CN107476794A - A kind of method that high temperature nitrogen increase coal body gas permeability is noted after liquid nitrogen gasification circulation - Google Patents

A kind of method that high temperature nitrogen increase coal body gas permeability is noted after liquid nitrogen gasification circulation Download PDF

Info

Publication number
CN107476794A
CN107476794A CN201710896755.8A CN201710896755A CN107476794A CN 107476794 A CN107476794 A CN 107476794A CN 201710896755 A CN201710896755 A CN 201710896755A CN 107476794 A CN107476794 A CN 107476794A
Authority
CN
China
Prior art keywords
nitrogen
liquid nitrogen
pipe
control valve
coal body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710896755.8A
Other languages
Chinese (zh)
Other versions
CN107476794B (en
Inventor
王圣程
姜慧
禄利刚
殷惠光
张朕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou University of Technology
Original Assignee
Xuzhou University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou University of Technology filed Critical Xuzhou University of Technology
Priority to CN201710896755.8A priority Critical patent/CN107476794B/en
Publication of CN107476794A publication Critical patent/CN107476794A/en
Application granted granted Critical
Publication of CN107476794B publication Critical patent/CN107476794B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/006Production of coal-bed methane

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Chemical & Material Sciences (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

A kind of method that high temperature nitrogen increase coal body gas permeability is noted after being circulated the invention discloses liquid nitrogen gasification, mash gas pumping drilling of being constructed in roadway workface;Magnetized water is injected into mash gas pumping drilling by magnetized water ascending pipe, then magnetized water seepage flow into the coal body around mash gas pumping drilling;Liquid nitrogen in liquid nitrogen container fills liquid nitrogen into mash gas pumping drilling;The magnetized water that liquid nitrogen freezing is penetrated into coal body, and gasify and be changed into nitrogen, make pressure rise in mash gas pumping drilling;The nitrogen to have gasified in mash gas pumping drilling, which enters in nitrogen heating tank, to be collected;Above-mentioned freeze thawing step is repeated, implementing multiple liquid nitrogen gasification to mash gas pumping drilling circulates;Nitrogen heating tank heats to the nitrogen of its internal gathering, makes in high temperature nitrogen injection mash gas pumping drilling, high temperature nitrogen is carried out fracturing to coal body.The present invention first makes coal body produce weakening region, then coal body rupture anti-reflection, so as to shorten the thermal storage time of nitrogen, while is improving the anti-reflection scope to coal body.

