CN107476257A CN201710914422.3A CN201710914422A CN107476257A CN 107476257 A CN107476257 A CN 107476257A CN 201710914422 A CN201710914422 A CN 201710914422A CN 107476257 A CN107476257 A CN 107476257A
Authority
CN
China
Prior art keywords
flexible water
bladder
water bladder
closure
flexible
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710914422.3A
Other languages
Chinese (zh)
Inventor
潘文安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710914422.3A priority Critical patent/CN107476257A/en
Publication of CN107476257A publication Critical patent/CN107476257A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/16Sealings or joints

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Farming Of Fish And Shellfish (AREA)

Abstract

The invention provides a kind of method for blocking to be joined the two sections of a bridge, etc with water resistance water, the rapid dike breach of closure and cofferdam, includes water body perfusion in flexible water bladder determination of amount, the fixation of flexible water bladder, flexible water bladder, flexible water bladder is mobile and blocks, completes to carry out stacking five steps of closure after closure is dammed at flexible water bladder rear with weights such as building stones in time;Use and dike breach closure is carried out in a manner of water resistance water, it is convenient to draw materials, make use of fill reality after flexible water bladder own wt, and in water it is in half floating state, at the current downstream and breach under the force action of current, flexible water bladder is pushed at dike breach, realize the rapid closure of dike breach, effectively promptly slow down the current at breach, it is applicable to different size, the dike breach of different depth, and its Ba Kou that can also be used in dam construction closes up and stifled stream, use range is wide, convenient material drawing, it is swift to operate, closure is rapid, operating efficiency is high, it is time saving and energy saving.

