CN107476823A - Rail rapid transit engineering hydraulic vertical rotary flood and preventive airtight blast door - Google Patents

Rail rapid transit engineering hydraulic vertical rotary flood and preventive airtight blast door Download PDF

Info

Publication number
CN107476823A
CN107476823A CN201710916866.0A CN201710916866A CN107476823A CN 107476823 A CN107476823 A CN 107476823A CN 201710916866 A CN201710916866 A CN 201710916866A CN 107476823 A CN107476823 A CN 107476823A
Authority
CN
China
Prior art keywords
door leaf
preventive
door
vertical
rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710916866.0A
Other languages
Chinese (zh)
Inventor
胡圣伟
王阳明
农兴中
刘鑫美
何治新
饶美婉
史海欧
邓剑荣
曾程亮
秦伟民
舒骆鹏
卢昌仪
崔艳斌
张建伟
贾彦明
郑翔
解峰
张德军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Metro Design and Research Institute Co Ltd
Original Assignee
Guangzhou Metro Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Metro Design and Research Institute Co Ltd filed Critical Guangzhou Metro Design and Research Institute Co Ltd
Priority to CN201710916866.0A priority Critical patent/CN107476823A/en
Publication of CN107476823A publication Critical patent/CN107476823A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/103Dams, e.g. for ventilation
    • E21F17/12Dam doors
    • EFIXED CONSTRUCTIONS
    • E05LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
    • E05FDEVICES FOR MOVING WINGS INTO OPEN OR CLOSED POSITION; CHECKS FOR WINGS; WING FITTINGS NOT OTHERWISE PROVIDED FOR, CONCERNED WITH THE FUNCTIONING OF THE WING
    • E05F15/00Power-operated mechanisms for wings
    • E05F15/50Power-operated mechanisms for wings using fluid-pressure actuators

Abstract

The present invention relates to rail rapid transit engineering hydraulic vertical rotary flood and preventive airtight blast door, belong to protective airtight partition door technical field.Including door leaf, doorframe, hinge page, blocking mechanism, fluid pressure drive device and electric control system;Door leaf is connected by the doorframe of hinge page and side, and door leaf side is additionally provided with blocking mechanism, and door leaf is connected with fluid pressure drive device;Fluid pressure drive device is connected with electric control system;Fluid pressure drive device includes base, hydraulic cylinder, the first actuating arm, the second actuating arm, rotating shaft and support arm.The present invention preferably solves track traffic large space vertical rotary type sealed door to space and deadweight and the requirement of hydraulic pressure door closing force, fluid pressure drive device is synchronously opened and closed, prevent the upper and lower driving force difference of sealed door to cause the generation of unbalance stress problem, there is preferable application prospect.

