CN107100143A - Novel energy dissipation structure of hydraulic and hydroelectric engineering - Google Patents

Novel energy dissipation structure of hydraulic and hydroelectric engineering Download PDF

Info

Publication number
CN107100143A
CN107100143A CN201710327578.1A CN201710327578A CN107100143A CN 107100143 A CN107100143 A CN 107100143A CN 201710327578 A CN201710327578 A CN 201710327578A CN 107100143 A CN107100143 A CN 107100143A
Authority
CN
China
Prior art keywords
discharge channel
water
discharge
dam
energy dissipation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710327578.1A
Other languages
Chinese (zh)
Other versions
CN107100143B (en
Inventor
张焕敏
王非
孙井沛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xihua University
Original Assignee
Xihua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xihua University filed Critical Xihua University
Priority to CN201910373059.8A priority Critical patent/CN110004891B/en
Priority to CN201710327578.1A priority patent/CN107100143B/en
Publication of CN107100143A publication Critical patent/CN107100143A/en
Application granted granted Critical
Publication of CN107100143B publication Critical patent/CN107100143B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B8/00Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
    • E02B8/06Spillways; Devices for dissipation of energy, e.g. for reducing eddies also for lock or dry-dock gates

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)
  • Hydraulic Turbines (AREA)

Abstract

The invention relates to the technical field of water conservancy and hydropower engineering. Aim at provides the effectual novel energy dissipation structure of hydraulic and hydroelectric engineering of energy dissipation. The adopted technical scheme is as follows: the utility model provides a novel dissipation structure of hydraulic and hydroelectric engineering, is including setting up the earial drainage mouth on dam upper portion, setting up the first earial drainage passageway on dam low reaches side surface, and set up the second earial drainage passageway in dam main part inside. The upper end of the first drainage channel is communicated with the tail end of the drainage port, the bottom of the drainage port is provided with a water diversion port, and the water diversion port is positioned in front of the joint of the first drainage channel and the drainage port. The upper end of the second drainage channel is communicated with a water distribution port, and a flow regulating valve is arranged at the water distribution port. The water outlet of the second discharge channel is positioned below the water outlet of the first discharge channel, and the water flow discharged by the first discharge channel and the water flow discharged by the second discharge channel collide with each other in the air to realize energy dissipation. The invention has excellent energy dissipation effect.

Description

一种水利水电工程的新型消能结构A New Energy Dissipation Structure for Water Conservancy and Hydropower Projects

技术领域technical field

本发明涉及水利水电工程技术领域,具体涉及一种水利水电工程的新型消能结构。The invention relates to the technical field of water conservancy and hydropower engineering, in particular to a novel energy dissipation structure for water conservancy and hydropower engineering.

背景技术Background technique

目前,随着我国山区性河流水力资源的逐步开发,我国水电工程建设事业发展进入了高潮阶段,尤其是在西部山区修建了大量的中小型水电站。天然河道中的水流一般属于缓流,单宽流量沿河宽方向的分布较为均匀。但当河道中修建了坝、闸等泄水建筑后,河道的流动条件发生了巨大的变化,下泄水流流速大、水流能量大,对泄水建筑下游河床具有较大的破坏作用。这个问题在实际工程中如果解决不好,不仅将在下游河床产生严重的冲刷、河道淤积,而且还会造成恶劣的流态,影响水利水电工程中其他建筑物的正常运行,甚至危及大坝安全。因此,采取有效的工程措施,人为地控制泄水建筑物下游水流的衔接与消能,以确保建筑物的安全是十分重要的。水利水电工程的消能结构是一种消除泄水建筑物下泄急流的动能,防止或减轻水流对水工建筑物及其下游河渠的冲刷破坏,并使水流在较短的距离内与下游正常水流取得妥善衔接而修建的工程设施。At present, with the gradual development of hydropower resources in mountainous rivers in my country, the development of hydropower engineering construction in China has entered a climax stage, especially in the western mountainous areas where a large number of small and medium hydropower stations have been built. The water flow in natural rivers is generally a slow flow, and the single-width flow distribution along the river width is relatively uniform. However, when drainage structures such as dams and sluices are built in the river, the flow conditions of the river have undergone tremendous changes, and the flow velocity and energy of the discharged water are large, which has a great destructive effect on the riverbed downstream of the drainage structures. If this problem is not solved in actual engineering, it will not only cause serious erosion and siltation in the downstream riverbed, but also cause bad flow conditions, affect the normal operation of other buildings in water conservancy and hydropower projects, and even endanger the safety of the dam . Therefore, it is very important to take effective engineering measures to artificially control the connection and energy dissipation of the downstream water flow of the drainage structure to ensure the safety of the building. The energy dissipation structure of water conservancy and hydropower projects is a kind of kinetic energy that eliminates the rapid discharge of the discharge structure, prevents or reduces the erosion and damage of the water flow to the hydraulic structure and the downstream canal, and makes the water flow in a short distance from the downstream normal flow. Engineering facilities built for proper connection.

现有的消能结构主要有以下方式:The existing energy dissipation structure mainly has the following methods:

一是在泄水建筑物的下游人工建设消力池,并从泄水建筑物处修建倾斜的护坦与消力池连通。其消能机理是,急流沿护坦排入消力池中,通过在消力池中形成水跃从而将急流转变为缓流。消能主要是通过水跃产生的表面漩滚与底部主流间强烈紊动、剪切和混掺作用来完成。该方式具有流态稳定、消能效果好、对地址条件和喂水变幅适应性强及水流雾化小等优点。但由于护坦长度较长,一方面工程造价高,另一方面建筑物布置的空间不足,尤其是在山区河流修建水电工程时,该情况尤为突出。One is to artificially build a stilling basin downstream of the drainage structure, and build an inclined apron from the drainage building to communicate with the stilling basin. The energy dissipation mechanism is that the rapid flow is discharged into the stilling basin along the apron, and the rapid flow is transformed into a slow flow by forming a hydraulic jump in the stilling basin. Energy dissipation is mainly accomplished through the strong turbulence, shearing and mixing between the surface tumbling generated by the hydraulic jump and the bottom mainstream. This method has the advantages of stable flow state, good energy dissipation effect, strong adaptability to address conditions and water feeding amplitude, and small water atomization. However, due to the long length of the apron, on the one hand, the project cost is high, and on the other hand, the space for building layout is insufficient, especially when hydropower projects are constructed in mountainous rivers, this situation is particularly prominent.

二是在泄水建筑物的末端修建挑流鼻坎,将泄出的高速水流抛向下游离泄水建筑物较远的位置,水流在空中与空气混掺、摩擦下实现消能,水流在落下后在河床上自然冲刷出凹坑,水流在凹坑中形成紊流,再次实现消能。该方式结构简单、工程造价低,目前广泛应用在水利水电工程中。然而该结构仍然存在巨大的缺陷,由于水流在下落的过程中落点较为集中,往往对下游落点处造成严重的局部冲刷。同时在泄水流量较大、流速较快时,水流高速冲击落点位置,造成落点位置河床下凹严重,极大的改变了河床原貌,增加了流态的不稳定性。同时,在上下游水位落差较大时,水流自身夹带的动能较大,单纯采用挑流消能的方式往往达不到预期的消能效果。The second is to build a bridge at the end of the drainage structure to throw the high-speed water flow downstream far away from the drainage structure. The water flow is mixed with air in the air and under friction to achieve energy dissipation. After falling, a pit is naturally washed out on the river bed, and the water flow forms a turbulent flow in the pit to realize energy dissipation again. This method is simple in structure and low in construction cost, and is currently widely used in water conservancy and hydropower projects. However, there are still huge defects in this structure. Because the water flow is relatively concentrated during the falling process, it often causes serious local erosion to the downstream landing point. At the same time, when the discharge flow rate is large and the flow velocity is fast, the high-speed water flow hits the landing point, causing serious depression of the riverbed at the landing point, which greatly changes the original appearance of the riverbed and increases the instability of the flow regime. At the same time, when the water level difference between the upstream and the downstream is large, the kinetic energy carried by the water flow itself is relatively large, and the simple energy dissipation method of deflecting flow often fails to achieve the expected energy dissipation effect.

