CN107478812A - Rock And Soil large dosage expansion cement slurry expansion process visualization device and application method - Google Patents

Rock And Soil large dosage expansion cement slurry expansion process visualization device and application method Download PDF

Info

Publication number
CN107478812A
CN107478812A CN201710556571.7A CN201710556571A CN107478812A CN 107478812 A CN107478812 A CN 107478812A CN 201710556571 A CN201710556571 A CN 201710556571A CN 107478812 A CN107478812 A CN 107478812A
Authority
CN
China
Prior art keywords
soil
expansion
safety glass
rock
cement slurry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710556571.7A
Other languages
Chinese (zh)
Other versions
CN107478812B (en
Inventor
刘杰
王连
张罗送
兰俊
高进
高春雨
童元申
付鑫
申继辉
龚子荣
艾芊
谢元元
李昌海
刘宇昂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Gaohang Intellectual Property Operation Co ltd
Taizhou Haitong Asset Management Co ltd
Original Assignee
China Three Gorges University CTGU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Three Gorges University CTGU filed Critical China Three Gorges University CTGU
Priority to CN201710556571.7A priority Critical patent/CN107478812B/en
Publication of CN107478812A publication Critical patent/CN107478812A/en
Application granted granted Critical
Publication of CN107478812B publication Critical patent/CN107478812B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/38Concrete; ceramics; glass; bricks
    • G01N33/383Concrete, cement

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Food Science & Technology (AREA)
  • Medicinal Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Ceramic Engineering (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention discloses a kind of Rock And Soil large dosage expansion cement slurry expansion process visualization device, including for containing the rectangular box body of soil or rock sample, rectangular box body open-top, bottom lock;Rectangular box body wherein one side is open and equipped with safety glass, safety glass outer surface is provided with graduated scale, safety glass medial surface is provided with the tubing for being used for adding expansion cement slurry, anchor pole is provided with tubing, anchor pole is provided with pressure sensor and foil gauge, and pressure sensor and foil gauge output end are connected with data collecting system;It is connected at the top of rectangular box body by supporting frame with installing plate, installing plate bottom is connected with jack fixing end, and the bearing plate to match with rectangular box body open top is provided with inside supporting frame, and jack telescopic end is close to bearing plate upper surface;Invention additionally discloses corresponding application method, finally realize different bulking agent levels cement mortars under the conditions of different soils compactness or crustal stress change over time and anchor rod drawing experiment failure mode it is visualized.