Description

Rail rapid transit engineering hydraulic vertical rotary flood and preventive airtight blast door
Technical field
The present invention relates to a kind of rail rapid transit engineering hydraulic vertical rotary flood and preventive airtight blast door, belong to protection airtight every Disconnected gate technique field.
Background technology
Most of City Rail Transit System is all the passenger for delivering city commuting, and city in many instances City's Rail Transit System can all be treated as the backbone of urban transportation.At war (such as World War II), subterranean railway is also Factory or bomb shelter can be used as.The subway system of many countries (such as South Korea), war may be calculated by having in design In design, so the either depth of railway, crowd's control aspect, the needs of daily traffic and national defence are all taken into account simultaneously.
Subway engineering is usually City Underground Transportation arterial highway, wartime be urban civil air defense main passage for evacuation, material storage storehouse, Personnel portion to be covered or personnel shelter.Usually each station, running tunnel are interconnected, and are open to traffic, and wartime can then separate Into separate protective unit.The division of protective unit be using underground station plus coupled running tunnel section as One independent protective unit.Safeguard and internal unit are supporting into autonomous system in each protective unit, establish one's own system, wartime Air defense, usually take precautions against natural calamities.Require to have between each protective unit and can bear bidirectional load and the interval partition door with sealing function.It is close Close partition door and allow for bearing certain pressure even shock wave of nuclear explosion, it is necessary to reach certain people's air defense grade.And Obturation effect is very good, can prevent the seepage of malicious gas and water.
Often there is the situation that section is crossed in underground urban subway, it is common practice to the both ends of section are crossed in section Flood gate and partition door are individually set.This traditional method compares waste of resource, in construction and installation and later maintenance Difficulty is larger.In order to save civil engineering and equipment investment, accomplish to construct, install and use, be easy to maintenance, " under underground railway waters Running tunnel Flood gate be combined with people's air defense section protective airtight partition door " by be subway construction from now on trend.Subway area Between protective airtight partition door as the handling characteristics of Flood gate be when river bed section running tunnel is closed by Flood gate when destroying Action is closed, generally, no matter being all anhydrous in running tunnel, therefore, the Flood gate is typically at normally opened shape usually or wartime State, although needing typically to have certain omen sign when closing Flood gate, when when turning off Flood gate with certain reaction Between, but design is also required to make it have the function that operation is opened and closed under moving water state.So the design of partition door just seems It is particularly important.It must account for its closing property, load people's air defense drag rank (Subjected To Biaxial Loading), door leaf upstream face stress hydraulic pressure Situation, and door leaf closing direction and water (flow) direction are relation of following current or adverse current etc..
The anti-Mi Men of flood is divided into rotatable two class of vertical lift type, hydraulic vertical by switch pattern, and wherein lift is divided into volume again Raise machine formula and electric block type.Lift is similar with traditional water conservancy Flood gate, located at the position with two layer of space, usually puts It is placed in station hall layer, fall during closing cut-off station layer tunnel.More city underground buried depth is shallower, and vertical lift type needs 7 up and down ~8 meters of space, difficult arrangement, the rotatable door of hydraulic vertical is devised for the situation.The Men Li, which is turned on, to be opened, for infer bus-bar or Close the door against the current, need stronger shutdown drive mechanism.And meeting the nervous requirement of tunnel space, hydraulic push rod mechanism needs to provide 320KN door closing force.But for the rail tunnel of large space, vertical rotary type sealed door size used just needs to do It is very big, but its deadweight increase is more simultaneously, and this just proposes higher requirement to hydraulic push rod mechanism, and there has been no have at present The solution of effect.
The content of the invention
The present invention floods protective airtight partition door from great, the larger hydraulic pressure of need to solve rotatable imitate of subway large space hydraulic vertical The problem of door closing force, the present invention propose a kind of rail rapid transit engineering hydraulic vertical rotary flood and preventive airtight blast door, effectively Solves the problems, such as the closed cut-off of subway large space.
To achieve these goals, this invention takes following technical scheme:
Rail rapid transit engineering hydraulic vertical rotary flood and preventive airtight blast door, including door leaf, doorframe, hinge page, blocking mechanism, Fluid pressure drive device and electric control system;Wherein, the doorframe is arranged on rail tunnel inwall, and the door leaf leads to The doorframe for crossing hinge page and side connects, and the door leaf side is additionally provided with blocking mechanism, and the door leaf connects with fluid pressure drive device Connect;Fluid pressure drive device is connected with electric control system;It is U-shaped that one is provided with the rail tunnel inwall of the hinge page side Groove, the fluid pressure drive device is provided with the U-shaped groove, and the fluid pressure drive device includes base, hydraulic cylinder, first Actuating arm, the second actuating arm, rotating shaft and support arm, the base are arranged among U-shaped groove, are connected with described turn thereon Axle, multiple first actuating arms are connected to from bottom to up in the rotating shaft, each first actuating arm also passes through bearing pin water Flat to be rotatably connected to second actuating arm, the end of second actuating arm is also connected with being provided with a fixed plate, the fixation Plate is fixedly installed on the door leaf centre position;Multiple support arms, the multiple branch are also socketed with the rotating shaft from bottom to up The other end of brace is fixedly installed with rail tunnel inwall;Hydraulic cylinder is additionally provided with the base, the hydraulic cylinder One end is rotated and is arranged on the base, and one end of the first actuating arm described in the other end of the hydraulic cylinder and bottom, which rotates, to be connected Connect;The hydraulic cylinder connects the electric control system.
Further, positioning buffer unit is additionally provided with the U-shaped groove, the positioning buffering after being opened for door leaf.
Further, the bottom of the doorframe is additionally provided with gutter flashboard.
Further, first actuating arm and the second actuating arm be horizontal parallel set three.
Further, the blocking mechanism includes reductor and multiple locking heads;The decelerator is provided with housing, shell Worm gear is provided with vivo, handwheel is connected by worm and wheel, and worm gear is connected with the leading screw being vertically arranged, above and below leading screw Both ends are connected with vertical connecting rod A, and vertical connecting rod A overlaps with the central lines of track of rail tunnel, are set on the vertical connecting rod A Multiple articulated elements are equipped with, articulated elements both sides pass sequentially through triangle pivoted arm respectively and one end of waling stripe is hinged, and the level is even The other end of bar is fixedly connected with vertical connecting rod B, and the vertical connecting rod B is horizontally disposed with from top to bottom to be had in multiple connection latch receptacles Locking head;The waling stripe is three rows that upper, middle and lower or so be arranged in parallel, in the waling stripe at left and right sides of top Between be also hinged with transfer link vertically, the transfer link vertically connects the locking head in latch receptacles;The water that bottom is set Sealed beam elevating mechanism is also vertically arranged among flat connecting rod, the sealed beam elevating mechanism bottom is connected with sealed beam, described Multiple locking heads are connected with sealed beam;The linear motion of the leading screw can pass through vertical connecting rod A, triangle pivoted arm, level The linkage of connecting rod, vertical connecting rod B, transfer link, sealed beam elevating mechanism drives locking head to do linearly operating;Locking head inserts door Corresponding to frame in lockhole;Also it is arranged with the vertical connecting rod A, waling stripe guide locating device provided;In the handwheel of blocking mechanism The heart is additionally provided with gear, and gear is connected by chain with hydraulic motor, hydraulic motor and motor connection.
Further, 5 locking heads are set respectively at left and right sides of the door leaf, it is upper and lower that 2 and 3 locking heads are set respectively.
Further, 8 locking heads are set respectively at left and right sides of the door leaf, it is upper and lower that 4 locking heads are set respectively.
Further, the hinge page includes free bearing, loading arm, vertical shaft, door leaf free bearing, and vertical shaft, vertical shaft are provided with free bearing Flap and door leaf free bearing are connected between door leaf, load backing plate, load backing plate and door leaf are additionally provided with the vertical shaft Between be also connected with being provided with loading arm, the flap is socketed on vertical shaft.
Further, it is additionally provided with sealing strip between the door leaf and doorframe.
Further, the sealing strip is sponge rubber;The door leaf size is width × height=6000mm × 6500mm.
Relative to prior art, the invention has the advantages that:
The vertically rotary flood and preventive protective airtight partition door preferably solves track traffic large space vertical rotary type sealed door to sky Between and deadweight and hydraulic pressure door closing force requirement so that fluid pressure drive device can be opened and closed synchronously, it is therefore prevented that sealed door Upper and lower driving force difference causes the generation of unbalance stress problem, has preferable application prospect.
Brief description of the drawings:
Fig. 1 is rail rapid transit engineering hydraulic vertical rotary flood and preventive airtight blast door elevational schematic view of the present invention;
Fig. 2 is Fig. 1 A-A profiles;
Fig. 3 is Fig. 1 B-B profiles.
Embodiment
The present invention is further described with reference to embodiment.