Description

A kind of dike breach and the method for blocking of cofferdam closure
Technical field
The present invention relates to dykes and dams flood control and dykes and dams to construct technical field, and in particular to a kind of dike breach and cofferdam closure Method for blocking.
Background technology
River course dykes and dams are in flood fighting flood control, because dike breach phenomenon occurs in a variety of causes, to country, society and the people The masses cause serious economic loss, or even entail dangers to people's life safety.Burst occur after, due to each side condition not Together, the method for blocking up of use is also not quite similar, be typically to the closure of breach from dam crest to breach at stack sand pocket, but due to Rapidly, sand pocket or weight are easily washed away dike breach current by current;And the existing device for stacking sand pocket is from a dress Sand pocket place is moved to another place for needing to stack sand pocket, and it is more time-consuming, and needs closely to stack sand pocket, this All it is unpractical in dike breach closure, the method that this closure is burst can cause waste of time, and operating efficiency is low, time-consuming Arduously, exhaust the people and drain the treasury;During construction of hydro project, the closure of confferdam and dyke-dam is a technical barrier, traditional construction method It is that the method for throwing megalith is dammed, it is blocked, and speed is slow, and work consuming is time-consuming, plugging effect is poor.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of with water resistance water, the rapid dike breach of closure and cofferdam conjunction The method for blocking of dragon.
The technical solution adopted for the present invention to solve the technical problems is:A kind of dike breach and the closure side of cofferdam closure Method, comprise the following steps:
Step 1, flexible water bladder determination of amount:According to dike breach depth, flexible water bladder quantity is determined;Determined according to dykes and dams Mouth width, determine the length of flexible water bladder;
The fixation of step 2, flexible water bladder:Flexible water bladder one end is sealed end, and the other end is openend, and flexible water bladder is close End-blocking is fixedly connected on the opening position that current upstream is more than breach width 1/2, and openend is placed in current;
Water body irrigates in step 3, flexible water bladder:It is by the placement direction of flexible water bladder openend and water (flow) direction on the contrary, logical Cross flow action and water body is irrigated into flexible water bladder, water inlet, exhaust outlet are offered on flexible water bladder, is supplemented by water inlet Perfusion water body, the gas in flexible water bladder is discharged by exhaust outlet, until flexible water bladder fills real, the flexible water bladder after filling reality led to Cross sealed piece sealing;
Step 4, flexible water bladder are mobile and block:In flexible water bladder after the completion of water body perfusion, partly swim in current, will be soft Property water pocket openend pushes away embankment, and under the force action of current downstream and breach current, taking advantage of a situation drifts at current downstream, soft Property water pocket drift to current downstream position fix after, flexible water bladder openend is fixed on current downstream position, makes flexibility Water pocket utricule blocks dike breach comprehensively, completes closure and dams;
After step 5, completion closure are dammed, stacking closure is carried out at flexible water bladder rear with weights such as building stones in time, ensured Block continuation.
Further, when flexible water bladder described in step 1 is multiple, multiple flexible water bladders are stacked successively up and down, it is adjacent soft Connected between property water pocket by bindiny mechanism.
Further, when water body is irrigated in step 3 into flexible water bladder, at the same using water pump by water inlet to flexible water bladder Middle perfusion water body.
Further, when irrigating water body into flexible water bladder, the superiors' flexible water bladder water injection rate, which is that flexible water bladder is maximum, to be held The 75-90% of amount, remainder are air, the superiors' flexible water bladder is partly swum in current, when the superiors' flexible water bladder drift Move to after current downstream position fixes, lower floor's flexible water bladder then under the collective effect of gravity and upper strata flexible water bladder buoyancy, Arrange in an overlapping, formed one of waterwall, to prevent to burst or closure at current, reach the purpose dammed.
Further, the bindiny mechanism includes the engaging lug being arranged on flexible water bladder;The engaging lug of adjacent flexible water pocket Set for axially spaced-apart, and axial latch is installed in above-mentioned engaging lug.
Further, sealed piece described in step 3 is stick harness, and the stick harness is connected at flexible water bladder openend.
Further, a diameter of 1~2 meter of the flexible water bladder, length are 100-200 rice.