发明内容Contents of the invention

本发明的目的在于提供一种消能效果好的水利水电工程的新型消能结构。The purpose of the present invention is to provide a novel energy dissipation structure for water conservancy and hydropower projects with good energy dissipation effect.

为实现上述发明目的,本发明所采用的技术方案是:一种水利水电工程的新型消能结构,包括设置在大坝上部的泄流口、设置在大坝下游一侧表面的第一泄流通道、及设置在大坝主体内部的第二泄流通道。In order to achieve the purpose of the above invention, the technical solution adopted in the present invention is: a new type of energy dissipation structure for water conservancy and hydropower projects, including a discharge port arranged on the upper part of the dam, and a first discharge flow outlet arranged on the surface of the downstream side of the dam. channel, and the second discharge channel arranged inside the main body of the dam.

所述第一泄流通道和第二泄流通道均由大坝的上游侧向下游侧斜向下延伸,所述第一泄流通道的上端与泄流口的末端连通,所述泄流口的底部设置分水口,所述分水口位于第一泄流通道与泄流口连接处的前方。所述第二泄流通道的上端与分水口连通,所述分水口处设置流量调节阀门。所述第二泄流通道的出水口位于第一泄流通道的出水口下方,第二泄流通道的出水口处设置挑流机构。第一泄流通道的出水口处设置导流机构。第一泄流通道排出的水流和第二泄流通道排出的水流在空中相互碰撞实现消能。Both the first discharge channel and the second discharge channel extend obliquely downward from the upstream side of the dam to the downstream side, the upper end of the first discharge channel communicates with the end of the discharge port, and the discharge port A water diversion port is provided at the bottom of the body, and the water diversion port is located in front of the connection between the first discharge channel and the discharge port. The upper end of the second discharge channel communicates with the water diversion port, and a flow regulating valve is arranged at the water diversion port. The water outlet of the second discharge channel is located below the water outlet of the first discharge channel, and a deflecting mechanism is arranged at the water outlet of the second discharge channel. A flow guiding mechanism is arranged at the water outlet of the first discharge channel. The water flow discharged from the first discharge channel and the water flow discharged from the second discharge channel collide with each other in the air to realize energy dissipation.

优选的,所述导流机构包括导流板和调节液压缸,所述导流板与第一泄流通道出水口的下边沿铰接,所述调节液压缸固定设置在导流板下方,且调节液压缸的缸体和伸缩杆均呈以导流板的铰接位置为中心的弧形。Preferably, the deflector mechanism includes a deflector and an adjustment hydraulic cylinder, the deflector is hinged to the lower edge of the water outlet of the first discharge channel, the adjustment hydraulic cylinder is fixedly arranged under the deflector, and adjusted Both the cylinder body and the telescopic rod of the hydraulic cylinder are arc-shaped with the hinge position of the deflector as the center.

优选的,所述第二泄流通道的后段呈向下凸出的弧形,所述挑流机构由第二泄流通道出水口的出水方向斜向上构成。Preferably, the rear section of the second discharge channel is in the shape of an arc protruding downward, and the deflecting mechanism is formed by the water outlet direction of the outlet of the second discharge channel being obliquely upward.

优选的,所述第一泄流通道在垂直方向上的投影呈向大坝一端或另一端凸出的弧形,所述第二泄流通道在垂直方向上的投影呈与第一泄流通道凸出方向相反的弧形。Preferably, the projection of the first discharge channel in the vertical direction is an arc protruding toward one end or the other end of the dam, and the projection of the second discharge channel in the vertical direction is in the same shape as the first discharge channel. Arcs that bulge in opposite directions.

优选的,所述大坝上设置多个泄流组,且每个泄流组包括两个泄流口及与两个泄流口对应的分水口、第一泄流通道和第二泄流通道。每个泄流组内的两条第一泄流通道相邻且在中部相互贯通。Preferably, a plurality of discharge groups are set on the dam, and each discharge group includes two discharge ports and water diversion ports corresponding to the two discharge ports, a first discharge channel and a second discharge channel . The two first discharge passages in each discharge group are adjacent and communicate with each other in the middle.

优选的,所述第一泄流通道内设置多条沿第一泄流通道宽度方向延伸的消力缓冲带,所述消力缓冲带由多根并排布置的截面呈半圆形的消力凸棱构成。Preferably, a plurality of relieving buffer strips extending along the width direction of the first bleed passage are arranged in the first bleed channel, and the relieving buffer strips are composed of a plurality of relieving ribs arranged side by side with a semicircular cross-section constitute.

优选的,所述多条消力缓冲带的尺寸沿水流方向逐渐变大。Preferably, the size of the plurality of force-reducing buffer zones gradually increases along the water flow direction.

优选的,所述每条消力缓冲带上的多根消力凸棱的半径也沿水流方向逐渐变大。Preferably, the radii of the plurality of force-reducing ribs on each force-reducing buffer zone also gradually increase along the direction of water flow.

优选的,还包括设置在大坝下游的消力池,所述消力池位于第一泄流通道排出的水流和第二泄流通道排出的水流碰撞点附近的河床上。所述消力池的截面呈三角形,且由靠近大坝的一端向远离大坝的一端逐渐变浅。Preferably, it also includes a stilling basin arranged downstream of the dam, and the stilling basin is located on the river bed near the collision point of the water flow discharged from the first discharge channel and the water flow discharged from the second discharge channel. The cross-section of the stilling pool is triangular, and gradually becomes shallower from the end close to the dam to the end far away from the dam.

优选的,所述大坝下游还设置有消音洞,所述第一泄流通道排出的水流和第二泄流通道排出的水流碰撞点位于消音洞内。Preferably, a sound-absorbing tunnel is provided downstream of the dam, and the collision point of the water flow discharged from the first discharge channel and the water flow discharged from the second discharge channel is located in the sound-absorbing tunnel.