Description

Rock And Soil large dosage expansion cement slurry expansion process visualization device and application method
Technical field
The present invention relates to civil engineering test field, in particular to a kind of Rock And Soil large dosage expansion cement slurry expansion process Visualization device and application method.
Background technology
Application of the swelling agent in current construction is very extensive, and its major function is in compensating concrete hardening process Drying shrinkage and shrinkage, be concrete in betterment works some correlated performances, swelling agent can apply to the ground relevant with waterproof Under, water conservancy project, Hai Gong, subway, the reinforced concrete work such as tunnel, improve the density, anti-of concrete in use Oozing property, wearability, and bond stress to reinforcing bar etc..Expansion cement slurry gradually starts to apply in support engineering at this stage, can So that expansion cement slurry is used for into anchorage body, anti-pulling of anchor bar is improved using its lateral expansion performance, this apply in rock mass and There is significant economic benefit in terms of soil body anchorage technology, but in swelling agent in use, there is strict demand in terms of to quality, mistake The high too low use for being all unfavorable for engineering, it could even be possible to exceeding expected effect, therefore need to set with reference to Practical Project overview The content of meter swelling agent, and influence of the expansion cement slurry under different bulking agent levels and the effect of different external force to country rock Journey, it is unpredictable in engineering design, and the problem of workmen compares concern, therefore the cement of different bulking agent levels The expansion process visualization of slurry at different conditions has high engineering research to be worth expansion cement slurry extensive use, but In Practical Project, the expansion process of large dosage expansion cement slurry is unfavorable for also without specific visualization device and observational technique People study three main bodys under the conditions of different soils compactness or crustal stress(Anchor pole, anchoring body, soil mass or rock mass)Two interfaces(Three Interface between main body)Failure mode and Evolution.
The content of the invention
It is an object of the invention to overcome above-mentioned deficiency, there is provided a kind of Rock And Soil large dosage expansion cement slurry expansion process can Put depending on makeup and application method, directly to observe the expansion process of large dosage expansion cement slurry under different conditions, realize not With under the conditions of soil compactness or crustal stress, different bulking agent levels cement mortars change over time and anchor rod drawing experiment destroys mould Formula it is visualized, be advantageous to study the interfacial failure pattern of three main body two under the conditions of different soils compactness or crustal stress and drill Law.
The present invention is in order to solve the above technical problems, used technical scheme is:A kind of Rock And Soil large dosage expanding cement Expansion process visualization device is starched, including for containing the rectangular box body of soil or rock sample, is opened at the top of the rectangular box body Put, bottom lock;
The rectangular box body wherein one side is open and equipped with safety glass, and the safety glass outer surface is provided with scale Chi, the safety glass medial surface are provided with the tubing for being used for adding expansion cement slurry, anchor pole, the anchor pole are provided with the tubing Pressure sensor and foil gauge are provided with, pressure sensor and the foil gauge output end is connected with data collecting system;
It is connected at the top of the rectangular box body by supporting frame with installing plate, the installing plate bottom connects with jack fixing end Connect, the bearing plate to match with rectangular box body open top is provided with inside support frame as described above body, jack telescopic end is close to hold Pressing plate upper surface.
Preferably, the tubing is semi-circular shape steel-tube construction, and the side that the bearing plate contacts with tubing is provided with and pipe The semi-circular recesses that material profile matches.
Preferably, the anchor pole is made up of cylindrical bar and semi-cylindrical bar, and the exterior arc surface of the semi-cylindrical bar is opened Trough provided with installation pressure sensor and foil gauge, the cylindrical bar are located at the top of safety glass, the semi-cylindrical bar Rectangular surfaces be close to safety glass medial surface.
Preferably, the rectangular box body is welded for steel plate materialses, and support frame as described above body includes being welded in cuboid Four screw thread steel columns of casing top corner location, the screw-thread steel column top are connected by nut with installing plate.
Preferably, the installing plate bottom be also vertically provided with four be used for limit jack be displaced sideways it is spacing Steel column.
Preferably, the safety glass is rectangle, and anchor pole is close to overlap on the inside of safety glass and with its vertical centerline.
It is further preferable that graduated scale includes vertical graduated scale and horizontal graduated scale, wherein vertical graduated scale and safety glass Outside upright center line overlaps, and horizontal graduated scale is horizontally disposed with multiple and orthogonal with vertical graduated scale.
In addition, the present invention also provides the use of described Rock And Soil large dosage expansion cement slurry expansion process visualization device Method, comprise the following steps:
Step 1):In rectangular box body wherein one side installation safety glass, graduated scale is set in safety glass outer surface, will be managed Material is installed on safety glass medial surface, and anchor pole is extend into tubing, and by the pressure sensor on anchor pole and foil gauge output end It is connected with data collecting system;
Step 2):One layer of lubricating oil is applied in safety glass inner surface, to reduce large dosage expanding cement rubbing in expansion process Resistance, soil is then filled into cuboid box body or is put into the complete rock sample of well cutting, then by bearing plate be placed on soil or Rock sample surface, applies that different pressure makes soil or rock sample reaches different compactness and differently by jack pair bearing plate Stress, record the Pressure maximum value of application;
Step 3):Different content expansion cement slurry is prepared according to experiment demand, pours into tubing, ordinary cement is used at the top of grouting Slurry sealing, after the completion of extract tubing out;