Compared with prior art, the beneficial effects of the invention are as follows:A kind of dike breach provided by the present invention and cofferdam are closed The method for blocking of dragon, is used and dike breach closure is carried out in a manner of water resistance water, and materials are convenient, make use of flexible water bladder after filling reality Own wt, and be in half floating state in water, at the current downstream and breach under the force action of current, by flexible water bladder It is pushed at dike breach, flexible water bladder utricule is blocked dike breach completely, realizes the rapid closure of dike breach, it is effectively fast Slow down the current at breach fastly, it is applicable to different size, the dike breach of different depth, and it can also be used for dykes and dams and applies Ba Kou in work joins the two sections of a bridge, etc with damming, and use range is wide, convenient material drawing, swift to operate, and closure is rapid, and operating efficiency is high, time saving province Power.
Brief description of the drawings
Fig. 1 is schematic diagram of the present invention;
Fig. 2 is the operating process schematic diagram of the present invention;
Fig. 3 is that flexible water bladder connects schematic cross-section;
Fig. 1 is expressed as to reference shown in Fig. 3:1- flexible water bladders, 2- dike breach, 3- bindiny mechanisms, 4- Water inlet, 5- exhaust outlets, 6- sealed pieces, 101- sealed ends, 102- openends, 31- engaging lugs, 32- axial directions latch.
Embodiment
The present invention is further detailed explanation with reference to the accompanying drawings and examples.
As shown in Figure 1 and Figure 2, a kind of dike breach and the method for blocking of cofferdam closure, comprise the following steps:
Step 1, flexible water bladder determination of amount:According to the depth of dike breach 2, the quantity of flexible water bladder 1 is determined;According to dykes and dams Burst 2 width, determines the length of flexible water bladder 1;
The fixation of step 2, flexible water bladder:The one end of flexible water bladder 1 is sealed end 101, and the other end is openend 102, will be soft Property the sealed end 101 of water pocket 1 be fixedly connected on current upstream be more than breach width 1/2 opening position, openend 102 is placed in current In;
Water body irrigates in step 3, flexible water bladder:By the placement direction and water (flow) direction phase of the openend 102 of flexible water bladder 1 Instead, water body is irrigated into flexible water bladder 1 by flow action, water inlet 4, exhaust outlet 5 is offered on flexible water bladder 1, is passed through The supplement perfusion water body of water inlet 4, the gas in flexible water bladder 1 is discharged by exhaust outlet 5, until flexible water bladder 1 fills real, it is real by filling Flexible water bladder 1 afterwards is sealed by sealed piece 6;
Step 4, flexible water bladder are mobile and block:In flexible water bladder 1 after the completion of water body perfusion, partly swim in current, will The openend 102 of flexible water bladder 1 pushes away embankment, under the force action of current downstream and breach current, takes advantage of a situation and drifts under current Opening position is swum, after flexible water bladder 1 drifts to current downstream position, the openend 102 of flexible water bladder 1 is fixed on current downstream bits Place is put, the utricule of flexible water bladder 1 is blocked dike breach 2 comprehensively, closure is completed and dams;
After step 5, completion closure are dammed, stacking closure is carried out at the rear of flexible water bladder 1 with weights such as building stones in time, ensured Block continuation.
Because the depth of dike breach 2 is different, the breach for different depth, an appropriate number of flexible water bladder 1 is selected, Ensure the complete reliability of closure, described one end of flexible water bladder 1 is sealed end 101, and the sealed end 101 is fixedly connected on current Upstream position, the other end of flexible water bladder 1 are openend 102, and the openend 102 is placed in current, gathered materials on the spot, be easy to Water body is irrigated in flexible water bladder 1, in order to prevent the fixed position of 1 sealed end of flexible water bladder 101 from too causing close to dike breach 2 Flexible water bladder 1 washed away by water impact at breach, the sealed end 101 be fixed on apart from the upstream of dike breach 2 be more than burst The opening position of width 1/2, in order to improve the speed that water body is irrigated into flexible water bladder 1, the openend 102 of flexible water bladder 1 is put Direction and water (flow) direction are put on the contrary, water body is quickly filled into flexible water bladder 1 with certain flow velocity, accelerates the speed poured water, Improve efficiency of construction;In order that flexible water bladder 1 has certain structural strength, improve it and resist the ability of water impact, in institute State and water inlet 4 and exhaust outlet 5 are offered on flexible water bladder 1, when irrigating water body into flexible water bladder 1, supplemented by water inlet 4 Water body is irrigated, by exhaust outlet 5, the residual gas in flexible water bladder 1 is discharged, water body is filled real flexible water bladder 1, is filled after reality again The openend 102 of flexible water bladder 1 is sealed using sealed piece 6, reduce or anti-water-stop body outflow, make flexible water bladder 1 have compared with High intensity;After the completion of water body perfusion in flexible water bladder 1, now flexible water bladder 1 half is swum in current, by flexible water bladder 1 Embankment is pushed away, at the current downstream and breach under the force action of current, flexible water bladder 1, which is taken advantage of a situation, to be drifted at current downstream, soft After property water pocket 1 drifts to current downstream position, the openend 102 of flexible water bladder 1 is fixed on current downstream position, makes flexibility The utricule of water pocket 1 blocks dike breach comprehensively, realizes that closure is dammed, after damming, in time with weights such as building stones at the rear of flexible water bladder 1 Opening position is stacked and blocked, and ensures the continuation of closure.