本发明的有益效果集中体现在:The beneficial effects of the present invention are embodied in:

1、从泄流口处将水流分成两个部分,其中一部分沿第一泄流通道正常排下,另一部分经分水口和第二泄流通道排下,第二泄流通道排出的水流在挑流机构的作用下向上挑起射出,第一泄流通道排出的水流通过导流机构的导向作用与第二泄流通道排出的水流发生碰撞,从而实现消能。本发明和传统的长护坦加消力池的消能结构相比,无需设置长护坦,一方面省去了护坦修筑的空间,适应性强;另一方面节省了大量的工程成本,提高了经济效益。同时和传统的单纯采用挑流消能的方式相比,消能效果也得到显著地提升。具体来说,本发明水流的消能过程主要分为四个阶段:第一阶段,在沿泄流通道下滑的过程中与泄流通道本体发生摩擦进行消能;第二阶段,从出水口排出后还未发生碰撞前,在空中与空气混掺和摩擦进行消能;第三阶段,从第一、第二泄流通道排出的水流在空中相互碰撞、冲击,使水流携带的动能急剧下降;第四阶段,碰撞后水流进一步分散,分散后更加便于与空气混掺和摩擦,使得消能效果进一步提升。因此,本发明的消能效果极好。1. The water flow is divided into two parts from the discharge port, one part is discharged normally along the first discharge channel, and the other part is discharged through the water diversion port and the second discharge channel, and the water flow discharged from the second discharge channel is picked up Under the action of the flow mechanism, the water flow discharged from the first discharge channel collides with the water flow discharged from the second discharge channel through the guiding effect of the flow guide mechanism, thereby realizing energy dissipation. Compared with the energy-dissipating structure of the traditional long apron and stilling pool, the present invention does not need to set up a long apron, on the one hand, it saves the space for apron construction, and has strong adaptability; on the other hand, it saves a lot of engineering costs, Improved economic benefits. At the same time, compared with the traditional method of simply using deflected flow for energy dissipation, the energy dissipation effect has also been significantly improved. Specifically, the energy dissipation process of the water flow in the present invention is mainly divided into four stages: the first stage, in the process of sliding down the discharge channel, friction occurs with the body of the discharge channel to dissipate energy; the second stage, discharge from the outlet Finally, before the collision occurs, energy is dissipated by mixing and friction with air in the air; in the third stage, the water flow discharged from the first and second discharge channels collides and impacts each other in the air, causing the kinetic energy carried by the water flow to drop sharply; In the fourth stage, after the collision, the water flow is further dispersed. After dispersion, it is more convenient to mix and rub with air, which further improves the energy dissipation effect. Therefore, the energy dissipation effect of the present invention is excellent.

2、优选设置的导流机构采用铰接在出水口的导流板与调节液压缸构成,不仅结构简单,且能通过调节液压缸灵活调整导流板的角度,从而在不同的水流压力条件下,第一泄流通道排出的水流均能适应第二泄流通道排出的水流。2. The optimal flow guide mechanism is composed of a guide plate hinged at the water outlet and an adjusting hydraulic cylinder. It is not only simple in structure, but also can flexibly adjust the angle of the guide plate by adjusting the hydraulic cylinder, so that under different water pressure conditions, The water flow discharged from the first discharge channel can adapt to the water flow discharged from the second discharge channel.

3、挑流机构直接由第二泄流通道的一段构成,可将水流的势能直接转换成与第一泄流通道排出的水流相碰撞的动能,简单高效。3. The deflection mechanism is directly composed of a section of the second discharge channel, which can directly convert the potential energy of the water flow into the kinetic energy of colliding with the water flow discharged from the first discharge channel, which is simple and efficient.

4、通过优选设置的消音洞,可以有效的防止水雾扩散,避免工程两侧的岩层受到侵蚀,还可以降低碰撞产生的噪声,起到消音的作用。4. Through the optimized sound-absorbing tunnel, it can effectively prevent the diffusion of water mist, prevent the rock formations on both sides of the project from being eroded, and also reduce the noise generated by collisions to play the role of sound-absorbing.

5、由于第一泄流通道和第二泄流通道的垂直投影呈弧形,一方面可以增强水流在第一泄流通道和第二泄流通道内部流动时摩擦消能,另一方面使得二者射出的水流对冲碰撞的效果更好,进一步提高消能效果。5. Since the vertical projections of the first discharge channel and the second discharge channel are arc-shaped, on the one hand, it can enhance frictional energy dissipation when the water flow flows inside the first discharge channel and the second discharge channel; The sprayed water flow has a better impact against the collision, further improving the energy dissipation effect.

6、在设置有多个泄流口时,每个泄流组内的两条第一泄流通道相互中部贯通,使得两第一泄流通道内的水流在中段附近相互冲击、剪切,也进一步提高了消能效果。6. When a plurality of discharge ports are provided, the two first discharge channels in each discharge group communicate with each other in the middle, so that the water flows in the two first discharge channels impact and shear each other near the middle section, and further Improved energy dissipation.

附图说明Description of drawings

图1为本发明的结构示意图;Fig. 1 is a structural representation of the present invention;

图2为图1的俯视图;Fig. 2 is the top view of Fig. 1;

图3为图2中所示结构一种优选的实施方式的结构示意图;Fig. 3 is a schematic structural view of a preferred embodiment of the structure shown in Fig. 2;

图4为图1中A部放大图;Figure 4 is an enlarged view of part A in Figure 1;

图5为图4中所示结构一种使用状态结构示意图;Fig. 5 is a schematic structural diagram of a use state of the structure shown in Fig. 4;

图6为图1中B部放大图;Fig. 6 is an enlarged view of part B in Fig. 1;

图7为图6中所示结构一种优选的实施方式的结构示意图。FIG. 7 is a structural schematic diagram of a preferred embodiment of the structure shown in FIG. 6 .

具体实施方式detailed description

结合图1-7所示的一种水利水电工程的新型消能结构,包括设置在大坝1上部的泄流口2、设置在大坝1下游一侧表面的第一泄流通道3、及设置在大坝1主体内部的第二泄流通道4。所述泄流口2既可以是设置在大坝1顶部的溢流坎,也可以是设置有闸阀的泄洪通道,当然还可以是具有相同效果的其他构筑物。如图1所示,大坝1的左侧为上游侧,右侧为下游侧,第一泄流通道3位于大坝1的右侧,第二泄流通道4位于大坝1的内部,在大坝1修筑阶段与大坝1的主体一体构筑。A new type of energy dissipation structure for water conservancy and hydropower projects shown in Figures 1-7, including a discharge port 2 arranged on the upper part of the dam 1, a first discharge channel 3 arranged on the surface of the downstream side of the dam 1, and The second discharge channel 4 is arranged inside the main body of the dam 1 . The discharge outlet 2 can be either an overflow sill arranged on the top of the dam 1, or a flood discharge channel provided with a gate valve, or other structures with the same effect. As shown in Figure 1, the left side of the dam 1 is the upstream side, and the right side is the downstream side, the first discharge channel 3 is located on the right side of the dam 1, and the second discharge channel 4 is located inside the dam 1. The construction phase of the dam 1 is integrally constructed with the main body of the dam 1 .