Step 4):Contacted by the vertical and horizontal soil of visual safety glass observation or rock sample with expansion cement slurry initial Position, and read by graduated scale, record data, as the primary data before soil or rock sample expansion;By high-definition camera just To safety glass visible surface, it in video input computer, will at regular intervals observe and record vertical and laterally native after video recording The position of earth or rock sample, i.e. soil or rock sample expansion strain, then it is plotted in different swelling agents under the conditions of different soils compactness The cement mortar soil swelling strain time history plot of content, and differently different bulking agent levels under stress condition Cement mortar rock mass expansion strain time history plot;
Step 5):Pressure data is gathered by data collecting system, the pressure after the expansion cement slurry of collection perfusion at regular intervals Force data, that is, compression is expanded, draw out the cement mortar compression time history plot of different bulking agent levels;
Step 6):After conserving more days, pull-out test, and the destruction by camera record anchoring body and generation position are carried out to anchor pole The situation of shifting, and test data is measured by foil gauge and pressure sensor, all data are depicted as chart, obtain withdrawal resistance The rule changed with bulking agent levels.
Beneficial effects of the present invention:
1st, apparatus of the present invention control is good, can simulate different occurrence conditions, is drawn so as to carry out the rock soil anchor under different occurrence conditions Pull out experiment;Can obtain under the conditions of different soils compactness or differently under stress condition different bulking agent levels anchoring system System changes over time under the conditions of rule, and different soils compactness or differently three main bodys under stress condition(Anchor pole, anchoring Body, soil mass or rock mass)Two interfaces(Interface between three main bodys)Failure mode and Evolution, withdrawal resistance is finally given with expansion The rule of agent content change.
2nd, the device can realize that creep visualizes by horizontal, vertical graduated scale and phantom high-speed camera, can Reflect the change under the effect of large dosage expansion cement slurry in true Rock And Soil environment;
3rd, anchor pole, which changes into, can use spiral CT machine sweep test after nonmetallic materials, the boundary of three main body two in quantitative study drawing process The destructive process in face;
4th, under the conditions of various soil mass being studied, differently under stress condition, anti-pulling of anchor bar with bulking agent levels changing rule, The interface normal stress of anchoring body, shear stress, the regularity of distribution of axle power;
5th, the device can be recycled, simple in construction, and material is easy to get, easy to operate, significantly save experimentation cost and cycle, Environmental Effect It is beneficial notable.
Brief description of the drawings
Fig. 1 is a kind of structural representation of Rock And Soil large dosage expansion cement slurry expansion process visualization device;
Fig. 2 is the structural representation of anchor pole in Fig. 1;
Fig. 3 is Fig. 2 another viewing angle constructions schematic diagram;
In figure, rectangular box body 1, safety glass 2, graduated scale 3, vertical graduated scale 3.1, horizontal graduated scale 3.2, tubing 4, anchor pole 5th, cylindrical bar 5.1, semi-cylindrical bar 5.2, trough 5.3, supporting frame 6, screw thread steel column 6.1, nut 6.2, installing plate 7, limit Position steel column 7.1, bearing plate 8.
Embodiment
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
As shown in figure 1, a kind of Rock And Soil large dosage expansion cement slurry expansion process visualization device, including for containing soil The rectangular box body 1 of earth or rock sample, the open-top of rectangular box body 1, bottom lock;
The rectangular box body 1 wherein one side is open and equipped with safety glass 2, and the outer surface of safety glass 2, which is provided with, carves Chi 3 is spent, the medial surface of safety glass 2 is provided with the tubing 4 for being used for adding expansion cement slurry, anchor pole 5 is provided with the tubing 4, The anchor pole 5 is provided with pressure sensor and foil gauge, pressure sensor and the foil gauge output end and data collecting system Connection;
The top of rectangular box body 1 is connected by supporting frame 6 with installing plate 7, and the bottom of installing plate 7 is fixed with jack End connection, the inside of support frame as described above body 6 are provided with the bearing plate 8 to match with the open top of rectangular box body 1, jack telescopic end It is close to the upper surface of bearing plate 8.
Preferably, the tubing 4 is semi-circular shape steel-tube construction, the side that the bearing plate 8 contacts with tubing 4 be provided with The semi-circular recesses that the profile of tubing 4 matches.This design does not interfere with tubing 4 when bearing plate 8 is pressurized.
Preferably, as shown in Figures 2 and 3, the anchor pole 5 is made up of cylindrical bar 5.1 and semi-cylindrical bar 5.2, and described half The exterior arc surface of cylindrical bar 5.2 offers the trough 5.3 of installation pressure sensor and foil gauge, the cylindrical bar 5.1 In the top of safety glass 2, the rectangular surfaces of the semi-cylindrical bar 5.2 are close to the medial surface of safety glass 2.It is this to be designed with two originals Cause, first, the rectangular surfaces of semi-cylindrical bar 5.2 can be close to the medial surface of safety glass 2, the expansion cement slurry of perfusion will not be by anchor Bar 5 is overall all to be surrounded, and reference position can be used as by leaving the rectangular surfaces of semi-cylindrical bar 5.2, to facilitate observation measurement anchoring body And the displacement that both sides soil is occurred centered on anchor pole 5 to both sides;Second, pressure sensor and foil gauge are arranged on semi-cylindrical bar After 5.2 exterior arc surface, pressure sensor can accurately tests the power of expansion extruding, and foil gauge is accurately tested anchor pole 5 and existed In drawing process and extrusion process strain deformation.
Preferably, the rectangular box body 1 is welded for steel plate materialses, and support frame as described above body 6 is rectangular including being welded in Four screw thread steel columns 6.1 of the top corner location of body casing 1, the top of screw thread steel column 6.1 pass through nut 6.2 and installing plate 7 Connection.
