CN107480886A - Mission bit stream processing method - Google Patents
Mission bit stream processing method Download PDFInfo
- Publication number
- CN107480886A CN107480886A CN201710696227.8A CN201710696227A CN107480886A CN 107480886 A CN107480886 A CN 107480886A CN 201710696227 A CN201710696227 A CN 201710696227A CN 107480886 A CN107480886 A CN 107480886A
- Authority
- CN
- China
- Prior art keywords
- task
- publisher
- bit stream
- leader
- mission bit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Abstract
The present invention relates to a kind of mission bit stream processing method, including step:Task generates and modification:Mission bit stream, and task based access control information creating task are obtained, wherein, the mission bit stream comprises at least task leader, deadline of task and task coupling index;Task comes into force and performed:Task is sent to task leader, is confirmed whether to receive by task leader, confirms to receive if task leader, then task comes into force, and otherwise, then returns to task generation and amendment step;Task termination:When the task coupling index of task is up to standard or when deadline of task terminates, corresponding informance is pushed to task publisher, confirms whether task is completed by task publisher, and end task.Compared with prior art, the present invention provides a kind of task management scheme, and is got through with BI systems, there is provided the assignment decisions link lacked in BI systems, has filled up in management closed loop the ring lacked.
Description
Technical field
The present invention relates to a kind of BI decision-making technics, more particularly, to a kind of mission bit stream processing method.
Background technology
It can be used in business administration and arrive business intelligence (OA, BI) system, to integrate enterprise business data, uniform data rule
Model, Data Warehouse for Enterprises is built, visual form/report is finally provided and helps enterprise to make business decision.
But the work of current BI systems often simply just terminates from the report form showing that is drawn into of bottom data, is needing
Correlation function is not provided when administrative decision is assigned according to data, will typically rely on other system, such as office automation
(OA) administrative decision is issued, can not completes entirely to manage closed loop inside BI.
Such as Chinese patent CN 104461712A disclose task processing method and a kind of task processing dress
Put, wherein, task processing method includes:Receive the task processing request of input;Handled and asked according to task,
The business operation to match with the work at present task of task processing request is transferred from pre-set business operating database, with
Work at present task is completed by processing business operation.However, its data flow does not connect with data warehouse, task is reached
Single typing is needed, or makes special task data.
The content of the invention
It is an object of the present invention to overcome the above-mentioned drawbacks of the prior art and provide a kind of processing of mission bit stream
Method.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of mission bit stream processing method, including step:
Task generates and modification:Mission bit stream, and task based access control information creating task are obtained, wherein, the mission bit stream
Including at least task leader, deadline of task and task coupling index;
Task comes into force and performed:Task is sent to task leader, is confirmed whether to receive by task leader, if task
Director confirms to receive, then task comes into force, and otherwise, then returns to task generation and amendment step;
Task termination:When the task coupling index of task is up to standard or when deadline of task terminates, pushed to task publisher
Corresponding informance, confirm whether task is completed by task publisher, and end task.
The task generation and amendment step include:
The mission bit stream sent by task publisher is received, and generates task;
The task of generation is showed into task publisher, confirms whether task needs to change or cancel by task publisher,
Task publisher confirms that task need not be changed and cancelled, then performs task and come into force and perform step, otherwise:
If task publisher confirms that task needs to change, by generation is appointed again after task publisher modification mission bit stream
Business, if task publisher confirms that task needs to cancel, task publisher is prompted to fill in revocation reason, and cancel task.
The task step that comes into force and perform includes:
Task is sent to task leader;
It is confirmed whether to receive by task leader, confirms to receive if task leader, then task comes into force, and is performing
Confirm whether task needs an extension in journey, otherwise, prompt task leader to fill in refusal acceptance reason, and the refusal is received into original
Because returning to task publisher, it is confirmed whether to allow to refuse by task publisher;
If task publisher does not allow to refuse, task is returned to task leader, and confirmed again by task leader
Whether receive, if task publisher allows to refuse, end task or return task generation and amendment step by task publisher
Task is generated again after modification mission bit stream.
Whether the process of needing an extension includes the confirmation task:
During tasks carrying, if receive the instruction that being sent by task leader for task needs an extension, prompt to appoint
Business director fills in extension reason, and the extension reason is sent to task publisher, when issuing the completion of modification task by task
Limit, or refusal delay to ask and return task leader.
The mission bit stream also includes task type, priority, director contributor and task details.