Description

A kind of method that high temperature nitrogen increase coal body gas permeability is noted after liquid nitrogen gasification circulation
Technical field
The present invention relates to a kind of method for increasing coal body gas permeability using nitrogen, noted after specifically a kind of liquid nitrogen gasification circulation The method that high temperature nitrogen increases coal body gas permeability.
Background technology
The construction in China coal seam is complicated, and permeability is generally relatively low, and many high methane coal bodies belong to low-permeable coal body.Together When increase with the progressively increasing of coal mining depth, stress, reduce further the gas permeability of coal body.In poor air permeability Mine carries out non-release coal gas and takes out that effect is often all undesirable, and increase coal body gas permeability is particularly important in advance.At present, I Waterpower measure mainly is used during state's increase coal body gas permeability, as hydraulic fracturing, waterpower are cut.Arranged using waterpowerization is anti-reflection Shi Shi, coal body easy argillization after being immersed in water, so as to the Gas Flow passage that results in blockage, and it is limited by the surface tension of water It is anti-reflection to be limited in scope;In addition in the anti-reflection measure of progress waterpowerization, the requirement of coal body initial cracking pressure is at least 25MPa, therefore in height Coal and gas prominent is easily induced under pressure water effect, is efficiently produced to colliery and brings serious potential safety hazard.
The Chinese patent of Application No. 201210056438.2 discloses a kind of nitrogen noted under temperature and pressure coupling The method of gas anti-reflection mash gas extraction, this method act on anti-reflection hole implantation temperature and coupling pressure lower nitrogen, by temperature with The coupling of the lower nitrogen of coupling pressure effect, anti-reflection to coal body progress, concrete principle is that nitrogen presses off the small yardstick crack of coal body, Further expand original closure crack expansion crack in coal body, anti-reflection rear gas can pass through crack passage and discharge coal body, the party Although method will not block Gas Flow passage, during coal body gas permeability is increased, when nitrogen needs the accumulation of heat grown very much Between after can just cause coal fracturing and anti-reflection, in addition its there is also gas injection time is long, anti-reflection the problem of being limited in scope.
The content of the invention
In view of the above-mentioned problems of the prior art, the present invention notes high temperature nitrogen increase after providing a kind of liquid nitrogen gasification circulation The method of coal body gas permeability, coal body is produced weakening region, then coal body rupture it is anti-reflection, so as to not only greatly shorten The thermal storage time of nitrogen simultaneously reduces gas injection time, while effectively improves the anti-reflection scope to coal body.
To achieve these goals, the technical solution adopted by the present invention is:High temperature nitrogen is noted after a kind of liquid nitrogen gasification circulation Increase the method for coal body gas permeability, the nitrogen permeability improvement device of use includes liquid nitrogen container, amount of liquid nitrogen visualizer, the conveying of the first liquid nitrogen absolutely Heat pipe, the first nitrogen reflux pipe, liquid nitrogen surge tank, the second liquid nitrogen conveying heat-insulated pipe, the second control valve, sealing of hole pipe connection, Nitrogen heater, the 3rd control valve, the second nitrogen reflux pipe, high temperature nitrogen ascending pipe, the 4th control valve, triple valve, backflow Mouth connecting tube, magnetized water ascending pipe and the 5th control valve, amount of liquid nitrogen visualizer are fixed on liquid nitrogen container, and the outlet of liquid nitrogen container passes through First liquid nitrogen conveys the inlet communication of heat-insulated pipe and liquid nitrogen surge tank, and the refluxing opening of liquid nitrogen surge tank passes through the first nitrogen reflux pipe Connected with the refluxing opening of liquid nitrogen surge tank, the outlet of liquid nitrogen surge tank conveys heat-insulated pipe and hole sealing tube connection dress by the second liquid nitrogen Put the import with hole sealing tube to be connected, the hole sealing tube is fixed in mash gas pumping drilling by sealing of hole sections, on the tube wall of hole sealing tube Nitrogen reflux mouth and magnetized water inlet are offered, magnetized water inlet connects with one end of magnetized water ascending pipe, nitrogen reflux Mouth is connected by refluxing opening connecting tube with the one of port of triple valve, and two other port of triple valve passes through the second nitrogen respectively Return duct and high temperature nitrogen ascending pipe and the refluxing opening of nitrogen heating tank and the outlet of nitrogen heating tank;First liquid nitrogen conveys Heat-insulated pipe is provided with the first control valve, and the second liquid nitrogen conveying heat-insulated pipe is provided with the second control valve, the second nitrogen reflux Guan Shangshe There is the 3rd control valve, high temperature nitrogen ascending pipe is provided with the 4th control valve, and magnetized water filling line is provided with the 5th control valve;Its Concretely comprising the following steps during work:
A, according to the mash gas pumping drilling that coal body tendency construction is downward in roadway workface;
B, mash gas pumping drilling is sealed using High-Pressure Grouting Method and hole sealing tube is set, the hole sealing tube is that liquid nitrogen is defeated Send dedicated pipe;
C, the 5th control valve is opened, magnetized water is injected into mash gas pumping drilling by magnetized water ascending pipe and hole sealing tube, The injection pressure of magnetized water is 2~4MPa, and the duration is 1~2h, and then magnetized water is to the coal body around mash gas pumping drilling Interior seepage flow;