Preferably, the bottom of installing plate 7 is also vertically provided with four and is used to limit the limit that jack is displaced sideways Position steel column 7.1.
Preferably, the safety glass 2 is rectangle, anchor pole 5 be close to the inner side of safety glass 2 and with its vertical centerline weight Close.
It is further preferable that graduated scale 3 includes vertical graduated scale 3.1 and horizontal graduated scale 3.2, wherein vertical graduated scale 3.1 Overlapped with the outside upright center line of safety glass 2, horizontal graduated scale 3.2 is horizontally disposed with multiple and mutual with vertical graduated scale 3.1 Vertically.Preferably, graduated scale 3 is thousand scale division chis.
In addition, the present invention also provides the use of described Rock And Soil large dosage expansion cement slurry expansion process visualization device Method, comprise the following steps:
Step 1):In the wherein one side installation safety glass 2 of rectangular box body 1, graduated scale 3 is set in the outer surface of safety glass 2, Tubing 4 is installed on the medial surface of safety glass 2, anchor pole 5 is extend into tubing 4, and by the pressure sensor on anchor pole 5 and strain Piece output end is connected with data collecting system;
Step 2):One layer of lubricating oil is applied in the inner surface of safety glass 2, to reduce large dosage expanding cement rubbing in expansion process Resistance, soil is then filled into rectangular box body 1 or is put into the complete rock sample of well cutting, bearing plate 8 is then placed on soil Or rock sample surface, apply that different pressure makes soil or rock sample reaches different compactness and not by jack pair bearing plate 8 Same crustal stress, record the Pressure maximum value of application;
Step 3):Different content expansion cement slurry is prepared according to experiment demand, pours into tubing 4, light water is used at the top of grouting Mud seal, after the completion of extract out tubing 4;
Step 4):By visual safety glass 2 observe that vertical and horizontal soil or rock sample contacts with expansion cement slurry just Beginning position, and read by graduated scale 3, record data, as the primary data before soil or rock sample expansion;By high-definition camera The visible surface of face safety glass 2, it in video input computer, will at regular intervals observe and record vertical and horizontal after video recording The position of soil or rock sample, i.e. soil or rock sample expansion strain, then it is plotted in different expansions under the conditions of different soils compactness Agent content cement mortar soil swelling strain time history plot, and differently under stress condition different swelling agents contain The cement mortar rock mass expansion strain time history plot of amount;
Step 5):Pressure data is gathered by data collecting system, the pressure after the expansion cement slurry of collection perfusion at regular intervals Force data, that is, compression is expanded, draw out the cement mortar compression time history plot of different bulking agent levels;
Step 6):After conserving more days, pull-out test, and the destruction and generation for passing through camera record anchoring body are carried out to anchor pole 5 The situation of displacement, and test data is measured by foil gauge and pressure sensor, all data are depicted as chart, can be obtained The anchor system of different bulking agent levels changes over time rule under the conditions of different soils compactness or differently under stress condition Rule, and under the conditions of different soils compactness or differently three main bodys under stress condition(Anchor pole, anchoring body, soil mass or rock mass) Two interfaces(Interface between three main bodys)Failure mode and Evolution, finally give the rule that withdrawal resistance changes with bulking agent levels Rule.
Embodiment 1 and embodiment 2 are used as using the implementation process of soil and rock sample respectively.
Embodiment 1
Step 1):In the wherein one side installation safety glass 2 of rectangular box body 1, graduated scale 3 is set in the outer surface of safety glass 2, Tubing 4 is installed on the medial surface of safety glass 2, anchor pole 5 is extend into tubing 4, and by the pressure sensor on anchor pole 5 and strain Piece output end is connected with data collecting system;The present embodiment graduated scale 3 includes vertical graduated scale 3.1 and horizontal graduated scale 3.2, its In vertical graduated scale 3.1 is overlapped with the outside upright center line of safety glass 2, horizontal graduated scale 3.2 is horizontally disposed with three and with erecting It is orthogonal to graduated scale 3.1;Tubing 4 is semi-circular shape steel-tube construction, and anchor pole 5 is by cylindrical bar 5.1 and semi-cylindrical bar 5.2 Composition, the exterior arc surface of semi-cylindrical bar 5.2 equidistantly offer the trough 5.3 of installation pressure sensor and foil gauge, cylinder Shape bar 5.1 is located at the top of safety glass 2, and the rectangular surfaces of the semi-cylindrical bar 5.2 are close to the medial surface of safety glass 2;
Step 2):One layer of lubricating oil is applied in the inner surface of safety glass 2, to reduce large dosage expanding cement rubbing in expansion process Resistance, soil is then filled into rectangular box body 1, bearing plate 8 is then placed on soil surface, pass through jack pair bearing plate 8, which apply different pressure, makes soil reach different compactness and different crustal stress, records the Pressure maximum value of application, this implementation Example applies 30KN pressure;
Step 3):Different content expansion cement slurry is prepared according to experiment demand, pours into tubing 4, light water is used at the top of grouting Mud seal, after the completion of extract out tubing 4;In the present embodiment, when preparing different content expansion cement slurry, electronic scale weighs 3 groups Cement marked as 42.5, weight are respectively 1700 grams, 1500 grams, 1300 grams, weigh 300 grams, 500 grams, 700 grams of expansions respectively Agent;Weigh three groups of warm water(50 degrees centigrades), every group 600 grams;Cement, swelling agent and warm water are mixed successively, are configured to swollen Swollen agent content is 15%, 25%, 35% expansion cement slurry.