所述第一泄流通道3和第二泄流通道4均由大坝1的上游侧向下游侧斜向下延伸,从泄流口2泄出的水流可沿着第一泄流通道3和第二泄流通道4排出。所述第一泄流通道3的上端与泄流口2的末端连通,所述泄流口2的底部设置分水口5,所述分水口5位于第一泄流通道3与泄流口2连接处的前方。所述第二泄流通道4的上端与分水口5连通。分水口5设置在泄流口2内且用于水流分流,从分水口5分流的水导入第二泄流通道4中,还有一部分直接越过分水口5排入第一泄流通道3中。分水口5可以是如图2中所示的沿泄流口2宽度方向延伸的条形口,当然,也可以是圆形或其他形状,只要能起到分流的作用且与第二泄流通道4连通即可。所述分水口5处设置流量调节阀门,所述流量调节阀门用于调整分水口5的流量大小,所述流量调节阀门的具体结构较多,例如:所述分水口5的侧壁设置腔体,腔体内设置一个封口板,通过电机、液压杆等部件驱动封口板在分水口5处的伸出量或回缩量,进而改变分水口5开启的大小,起到调节的作用。该结构较为简单,图中未示出。Both the first discharge channel 3 and the second discharge channel 4 extend obliquely downward from the upstream side of the dam 1 to the downstream side, and the water flow discharged from the discharge port 2 can flow along the first discharge channel 3 and the The second drain channel 4 exits. The upper end of the first discharge channel 3 communicates with the end of the discharge port 2, and the bottom of the discharge port 2 is provided with a water diversion port 5, and the water diversion port 5 is located at the first discharge channel 3 and is connected to the discharge port 2. in front of. The upper end of the second drain channel 4 communicates with the water diversion port 5 . The water diversion port 5 is arranged in the discharge port 2 and is used for water flow diversion. The water diverted from the water diversion port 5 is introduced into the second discharge channel 4 , and some of it is directly discharged into the first discharge channel 3 across the water diversion port 5 . The water diversion port 5 can be a bar-shaped mouth extending along the width direction of the discharge port 2 as shown in Figure 2, and of course, it can also be a circle or other shapes, as long as it can play the role of diversion and connect with the second discharge channel. 4 can be connected. The flow regulating valve is set at the water distribution port 5, and the flow regulating valve is used to adjust the flow rate of the water distribution port 5. The specific structure of the flow regulating valve is more, for example: the side wall of the water distribution port 5 is provided with a cavity , a sealing plate is set in the cavity, and the extension or retraction of the sealing plate at the water distribution port 5 is driven by components such as a motor and a hydraulic rod, and then the opening size of the water distribution port 5 is changed to play a role in regulation. This structure is relatively simple and is not shown in the figure.

如图1中所示,所述第二泄流通道4的出水口位于第一泄流通道3的出水口下方,第二泄流通道4的出水口处设置挑流机构,第二泄流通道4可以是沿直线延伸的泄流通道,挑流机构就是设置在第二泄流通道4出水口处的挑流鼻坎、挑流坡或其他起到相同作用的结构。由于第二泄流通道4设置在大坝1主体内部,为了进一步提高本发明的性能,更好的做法是,如图1所示,所述第二泄流通道4的后段呈向下凸出的弧形,所述挑流机构由第二泄流通道4出水口的出水方向斜向上构成。也就是说第二泄流通道4的靠近出水口的一段呈弧形,弧形的最低处低于出水口的高度,从而使第二泄流通道4的出水方向呈斜向上的态势,实现挑流。第二泄流通道4的弧形段一方面起到导向的作用,另一方面又能缓解水流对大坝1的冲刷侵蚀。As shown in Figure 1, the water outlet of the second discharge channel 4 is located below the water outlet of the first discharge channel 3, and a deflecting mechanism is arranged at the water outlet of the second discharge channel 4, and the second discharge channel 4 can be a discharge channel extending along a straight line, and the deflecting mechanism is a deflecting nose sill, deflecting slope or other structures that play the same role arranged at the water outlet of the second discharge channel 4 . Since the second discharge channel 4 is arranged inside the main body of the dam 1, in order to further improve the performance of the present invention, it is better that, as shown in Figure 1, the rear section of the second discharge channel 4 is convex downward. Out of the arc, the deflecting mechanism is formed by the water outlet direction of the outlet of the second discharge channel 4 obliquely upward. That is to say, a section of the second discharge channel 4 close to the water outlet is arc-shaped, and the lowest point of the arc is lower than the height of the water outlet, so that the water outlet direction of the second discharge channel 4 is in an oblique upward situation, realizing the challenge flow. The arc-shaped section of the second discharge channel 4 plays a guiding role on the one hand, and on the other hand, it can relieve the erosion of the dam 1 by the water flow.

第一泄流通道3的出水口处设置导流机构,第一泄流通道3排出的水流和第二泄流通道4排出的水流在空中相互碰撞实现消能。所述的导流机构也可以是挑流鼻坎、挑流坡等。只要在导流机构的引导下可实现第一泄流通道3和第二泄流通道4排出水流的碰撞即可。但由于大坝1上游水位不同,从而造成泄流水压具有一定的差异,进而导致第一泄流通道3和第二泄流通道4中排出的水流其抛射距离、抛物线轨迹也具有一定的差异。因此,如图4和5所示,导流机构最好具有调节射出水流角度的作用,故所述导流机构包括导流板7和调节液压缸8,所述导流板7与第一泄流通道3出水口的下边沿铰接,所述调节液压缸8固定设置在导流板7下方,且调节液压缸8的缸体和伸缩杆均呈以导流板7的铰接位置为中心的弧形。通过调节液压缸8的伸缩,可以对导流板7的角度进行调整,从而实现更加灵活的导流作用,以适应不同的水流抛射距离,使第一泄流通道3和第二泄流通道4排出的水流均能在空中发生碰撞、冲击。调节液压缸8由大坝1枢纽的总控机房进行控制。由于导流板7受到的水流冲击较大,通常还配套设置有用于对导流板7进行加固的加固组件,加固组件的具体结构方式较多,设计人员可根据各工程的泄洪流量进行具体设计,此处不再一一赘述。The water outlet of the first discharge channel 3 is provided with a guide mechanism, and the water flow discharged from the first discharge channel 3 and the water flow discharged from the second discharge channel 4 collide with each other in the air to realize energy dissipation. The deflecting mechanism may also be a deflecting nose ridge, deflecting slope and the like. As long as the collision of the water discharged from the first discharge channel 3 and the second discharge channel 4 can be realized under the guidance of the flow guiding mechanism. However, due to the difference in the upstream water level of the dam 1 , there is a certain difference in the discharge water pressure, which in turn leads to certain differences in the projecting distance and parabolic trajectory of the water discharged from the first discharge channel 3 and the second discharge channel 4 . Therefore, as shown in Figures 4 and 5, the flow guide mechanism preferably has the function of adjusting the angle of the jetted water flow, so the flow guide mechanism includes a deflector 7 and an adjustment hydraulic cylinder 8, and the deflector 7 is connected to the first discharge The lower edge of the water outlet of the flow channel 3 is hinged, the adjusting hydraulic cylinder 8 is fixedly arranged below the deflector 7, and the cylinder body and the telescopic rod of the adjusting hydraulic cylinder 8 are in an arc centered on the hinged position of the deflector 7 shape. By adjusting the expansion and contraction of the hydraulic cylinder 8, the angle of the deflector 7 can be adjusted to achieve a more flexible flow diversion to adapt to different water jetting distances, so that the first discharge channel 3 and the second discharge channel 4 The discharged water flow can collide and impact in the air. The adjustment hydraulic cylinder 8 is controlled by the general control machine room of the dam 1 hub. Because the deflector 7 is subjected to a large impact of water flow, it is usually equipped with a reinforcement component for reinforcing the deflector 7. There are many specific structural methods of the reinforcement component, and the designer can carry out specific design according to the flood discharge flow of each project , which will not be repeated here.