D, the 5th control valve is closed, 6~8h is stood, then opens the first control valve and the second control valve, in liquid nitrogen container Liquid nitrogen conveys heat-insulated pipe, liquid nitrogen surge tank, the second liquid nitrogen through the first liquid nitrogen and conveys heat-insulated pipe, sealing of hole pipe connection and hole sealing tube Liquid nitrogen is injected into mash gas pumping drilling, until filling;
E, the first control valve and the second control valve are closed, stands 2~3h, makes to form relative closure in mash gas pumping drilling Space, the magnetized water that liquid nitrogen freezing is penetrated into coal body, and a part of liquid nitrogen is changed into nitrogen through gasification, makes mash gas pumping drilling Interior pressure rise;
F, the 3rd control valve is opened, the nitrogen for making to have gasified in mash gas pumping drilling connects through nitrogen reflux mouth, refluxing opening Pipe, triple valve and the second nitrogen reflux pipe enter in nitrogen heating tank, until after the liquid nitrogen in mash gas pumping drilling is gasified totally Close the 3rd control valve;
G, repeat step D~F, multiple liquid nitrogen gasification is implemented to mash gas pumping drilling and circulated, so that coal body forms reduction Area;
H, nitrogen heating tank heats to the nitrogen of its internal gathering, the heating-up temperature of nitrogen is reached 60~100 DEG C High temperature nitrogen, then open the 4th control valve, make high temperature nitrogen through high temperature nitrogen ascending pipe, triple valve and hole sealing tube injection watt In this extraction borehole, the weakening region that high temperature nitrogen is formed to coal body is carried out fracturing, be finally reached the gas permeability of increase coal body.
Further, the liquid nitrogen gasification cycle-index of the step G is 4~8 times.
Further, the first liquid nitrogen conveying heat-insulated pipe is provided with the first non-return valve, and it is inverse that the first nitrogen reflux pipe is provided with second Only valve, the second nitrogen reflux pipe are provided with the 3rd non-return valve, and high temperature nitrogen ascending pipe is provided with the 4th non-return valve.
Compared with prior art, the present invention is finally noted using first injecting magnetized water and then carrying out multiple liquid nitrogen gasification circulation Enter high temperature nitrogen and fracturing is carried out to coal body;Because the scope that the more conventional water of magnetized water spreads in coal is big, therefore inject magnetized water Make the water absorption rate of coal body high, the freezing range for being subsequently implanted into liquid nitrogen is greatly improved, and after coal body is due to water suction glaciation, Make its expansion rate bigger, be favorably improved coal body freeze thawing fracturing effect;Coal seam arrangement under to mash gas pumping drilling, liquid nitrogen lean on from Body gravity is flowed into drilling, it is ensured that and liquid nitrogen can fill up whole mash gas pumping drilling, and as the gasification of liquid nitrogen, nitrogen are taken out to gas It is mobile outside borehole, it is easy to the collection of nitrogen.Then due to magnetized water heat release Cheng Bing, now liquid nitrogen endothermic gasification is changed into nitrogen Gas, make pressure rise in mash gas pumping drilling, accelerate seepage flow of the liquid nitrogen in coal body, increase the freezing range of coal body;In more not good liquors Under nitrogen ringing, coal body macroscopic view crack is promoted to develop by the congelation of coal body and the expansion of magnetization water freezing Link up and micro-pore opens development, so as to form coal body weakening region.Then high temperature nitrogen, fracturing pin are injected to coal body weakening region Strong to property, coal body fracturing effect is good, and gas permeability increasing degree is big, can effectively improve coal bed gas extraction effect;High temperature nitrogen is also Thermal source can be provided for gasresolution, accelerate the parsing speed of gas, be easy to gas high concentration, big flow extraction.The nitrogen of collection It is changed into high temperature nitrogen through heating device, realizes recycling for liquid nitrogen, it is simple and convenient without being additionally provided source nitrogen again.Should Method not only efficiently solves the problem that the anti-reflection scope of lower permeability seam is small, antireflective effect is poor, moreover it is possible to improves gas extraction concentration And accelerate low-air-permeability coal-bed gas extraction speed, there is wide applicability.
Brief description of the drawings
Fig. 1 is the structural representation after present invention assembling.
In figure:1st, liquid nitrogen container;2nd, amount of liquid nitrogen visualizer;3rd, the first liquid nitrogen conveying heat-insulated pipe;4th, the first control valve;5th, first Non-return valve;6th, the first nitrogen reflux pipe;7th, the second non-return valve;8th, liquid nitrogen surge tank;9th, the second liquid nitrogen conveying heat-insulated pipe;10th, Two control valves;11st, sealing of hole pipe connection;12nd, nitrogen heating tank;13rd, the 3rd control valve;14th, the 3rd non-return valve;15th, second Nitrogen reflux pipe;16th, high temperature nitrogen ascending pipe;17th, the 4th control valve;18th, the 4th non-return valve;19th, nitrogen reflux mouth;20th, three Port valve;21st, refluxing opening attachment means;22nd, magnetized water ascending pipe;23rd, the 5th control valve;24th, hole sealing tube;25th, sealing of hole sections;26、 Mash gas pumping drilling;27th, coal body.
Embodiment
The invention will be further described below.