Step 4):By visual safety glass 2 observe vertical and horizontal soil contacted with expansion cement slurry it is initial Position, and read by graduated scale 3, record data, as the primary data before soil swelling;By high-definition camera face tempering The visible surface of glass 2, it in video input computer, will at regular intervals be observed after video recording and record vertical and horizontal soil or rock The position of sample, i.e. soil swelling strain, and are then plotted in the cement mortar of different bulking agent levels under the conditions of different soils compactness Soil swelling strains time history plot;Specific implementation process is as follows:1 hour after expansion cement slurry is irrigated, every The expansion status and record of 10 minutes observation expansion cement slurries, between 1 to 12 hours, every 1 hour observed data and are recorded, Between 12 to 48 hours, its data was observed every 6 hours, in the latter week, observation daily is once and record data, record are perpendicular To the position with horizontal soil, i.e. soil swelling strains, and then draws the cement mortar soil swelling strain of different bulking agent levels Time history plot;
Step 5):Pressure data is gathered by data collecting system, the pressure after the expansion cement slurry of collection perfusion at regular intervals Force data, that is, compression is expanded, draw out the cement mortar compression time history plot of different bulking agent levels;This reality Apply in example, it is necessary to carried out that turgor pressure stress data is calculated according to the pressure data of collection, draw different swelling agent quality and contain The expansion cement slurry compression of amount changes over time image;
Step 6):After maintenance 28 days, pull-out test, and the destruction and generation for passing through camera record anchoring body are carried out to anchor pole 5 The situation of displacement, and test data is measured by foil gauge and pressure sensor, it is a certain contrast can be observed by photologging Point is from the situation of change for starting to pull to end.
Embodiment 2
Step 1):In the wherein one side installation safety glass 2 of rectangular box body 1, graduated scale 3 is set in the outer surface of safety glass 2, Tubing 4 is installed on the medial surface of safety glass 2, anchor pole 5 is extend into tubing 4, and by the pressure sensor on anchor pole 5 and strain Piece output end is connected with data collecting system;The present embodiment graduated scale 3 includes vertical graduated scale 3.1 and horizontal graduated scale 3.2, its In vertical graduated scale 3.1 is overlapped with the outside upright center line of safety glass 2, horizontal graduated scale 3.2 is horizontally disposed with three and with erecting It is orthogonal to graduated scale 3.1;Tubing 4 is semi-circular shape steel-tube construction, and anchor pole 5 is by cylindrical bar 5.1 and semi-cylindrical bar 5.2 Composition, the exterior arc surface of semi-cylindrical bar 5.2 equidistantly offer the trough 5.3 of installation pressure sensor and foil gauge, cylinder Shape bar 5.1 is located at the top of safety glass 2, and the rectangular surfaces of the semi-cylindrical bar 5.2 are close to the medial surface of safety glass 2;
Step 2):One layer of lubricating oil is applied in the inner surface of safety glass 2, to reduce large dosage expanding cement rubbing in expansion process Resistance, the complete rock sample of well cutting is then put into rectangular box body 1, bearing plate 8 is then placed on rock sample surface, passes through thousand Jin top, which applies different pressure to bearing plate 8, makes rock sample reach different compactness and different crustal stress, records the pressure of application Maximum;The present embodiment applies 30KN, 40KN, 50KN pressure to three devices respectively;
Step 3):Different content expansion cement slurry is prepared according to experiment demand, pours into tubing 4, light water is used at the top of grouting Mud seal, after the completion of extract out tubing 4;In the present embodiment, electronic scale weighs 1700 grams of the cement that 3 deck labels are 42.5, claims 300 grams of swelling agents are measured, weigh warm water(50 degrees centigrades)600 grams, cement, swelling agent and warm water are mixed successively, are configured to Bulking agent levels are 15% expansion cement slurry, and expansion cement slurry is poured into a mould in the tubing 4 into different visual devices respectively;
Step 4):By visual safety glass 2 observe that vertical and horizontal soil or rock sample contacts with expansion cement slurry just Beginning position, and read by graduated scale 3, record data, as the primary data before soil or rock sample expansion;By high-definition camera The visible surface of face safety glass 2, it in video input computer, will at regular intervals observe and record vertical and horizontal after video recording The position of soil or rock sample, i.e. soil or rock sample expansion strain, then it is plotted in different expansions under the conditions of different soils compactness Agent content cement mortar soil swelling strain time history plot, and differently under stress condition different swelling agents contain The cement mortar rock mass expansion strain time history plot of amount;Specific implementation process is as follows:1 after expansion cement slurry is irrigated Hour, every the expansion status of 10 minutes observation expansion cement slurries, and record, between 1 to 12 hours, observed every 1 hour Data simultaneously record, and between 12 to 48 hours, its data were observed every 6 hours, in the latter week, observes once and records daily Data, record vertically and horizontal rock sample position, i.e. rock sample expansion strain, then draw the cement magmatic rocks of different crustal stress situations Sample expansion strain time history plot;
Step 5):Pressure data is gathered by data collecting system, the pressure after the expansion cement slurry of collection perfusion at regular intervals Force data, that is, compression is expanded, be plotted in expansion cement slurry compression under different soil conditions and change over time image;
Step 6):After maintenance 28 days, pull-out test, and the destruction and generation for passing through camera record anchoring body are carried out to anchor pole 5 The situation of displacement, and test data is measured by foil gauge and pressure sensor, it is a certain contrast can be observed by photologging Point is from the situation of change for starting to pull to end.
The above embodiments are only the preferred technical solution of the present invention, and are not construed as the limitation for the present invention, this Shen Please in embodiment and embodiment in feature in the case where not conflicting, can mutually be combined.The protection model of the present invention Enclose the equivalent substitution side of technical characteristic in the technical scheme that should be recorded with claim, including the technical scheme of claim record Case is protection domain.Equivalent substitution i.e. within this range is improved, also within protection scope of the present invention.