As Figure 1-3, a kind of rail rapid transit engineering hydraulic vertical rotary flood and preventive airtight blast door of the invention, including Door leaf 1, doorframe 2, hinge page 3, blocking mechanism, fluid pressure drive device and electric control system 4.Wherein, doorframe 1 is arranged at track On traffic tunnel inwall, the size of door leaf 1 is width × height=6000mm × 6500mm, and it is connected by hinge page 3 and the doorframe 2 of side Connect, the side of door leaf 1 is additionally provided with blocking mechanism, and door leaf 1 is connected with fluid pressure drive device.Fluid pressure drive device and electrical control system The connection of system 4.A U-shaped groove 5 is provided with the rail tunnel inwall of the side of hinge page 3, hydraulic pressure drive is provided with U-shaped groove 5 Dynamic device and positioning buffer unit 13, the positioning buffering after being opened for door leaf 1.Fluid pressure drive device includes base 6, hydraulic pressure Cylinder 7, the first actuating arm 8, the second actuating arm 9, rotating shaft 10 and support arm 11.Base 6 is arranged among U-shaped groove 5, is connected thereon Rotating shaft 10 is connected to, is connected to multiple first actuating arms 8 in rotating shaft 10 from bottom to up.Each first actuating arm 8 also passes through pin Axle, which horizontally rotates, is connected with the second actuating arm 9.First actuating arm 8 and the second actuating arm 9 are three that horizontal parallel is set. The end of second actuating arm 9 is also connected with being provided with a fixed plate 12.Fixed plate 12 is fixedly installed on the centre position of door leaf 1.Rotating shaft Multiple support arms 11 are also socketed with 10 from bottom to up, the other end of multiple support arms 11 is fixed with rail tunnel inwall to be set Put.Hydraulic cylinder 7 is additionally provided with base 6, one end of hydraulic cylinder 7, which rotates, to be arranged on base 6, the other end of hydraulic cylinder 7 and bottom One end rotation connection of the first actuating arm of portion 8.Hydraulic cylinder 7 connects electric control system 4.The bottom of doorframe 2 is additionally provided with draining Ditch flashboard 14.
Blocking mechanism includes decelerator 15 and multiple locking heads 16;Decelerator 15 is provided with housing, is provided with housing Worm gear, handwheel 17 are connected by worm and wheel, and worm gear is connected with the leading screw 18 being vertically arranged, the upper and lower ends of leading screw 18 Vertical connecting rod A19 is connected with, vertical connecting rod A19 overlaps with the central lines of track of rail tunnel, is set on vertical connecting rod A19 There are multiple articulated elements 20, the both sides of articulated elements 20 pass sequentially through triangle pivoted arm 21 respectively and one end of waling stripe 22 is hinged, horizontal The other end of connecting rod 22 is fixedly connected with vertical connecting rod B23, and vertical connecting rod B23 is horizontally disposed with from top to bottom multiple connection latch receptacles Interior locking head 16.Waling stripe 22 is three rows that upper, middle and lower or so be arranged in parallel, the waling stripe 22 at left and right sides of top Centre is also hinged with transfer link 24 vertically, and transfer link 24 vertically connects the locking head 16 in latch receptacles.The water that bottom is set Sealed beam elevating mechanism 25 is also vertically arranged among flat connecting rod 22, the bottom of sealed beam elevating mechanism 25 is connected with sealed beam 26, Multiple locking heads 16 are connected with sealed beam 26;The linear motion of leading screw 18 can pass through vertical connecting rod A19, triangle pivoted arm 21st, the linkage of waling stripe 22, vertical connecting rod B23, transfer link 24, sealed beam elevating mechanism 25 drives locking head 16 to do straight line Action;Locking head 16 is inserted corresponding to doorframe 2 in lockhole;Guide-localization dress is also arranged with vertical connecting rod A19, waling stripe 22 Put 27.The left and right sides of door leaf 1 of the present embodiment sets 5 locking heads 16 respectively, it is upper and lower set respectively 2 and 3 locking heads 16 or The left and right sides of person's door leaf 1 sets 8 locking heads 16 respectively, upper and lower to set 4 locking heads 16 respectively.
Hinge page 3 includes free bearing 28, loading arm 29, vertical shaft 30, door leaf free bearing 31, and vertical shaft 30, vertical shaft are provided with free bearing 31 Flap 32 and door leaf free bearing 31 are connected between 30 and door leaf 1, is additionally provided with load backing plate on vertical shaft 30, load backing plate with It is also connected with being provided with loading arm 29 between door leaf 1, flap 32 is socketed on vertical shaft 30.
The handwheel center of blocking mechanism is additionally provided with gear, and gear is connected by chain with hydraulic motor 38, hydraulic motor 38 with motor connection (not shown).Motor driven hydraulic motor 38, hydraulic motor 38 are driven by chain and gear drive Blocking mechanism makes the fitting doorframe 2 of door leaf 1 realize flood protection airtight function.
Sealing strip 34 is additionally provided between the door leaf 1 and doorframe 2 of the present invention, sealing strip 34 is sponge rubber.
Embodiment above is only that the preferred embodiment of the present invention is described, and not the scope of the present invention is entered Row limits, and on the premise of design spirit of the present invention is not departed from, those of ordinary skill in the art make to technical scheme The various modifications gone out and improvement, it all should fall into the protection domain of claims of the present invention determination.