The task coupling index includes the mark of coupling index and the desired value of each coupling index;
The task termination step includes:
The currency of corresponding coupling index is obtained from data source according to the mark of each coupling index;
The currency of each coupling index of acquisition is compared with desired value, if the currency of all coupling indexs reaches mesh
Scale value, then preliminary judgement task completed, otherwise:
When continuing deadline of task termination, still there is the currency miss the mark value of at least one coupling index, then tentatively sentence
Determine task not completing;
Preliminary judgement result is pushed to task publisher, confirms whether task is completed by task publisher, and end task.
Compared with prior art, the present invention has advantages below:
1) a kind of task management scheme is provided, and got through with BI systems, there is provided the assignment decisions link lacked in BI systems,
The ring lacked has been filled up in management closed loop.
2) perfect workflow process, meet that task is in the possibility selection of each node.
3) decision making function is provided, can be with the result after analysis decision and BI system data interactions, the validity of analysis decision.
Brief description of the drawings
Fig. 1 is the key step schematic flow sheet of the inventive method;
Fig. 2 is the process for using figure of the inventive method.
Embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with technical solution of the present invention
Premised on implemented, give detailed embodiment and specific operating process, but protection scope of the present invention is not limited to
Following embodiments.
A kind of mission bit stream processing method, as shown in figure 1, including step:
Task generates and modification:Mission bit stream, and task based access control information creating task are obtained, wherein, mission bit stream is at least
Including task leader, deadline of task and task coupling index;
Task comes into force and performed:Task is sent to task leader, is confirmed whether to receive by task leader, if task
Director confirms to receive, then task comes into force, and otherwise, then returns to task generation and amendment step;
Task termination:When the task coupling index of task is up to standard or when deadline of task terminates, pushed to task publisher
Corresponding informance, confirm whether task is completed by task publisher, and end task.
Task generates and amendment step includes:
The mission bit stream sent by task publisher is received, and generates task;
The task of generation is showed into task publisher, confirms whether task needs to change or cancel by task publisher,
Task publisher confirms that task need not be changed and cancelled, then performs task and come into force and perform step, otherwise:
If task publisher confirms that task needs to change, by generation is appointed again after task publisher modification mission bit stream
Business, if task publisher confirms that task needs to cancel, task publisher is prompted to fill in revocation reason, and cancel task.
The task step that comes into force and perform includes:
Task is sent to task leader;
It is confirmed whether to receive by task leader, confirms to receive if task leader, then task comes into force, and is performing
Confirm whether task needs an extension in journey, otherwise, prompt task leader to fill in refusal acceptance reason, and the refusal is received into original
Because returning to task publisher, it is confirmed whether to allow to refuse by task publisher;
If task publisher does not allow to refuse, task is returned to task leader, and confirmed again by task leader
Whether receive, if task publisher allows to refuse, end task or return task generation and amendment step by task publisher
Task is generated again after modification mission bit stream.
Whether the process of needing an extension includes confirmation task:
During tasks carrying, if receive the instruction that being sent by task leader for task needs an extension, prompt to appoint
Business director fills in extension reason, and the extension reason is sent to task publisher, when issuing the completion of modification task by task
Limit, or refusal delay to ask and return task leader.
Mission bit stream also includes task type, priority, director contributor and task details.
Task coupling index includes the mark of coupling index and the desired value of each coupling index;
Task termination step includes:
The currency of corresponding coupling index is obtained from data source according to the mark of each coupling index;
The currency of each coupling index of acquisition is compared with desired value, if the currency of all coupling indexs reaches mesh
Scale value, then preliminary judgement task completed, otherwise:
When continuing deadline of task termination, still there is the currency miss the mark value of at least one coupling index, then tentatively sentence
Determine task not completing;
Preliminary judgement result is pushed to task publisher, confirms whether task is completed by task publisher, and end task.