本发明从泄流口2处将水流分成两个部分,其中一部分沿第一泄流通道3正常排下,另一部分经分水口5和第二泄流通道4排下,第二泄流通道4排出的水流在挑流机构的作用下向上挑起射出,第一泄流通道3排出的水流通过导流机构的导向作用与第二泄流通道4排出的水流发生碰撞,从而实现消能。本发明和传统的长护坦加消力池的消能结构相比,无需设置长护坦,一方面省去了护坦修筑的空间,适应性强;另一方面节省了大量的工程成本,提高了经济效益。同时和传统的单纯采用挑流消能的方式相比,消能效果也得到显著的提升。具体来说,本发明水流的消能过程主要分为四个阶段:第一阶段,在沿泄流通道3、4下滑的过程中与泄流通道3、4本体发生摩擦进行消能;第二阶段,从出水口排出后还未发生碰撞前,在空中与空气混掺和摩擦进行消能;第三阶段,从第一、第二泄流通道3、4排出的水流在空中相互碰撞、冲击,使水流携带的动能急剧下降;第四阶段,碰撞后水流进一步分散,分散后更加便于与空气混掺和摩擦,使得消能效果进一步提升。因此,本发明的消能效果极好。第二泄流通道4可将水流的势能直接转换成与第一泄流通道3排出的水流相碰撞的动能,简单高效。The present invention divides the water flow from the discharge port 2 into two parts, one of which is normally discharged along the first discharge channel 3, and the other part is discharged through the water diversion port 5 and the second discharge channel 4, and the second discharge channel 4 The discharged water flow is propelled upwards and ejected under the action of the deflecting mechanism, and the water flow discharged from the first discharge channel 3 collides with the water flow discharged from the second discharge channel 4 through the guiding effect of the flow guide mechanism, thereby realizing energy dissipation. Compared with the energy-dissipating structure of the traditional long apron and stilling pool, the present invention does not need to set up a long apron, on the one hand, it saves the space for apron construction, and has strong adaptability; on the other hand, it saves a lot of engineering costs, Improved economic benefits. At the same time, compared with the traditional method of simply using deflected flow for energy dissipation, the energy dissipation effect has also been significantly improved. Specifically, the energy dissipation process of the water flow in the present invention is mainly divided into four stages: the first stage, in the process of sliding down the discharge passages 3 and 4, friction occurs with the bodies of the discharge passages 3 and 4 to dissipate energy; the second stage In the third stage, the water flows discharged from the first and second discharge channels 3 and 4 collide and impact each other in the air. , so that the kinetic energy carried by the water flow drops sharply; in the fourth stage, the water flow is further dispersed after the collision, and it is easier to mix and rub with air after dispersion, which further improves the energy dissipation effect. Therefore, the energy dissipation effect of the present invention is excellent. The second discharge channel 4 can directly convert the potential energy of the water flow into the kinetic energy of colliding with the water flow discharged from the first discharge channel 3 , which is simple and efficient.

本发明由于在水流发生碰撞后,水流的雾化现象较为严重,更好的做法是如图1所示,所述大坝1下游还设置有消音洞12,所述第一泄流通道3排出的水流和第二泄流通道4排出的水流碰撞点位于消音洞12内。消音洞12的侧壁通常就是加高设计的泄洪通道下游的、位于河道两侧的护坎,两护坎上浇筑横跨两护坎的顶。消音洞12可以有效的防止水雾扩散,避免工程两侧的岩层受到侵蚀,还可以降低碰撞产生的噪声,起到消音的作用。In the present invention, since the atomization phenomenon of the water flow is relatively serious after the water flow collides, a better method is as shown in FIG. The collision point of the water flow and the water flow discharged from the second discharge channel 4 is located in the sound-absorbing hole 12 . The side walls of the muffler tunnel 12 are usually the protection sills downstream of the heightened flood discharge channel and located on both sides of the river, and the tops spanning the two protection sills are poured on the two protection sills. The sound-absorbing tunnel 12 can effectively prevent the diffusion of water mist, prevent the rock formations on both sides of the project from being eroded, and can also reduce the noise generated by collisions to play the role of silencing.

另外,如图2所示,所述第一泄流通道3在垂直方向上的投影呈向大坝1一端或另一端凸出的弧形,所述第二泄流通道4在垂直方向上的投影呈与第一泄流通道3凸出方向相反的弧形。由于第一泄流通道3和第二泄流通道4的垂直投影呈弧形,一方面可以增强水流在第一泄流通道3和第二泄流通道4内部流动时摩擦消能,另一方面使得二者射出的水流对冲碰撞的效果更好,进一步提高消能效果。In addition, as shown in Figure 2, the projection of the first discharge channel 3 in the vertical direction is an arc protruding toward one end or the other end of the dam 1, and the projection of the second discharge channel 4 in the vertical direction is The projection is an arc opposite to the protruding direction of the first discharge channel 3 . Since the vertical projection of the first discharge channel 3 and the second discharge channel 4 is arc-shaped, on the one hand, frictional energy dissipation can be enhanced when the water flow flows inside the first discharge channel 3 and the second discharge channel 4; This makes the effect of the water jets ejected by the two jets better against the collision, and further improves the energy dissipation effect.

针对不同容量的大坝1和水库,所述泄流口2的数量设置不同,水库容量大则泄流口2数量多,水库容量小则泄流口2数量设置少。特别是,当泄流口2的数量增加仍不能满足泄流要求时,可在第一泄流通道3对应的坝体内设置另一条第二泄流通道4,在第二泄流通道4对应的坝体表面设置另一条第一泄流通道3,也就是说两条第一泄流通道3和两条第二泄流通道4均对称设置。更好的做法是,如图3所示,当泄流口2的数量较多时,泄流口2两两呈一组。所述大坝1上设置多个泄流组,图3中示出的泄流组一个,实际应用中根据实际需求可以是多个,泄流组的每个泄流口2对应设置分水口5、第一泄流通道3和第二泄流通道4。每个泄流组内的两条第一泄流通道3相邻且在中部相互贯通。如图3中所示,两个第一泄流通道3呈相背的两个弧形,两个第一泄流通道3的中部相互连通。使得两第一泄流通道3内的水流在中段附近相互冲击、剪切,也进一步提高了消能效果。For dams 1 and reservoirs of different capacities, the quantity of the discharge ports 2 is set differently. If the capacity of the reservoir is large, the quantity of the discharge ports 2 is large, and if the capacity of the reservoir is small, the quantity of the discharge ports 2 is set to be few. In particular, when the increase in the number of discharge outlets 2 still cannot meet the discharge requirements, another second discharge passage 4 can be set in the dam body corresponding to the first discharge passage 3, and another second discharge passage 4 can be set in the dam corresponding to the second discharge passage 4. Another first discharge channel 3 is provided on the surface of the dam body, that is to say, two first discharge channels 3 and two second discharge channels 4 are arranged symmetrically. A better way is, as shown in FIG. 3 , when the number of discharge ports 2 is large, the discharge ports 2 form a group of two. A plurality of discharge groups are set on the dam 1, one discharge group shown in Fig. 3 may be multiple in actual application according to actual needs, and each discharge port 2 of the discharge group is correspondingly provided with a water diversion port 5 , the first drain channel 3 and the second drain channel 4 . The two first discharge passages 3 in each discharge group are adjacent and communicate with each other in the middle. As shown in FIG. 3 , the two first discharge channels 3 are in two arc shapes opposite to each other, and the middle parts of the two first discharge channels 3 communicate with each other. The water flows in the two first discharge channels 3 collide and shear each other near the middle section, which further improves the energy dissipation effect.