As shown in figure 1, the method for high temperature nitrogen increase coal body gas permeability, the nitrogen of use are noted after a kind of liquid nitrogen gasification circulation Permeability improvement device includes liquid nitrogen container 1, amount of liquid nitrogen visualizer 2, the first liquid nitrogen conveying heat-insulated pipe 3, the first nitrogen reflux pipe 6, liquid nitrogen and delayed Tank 8, the second liquid nitrogen conveying heat-insulated pipe 9, the second control valve 10, sealing of hole pipe connection 11, nitrogen heater the 12, the 3rd is rushed to control Valve 13 processed, the second nitrogen reflux pipe 15, high temperature nitrogen ascending pipe 16, the 4th control valve 17, triple valve 20, refluxing opening connecting tube 21st, the control valve 23 of magnetized water ascending pipe 22 and the 5th, amount of liquid nitrogen visualizer 2 are fixed on liquid nitrogen container 1, and the outlet of liquid nitrogen container 1 leads to The inlet communication of the first liquid nitrogen conveying heat-insulated pipe 3 and liquid nitrogen surge tank 8 is crossed, the refluxing opening of liquid nitrogen surge tank 8 passes through the first nitrogen Return duct 6 connects with the refluxing opening of liquid nitrogen surge tank 8, and the outlet of liquid nitrogen surge tank 8 conveys heat-insulated pipe 9 and envelope by the second liquid nitrogen Hole pipe connection 11 is connected with the import of hole sealing tube 24, and the hole sealing tube 24 is fixed on mash gas pumping drilling by sealing of hole sections 25 In 26, nitrogen reflux mouth 19 and magnetized water inlet are offered on the tube wall of hole sealing tube 24, magnetized water inlet is noted with magnetized water Entering one end connection of pipe 22, nitrogen reflux mouth 19 is connected by refluxing opening connecting tube 21 with 20 one of port of triple valve, and three Two other port of port valve 20 passes through the second nitrogen reflux pipe 15 and high temperature nitrogen ascending pipe 16 and nitrogen heating tank 12 respectively The outlet of refluxing opening and nitrogen heating tank 12;First liquid nitrogen conveying heat-insulated pipe 3 is provided with the first control valve 4, the second liquid nitrogen Conveying heat-insulated pipe 9 is provided with the second control valve 10, and the second nitrogen reflux pipe 15 is provided with the 3rd control valve 13, high temperature nitrogen injection Pipe 16 is provided with the 4th control valve 17, and magnetized water ascending pipe 22 is provided with the 5th control valve 23;Concretely comprising the following steps during its work:
A, according to the mash gas pumping drilling 26 that coal body tendency construction is downward in roadway workface;
B, mash gas pumping drilling 26 is sealed using High-Pressure Grouting Method and hole sealing tube 24 is set, the hole sealing tube 24 is Liquid nitrogen conveys dedicated pipe;
C, the 5th control valve 23 is opened, is injected by magnetized water ascending pipe 22 and hole sealing tube 24 into mash gas pumping drilling 26 Magnetized water, the injection pressure of magnetized water is 2~4MPa, and the duration is 1~2h, and then magnetized water was to mash gas pumping drilling 26 weeks Seepage flow in the coal body enclosed;Percolation flow velocity of the magnetized water compared to conventional water in coal body 27 is fast, and penetration range is wide;
D, the 5th control valve 23 is closed, 6~8h is stood, then opens the first control valve 4 and the second control valve 10, liquid nitrogen container Liquid nitrogen in 1 conveys heat-insulated pipe 3, liquid nitrogen surge tank 8, the second liquid nitrogen through the first liquid nitrogen and conveys heat-insulated pipe 9, sealing of hole pipe connection 11 and hole sealing tube 24 inject liquid nitrogen into mash gas pumping drilling 26, until fill;The nitrogen of gasification is through the in the liquid nitrogen surge tank 8 One nitrogen reflux pipe 6 and the second non-return valve 7 pass back into liquid nitrogen container 1, so as to balance the air pressure of liquid nitrogen container 1 and liquid nitrogen surge tank 8, Be advantageous to accelerate liquid nitrogen injection rate;
E, the first control valve 4 and the second control valve 10 are closed, stands 2~3h, makes to be formed relatively in mash gas pumping drilling 26 The space of closing, the magnetized water that liquid nitrogen freezing is penetrated into coal body 27, and a part of liquid nitrogen is changed into nitrogen through gasification, makes gas Pressure rise in extraction borehole 26;So as to accelerate seepage flow of the liquid nitrogen in coal body 27, and increase the freezing range of coal body 27;
F, the 3rd control valve 13 is opened, the nitrogen for making to have gasified in mash gas pumping drilling 26 is through nitrogen reflux mouth 19, backflow Mouth connecting tube 21, the nitrogen reflux pipe 15 of triple valve 20 and second enter in nitrogen heating tank 12, until in mash gas pumping drilling 26 Liquid nitrogen be gasified totally after close the 3rd control valve 13;
G, repeat step D~F, multiple liquid nitrogen gasification circulation is implemented to mash gas pumping drilling 26, so that coal body 27 is formed Weakening region;As liquid nitrogen is used up during being circulated, then liquid nitrogen is supplemented by way of changing liquid nitrogen container 1;
H, nitrogen heating tank 12 heats to the nitrogen of its internal gathering, the heating-up temperature of nitrogen is reached 60~100 DEG C high temperature nitrogen, then open the 4th control valve 17, make high temperature nitrogen through high temperature nitrogen ascending pipe 16, triple valve 20 and sealing of hole Pipe 24 is injected in mash gas pumping drilling 26, the weakening region that high temperature nitrogen is formed to coal body 27 is carried out fracturing, is finally reached increase The gas permeability of coal body 27.
Further, the liquid nitrogen gasification cycle-index of the step G is 4~8 times.Using the cycle-index of this scope, both The excessive Frozen-thawed cycled time will not be increased, and coal body 27 produces preferable weakening region after can ensureing Frozen-thawed cycled, so as to just Fracturing in subsequent high temperature nitrogen to weakening region, finally make the fracturing effect of coal body 27 good, the gas permeability increasing degree of coal body 27 Greatly.
Further, the first liquid nitrogen conveying heat-insulated pipe 3 is provided with the first non-return valve 5, and the first nitrogen reflux pipe 6 is provided with second Non-return valve 7, the second nitrogen reflux pipe 15 are provided with the 3rd non-return valve 14, and high temperature nitrogen ascending pipe 16 is provided with the 4th non-return valve 18.Set multiple non-return valves to prevent the backflow of liquid nitrogen or nitrogen in above-mentioned pipeline, improve the injection effect of liquid nitrogen or nitrogen.