Because the depth of dike breach 2 is different, also it is not quite similar for the quantitative requirement of flexible water bladder 1, in the present invention, works as flexibility When water pocket 1 is multiple, multiple flexible water bladders are stacked successively about 1, connected between adjacent flexible water pocket 1 by bindiny mechanism 3; The flexible water bladder has certain pliability, when multiple flexible water bladders stack connection successively about 1, adjacent flexible water pocket 1 Between be mutually close to, will not produce larger gap, strengthen dash plugging effect, and the mounted on top of flexible water bladder 1 is set, and is suitable for The dike breach 2 of different depth, use range is wide;Each structure of flexible water bladder 1 is identical, passes through connection between adjacent flexible water pocket 1 Mechanism 3 connects, and by bindiny mechanism 3, ensure that the stability connected between adjacent flexible water pocket 1, is advantageous to strengthen multiple soft The overall construction intensity that property water pocket 1 is stacked together.
In order to accelerate that the speed of water body is irrigated into flexible water bladder 1, strengthen the rigid of flexible water bladder 1, in of the invention, When water body is irrigated into flexible water bladder 1 in step 3, while water body into flexible water bladder 1 is irrigated by water inlet 4 using water pump; High pressure water injection is carried out by water pump, significantly improves the speed that water body irrigates in flexible water bladder 1, flexible water bladder 1 is filled real rapidly, Operating efficiency is improved, enhances the intensity of flexible water bladder 1, strengthens plugging effect.
For the ease of the movement of flexible water bladder 1, in of the invention, when irrigating water body into flexible water bladder 1, the superiors are flexible The water injection rate of water pocket 1 is the 75-90% of the maximum capacity of flexible water bladder 1, and remainder is air, floats the superiors' flexible water bladder 1 half Float in current, after the superiors' flexible water bladder 1, which drifts to current downstream position, to be fixed, lower floor's flexible water bladder then in gravity and Under the collective effect of upper strata flexible water bladder buoyancy, arrange in an overlapping, formed one of waterwall, to prevent to burst or closure at water Stream, reaches purpose of damming.
Magic tape can be selected in the bindiny mechanism 3, rapidly and firm for the ease of the connection between adjacent flexible water pocket 1, In the present invention, bindiny mechanism 3 described in step 1 is connected from engaging lug 31 with axial latch 32, and the bindiny mechanism 3 wraps Include the engaging lug 31 being arranged on flexible water bladder 1;The engaging lug 31 of adjacent flexible water pocket 1 is set for axially spaced-apart, and above-mentioned Axial latch 32 is installed in engaging lug 31;When carrying out the connection of adjacent flexible water pocket 1, only axial latch 32 need to be inserted into phase It can complete to connect on the engaging lug 31 of adjacent flexible water bladder 1, adjacent flexible water pocket 1 is fixedly connected to form integrative-structure, it is grasped Make simply, connection is rapid.
After flexible water bladder 1 fills reality, in order to which anti-water-stop body largely flows out at openend 102, in the present invention, in step 3 The sealed piece 6 is stick harness, and the stick harness is connected at the openend of flexible water bladder 1;When being tightened up to the openend of flexible water bladder 1, Being connected to a part for stick harness on openend 102 can be put in into the openend of flexible water bladder 1, and openend 102 is carried out effectively Sealing blocking, and the part that stick harness does not extend into can be easy to follow-up being fixedly connected in dike breach downstream position of openend 102, It is convenient and swift, it is simple to operate.
For the ease of transport and it is easy to operate, the present invention in, 1 a diameter of 1~2 meter of the flexible water bladder, length 100- 200 meters;The closure of larger breach can be met, and it is readily transported, also can be rapidly by flexible water bladder when carrying out plugging operations 1 opens, easy to operate.
It is above the embodiment of the present invention, from implementation process as can be seen that a kind of dykes and dams provided by the present invention The method for blocking to burst with cofferdam closure, is used and dike breach closure is carried out in a manner of water resistance water, and materials are convenient, make use of filling The own wt of flexible water bladder after reality, and be in half floating state in water, the force action of current at current downstream and breach Under, flexible water bladder is pushed at dike breach, flexible water bladder utricule is blocked dike breach completely, realizes the rapid of dike breach Closure, effectively promptly slows down the current at breach, it is applicable to different size, the dike breach of different depth, and its The Ba Kou that can also be used in dam construction joins the two sections of a bridge, etc with damming, and use range is wide, convenient material drawing, swift to operate, and closure is rapid, work Efficiency high, it is time saving and energy saving.