Administrative decision link is assigned according to what the above method designed that a kind of task generator is used to filling up BI systematic absences, it is complete
Kind whole management closed loop is starting point to design, and task generator is combined with index system, and index represents the number in BI systems
It is believed that breath, it is to have its index being related to by index, each assignment decisions of index that decision-making, which is assigned,.Can flexibly it match somebody with somebody in decision-making
Task type, priority level, director, contributor, deadline and task details are put, and complete task flow turn of tidal stream journey is provided
With in face of it is various the occurrence of.As shown in Fig. 2 specifically used step is as follows:
1) decision-making relevant information is obtained, includes the index of association, task type, priority, completes deadline, director
Contributor and task details;
2) decision-making is issued;
3) judge whether decision-making is wrong, whether issue user needs to change or cancel task, performs step if necessary
5) step 4), is otherwise performed;
4) director that decision-making is specified judges whether reception task, and step 9) is performed if receiving, otherwise performs step
7);
5) user for issuing decision-making judges whether modification task, returns to perform step 1) and change correlation if modification and determines
The information of plan, otherwise perform step 6);
6) decision-making publisher fills in revocation reason, terminates decision process;
7) director, which fills in, retracts reason, performs step 8);
8) whether decision-making publisher examination & verification allows to retract decision-making, does not allow, performs step 4), otherwise receives to retract, terminates
Decision process;
9) in the process of implementation, judge whether task needs an extension, perform step 13) if necessary, it is not necessary to then hold
Row step 10);
10) director fills in extension reason;
11) whether decision-making publisher examination & verification allows to delay, and step 12) is performed if allowing, and otherwise returns and performs step
9);
12) decision-making publisher changes task and completes deadline, returns and performs step 9);
13) director submits task;
14) decision-making publisher judges whether task has been completed, and step 16) is performed if completing, otherwise performs step
15);
15) task is judged to not completing by decision-making publisher, terminates decision process;
16) task is judged not complete by decision-making publisher, terminates decision process;
Above-mentioned step 4), 11), 14) and it is to be notified by the information in system, specifically see the login ring of user
Border.
Claims (6)
1. a kind of mission bit stream processing method, it is characterised in that including step:
Task generates and modification:Mission bit stream, and task based access control information creating task are obtained, wherein, the mission bit stream is at least
Including task leader, deadline of task and task coupling index;
Task comes into force and performed:Task is sent to task leader, is confirmed whether to receive by task leader, is responsible for if task
People confirms to receive, then task comes into force, and otherwise, then returns to task generation and amendment step;
Task termination:When the task coupling index of task is up to standard or when deadline of task terminates, pushed to task publisher corresponding
Information, confirm whether task is completed by task publisher, and end task.
2. a kind of mission bit stream processing method according to claim 1, it is characterised in that the task generation and modification step
Suddenly include:
The mission bit stream sent by task publisher is received, and generates task;
The task of generation is showed into task publisher, confirms whether task needs to change or cancel by task publisher, task
Publisher confirms that task need not be changed and cancelled, then performs task and come into force and perform step, otherwise:
If task publisher confirms that task needs to change, task is generated again after changing mission bit stream by task publisher, if
Task publisher confirms that task needs to cancel, then prompts task publisher to fill in revocation reason, and cancel task.
3. a kind of mission bit stream processing method according to claim 1, it is characterised in that the task comes into force and performed step
Suddenly include:
Task is sent to task leader;
Being confirmed whether to receive by task leader, confirm to receive if task leader, then task comes into force, and in the process of implementation
Whether confirmation task needs an extension, and otherwise, prompts task leader to fill in refusal acceptance reason, and the refusal acceptance reason is returned
Back to task publisher, it is confirmed whether to allow to refuse by task publisher;
If task publisher does not allow to refuse, task is returned to task leader, and be confirmed whether again by task leader
Receive, if task publisher allows to refuse, end task or return task generation and amendment step is changed by task publisher
Task is generated after mission bit stream again.
4. a kind of mission bit stream processing method according to claim 3, it is characterised in that whether the confirmation task needs
Extension process includes:
During tasks carrying, if receive the instruction that being sent by task leader for task needs an extension, prompting task is born
Duty people fills in extension reason, and the extension reason is sent to task publisher, issues modification task by task and completes the time limit, or
Refusal delays to ask and return task leader.
5. a kind of mission bit stream processing method according to claim 1, it is characterised in that the mission bit stream also includes appointing
Service type, priority, director contributor and task details.