Claims (8)

1. a kind of Rock And Soil large dosage expansion cement slurry expansion process visualization device, including for containing the length of soil or rock sample Cube casing(1), the rectangular box body(1)Open-top, bottom lock, it is characterised in that:
The rectangular box body(1)Wherein one side is open and equipped with safety glass(2), the safety glass(2)Outer surface Provided with graduated scale(3), the safety glass(2)Medial surface is provided with the tubing for being used for adding expansion cement slurry(4), the tubing (4)It is interior to be provided with anchor pole(5), the anchor pole(5)Pressure sensor and foil gauge are provided with, the pressure sensor and foil gauge are defeated Go out end to be connected with data collecting system;
The rectangular box body(1)Top passes through supporting frame(6)With installing plate(7)Connection, the installing plate(7)Bottom and thousand The fixing end connection of jin top, support frame as described above body(6)Inside is provided with and rectangular box body(1)The bearing plate that open top matches (8), jack telescopic end is close to bearing plate(8)Upper surface.
2. Rock And Soil large dosage expansion cement slurry expansion process visualization device according to claim 1, it is characterised in that: The tubing(4)For semi-circular shape steel-tube construction, the bearing plate(8)With tubing(4)The side of contact is provided with and tubing(4)Outside The semi-circular recesses that shape matches.
3. Rock And Soil large dosage expansion cement slurry expansion process visualization device according to claim 1, it is characterised in that: The anchor pole(5)By cylindrical bar(5.1)With semi-cylindrical bar(5.2)Composition, the semi-cylindrical bar(5.2)Exterior arc surface Offer the trough of installation pressure sensor and foil gauge(5.3), the cylindrical bar(5.1)Positioned at safety glass(2)Top, The semi-cylindrical bar(5.2)Rectangular surfaces be close to safety glass(2)Medial surface.
4. Rock And Soil large dosage expansion cement slurry expansion process visualization device according to claim 1, it is characterised in that: The rectangular box body(1)It is welded for steel plate materialses, support frame as described above body(6)Including being welded in rectangular box body(1)Top Four screw thread steel columns of portion's corner location(6.1), the screw thread steel column(6.1)Top passes through nut(6.2)With installing plate(7)Even Connect.
5. Rock And Soil large dosage expansion cement slurry expansion process visualization device according to claim 1, it is characterised in that: The installing plate(7)Bottom is also vertically provided with four and is used to limit the spacing steel column that jack is displaced sideways(7.1).
6. Rock And Soil large dosage expansion cement slurry expansion process visualization device according to claim 1, it is characterised in that: The safety glass(2)For rectangle, anchor pole(5)It is close to safety glass(2)Inner side and overlapped with its vertical centerline.
7. Rock And Soil large dosage expansion cement slurry expansion process visualization device according to claim 6, it is characterised in that: Graduated scale(3)Including vertical graduated scale(3.1)With horizontal graduated scale(3.2), wherein vertical graduated scale(3.1)With safety glass (2)Outside upright center line overlaps, horizontal graduated scale(3.2)It is horizontally disposed multiple and with vertical graduated scale(3.1)It is orthogonal.
8. a kind of application method of the Rock And Soil large dosage expansion cement slurry expansion process visualization device described in claim 1, It is characterized in that:Comprise the following steps:
Step 1):In rectangular box body(1)Wherein one side installation safety glass(2), in safety glass(2)Outer surface, which is set, carves Spend chi(3), by tubing(4)It is installed on safety glass(2)Medial surface, anchor pole(5)It extend into tubing(4)It is interior, and by anchor pole(5)On Pressure sensor and foil gauge output end be connected with data collecting system;
Step 2):In safety glass(2)Inner surface applies one layer of lubricating oil, to reduce large dosage expanding cement in expansion process Frictional resistance, then to rectangular box body(1)Inside fill soil or be put into the complete rock sample of well cutting, then by bearing plate(8)Put On soil or rock sample surface, pass through jack pair bearing plate(8)Apply that different pressure makes soil or rock sample reaches different close Solidity and different crustal stress, record the Pressure maximum value of application;
Step 3):Different content expansion cement slurry is prepared according to experiment demand, pours into tubing(4)It is interior, with common at the top of grouting Cement mortar seal, after the completion of extract tubing out(4);
Step 4):Pass through visual safety glass(2)What the vertical and horizontal soil of observation or rock sample contacted with expansion cement slurry Initial position, and pass through graduated scale(3)Read, record data, as the primary data before soil or rock sample expansion;High definition is taken the photograph Camera face safety glass(2)Visible surface, it in video input computer, will at regular intervals observe and record vertical after video recording With the position of horizontal soil or rock sample, i.e. soil or rock sample expansion strain, then it is plotted under the conditions of different soils compactness not Cement mortar soil swelling with bulking agent levels strains time history plot, and differently different swollen under stress condition The cement mortar rock mass expansion strain time history plot of swollen agent content;
Step 5):Pressure data is gathered by data collecting system, the pressure after the expansion cement slurry of collection perfusion at regular intervals Force data, that is, compression is expanded, draw out the cement mortar compression time history plot of different bulking agent levels;
Step 6):After conserving more days, to anchor pole(5)Carry out pull-out test, and the destruction by camera record anchoring body and hair The situation of raw displacement, and test data is measured by foil gauge and pressure sensor, all data are depicted as chart, resisted The rule that pull out force changes with bulking agent levels.
CN201710556571.7A 2017-07-10 2017-07-10 Rock And Soil large dosage expansion cement slurry expansion process visualization device and application method Active CN107478812B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710556571.7A CN107478812B (en) 2017-07-10 2017-07-10 Rock And Soil large dosage expansion cement slurry expansion process visualization device and application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710556571.7A CN107478812B (en) 2017-07-10 2017-07-10 Rock And Soil large dosage expansion cement slurry expansion process visualization device and application method