Claims (3)

1. the method for high temperature nitrogen increase coal body gas permeability is noted after a kind of liquid nitrogen gasification circulation, it is characterised in that the nitrogen of use Permeability improvement device includes liquid nitrogen container (1), amount of liquid nitrogen visualizer (2), the first liquid nitrogen conveying heat-insulated pipe (3), the first nitrogen reflux pipe (6), liquid nitrogen surge tank (8), the second liquid nitrogen conveying heat-insulated pipe (9), the second control valve (10), sealing of hole pipe connection (11), nitrogen Gas heater (12), the 3rd control valve (13), the second nitrogen reflux pipe (15), high temperature nitrogen ascending pipe (16), the 4th control Valve (17), triple valve (20), refluxing opening connecting tube (21), magnetized water ascending pipe (22) and the 5th control valve (23), amount of liquid nitrogen are seen Survey instrument (2) to be fixed on liquid nitrogen container (1), the outlet of liquid nitrogen container (1) conveys heat-insulated pipe (3) and liquid nitrogen surge tank by the first liquid nitrogen (8) inlet communication, the refluxing opening of liquid nitrogen surge tank (8) pass through the backflow of the first nitrogen reflux pipe (6) and liquid nitrogen surge tank (8) Mouth connection, the outlet of liquid nitrogen surge tank (8) pass through the second liquid nitrogen and convey heat-insulated pipe (9) and sealing of hole pipe connection (11) and sealing of hole The import connection of (24) is managed, the hole sealing tube (24) is fixed in mash gas pumping drilling (26) by sealing of hole sections (25), hole sealing tube (24) nitrogen reflux mouth (19) and magnetized water inlet, magnetized water inlet and magnetized water ascending pipe (22) are offered on tube wall One end connection, nitrogen reflux mouth (19) connected by refluxing opening connecting tube (21) with triple valve (20) one of port, three Heated respectively by the second nitrogen reflux pipe (15) and high temperature nitrogen ascending pipe (16) with nitrogen port valve (20) two other port The refluxing opening of tank (12) and the outlet of nitrogen heating tank (12);First liquid nitrogen conveying heat-insulated pipe (3) is provided with the first control Valve (4), the second liquid nitrogen conveying heat-insulated pipe (9) are provided with the second control valve (10), and the second nitrogen reflux pipe (15) is provided with the 3rd Control valve (13), high temperature nitrogen ascending pipe (16) are provided with the 4th control valve (17), and magnetized water ascending pipe (22) is provided with the 5th Control valve (23);Concretely comprising the following steps during its work:
A, according to the mash gas pumping drilling (26) that coal body tendency construction is downward in roadway workface;
B, mash gas pumping drilling (26) is sealed using High-Pressure Grouting Method and hole sealing tube (24) is set;
C, the 5th control valve (23) is opened, by magnetized water ascending pipe (22) and hole sealing tube (24) into mash gas pumping drilling (26) Magnetized water is injected, the injection pressure of magnetized water is 2~4MPa, and the duration is 1~2h, and then magnetized water is to mash gas pumping drilling (26) seepage flow in the coal body around;
D, the 5th control valve (23) is closed, 6~8h is stood, then opens the first control valve (4) and the second control valve (10), liquid nitrogen Liquid nitrogen in tank (1) conveys heat-insulated pipe (3), liquid nitrogen surge tank (8), the second liquid nitrogen through the first liquid nitrogen and conveys heat-insulated pipe (9), sealing of hole Pipe connection (11) and hole sealing tube (24) the injection liquid nitrogen into mash gas pumping drilling (26), until filling;
E, the first control valve (4) and the second control valve (10) are closed, stands 2~3h, makes to form phase in mash gas pumping drilling (26) The magnetized water penetrated into the space of closing, liquid nitrogen freezing in coal body (27), and a part of liquid nitrogen is changed into nitrogen through gasification, makes Mash gas pumping drilling (26) interior pressure rise;
F, the 3rd control valve (13) is opened, makes the interior nitrogen to have gasified of mash gas pumping drilling (26) through nitrogen reflux mouth (19), return Head piece connecting tube (21), triple valve (20) and the second nitrogen reflux pipe (15) enter in nitrogen heating tank (12), until gas is taken out Liquid nitrogen in borehole (26) closes the 3rd control valve (13) after being gasified totally;
G, repeat step D~F, multiple liquid nitrogen gasification is implemented to mash gas pumping drilling (26) and circulated, so that coal body (27) is formed Weakening region;
H, nitrogen heating tank (12) heats to the nitrogen of its internal gathering, the heating-up temperature of nitrogen is reached 60~100 DEG C High temperature nitrogen, then open the 4th control valve (17), make high temperature nitrogen through high temperature nitrogen ascending pipe (16), triple valve (20) and In hole sealing tube (24) injection mash gas pumping drilling (26), the weakening region that high temperature nitrogen is formed to coal body (27) is set to carry out fracturing, most Reach the gas permeability of increase coal body (27) eventually.
2. noting the method for high temperature nitrogen increase coal body gas permeability after liquid nitrogen gasification circulation according to claim 1, its feature exists In the liquid nitrogen gasification cycle-index of the step G is 4~8 times.
3. noting the method for high temperature nitrogen increase coal body gas permeability after liquid nitrogen gasification circulation according to claim 1, its feature exists In the first liquid nitrogen conveying heat-insulated pipe (3) is provided with the first non-return valve (5), and the first nitrogen reflux pipe (6) is provided with the second non-return valve (7), the second nitrogen reflux pipe (15) is provided with the 3rd non-return valve (14), and high temperature nitrogen ascending pipe (16) is provided with the 4th non-return valve (18)。
CN201710896755.8A 2017-09-28 2017-09-28 Note high temperature nitrogen increases the method for coal body gas permeability after a kind of liquid nitrogen gasification circulation Active CN107476794B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710896755.8A CN107476794B (en) 2017-09-28 2017-09-28 Note high temperature nitrogen increases the method for coal body gas permeability after a kind of liquid nitrogen gasification circulation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710896755.8A CN107476794B (en) 2017-09-28 2017-09-28 Note high temperature nitrogen increases the method for coal body gas permeability after a kind of liquid nitrogen gasification circulation