Claims (10)

1. rail rapid transit engineering hydraulic vertical rotary flood and preventive airtight blast door, it is characterised in that:Including door leaf (1), doorframe (2), hinge page (3), blocking mechanism, fluid pressure drive device and electric control system (4);Wherein, the doorframe (1) is arranged at rail On road traffic tunnel inwall, the door leaf (1) is connected by hinge page (3) with the doorframe (2) of side, and door leaf (1) side is also Blocking mechanism is provided with, the door leaf (1) is connected with fluid pressure drive device;Fluid pressure drive device connects with electric control system (4) Connect;A U-shaped groove (5) is provided with the rail tunnel inwall of hinge page (3) side, is set in the U-shaped groove (5) There is the fluid pressure drive device, the fluid pressure drive device includes base (6), hydraulic cylinder (7), the first actuating arm (8), the second drive Swing arm (9), rotating shaft (10) and support arm (11), the base (6) are arranged among U-shaped groove (5), are connected with thereon described Rotating shaft (10), multiple first actuating arms (8) are connected to from bottom to up on the rotating shaft (10), each first actuating arm (8) also horizontally rotated by bearing pin and be connected with second actuating arm (9), the end of second actuating arm (9) is also connected with setting A fixed plate (12) is equipped with, the fixed plate (12) is fixedly installed on the door leaf (1) centre position;On the rotating shaft (10) from Under it is supreme be also socketed with multiple support arms (11), the other end of the multiple support arm (11) is fixed with rail tunnel inwall Set;Hydraulic cylinder (7) is additionally provided with the base (6), one end of the hydraulic cylinder (7), which rotates, is arranged at the base (6) On, one end rotation connection of the first actuating arm (8) described in the other end of the hydraulic cylinder (7) and bottom;The hydraulic cylinder (7) is even Connect the electric control system (4).
2. rail rapid transit engineering hydraulic vertical rotary flood and preventive airtight blast door according to claim 1, it is characterised in that: Positioning buffer unit (13) is additionally provided with the U-shaped groove (5), the positioning buffering after being opened for door leaf (1).
3. rail rapid transit engineering hydraulic vertical rotary flood and preventive airtight blast door according to claim 1, it is characterised in that: The bottom of the doorframe (2) is additionally provided with gutter flashboard (14).
4. rail rapid transit engineering hydraulic vertical rotary flood and preventive airtight blast door according to claim 1, it is characterised in that: First actuating arm (8) and the second actuating arm (9) are three that horizontal parallel is set.
5. rail rapid transit engineering hydraulic vertical rotary flood and preventive airtight blast door according to claim 1, it is characterised in that: The blocking mechanism includes decelerator (15) and multiple locking heads (16);The decelerator (15) is provided with housing, in housing Worm gear is provided with, handwheel (17) is connected by worm and wheel, and worm gear is connected with the leading screw (18) being vertically arranged, leading screw (18) upper and lower ends are connected with vertical connecting rod A (19), vertical connecting rod A (19) and the central lines of track weight of rail tunnel Close, be provided with multiple articulated elements (20) on the vertical connecting rod A (19), articulated elements (20) both sides pass sequentially through triangle pivoted arm respectively (21) it is hinged with one end of waling stripe (22), the other end of the waling stripe (22) is fixedly connected with vertical connecting rod B (23), institute State vertical connecting rod B (23) and be horizontally disposed with the locking head (16) having in multiple connection latch receptacles from top to bottom;The waling stripe (22) three rows being be arranged in parallel for upper, middle and lower or so, it is also vertical be hinged among the waling stripe (22) at left and right sides of top There is transfer link (24), the transfer link (24) vertically connects the locking head (16) in latch receptacles;The water that bottom is set Sealed beam elevating mechanism (25) is also vertically arranged among flat connecting rod (22), sealed beam elevating mechanism (25) bottom is connected with Sealed beam (26), multiple locking heads (16) are connected with the sealed beam (26);The linear motion of the leading screw (18) can Pass through vertical connecting rod A (19), triangle pivoted arm (21), waling stripe (22), vertical connecting rod B (23), transfer link (24), sealed beam The linkage of elevating mechanism (25) drives locking head (16) to do linearly operating;Corresponding to locking head (16) insertion doorframe (2) in lockhole; Also it is arranged with guide locating device provided (27) on the vertical connecting rod A (19), waling stripe (22);The handwheel center of blocking mechanism is also Gear is provided with, gear is connected by chain with hydraulic motor (38), hydraulic motor (38) and motor connection.
6. rail rapid transit engineering hydraulic vertical rotary flood and preventive airtight blast door according to claim 5, it is characterised in that: 5 locking heads (16) are set respectively at left and right sides of the door leaf (1), it is upper and lower that 2 and 3 locking heads (16) are set respectively.
7. rail rapid transit engineering hydraulic vertical rotary flood and preventive airtight blast door according to claim 5, it is characterised in that: 8 locking heads (16) are set respectively at left and right sides of the door leaf (1), it is upper and lower that 4 locking heads (16) are set respectively.
8. rail rapid transit engineering hydraulic vertical rotary flood and preventive airtight blast door according to claim 1, it is characterised in that: The hinge page (3) includes free bearing (28), loading arm (29), vertical shaft (30), door leaf free bearing (31), and free bearing is provided with vertical shaft on (31) (30) flap (32) and door leaf free bearing (31), are connected between vertical shaft (30) and door leaf (1), is also set on the vertical shaft (30) Load backing plate is equipped with, is also connected with being provided with loading arm (29) between load backing plate and door leaf (1), the flap (32) is socketed in On vertical shaft (30).
9. rail rapid transit engineering hydraulic vertical rotary flood and preventive airtight blast door according to claim 1, it is characterised in that: Sealing strip (34) is additionally provided between the door leaf (1) and doorframe (2).
10. rail rapid transit engineering hydraulic vertical rotary flood and preventive airtight blast door according to claim 1, its feature exist In:The sealing strip (34) is sponge rubber;The dimension of opening of the door leaf (1) is width × height=6000mm × 6500mm.
CN201710916866.0A 2017-09-30 2017-09-30 Rail rapid transit engineering hydraulic vertical rotary flood and preventive airtight blast door Pending CN107476823A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710916866.0A CN107476823A (en) 2017-09-30 2017-09-30 Rail rapid transit engineering hydraulic vertical rotary flood and preventive airtight blast door

