CN107460846B - It is a kind of for prevent and treat Canal in Loess Area groove channel erosion from the soft dam system of becoming silted up - Google Patents

It is a kind of for prevent and treat Canal in Loess Area groove channel erosion from the soft dam system of becoming silted up Download PDF

Info

Publication number
CN107460846B
CN107460846B CN201710576787.XA CN201710576787A CN107460846B CN 107460846 B CN107460846 B CN 107460846B CN 201710576787 A CN201710576787 A CN 201710576787A CN 107460846 B CN107460846 B CN 107460846B
Authority
CN
China
Prior art keywords
channel
erosion
pond
siltation
siphon
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710576787.XA
Other languages
Chinese (zh)
Other versions
CN107460846A (en
Inventor
孙红月
范雲鹤
尚岳全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University ZJU
Original Assignee
Zhejiang University ZJU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University ZJU filed Critical Zhejiang University ZJU
Priority to CN201710576787.XA priority Critical patent/CN107460846B/en
Priority to PCT/CN2017/109458 priority patent/WO2019010876A1/en
Publication of CN107460846A publication Critical patent/CN107460846A/en
Application granted granted Critical
Publication of CN107460846B publication Critical patent/CN107460846B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B1/00Equipment or apparatus for, or methods of, general hydraulic engineering, e.g. protection of constructions against ice-strains
    • E02B1/003Mechanically induced gas or liquid streams in seas, lakes or water-courses for forming weirs or breakwaters; making or keeping water surfaces free from ice, aerating or circulating water, e.g. screens of air-bubbles against sludge formation or salt water entry, pump-assisted water circulation
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/02Stream regulation, e.g. breaking up subaqueous rock, cleaning the beds of waterways, directing the water flow

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Sewage (AREA)

Abstract

The present invention is aiming at the problem that loess slope groove channel erosion, it is proposed the soft dam system of becoming silted up certainly for being used to prevent and treat Canal in Loess Area groove channel erosion for being different from traditional design theory, it is made of from soft dam system is become silted up permeable siltation system and siphon drainge system, the separation of water sand is realized using the permeable siltation system of channel, isolated water flow is excreted to downstream security region by siphonage, silt then forms in the case where water sand shunts in section channel siltation effect repeatedly wide slow from the soft dam that becomes silted up.The present invention by permeable siltation system combined with siphon drainage technology in the way of realize that water sand separates, silt is not only kept but also is fully utilized.Ladder-type distribution changes channel orographic condition from the soft dam that becomes silted up, and reduces the erosion to channel and washes away, while avoiding soil erosion, exempts from power from silt process, save a large amount of manpower and material resources.