Publications (2)

Publication Number Publication Date
CN107476794A true CN107476794A (en) 2017-12-15
CN107476794B CN107476794B (en) 2019-05-07

Family

ID=60604875

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710896755.8A Active CN107476794B (en) 2017-09-28 2017-09-28 Note high temperature nitrogen increases the method for coal body gas permeability after a kind of liquid nitrogen gasification circulation

Country Status (1)

Country Link
CN (1) CN107476794B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590740A (en) * 2018-04-25 2018-09-28 中国矿业大学(北京) A kind of magnetized water changes the gas drainage method of gas adsorption structure
CN108756836A (en) * 2018-05-29 2018-11-06 西安科技大学 A kind of underground coal mine fluid injection nitrogen permeability-increasing gas pumping system
CN109779597A (en) * 2019-03-06 2019-05-21 绍兴文理学院 The method and system of rock blast hazard prevention and control is realized using liquid nitrogen reduction coal body
CN109854210A (en) * 2019-03-05 2019-06-07 重庆大学 Using the gas pumping method and extraction system of liquid nitrogen and steam fracturing coal seam
CN110984941A (en) * 2019-11-08 2020-04-10 中国石油大学(华东) Method for liquid carbon dioxide fracturing modification of natural gas hydrate reservoir
CN111119829A (en) * 2019-12-20 2020-05-08 中国矿业大学 Coal bed permeability increasing method utilizing liquid nitrogen cold impact and phase change gas circulation damage
CN112031858A (en) * 2020-10-12 2020-12-04 黑龙江科技大学 Synthesis device for forming gas hydrate in coal bed
CN112412421A (en) * 2020-11-05 2021-02-26 河南理工大学 Method for strengthening pumping promotion by heat injection of cross-layer drilling and hydraulic punching
CN112412415A (en) * 2020-11-05 2021-02-26 河南理工大学 Hydraulic punching, freezing fracturing and heat injection stimulation synergistic permeability-increasing pumping-promoting method
CN112412418A (en) * 2020-11-05 2021-02-26 河南理工大学 Freezing fracturing synergistic hydraulic punching permeability-increasing pumping-promoting method for low-permeability coal seam
CN114607337A (en) * 2022-03-09 2022-06-10 中国石油大学(北京) Liquid nitrogen-water composite fracturing method for coal-bed gas well