为了进一步提升消能效果,更好的做法还可以是,如图6和7所示,所述第一泄流通道3内设置多条沿第一泄流通道3宽度方向延伸的消力缓冲带9,所述消力缓冲带9由多根并排布置的截面呈半圆形的消力凸棱10构成。半圆形的消力凸棱10能够在应力时更好地缓冲受力,避免受力时刚性过大,减小了消力缓冲带9受到水流侵蚀的程度,提高了消力缓冲带9的使用寿命。同时,消力缓冲带9可带动水流翻腾,在水中形成紊流,在水面形成射流,提高消能效果。由于在第一泄流通道3的上端,水流在未经消能的情况下其动能夹带量大,故不宜直接在第一泄流通道3的上端设置大尺寸的消力缓冲带9,而是采用多条消力缓冲带9的尺寸沿水流方向逐渐变大。也就是说位于第一泄流通道3上段的消力缓冲带9尺寸小,下段的消力缓冲带9尺寸大。这样实现逐级消能,消能效果更佳。同理,所述每条消力缓冲带9上的多根消力凸棱10的半径也沿水流方向逐渐变大。In order to further improve the energy dissipation effect, a better way can also be, as shown in Figures 6 and 7, a plurality of force-reducing buffer strips extending along the width direction of the first discharge channel 3 are arranged in the first discharge channel 3 9. The force-reducing buffer zone 9 is composed of a plurality of force-reducing ribs 10 arranged side by side with a semicircular cross-section. The semi-circular force-reducing convex rib 10 can better buffer the force under stress, avoid excessive rigidity during stress, reduce the degree of water erosion of the force-reducing buffer zone 9, and improve the strength of the force-reducing buffer zone 9. service life. Simultaneously, the stilling buffer zone 9 can drive the water flow to churn, form turbulent flow in the water, and form a jet flow on the water surface, thereby improving the energy dissipation effect. Since at the upper end of the first discharge channel 3, the water flow has a large amount of kinetic energy entrainment without energy dissipation, it is not appropriate to directly set a large-sized force-reducing buffer zone 9 at the upper end of the first discharge channel 3, but The size of multiple stilling buffer strips 9 gradually becomes larger along the water flow direction. That is to say, the size of the stilling buffer zone 9 located at the upper section of the first discharge passage 3 is small, and the size of the stilling buffer zone 9 at the lower section is large. In this way, energy dissipation is realized step by step, and the energy dissipation effect is better. Similarly, the radii of the plurality of force-reducing ribs 10 on each of the force-reducing buffer strips 9 also gradually increase along the water flow direction.

另外,本发明也可以配置消力池11,所述消力池11位于第一泄流通道3排出的水流和第二泄流通道4排出的水流碰撞点附近的河床上。所述消力池11的截面呈三角形,且由靠近大坝1的一端向远离大坝1的一端逐渐变浅。本发明的消力池11由于与大坝1的距离较近,可与大坝1同步施工,便于管理。水流在碰撞后,分散的落入消力池11中,消力池11由于由靠近大坝1的一端向远离大坝1的一端逐渐变浅,大部分水流在落下后首先在消力池11中形成回水,再流入下游河道,提升了下游河道流态的稳定性。In addition, the present invention can also configure a stilling basin 11, which is located on the riverbed near the collision point between the water flow discharged from the first discharge channel 3 and the water flow discharged from the second discharge channel 4. The cross section of the stilling pool 11 is triangular, and gradually becomes shallower from one end close to the dam 1 to one end far away from the dam 1 . The stilling basin 11 of the present invention can be constructed synchronously with the dam 1 because it is relatively close to the dam 1, which is convenient for management. After the water flow collides, it falls into the stilling pool 11 scatteredly. Since the stilling pool 11 gradually becomes shallower from the end close to the dam 1 to the end far away from the dam 1, most of the water flow first falls in the stilling pool 11 after falling. Backwater is formed in the middle, and then flows into the downstream channel, which improves the stability of the flow state of the downstream channel.

应当理解,以上所述仅为本发明的较佳实施例,并不用以限制本发明。凡在本发明的精神和原则之内,所做的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。It should be understood that the above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included within the protection scope of the present invention.

Claims (10)

