's flat-top cracked concrete construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107489282A CN107489282A (en) | 2017-12-19 |
CN107489282B true CN107489282B (en) | 2019-11-29 |
Family
ID=60644080
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710602518.6A Expired - Fee Related CN107489282B (en) | 2017-07-21 | 2017-07-21 | A kind of the old and new's flat-top cracked concrete construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107489282B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100718649B1 (en) * | 2006-08-28 | 2007-05-15 | 삼성물산 주식회사 | Construction method for preventing a leak through crack of concrete structure |
JP2014163169A (en) * | 2013-02-27 | 2014-09-08 | Hikari Kensetsu Kogyo Kk | Cross section repair method of concrete structure |
CN104100102A (en) * | 2014-06-26 | 2014-10-15 | 马明才 | Waterproof comprehensive treatment method for flat tops |
JP2016186158A (en) * | 2015-03-27 | 2016-10-27 | 太平洋セメント株式会社 | Repair method for concrete |
-
2017
- 2017-07-21 CN CN201710602518.6A patent/CN107489282B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100718649B1 (en) * | 2006-08-28 | 2007-05-15 | 삼성물산 주식회사 | Construction method for preventing a leak through crack of concrete structure |
JP2014163169A (en) * | 2013-02-27 | 2014-09-08 | Hikari Kensetsu Kogyo Kk | Cross section repair method of concrete structure |
CN104100102A (en) * | 2014-06-26 | 2014-10-15 | 马明才 | Waterproof comprehensive treatment method for flat tops |
JP2016186158A (en) * | 2015-03-27 | 2016-10-27 | 太平洋セメント株式会社 | Repair method for concrete |
Non-Patent Citations (3)
Title |
---|
平顶保温屋面渗漏治理分析;祁抓琴;《科技信息》;20090315(第08期);284 * |
混凝土平顶屋面渗漏原因及处理方法;晏学明;《四川电力技术》;19960415(第02期);50-52 * |
玉树灾后重建项目平顶保温屋面渗漏处理分析;李和平等;《企业科技与发展》;20120305(第05期);38-39 * |
Also Published As
Publication number | Publication date |
---|---|
CN107489282A (en) | 2017-12-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206189647U (en) | Novel infilled wall brickwork drawknot muscle structure | |
CN106801517A (en) | A kind of schoolhouse surface consolidation of Prefabricated porous plate brick mixed structure strengthens method | |
CN106401205A (en) | Construction method for reinforcement of externally bonded profile steel of reinforced concrete structure | |
CN108166771A (en) | Steel reinforced concrete pool structural reform makes construction method | |
CN105970916A (en) | Construction method for plain concrete underground diaphragm wall of deep foundation pit | |
CN105369826A (en) | Basement bearing platform side mold construction method | |
CN105862897B (en) | Sandy Silt ground shallow foundation original groove pouring construction engineering method | |
CN107489282B (en) | A kind of the old and new's flat-top cracked concrete construction method | |
CN207553505U (en) | Assembled wall anchoring assembly | |
CN213927071U (en) | Simple and easy angle steel lintel strutting arrangement | |
CN203782577U (en) | Template assembly for anti-collision wall settlement joint construction | |
CN107237330A (en) | A kind of reinforced concrete inner support beam construction method without bed die | |
CN104763158B (en) | Tenon joint type light-weight aggregate chained block construction method | |
CN105332386A (en) | Structure construction method for tower crane foundation serving as basement bottom plate | |
CN213389771U (en) | Road and bridge crack repairing and fixing structure | |
CN109403632A (en) | A kind of ground-connecting-wall crown beam and superstructure connection construction method | |
CN109056702A (en) | The construction method of coercion underground continuous wall | |
CN109339083A (en) | Utilize the open caisson construction method of twisting sucker head | |
CN206467697U (en) | Column foot and raft plate junction integrated water-proof structure | |
CN206189449U (en) | Integrated wood formwork system of foundation slab and guide wall | |
CN105863665B (en) | A kind of processing method of stone matter tunnel inverted arch scum silica frost | |
CN214006543U (en) | Side wall, roof beam upper shed leak protection water and mould that rises reinforcement system | |
CN207999065U (en) | A kind of 3.5 meters of height internal shear force wall form composite structures | |
CN207484281U (en) | A kind of stress relief construction for local concrete connection | |
JPH01125472A (en) | Method of crushing construction of reinforced concrete |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191129 |
|
CF01 | Termination of patent right due to non-payment of annual fee |