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102352768A (en) * 2011-10-19 2012-02-15 中国矿业大学 Gas drainage method and equipment with alternative drainage
CN102562023A (en) * 2012-03-06 2012-07-11 中国矿业大学 System for improving air permeability of coal by using warm-pressing inert gas
US20140124208A1 (en) * 2006-03-03 2014-05-08 Gasfrac Energy Services Inc. Liquified petroleum gas fracturing system
CN105136837A (en) * 2015-07-24 2015-12-09 中国矿业大学 Test system and test method of liquid nitrogen circulation freeze-thawing permeability-increasing simulation of coal rock sample
CN106337672A (en) * 2016-10-25 2017-01-18 中国矿业大学 Method for extracting coal bed gas from circulating pulse type low temperature freeze-thawed anti-reflection coal
CN106968705A (en) * 2017-05-10 2017-07-21 河南理工大学 A kind of hot cold punching of drainage from coal seam drilling breaks up coal permeability improvement device and anti-reflection method
CN107100664A (en) * 2017-05-10 2017-08-29 河南理工大学 A kind of hot cold alternating breaks coal permeability-increasing gas enhanced gas extraction System and method for

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140124208A1 (en) * 2006-03-03 2014-05-08 Gasfrac Energy Services Inc. Liquified petroleum gas fracturing system
CN102352768A (en) * 2011-10-19 2012-02-15 中国矿业大学 Gas drainage method and equipment with alternative drainage
CN102562023A (en) * 2012-03-06 2012-07-11 中国矿业大学 System for improving air permeability of coal by using warm-pressing inert gas
CN105136837A (en) * 2015-07-24 2015-12-09 中国矿业大学 Test system and test method of liquid nitrogen circulation freeze-thawing permeability-increasing simulation of coal rock sample
CN106337672A (en) * 2016-10-25 2017-01-18 中国矿业大学 Method for extracting coal bed gas from circulating pulse type low temperature freeze-thawed anti-reflection coal
CN106968705A (en) * 2017-05-10 2017-07-21 河南理工大学 A kind of hot cold punching of drainage from coal seam drilling breaks up coal permeability improvement device and anti-reflection method
CN107100664A (en) * 2017-05-10 2017-08-29 河南理工大学 A kind of hot cold alternating breaks coal permeability-increasing gas enhanced gas extraction System and method for

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张志强等: "《低渗透煤层气储层循环冻融增透技术研究》", 《煤炭技术》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590740A (en) * 2018-04-25 2018-09-28 中国矿业大学(北京) A kind of magnetized water changes the gas drainage method of gas adsorption structure
CN108756836A (en) * 2018-05-29 2018-11-06 西安科技大学 A kind of underground coal mine fluid injection nitrogen permeability-increasing gas pumping system
CN108756836B (en) * 2018-05-29 2024-01-26 西安科技大学 Coal mine underground liquid nitrogen injection anti-reflection gas extraction system
CN109854210A (en) * 2019-03-05 2019-06-07 重庆大学 Using the gas pumping method and extraction system of liquid nitrogen and steam fracturing coal seam
CN109779597A (en) * 2019-03-06 2019-05-21 绍兴文理学院 The method and system of rock blast hazard prevention and control is realized using liquid nitrogen reduction coal body
CN110984941A (en) * 2019-11-08 2020-04-10 中国石油大学(华东) Method for liquid carbon dioxide fracturing modification of natural gas hydrate reservoir
CN110984941B (en) * 2019-11-08 2022-05-27 中国石油大学(华东) Method for liquid carbon dioxide fracturing modification of natural gas hydrate reservoir
CN111119829B (en) * 2019-12-20 2021-07-23 中国矿业大学 Coal bed permeability increasing method utilizing liquid nitrogen cold impact and phase change gas circulation damage
CN111119829A (en) * 2019-12-20 2020-05-08 中国矿业大学 Coal bed permeability increasing method utilizing liquid nitrogen cold impact and phase change gas circulation damage
CN112031858A (en) * 2020-10-12 2020-12-04 黑龙江科技大学 Synthesis device for forming gas hydrate in coal bed
CN112412418A (en) * 2020-11-05 2021-02-26 河南理工大学 Freezing fracturing synergistic hydraulic punching permeability-increasing pumping-promoting method for low-permeability coal seam
CN112412415A (en) * 2020-11-05 2021-02-26 河南理工大学 Hydraulic punching, freezing fracturing and heat injection stimulation synergistic permeability-increasing pumping-promoting method
CN112412421A (en) * 2020-11-05 2021-02-26 河南理工大学 Method for strengthening pumping promotion by heat injection of cross-layer drilling and hydraulic punching
CN114607337A (en) * 2022-03-09 2022-06-10 中国石油大学(北京) Liquid nitrogen-water composite fracturing method for coal-bed gas well