1.一种水利水电工程的新型消能结构,其特征在于:包括设置在大坝(1)上部的泄流口(2)、设置在大坝(1)下游一侧表面的第一泄流通道(3)、及设置在大坝(1)主体内部的第二泄流通道(4);1. A novel energy-dissipating structure for water conservancy and hydropower projects, characterized in that: it includes a discharge opening (2) arranged on the top of the dam (1), a first discharge outlet arranged on the surface of the downstream side of the dam (1) Road (3), and the second discharge channel (4) arranged inside the main body of the dam (1); 所述第一泄流通道(3)和第二泄流通道(4)均由大坝(1)的上游侧向下游侧斜向下延伸,所述第一泄流通道(3)的上端与泄流口(2)的末端连通,所述泄流口(2)的底部设置分水口(5),所述分水口(5)位于第一泄流通道(3)与泄流口(2)连接处的前方;所述第二泄流通道(4)的上端与分水口(5)连通,所述分水口(5)处设置流量调节阀门;所述第二泄流通道(4)的出水口位于第一泄流通道(3)的出水口下方,第二泄流通道(4)的出水口处设置挑流机构;第一泄流通道(3)的出水口处设置导流机构;第一泄流通道(3)排出的水流和第二泄流通道(4)排出的水流在空中相互碰撞实现消能。Both the first discharge channel (3) and the second discharge channel (4) extend obliquely downward from the upstream side of the dam (1) to the downstream side, and the upper end of the first discharge channel (3) is connected to the The end of the discharge port (2) is connected, and the bottom of the discharge port (2) is provided with a water distribution port (5), and the water distribution port (5) is located between the first discharge channel (3) and the discharge port (2). The front of the joint; the upper end of the second discharge channel (4) communicates with the water diversion port (5), and a flow regulating valve is set at the water diversion port (5); the outlet of the second discharge channel (4) The water outlet is located below the water outlet of the first discharge channel (3), and the water outlet of the second discharge channel (4) is provided with a deflecting mechanism; the water outlet of the first discharge channel (3) is provided with a flow guide mechanism; The water flow discharged from the first discharge channel (3) and the water flow discharged from the second discharge channel (4) collide with each other in the air to realize energy dissipation. 2.根据权利要求1所述的水利水电工程的新型消能结构,其特征在于:所述导流机构包括导流板(7)和调节液压缸(8),所述导流板(7)与第一泄流通道(3)出水口的下边沿铰接,所述调节液压缸(8)固定设置在导流板(7)下方,且调节液压缸(8)的缸体和伸缩杆均呈以导流板(7)的铰接位置为中心的弧形。2. The new energy-dissipating structure of water conservancy and hydropower projects according to claim 1, characterized in that: the deflector mechanism includes a deflector (7) and an adjustment hydraulic cylinder (8), and the deflector (7) Hinged with the lower edge of the water outlet of the first discharge channel (3), the adjustment hydraulic cylinder (8) is fixedly arranged under the deflector (7), and the cylinder body and telescopic rod of the adjustment hydraulic cylinder (8) are both in the shape of An arc centered on the hinged position of the deflector (7). 3.根据权利要求1所述的水利水电工程的新型消能结构,其特征在于:所述第二泄流通道(4)的后段呈向下凸出的弧形,所述挑流机构由第二泄流通道(4)出水口的出水方向斜向上构成。3. The novel energy-dissipating structure of water conservancy and hydropower projects according to claim 1, characterized in that: the rear section of the second discharge channel (4) is in a downwardly protruding arc, and the deflecting mechanism is composed of The water outlet direction of the water outlet of the second discharge channel (4) is formed obliquely upward. 4.根据权利要求1所述的水利水电工程的新型消能结构,其特征在于:所述第一泄流通道(3)在垂直方向上的投影呈向大坝(1)一端或另一端凸出的弧形,所述第二泄流通道(4)在垂直方向上的投影呈与第一泄流通道(3)凸出方向相反的弧形。4. The new energy dissipation structure of water conservancy and hydropower projects according to claim 1, characterized in that: the projection of the first discharge channel (3) in the vertical direction is convex toward one end or the other end of the dam (1). The projection of the second discharge channel (4) in the vertical direction is an arc opposite to the protruding direction of the first discharge channel (3). 5.根据权利要求4所述的水利水电工程的新型消能结构,其特征在于:所述大坝(1)上设置多个泄流组,且每个泄流组包括两个泄流口(2)及与两个泄流口(2)对应的分水口(5)、第一泄流通道(3)和第二泄流通道(4);每个泄流组内的两条第一泄流通道(3)相邻且在中部相互贯通。5. The novel energy dissipation structure of water conservancy and hydropower engineering according to claim 4, characterized in that: a plurality of discharge groups are set on the dam (1), and each discharge group comprises two discharge ports ( 2) and the water diversion port (5), the first discharge channel (3) and the second discharge channel (4) corresponding to the two discharge ports (2); the two first discharge channels in each discharge group The flow channels (3) are adjacent and communicate with each other in the middle. 6.根据权利要求1所述的水利水电工程的新型消能结构,其特征在于:所述第一泄流通道(3)内设置多条沿第一泄流通道(3)宽度方向延伸的消力缓冲带(9),所述消力缓冲带(9)由多根并排布置的截面呈半圆形的消力凸棱(10)构成。6. The novel energy dissipation structure of water conservancy and hydropower projects according to claim 1, characterized in that: the first discharge channel (3) is provided with a plurality of energy dissipation structures extending along the width direction of the first discharge channel (3). A force buffer zone (9), the force-reducing buffer zone (9) is composed of a plurality of force-reducing ribs (10) arranged side by side with a semicircular cross-section. 7.根据权利要求6所述的水利水电工程的新型消能结构,其特征在于:所述多条消力缓冲带(9)的尺寸沿水流方向逐渐变大。7. The novel energy dissipation structure for water conservancy and hydropower projects according to claim 6, characterized in that: the size of the plurality of force dissipation buffer strips (9) gradually increases along the water flow direction. 8.根据权利要求7所述的水利水电工程的新型消能结构,其特征在于:所述每条消力缓冲带(9)上的多根消力凸棱(10)的半径也沿水流方向逐渐变大。8. The novel energy-dissipating structure of water conservancy and hydropower projects according to claim 7, characterized in that: the radii of the plurality of force-reducing ribs (10) on each of the force-reducing buffer strips (9) are also along the direction of water flow Gradually get bigger. 9.根据权利要求1所述的水利水电工程的新型消能结构,其特征在于:还包括设置在大坝(1)下游的消力池(11),所述消力池(11)位于第一泄流通道(3)排出的水流和第二泄流通道(4)排出的水流碰撞点附近的河床上;所述消力池(11)的截面呈三角形,且由靠近大坝(1)的一端向远离大坝(1)的一端逐渐变浅。9. The novel energy dissipation structure of water conservancy and hydropower projects according to claim 1, characterized in that: it also includes a stilling pool (11) arranged downstream of the dam (1), and the stilling pool (11) is located at the first The water flow discharged from a discharge channel (3) and the river bed near the collision point of the water flow discharged from the second discharge channel (4); One end of is gradually shallower towards the end away from the dam (1). 10.根据权利要求1所述的水利水电工程的新型消能结构,其特征在于:所述大坝(1)下游还设置有消音洞(12),所述第一泄流通道(3)排出的水流和第二泄流通道(4)排出的水流碰撞点位于消音洞(12)内。10. The new energy dissipation structure of water conservancy and hydropower projects according to claim 1, characterized in that: a sound-absorbing hole (12) is provided downstream of the dam (1), and the first discharge channel (3) discharges The colliding point of the water flow and the water flow discharged from the second discharge channel (4) is located in the silencer hole (12).
CN201710327578.1A 2017-05-10 2017-05-10 Energy dissipation structure of hydraulic and hydroelectric engineering Expired - Fee Related CN107100143B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201910373059.8A CN110004891B (en) 2017-05-10 2017-05-10 Energy dissipation method for hydraulic and hydroelectric engineering
CN201710327578.1A CN107100143B (en) 2017-05-10 2017-05-10 Energy dissipation structure of hydraulic and hydroelectric engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710327578.1A CN107100143B (en) 2017-05-10 2017-05-10 Energy dissipation structure of hydraulic and hydroelectric engineering

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201910373059.8A Division CN110004891B (en) 2017-05-10 2017-05-10 Energy dissipation method for hydraulic and hydroelectric engineering

Publications (2)

Publication Number Publication Date
CN107100143A true CN107100143A (en) 2017-08-29
CN107100143B CN107100143B (en) 2019-06-07

Family

ID=59668828

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201910373059.8A Expired - Fee Related CN110004891B (en) 2017-05-10 2017-05-10 Energy dissipation method for hydraulic and hydroelectric engineering
CN201710327578.1A Expired - Fee Related CN107100143B (en) 2017-05-10 2017-05-10 Energy dissipation structure of hydraulic and hydroelectric engineering

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201910373059.8A Expired - Fee Related CN110004891B (en) 2017-05-10 2017-05-10 Energy dissipation method for hydraulic and hydroelectric engineering

Country Status (1)

Country Link
CN (2) CN110004891B (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086261A (en) * 2018-01-29 2018-05-29 安徽理工大学 A kind of wing water conservancy energy dissipator of variable-angle
CN108517843A (en) * 2018-03-30 2018-09-11 昆明理工大学 A kind of downflow weir and elastic force type stilling pond combined energy dissipation structure and energy dissipating method
CN108560507A (en) * 2018-05-24 2018-09-21 天津大学 A kind of " catching mist " formula Lapping quantity preventing atomization device
CN108589669A (en) * 2018-05-03 2018-09-28 四川大学 The method for reducing tunnel flood discharge fog precipitation amount using air curtain
CN108797532A (en) * 2018-05-24 2018-11-13 天津大学 A kind of Lapping quantity preventing atomization method
CN108824380A (en) * 2018-05-21 2018-11-16 昆明理工大学 A kind of energy-dissipating structure and its adjusting method of adjustable stilling pond end sill height
CN108914893A (en) * 2018-07-25 2018-11-30 李自鹏 A kind of the slidingtype energy dissipator and construction method of hydraulic-driven
CN109252494A (en) * 2018-08-21 2019-01-22 昆明理工大学 A kind of deformation type stilling pond front end energy-dissipating structure and its energy dissipating method
CN110172955A (en) * 2019-06-26 2019-08-27 河南省水利第一工程局 A kind of multi-angle is adjustable flip trajectory bucket device and its construction method
CN110359433A (en) * 2019-07-23 2019-10-22 焦雷 A kind of reservoir dam flood discharge automatic protection structure and its application method
CN110747822A (en) * 2019-11-16 2020-02-04 朱文福 Movable gate with noise reduction function
CN111197302A (en) * 2020-01-11 2020-05-26 河南华北水利水电勘察设计有限公司 Energy dissipation structure of water delivery hole
CN111236180A (en) * 2020-01-15 2020-06-05 湖南中信水电建设有限公司 Energy dissipation structure of hydraulic and hydroelectric engineering
CN112813933A (en) * 2021-01-20 2021-05-18 福建水利电力职业技术学院 Hidden type noise-reducing energy-dissipating scoop
CN115233631A (en) * 2022-06-06 2022-10-25 华北水利水电大学 A device for eliminating abnormal noise at an inverted siphon outlet