Claims (7)

1. a kind of dike breach and the method for blocking of cofferdam closure, it is characterised in that comprise the following steps:
Step 1, flexible water bladder determination of amount:According to dike breach (2) depth, flexible water bladder (1) quantity is determined;According to dykes and dams Burst (2) width, determines the length of flexible water bladder (1);
The fixation of step 2, flexible water bladder:Flexible water bladder (1) one end is sealed end (101), and the other end is openend (102), will Flexible water bladder (1) sealed end (101) is fixedly connected on the opening position that current upstream is more than breach width 1/2, and openend (102) are put In current;
Water body irrigates in step 3, flexible water bladder:By flexible water bladder (1) openend (102) placement direction and water (flow) direction on the contrary, Water body is irrigated into flexible water bladder (1) by flow action, water inlet (4), exhaust outlet (5) are offered on flexible water bladder (1), Perfusion water body is supplemented by water inlet (4), the gas in flexible water bladder (1) is discharged by exhaust outlet (5), until flexible water bladder (1) fill real, the flexible water bladder (1) after filling reality is passed through into sealed piece (6) seals;
Step 4, flexible water bladder are mobile and block:In flexible water bladder (1) after the completion of water body perfusion, partly swim in current, will be soft Property water pocket (1) openend (102) pushes away embankment, under the force action of current downstream and breach current, takes advantage of a situation and drifts to current It is after flexible water bladder (1) drifts to current downstream position, flexible water bladder (1) openend (102) is fixed under a stream of water at downstream Opening position is swum, flexible water bladder (1) utricule is blocked dike breach (2) comprehensively, closure is completed and dams;
After step 5, completion closure are dammed, stacking closure is carried out at flexible water bladder (1) rear with weights such as building stones in time, ensures envelope Stifled continuation.
2. a kind of dike breach according to claim 1 and the method for blocking of cofferdam closure, it is characterised in that in step 1 When the flexible water bladder (1) is multiple, multiple flexible water bladders (1) are stacked successively up and down, adjacent flexible water pocket passes through between (1) Bindiny mechanism (3) connects.
3. a kind of dike breach according to claim 1 and the method for blocking of cofferdam closure, it is characterised in that in step 3 Into flexible water bladder (1) during perfusion water body, while water body is irrigated into flexible water bladder (1) by water inlet (4) using water pump.
4. a kind of dike breach according to claim 2 and the method for blocking of cofferdam closure, it is characterised in that to flexibility In water pocket (1) during perfusion water body, the superiors' flexible water bladder (1) water injection rate is the 75-90% of flexible water bladder (1) maximum capacity, its Remaining part is divided into air, the superiors' flexible water bladder (1) is partly swum in current, when the superiors' flexible water bladder (1) drifts to current After downstream position is fixed, lower floor's flexible water bladder then under the collective effect of gravity and upper strata flexible water bladder buoyancy, is arranged in an overlapping Row, formed one of waterwall, to prevent to burst or closure at current, reach purpose of damming.
5. a kind of dike breach according to claim 2 and the method for blocking of cofferdam closure, it is characterised in that the connection Mechanism (3) includes the engaging lug (31) being arranged on flexible water bladder (1);The engaging lug (31) of adjacent flexible water pocket (1) is axially It is arranged at intervals, and axial latch (32) is installed in above-mentioned engaging lug (31).
6. a kind of dike breach according to claim 1 and the method for blocking of cofferdam closure, it is characterised in that in step 3 The sealed piece (6) is stick harness, and the stick harness is connected at flexible water bladder (1) openend.
7. a kind of dike breach according to claim 4 and the method for blocking of cofferdam closure, it is characterised in that the flexibility A diameter of 1~2 meter of water pocket (1), length are 100-200 rice.
CN201710914422.3A 2017-09-30 2017-09-30 A kind of dike breach and the method for blocking of cofferdam closure Pending CN107476257A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710914422.3A CN107476257A (en) 2017-09-30 2017-09-30 A kind of dike breach and the method for blocking of cofferdam closure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710914422.3A CN107476257A (en) 2017-09-30 2017-09-30 A kind of dike breach and the method for blocking of cofferdam closure

Publications (1)