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710916866.0A CN107476823A (en) 2017-09-30 2017-09-30 Rail rapid transit engineering hydraulic vertical rotary flood and preventive airtight blast door

Publications (1)

Publication Number Publication Date
CN107476823A true CN107476823A (en) 2017-12-15

Family

ID=60605694

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710916866.0A Pending CN107476823A (en) 2017-09-30 2017-09-30 Rail rapid transit engineering hydraulic vertical rotary flood and preventive airtight blast door

Country Status (1)

Country Link
CN (1) CN107476823A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107916872A (en) * 2017-12-20 2018-04-17 中国建筑标准设计研究院有限公司 A kind of doorframe structure with safeguard function of convenient construction
CN110295834A (en) * 2018-03-21 2019-10-01 广东袁义人防科技有限公司 A kind of hydraulic control automation airtight blast door
CN113926126A (en) * 2020-07-14 2022-01-14 安徽斯格特信息系统有限公司 Water leakage prevention fire hydrant box for high-rise residence
CN113944509A (en) * 2021-09-14 2022-01-18 广州地铁设计研究院股份有限公司 Full-automatic flood-proof protective airtight door

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101666242A (en) * 2009-09-24 2010-03-10 中国人民解放军总参谋部工程兵第四设计研究院 Hydraulic vertically rotary airtight flood and preventive partition door in metro running
JP2013204328A (en) * 2012-03-29 2013-10-07 Mitsubishi Electric Corp Air conditioner for subway station platform
CA2892348A1 (en) * 2014-05-22 2015-11-22 John J. Breedlove Retainment wall for underground mine and method of construction
CN207363704U (en) * 2017-09-30 2018-05-15 广州地铁设计研究院有限公司 Rail rapid transit engineering hydraulic vertical rotary flood and preventive airtight blast door