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111058423A (en) * 2020-01-06 2020-04-24 中国电建集团成都勘测设计研究院有限公司 Internal energy dissipation retaining dam
CN113136840B (en) * 2021-05-21 2023-07-14 江苏省水利勘测设计研究院有限公司 Water conservancy project sluice downstream river diversion energy dissipation scour protection facility

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB174329A (en) * 1921-12-15 1923-03-15 Techn Projectierungs U Baubuer Improved installation for weirs and the like
CN102852122A (en) * 2012-10-15 2013-01-02 戴会超 Eco-friendly subsidiary dam capable of improving gas supersaturation
CN104652378A (en) * 2015-01-16 2015-05-27 四川大学 Variable-radius spiral flood discharge tunnel
CN205822146U (en) * 2016-06-30 2016-12-21 中国电建集团中南勘测设计研究院有限公司 A kind of reservoir is let out in advance and is let out structure under double ecological flow
CN106436662A (en) * 2016-11-28 2017-02-22 山东大学 Massif flow energy dissipation hydraulic tunnel structure and method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201915368U (en) * 2010-12-13 2011-08-03 福建省水利水电勘测设计研究院 Dam structure with water flow self-dissipation and energy-dissipation function
CN203947445U (en) * 2013-07-11 2014-11-19 安徽理工大学 One is chosen stream and jet combined energy dissipating experimental rig
CN106120675B (en) * 2016-08-08 2018-07-06 浙江水利水电学院 A kind of efficient energy dissipating flood discharge overfull dam surface structure
CN106223273B (en) * 2016-08-15 2019-04-30 四川大学 A device and method for alleviating high dam flood discharge atomization

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB174329A (en) * 1921-12-15 1923-03-15 Techn Projectierungs U Baubuer Improved installation for weirs and the like
CN102852122A (en) * 2012-10-15 2013-01-02 戴会超 Eco-friendly subsidiary dam capable of improving gas supersaturation
CN104652378A (en) * 2015-01-16 2015-05-27 四川大学 Variable-radius spiral flood discharge tunnel
CN205822146U (en) * 2016-06-30 2016-12-21 中国电建集团中南勘测设计研究院有限公司 A kind of reservoir is let out in advance and is let out structure under double ecological flow
CN106436662A (en) * 2016-11-28 2017-02-22 山东大学 Massif flow energy dissipation hydraulic tunnel structure and method

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086261A (en) * 2018-01-29 2018-05-29 安徽理工大学 A kind of wing water conservancy energy dissipator of variable-angle
CN108517843A (en) * 2018-03-30 2018-09-11 昆明理工大学 A kind of downflow weir and elastic force type stilling pond combined energy dissipation structure and energy dissipating method
CN108589669A (en) * 2018-05-03 2018-09-28 四川大学 The method for reducing tunnel flood discharge fog precipitation amount using air curtain
CN108824380A (en) * 2018-05-21 2018-11-16 昆明理工大学 A kind of energy-dissipating structure and its adjusting method of adjustable stilling pond end sill height
CN108560507A (en) * 2018-05-24 2018-09-21 天津大学 A kind of " catching mist " formula Lapping quantity preventing atomization device
CN108797532A (en) * 2018-05-24 2018-11-13 天津大学 A kind of Lapping quantity preventing atomization method
CN108914893A (en) * 2018-07-25 2018-11-30 李自鹏 A kind of the slidingtype energy dissipator and construction method of hydraulic-driven
CN109252494B (en) * 2018-08-21 2019-11-08 昆明理工大学 A modified form of stilling pool front end energy dissipation structure and its energy dissipation method
CN109252494A (en) * 2018-08-21 2019-01-22 昆明理工大学 A kind of deformation type stilling pond front end energy-dissipating structure and its energy dissipating method
CN110172955A (en) * 2019-06-26 2019-08-27 河南省水利第一工程局 A kind of multi-angle is adjustable flip trajectory bucket device and its construction method
CN110172955B (en) * 2019-06-26 2020-12-08 河南省水利第一工程局 Construction method of multi-angle adjustable trajectory jet energy dissipation device
CN110359433A (en) * 2019-07-23 2019-10-22 焦雷 A kind of reservoir dam flood discharge automatic protection structure and its application method
CN110747822A (en) * 2019-11-16 2020-02-04 朱文福 Movable gate with noise reduction function
CN111197302A (en) * 2020-01-11 2020-05-26 河南华北水利水电勘察设计有限公司 Energy dissipation structure of water delivery hole
CN111236180A (en) * 2020-01-15 2020-06-05 湖南中信水电建设有限公司 Energy dissipation structure of hydraulic and hydroelectric engineering
CN112813933A (en) * 2021-01-20 2021-05-18 福建水利电力职业技术学院 Hidden type noise-reducing energy-dissipating scoop
CN115233631A (en) * 2022-06-06 2022-10-25 华北水利水电大学 A device for eliminating abnormal noise at an inverted siphon outlet
CN115233631B (en) * 2022-06-06 2023-10-24 华北水利水电大学 Abnormal sound eliminating device for inverted siphon outlet

Also Published As

Publication number Publication date
CN110004891B (en) 2020-08-07
CN110004891A (en) 2019-07-12
CN107100143B (en) 2019-06-07

Similar Documents

Publication Publication Date Title
CN107100143A (en) Novel energy dissipation structure of hydraulic and hydroelectric engineering
CN101215830B (en) Vertical shaft rotational flow flood discharging tunnel and emptying tunnel or diversion tunnel vertical arrangement hydraulic structure combination
CN108086260A (en) Differential type High-low Bucket Energy Dissipation Building-height falls bank type stiling basin system and energy dissipating method
CN102619200B (en) Energy dissipation method of sidewall aeration steps and outlet submerged flip bucket of inclined shaft type flood discharge tunnel
CN108221843A (en) A kind of discharge structure structure of water conservancy
CN107022987A (en) High dam spillwag chute jet vectoring structure
CN102277862B (en) Side-wall aeration ramp for free flow tunnel
CN208251034U (en) A kind of water power hydraulic engineering energy dissipating area safeguard structure
CN104195997B (en) A kind of aeration ramp arrangement being applicable to high water head flood discharging tunnel
CN107881994A (en) A kind of special-shaped guiding device for flood discharging groove of turning
CN202610774U (en) Deep-hole cyclone shaft type flood drainage tunnel
CN206428676U (en) Spillway inlet channel guiding device
CN101538840A (en) Trajectory bucket type energy dissipater in absorption basin
CN107663851B (en) Cavitation damage prevention curved stepped overflow dam
CN111893963A (en) Low limit wall pastes triangle body contraction type flip bucket
CN206204900U (en) A kind of hydraulic tunnel structure of massif current energy dissipating
CN206971181U (en) A kind of multichannel bank stiling basin of dispersible energy dissipating
CN106988283B (en) The energy dissipating method to be liquidated based on water stream
CN209412796U (en) An underflow energy dissipation structure suitable for wide tail piers extending to stilling basins
CN106436662A (en) Massif flow energy dissipation hydraulic tunnel structure and method
CN212335944U (en) Asymmetric steering shrinkage differential sill body
CN203530942U (en) High water head bottom hole flood discharge and energy dissipation structure
CN107419709A (en) A kind of stiling basin system
CN207582437U (en) A kind of anti-cavitation curved Stepped Spillway of destruction
CN111691377A (en) Curved surface corner-fitting narrow slit flip bucket

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190607

CF01 Termination of patent right due to non-payment of annual fee