Publications (2)

Publication Number Publication Date
CN107478812A true CN107478812A (en) 2017-12-15
CN107478812B CN107478812B (en) 2019-07-02

Family

ID=60596168

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710556571.7A Active CN107478812B (en) 2017-07-10 2017-07-10 Rock And Soil large dosage expansion cement slurry expansion process visualization device and application method

Country Status (1)

Country Link
CN (1) CN107478812B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108169260A (en) * 2017-12-28 2018-06-15 三峡大学 With the method for CT scan analysis different content swelling agent anchoring body mechanism of intumescence
CN109030210A (en) * 2018-08-02 2018-12-18 三峡大学 Soil body creep simulation device
CN109211676A (en) * 2018-09-21 2019-01-15 三峡大学 Measure the device and analogy method of Rock And Soil stress repletion transfer law
CN109211949A (en) * 2018-09-30 2019-01-15 三峡大学 A kind of test method measuring expansion cement slurry anchoring body and surrounding soil layer compactness based on CT scan
CN109238916A (en) * 2018-09-29 2019-01-18 佛山科学技术学院 A kind of use for laboratory cement slurry monitor station
CN109580346A (en) * 2018-11-21 2019-04-05 三峡大学 A kind of device and method of the compressive property using mgnetic observations expansion cement slurry
CN111650365A (en) * 2020-07-14 2020-09-11 清华大学 Intelligent grouting multifunctional test device
CN111735724A (en) * 2020-06-23 2020-10-02 三峡大学 Device and method for detecting creep stress of in-situ rock-soil body
CN113899889A (en) * 2021-12-10 2022-01-07 成都理工大学 Device and method for monitoring cement paste gel strength of visual retaining wall

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5586851A (en) * 1994-06-23 1996-12-24 Fischerwerke, Artur Fischer Gmbh & Co Kg Prestress-monitoring element for screw-type anchors
US6918292B2 (en) * 2001-06-22 2005-07-19 Bj Services Company Cement expansion/contraction test method
CN103398901A (en) * 2013-08-08 2013-11-20 中国科学院武汉岩土力学研究所 Indoor pull-out test apparatus for anchor rod
CN103558088A (en) * 2013-11-05 2014-02-05 兰州大学 Earthen archaeological site anchoring laboratory test system
CN104155176A (en) * 2014-08-28 2014-11-19 中国电建集团中南勘测设计研究院有限公司 Simulation test device and method for working state of anchor rod and anchor rod stress meter
CN104374649A (en) * 2014-11-20 2015-02-25 广州市建筑科学研究院有限公司 Testing device and method for observing shear deformation failure characteristics between tubular pile and grouting soil body
CN105675395A (en) * 2016-02-01 2016-06-15 山东科技大学 Testing system for interfacial stress transmission mechanism of soil anchorage body and testing method
CN105738200A (en) * 2016-02-01 2016-07-06 山东科技大学 Visible testing device for soil layer anchoring body stress transferring mechanism and testing method of visible testing device
CN205562356U (en) * 2016-04-29 2016-09-07 湖南科技大学 Testing arrangement of characteristic is cohered at anchor interface

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5586851A (en) * 1994-06-23 1996-12-24 Fischerwerke, Artur Fischer Gmbh & Co Kg Prestress-monitoring element for screw-type anchors
US6918292B2 (en) * 2001-06-22 2005-07-19 Bj Services Company Cement expansion/contraction test method
CN103398901A (en) * 2013-08-08 2013-11-20 中国科学院武汉岩土力学研究所 Indoor pull-out test apparatus for anchor rod
CN103558088A (en) * 2013-11-05 2014-02-05 兰州大学 Earthen archaeological site anchoring laboratory test system
CN104155176A (en) * 2014-08-28 2014-11-19 中国电建集团中南勘测设计研究院有限公司 Simulation test device and method for working state of anchor rod and anchor rod stress meter
CN104374649A (en) * 2014-11-20 2015-02-25 广州市建筑科学研究院有限公司 Testing device and method for observing shear deformation failure characteristics between tubular pile and grouting soil body
CN105675395A (en) * 2016-02-01 2016-06-15 山东科技大学 Testing system for interfacial stress transmission mechanism of soil anchorage body and testing method
CN105738200A (en) * 2016-02-01 2016-07-06 山东科技大学 Visible testing device for soil layer anchoring body stress transferring mechanism and testing method of visible testing device
CN205562356U (en) * 2016-04-29 2016-09-07 湖南科技大学 Testing arrangement of characteristic is cohered at anchor interface