Publication Number Publication Date
CN107476257A true CN107476257A (en) 2017-12-15

Family

ID=60604856

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710914422.3A Pending CN107476257A (en) 2017-09-30 2017-09-30 A kind of dike breach and the method for blocking of cofferdam closure

Country Status (1)

Country Link
CN (1) CN107476257A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112502093A (en) * 2020-12-25 2021-03-16 浙江省围海建设集团股份有限公司 Sand-filled pipe bag type seawall closure control method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2357039Y (en) * 1999-01-19 2000-01-05 叶平 Damming preventing structure for closing up breach of river dam
CN2434338Y (en) * 1999-10-17 2001-06-13 董禹全 Dam bag
JP2006144294A (en) * 2004-11-17 2006-06-08 Shunichi Oda Floating dam body sheet
CN201103113Y (en) * 2007-10-12 2008-08-20 马曙光 Multifunctional gas bag for fight against flooding
CN101298763A (en) * 2007-04-30 2008-11-05 上海勘测设计研究院 Method for closure of dam
CN106087869A (en) * 2016-08-15 2016-11-09 莫喻然 A kind of flood fighting dykes and dams crevasse quick blocking wall and using method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2357039Y (en) * 1999-01-19 2000-01-05 叶平 Damming preventing structure for closing up breach of river dam
CN2434338Y (en) * 1999-10-17 2001-06-13 董禹全 Dam bag
JP2006144294A (en) * 2004-11-17 2006-06-08 Shunichi Oda Floating dam body sheet
CN101298763A (en) * 2007-04-30 2008-11-05 上海勘测设计研究院 Method for closure of dam
CN201103113Y (en) * 2007-10-12 2008-08-20 马曙光 Multifunctional gas bag for fight against flooding
CN106087869A (en) * 2016-08-15 2016-11-09 莫喻然 A kind of flood fighting dykes and dams crevasse quick blocking wall and using method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112502093A (en) * 2020-12-25 2021-03-16 浙江省围海建设集团股份有限公司 Sand-filled pipe bag type seawall closure control method

Similar Documents

Publication Publication Date Title
CN203129107U (en) Split-flow flow-deflecting energy dissipator
CN101713178B (en) Method for creating three-stage flow passage of meandering riverway in lower Yellow River
CN104480914B (en) The fish pass structure that fish pass combines with ship lock and method
CN107100143A (en) A kind of new energy-dissipating structure of Hydraulic and Hydro-Power Engineering
CN103306250A (en) In-tunnel diversion type cascade hydropower station and construction method thereof
CN207244571U (en) Dike breach and the plugging device of cofferdam closure
CN107740389A (en) A kind of diversion tunnel structure and its plugging construction method
CN107476257A (en) A kind of dike breach and the method for blocking of cofferdam closure
CN203429606U (en) Sediment retaining bank reconstructed from temporary cofferdam
CN109083091A (en) It is a kind of to guarantee that the construction method that do not stop navigation during shutting off is led in cofferdam
CN205296100U (en) Husky equipment is arranged in reservoir segmentation
CN202440787U (en) Riverway diversion device
CN104264636A (en) Technology for using siphons to lower or control barrier lake level
CN206298863U (en) A kind of float-ball type water partition curtain cloth apparatus
CN102322041B (en) Dam-break-preventing and leakage-preventing hydroelectric station dam constructed in canyon and construction method thereof
CN202787190U (en) Frame used in riprap closure method for high flow rate closure gap
CN109098152A (en) A kind of anti-cavitation facility of Stepped Spillway
CN201610539U (en) Lower Yellow River wandering river way three-grade flow path building dam system
CN208604552U (en) For the stake woods dam under complex geological condition
CN105714740B (en) Dyke fast blockage equipment
CN2434338Y (en) Dam bag
CN105603942B (en) Dykes and dams super standard flood flood diversion siphon pipe band
CN101298763B (en) Method for closure of dam
CN210887095U (en) Flood control dam for hydraulic engineering
CN202611980U (en) Water flow-accelerating generating set

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171215