6. a kind of mission bit stream processing method according to claim 4, it is characterised in that the task coupling index includes
The desired value of the mark of coupling index and each coupling index;
The task termination step includes:
The currency of corresponding coupling index is obtained from data source according to the mark of each coupling index;
The currency of each coupling index of acquisition is compared with desired value, if the currency of all coupling indexs reaches target
Value, then preliminary judgement task has been completed, otherwise:
When continuing deadline of task termination, still there is the currency miss the mark value of at least one coupling index, then preliminary judgement is appointed
Business does not complete;
Preliminary judgement result is pushed to task publisher, confirms whether task is completed by task publisher, and end task.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710696227.8A CN107480886A (en) | 2017-08-15 | 2017-08-15 | Mission bit stream processing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710696227.8A CN107480886A (en) | 2017-08-15 | 2017-08-15 | Mission bit stream processing method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107480886A true CN107480886A (en) | 2017-12-15 |
Family
ID=60600555
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710696227.8A Pending CN107480886A (en) | 2017-08-15 | 2017-08-15 | Mission bit stream processing method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107480886A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109034606A (en) * | 2018-07-23 | 2018-12-18 | 万翼科技有限公司 | The measures and procedures for the examination and approval, device and the computer readable storage medium of task based access control pause |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0715244A1 (en) * | 1994-11-23 | 1996-06-05 | Xerox Corporation | System for controlling the distribution and use of digital works utilizing a usage rights grammar |
CN101770605A (en) * | 2008-12-30 | 2010-07-07 | 深圳市青铜器软件系统有限公司 | R & D project plan management method and system |
CN103778510A (en) * | 2014-01-23 | 2014-05-07 | 北京荣之联科技股份有限公司 | Task management method and device for quantifying task value |
CN104063273A (en) * | 2014-06-13 | 2014-09-24 | 航天恒星科技有限公司 | Center control type business process dispatching management system and realizing method |
CN105550968A (en) * | 2016-01-15 | 2016-05-04 | 中国民用航空总局第二研究所 | Flight refueling scheduling control system, fight refueling scheduling control method, transmitting and receiving method, and apparatus |
CN106850848A (en) * | 2017-03-14 | 2017-06-13 | 广东小天才科技有限公司 | Data management implementation method and data management platform based on data management platform |
-
2017
- 2017-08-15 CN CN201710696227.8A patent/CN107480886A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0715244A1 (en) * | 1994-11-23 | 1996-06-05 | Xerox Corporation | System for controlling the distribution and use of digital works utilizing a usage rights grammar |
CN101770605A (en) * | 2008-12-30 | 2010-07-07 | 深圳市青铜器软件系统有限公司 | R & D project plan management method and system |
CN103778510A (en) * | 2014-01-23 | 2014-05-07 | 北京荣之联科技股份有限公司 | Task management method and device for quantifying task value |
CN104063273A (en) * | 2014-06-13 | 2014-09-24 | 航天恒星科技有限公司 | Center control type business process dispatching management system and realizing method |
CN105550968A (en) * | 2016-01-15 | 2016-05-04 | 中国民用航空总局第二研究所 | Flight refueling scheduling control system, fight refueling scheduling control method, transmitting and receiving method, and apparatus |
CN106850848A (en) * | 2017-03-14 | 2017-06-13 | 广东小天才科技有限公司 | Data management implementation method and data management platform based on data management platform |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109034606A (en) * | 2018-07-23 | 2018-12-18 | 万翼科技有限公司 | The measures and procedures for the examination and approval, device and the computer readable storage medium of task based access control pause |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20140149166A1 (en) | Topic distribution within a meeting management system | |
CN105913219A (en) | Method and system used for monitoring and managing whole actuating process of electronic contract | |
Antunes et al. | Modeling contextual concerns in enterprise architecture | |
CN103985034A (en) | Construction payment management system and method with document tracking features | |
CN101663687A (en) | Scheduling resources for airline flights | |
CN107506442A (en) | The modeling method and device of a kind of model | |
Briol | BPMN, the Business Process Modeling Notation Pocket Handbook | |
CN110175822A (en) | A kind of equipment account management method and system | |
CN111695805B (en) | Intelligent contract model construction method and system for legal contracts | |
CN109460962A (en) | Design objective crowdsourcing management system and method based on full Photographing On-line platform | |
CN107480886A (en) | Mission bit stream processing method | |
Kovesdi et al. | Human factors engineering insights and guidance for implementing innovative technologies from the nuclear innovation workshop: a summary report | |
Gupta et al. | A framework for software requirement ambiguity avoidance | |
Candlin et al. | Managing the introduction of expert systems | |
Adler et al. | A research roadmap for trustworthy dynamic systems of systems-motivation challenges and research directions | |
CN101042759B (en) | Construction payment management system and method with document tracking features | |
CN115063101A (en) | Method, system and device for generating structure data based on case base and storage medium | |
Ladeira | Cost estimation methods for software engineering | |
CN105446729A (en) | SAP platform based code update and automatic transmission realization method and system | |
US20230036747A1 (en) | Cloud infrastructure planning assistant via multi-agent ai | |
Walker et al. | The Value of Dialogue in Alliancing Projects | |
CN109508368B (en) | Data processing method and device for rephrasing corpus | |
Serugga et al. | Benefits Realization: Novel Conceptual Model for Front End–Design Decision-Making Using Dempster–Shafer Theory and Quality Function Deployment | |
CN107944988A (en) | Support the managing device and management method without reimbursement situation to complicated order | |
Morien | Prototyping large on-line systems: using a concept of a focal entity for task identification |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171215 |
|
RJ01 | Rejection of invention patent application after publication |