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108169260B (en) * 2017-12-28 2020-06-30 三峡大学 Method for analyzing expansion mechanism of anchoring body with different content of expanding agent by CT scanning
CN108169260A (en) * 2017-12-28 2018-06-15 三峡大学 With the method for CT scan analysis different content swelling agent anchoring body mechanism of intumescence
CN109030210A (en) * 2018-08-02 2018-12-18 三峡大学 Soil body creep simulation device
CN109211676A (en) * 2018-09-21 2019-01-15 三峡大学 Measure the device and analogy method of Rock And Soil stress repletion transfer law
CN109238916A (en) * 2018-09-29 2019-01-18 佛山科学技术学院 A kind of use for laboratory cement slurry monitor station
CN109211949A (en) * 2018-09-30 2019-01-15 三峡大学 A kind of test method measuring expansion cement slurry anchoring body and surrounding soil layer compactness based on CT scan
CN109211949B (en) * 2018-09-30 2021-06-29 三峡大学 Test method for measuring compactness of anchoring body and surrounding soil layer of expansive cement paste based on CT scanning
CN109580346A (en) * 2018-11-21 2019-04-05 三峡大学 A kind of device and method of the compressive property using mgnetic observations expansion cement slurry
CN109580346B (en) * 2018-11-21 2021-08-10 三峡大学 Device and method for measuring compressive resistance of expanded cement slurry by using magnetic force
CN111735724A (en) * 2020-06-23 2020-10-02 三峡大学 Device and method for detecting creep stress of in-situ rock-soil body
CN111735724B (en) * 2020-06-23 2023-03-10 三峡大学 Device and method for detecting creep stress of in-situ rock-soil body
CN111650365A (en) * 2020-07-14 2020-09-11 清华大学 Intelligent grouting multifunctional test device
CN111650365B (en) * 2020-07-14 2021-05-07 清华大学 Intelligent grouting multifunctional test device
CN113899889A (en) * 2021-12-10 2022-01-07 成都理工大学 Device and method for monitoring cement paste gel strength of visual retaining wall
CN113899889B (en) * 2021-12-10 2022-04-15 成都理工大学 Device and method for monitoring cement paste gel strength of visual retaining wall

Also Published As

Publication number Publication date
CN107478812B (en) 2019-07-02

Similar Documents

Publication Publication Date Title
CN107478812A (en) Rock And Soil large dosage expansion cement slurry expansion process visualization device and application method
AU2013101531A4 (en) Deep softrock geostress test method and device based on flow stress recovery principle
Ashraf et al. Seismic behavior of unreinforced and confined brick masonry walls before and after ferrocement overlay retrofitting
Fang et al. The effect of external water pressure on the liner behavior of large cross-section tunnels
CN104374649B (en) A kind of experimental rig and method for being used to observe shear deformation breaks down feature between pile tube and the slip casting soil body
Wong et al. Centrifuge and numerical investigation of passive failure of tunnel face in sand
Zhang et al. True three-dimensional geomechanical model tests for stability analysis of surrounding rock during the excavation of a deep underground laboratory
Zhu et al. True 3D geomechanical model test for research on rheological deformation and failure characteristics of deep soft rock roadways
Ni et al. Plane strain evaluation of stress paths for supported excavations under lateral loading and unloading
CN102797269B (en) Internal force testing method for load test of pre-stress tubular pile
Wang et al. Investigation of the mechanical properties of double lining structure of shield tunnel with different joint surface
Yang et al. Research of jacking force of densely arranged pipe jacks process in pipe-roof pre-construction method
Chen et al. Geo-mechanical model testing for stability of underground gas storage in halite during the operational period
Wang et al. Study on load distribution characteristics of secondary lining of shield under different construction time
Tao et al. Model test on support scheme for carbonaceous slate tunnel in high geostress zone at high depth
Wu et al. Design and application of hydro-mechanical coupling test system for simulating rock masses in high dam reservoir operations
Ziegler et al. Stress evolution around a TBM tunnel in swelling clay shale over four years after excavation
Feng et al. Field mechanical properties of large section concrete pipes during jacking in fractured moderately weathered siltstone
Kim et al. Mock-up experiments on permeability measurement of concrete and construction joints for air tightness assessment
Cheng et al. Effects of fracture filling ratio and confining stress on the equivalent effective stress coefficient of rocks containing a single fracture
Zhou et al. Experiment on improving bearing capacity of pile foundation in loess area by postgrouting
CN105206157B (en) hydraulic model test teaching platform
Zhu et al. Experimental study on grouting seepage characteristics of single-fracture specimen under three-dimensional stress
Hu et al. Experimental study on the effect of water-cement ratios on the diffusion behavior of sand soil grouting
Chen et al. Small-and large-scale model tests on the buckling property of slender pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201222

Address after: Building 2, No. 3, Fuqian Road, Hailing District, Taizhou City, Jiangsu Province

Patentee after: Taizhou Haitong Asset Management Co.,Ltd.

Address before: Unit 2414-2416, main building, no.371, Wushan Road, Tianhe District, Guangzhou City, Guangdong Province

Patentee before: GUANGDONG GAOHANG INTELLECTUAL PROPERTY OPERATION Co.,Ltd.

Effective date of registration: 20201222

Address after: Unit 2414-2416, main building, no.371, Wushan Road, Tianhe District, Guangzhou City, Guangdong Province

Patentee after: GUANGDONG GAOHANG INTELLECTUAL PROPERTY OPERATION Co.,Ltd.

Address before: 443002 No. 8, University Road, Yichang, Hubei

Patentee before: CHINA THREE GORGES University

TR01 Transfer of patent right