Also Published As

Publication number Publication date
CN107476794B (en) 2019-05-07

Similar Documents

Publication Publication Date Title
CN107476794A (en) A kind of method that high temperature nitrogen increase coal body gas permeability is noted after liquid nitrogen gasification circulation
CN107762473B (en) A kind of method of liquid nitrogen and high temperature nitrogen Frozen-thawed cycled increase coal body gas permeability
CN108119094B (en) Two-plugging one-injection one-row hole sealing device for deep coal seam gas extraction drilling and use method
CN105822341B (en) A kind of hypotonic anti-reflection system and method for coal seam supercritical carbon dioxide
CN104314508A (en) Hole sealing method for coal bed gas drainage drill hole
CN106988719B (en) Anti-reflection system and anti-reflection method for circularly injecting hot water and liquid nitrogen into coal seam
CN109578059B (en) Underground coal bed gas extraction method and liquid nitrogen flowing frost cracking device used by same
CN109915199A (en) Gas drainage device and its application method are strengthened in anti-reflection coal seam step by step
CN104863555B (en) A kind of method that coal bed gas extraction amount is heated in raising underground
CN211692422U (en) Carbon dioxide injection huff and puff oil extraction ground device for oil field
CN203285410U (en) Steam injection technique pipe capable of improving thickened oil horizontal well horizontal section utilization degree
CN103590801A (en) Coal bed methane horizontal well nitrogen foam fracturing mining technology
CN102094612A (en) Active water fracturing technology of coal-bed gas well
CN106894799A (en) A kind of device and method of utilization supercritical carbon dioxide displacement coal-bed gas
CN112145145A (en) Supercritical carbon dioxide sand-carrying fracturing coal bed device and method
CN112253220A (en) Self-pressurization coal body fracturing permeability-increasing enhanced gas extraction method based on ultrasonic waves
CN108678721A (en) Packaged type hydraulic fracturing and injection hole sealing integrated apparatus and its construction method
CN105370256A (en) Method for increasing wetting radius of high-pressure water injection of low-air-permeability coal seams through sectioned pre-splitting
CN112727535A (en) Liquid CO2Coal body cracking and permeability increasing method with cooperative drilling and water filling
CN109736877A (en) A kind of concordant drilling pipe-following drilling mash gas extraction construction method
CN109322638A (en) A kind of gas drainage-water filling integration grouting with pressure hole sealing device and method
CN104612640A (en) Underground coal mine drilling, heat injection and hole sealing integration method
CN106939766A (en) A kind of hot cold shock three-level breaks device for coal and implementation
CN201144680Y (en) Heavy crude layer separation and selective gas injection integrated pipe column
CN105804691A (en) Pipe-free hole sealing method for mining gas extraction drill hole

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 221018 Jiangsu Province, Xuzhou City Yunlong District No. 2 Lishui Road

Patentee after: Xuzhou University of Technology

Address before: 221000 Jiangsu province Xuzhou Quanshan District South 3rd Ring Rd No. 18 Xuzhou Institute of Technology University of science and Technology Park (Xuzhou City, 2.5 Industrial Park)

Patentee before: Xuzhou University of Technology

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20171215

Assignee: Xuzhou Runyue Network Technology Co.,Ltd.

Assignor: XUZHOU University OF TECHNOLOGY

Contract record no.: X2023320000181

Denomination of invention: A method for increasing coal permeability by injecting high-temperature nitrogen gas after liquid nitrogen gasification cycle

Granted publication date: 20190507

License type: Common License

Record date: 20230731