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101666242A (en) * 2009-09-24 2010-03-10 中国人民解放军总参谋部工程兵第四设计研究院 Hydraulic vertically rotary airtight flood and preventive partition door in metro running
JP2013204328A (en) * 2012-03-29 2013-10-07 Mitsubishi Electric Corp Air conditioner for subway station platform
CA2892348A1 (en) * 2014-05-22 2015-11-22 John J. Breedlove Retainment wall for underground mine and method of construction
CN207363704U (en) * 2017-09-30 2018-05-15 广州地铁设计研究院有限公司 Rail rapid transit engineering hydraulic vertical rotary flood and preventive airtight blast door

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107916872A (en) * 2017-12-20 2018-04-17 中国建筑标准设计研究院有限公司 A kind of doorframe structure with safeguard function of convenient construction
CN110295834A (en) * 2018-03-21 2019-10-01 广东袁义人防科技有限公司 A kind of hydraulic control automation airtight blast door
CN110295834B (en) * 2018-03-21 2021-01-26 广东袁义人防科技有限公司 Hydraulic control automatic protective airtight door
CN113926126A (en) * 2020-07-14 2022-01-14 安徽斯格特信息系统有限公司 Water leakage prevention fire hydrant box for high-rise residence
CN113944509A (en) * 2021-09-14 2022-01-18 广州地铁设计研究院股份有限公司 Full-automatic flood-proof protective airtight door
CN113944509B (en) * 2021-09-14 2023-05-26 广州地铁设计研究院股份有限公司 Full-automatic flood-proof protective airtight door

Similar Documents

Publication Publication Date Title
CN107476823A (en) Rail rapid transit engineering hydraulic vertical rotary flood and preventive airtight blast door
CN207212409U (en) The manual vertical rotary type protective airtight partition door of rail rapid transit engineering
CN202467522U (en) Slide runner type steel structure protective sealed horizontal plugging plate
CN101666242A (en) Hydraulic vertically rotary airtight flood and preventive partition door in metro running
CN105421976B (en) Buried turnover plate type backwater gate
CN106593234A (en) Flood gate used for subway curved section
CN201599060U (en) Hydraulic vertical-rotatable type anti-submerging protective closed isolation door in metro sections
CN108442338A (en) The arrangement of Hydropower Station Underground formula workshop machine set outlet gate
CN109505493A (en) Double-leaf protective sealed partition door suitable for Subway Tunnel and discrepancy section line
CN207363704U (en) Rail rapid transit engineering hydraulic vertical rotary flood and preventive airtight blast door
CN201250671Y (en) Subway connection section super-wide abnormal flood-proof protective and closed blocking door
CN107559043A (en) The manual vertical rotary type protective airtight partition door of rail rapid transit engineering
WO2016165513A1 (en) Hydraulic lifting weir
CN209457767U (en) Double-leaf protective sealed partition door suitable for Subway Tunnel and discrepancy section line
CN2921256Y (en) Vertical rotary falling antisubmerging protective closed door
CN210768912U (en) Hyperboloid upturning type water-proof gate
CN201071500Y (en) Rotating gate
CN207392153U (en) A kind of collapsible water conservancy gate
CN203248024U (en) Super-large single-door-leaf protection airtight partition door in subway one-tunnel two-track section
CN2750042Y (en) Full automatic waterproof gate
CN208396746U (en) A kind of unidirectional closed protective partition door in section
CN206801401U (en) A kind of pair is opened flood-protection door sealing structure
CN207296725U (en) Subway protection flooding-proof closing door gear
CN113944509A (en) Full-automatic flood-proof protective airtight door
CN208056018U (en) The arrangement of Hydropower Station Underground formula workshop machine set outlet gate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: Room 12A1320, Huabao Building, Haidian District, Beijing 100036

Applicant after: GUANGZHOU METRO DESIGN & RESEARCH INSTITUTE Co.,Ltd.

Address before: Room 12A1320, Huabao Building, Haidian District, Beijing 100036

Applicant before: GUANGZHOU METRO DESIGN & RESEARCH INSTITUTE Co.,Ltd.

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20171215