Description

It is a kind of for prevent and treat Canal in Loess Area groove channel erosion from the soft dam system of becoming silted up
Technical field
The invention belongs to hydraulic engineering field more particularly to a kind of structures or system for preventing and treating Canal in Loess Area groove channel erosion.
Background technique
In the widely distributed loess in the provinces such as the Shanxi in China, Shaanxi, Gansu, Ningxia, Qinghai, the Inner Mongol, Henan, vegetation is covered Lid rate is low, and soil property is more loose, has strong water sensitivity.It is influenced by monsoon climate, Canal in Loess Area precipitation is concentrated, and is mostly sudden and violent Rain is easy to produce groove channel erosion under runoff effect, soil erosion occurs, cause region breaking topography, ravines and guillies criss-cross, produces item Part and the deterioration of the ecological environment, Ecological Safety Situation is severe, becomes and restricts the great of Canal in Loess Area society and economy sustainable development Strategic issue.Rill erosion is formed under flow dynamic and self gravity synergy, and rill erosion is according to the form and differentiation of generation Process is divided into the different phases such as rill erosion, shallow gully erosion, groove channel erosion.Loess channel and Zhigou often have landform gradient Greatly, the features such as ditch wide direction is narrow, catchment area is limited, traditional silt arrester is in middle and upper reaches channel and Zhigou sediment trapping alluvial plain efficiency It is low, it the problem of deficiency in economic performance, studies light-duty dispersibility and blocks deposit technique, change that concentrate accumulation before the dam of Littoral Barrier be channel point Cloth accumulation realizes the economic efficient utilization intercepted with water resource of silt in basin, is of great immediate significance.
Summary of the invention
The present invention proposes the soft dam system of becoming silted up certainly for being different from traditional design theory aiming at the problem that groove channel erosion of Canal in Loess Area System realizes the separation of water sand using the permeable siltation system of channel, isolated water flow is excreted to downstream security area by siphonage Domain, silt are then formed in the case where water sand shunts and washes away siltation effect in section channel repeatedly from the soft dam that becomes silted up, and change channel ratio of slope with this, Slow down groove channel erosion and soil erosion.
The technical solution of the present invention is as follows: it is a kind of for prevent and treat Canal in Loess Area groove channel erosion from the soft dam system of becoming silted up, including it is saturating Water siltation system, siphon drainge system.Permeable siltation system includes plastic blind-ditch, geotextiles, excavates groove in the bottom of trench of channel, Place multiple plastic blind-ditchs in groove, the cross section of plastic blind-ditch is rectangle, geotextiles is wrapped up outside plastic blind-ditch, in channel Water sand separates after silt carrying flow flows through permeable siltation system, and in the base slope of channel, erosion and deposition is formed from the soft dam that becomes silted up silt repeatedly;Siphon Drainage system includes shunting pond, cover board, discharge siphon, and the water outlet of plastic blind-ditch is connected to pond is shunted, and shunts the top in pond Equipped with cover board, the side wall for shunting pond is equipped with aperture, the height of aperture lower than the top 30cm or more for shunting pond, the diameter of aperture with The caliber of discharge siphon is identical, and the water inlet of discharge siphon, which is extend into, to be shunted in pond, and the water outlet of discharge siphon passes through Downstream security region is placed on after shunting the aperture of pond side wall.
Further, the depth in the shunting pond is 2m~4m, and the length and width for shunting pond are 0.8m~1m.
Further, the discharge siphon in the siphon drainge system be 1 or more, caliber be 200~ 500mm。
When heavy rainfall occurs, runoff enters channel after washing away slope surface, and silt carrying flow is accumulated in channel, works as silt carrying flow When flowing through the permeable siltation system for soft dam system of becoming silted up certainly, water flows into plastic blind-ditch through geotextiles, and it is laggard that water flows through plastic blind-ditch Enter to shunt pond, when the water level in shunting pond exceeds the aperture of shunting pond side wall, drainage procedure occurs, siphonage starting, draining The water shunted in pond is excreted to downstream security region by siphon pipe, and due to siphonage, the silt shunted in pond can be by draining rainbow Suction pipe is sucked out, and sediment siltation will not be occurred by shunting pond.In channel water sand separation after sediment siltation channel base slope, rainfall and Runoff effect repeated, and silt washes away siltation in the channel of water sand shunting section repeatedly and forms the wide slow soft dam that becomes silted up certainly. With increasing from the soft height of dam degree that becomes silted up, the permeability of permeable siltation system is gradually decreased, and silt carrying flow can more cross earlier shape At from the soft dam of becoming silted up, be gradually increased the width from the soft dam that becomes silted up.The orographic condition for changing channel after being formed from the soft dam that becomes silted up, slows down ditch The ratio of slope in road reduces the flow velocity of water flow, reduces the erosion to channel and washes away, avoids soil erosion.
The contents of the present invention are combined to explain advantages of the present invention as follows:
1. by permeable siltation system combined with siphon drainage technology in the way of realize that water sand separates, water is transported to down Safety zone is swum, sediment siltation is formed in channel base slope from the soft dam that becomes silted up, and silt is not only kept but also is fully utilized.
2. slowing down the ratio of slope of channel using the orographic condition for changing channel from the soft dam that becomes silted up of ladder-type distribution, reducing water flow Flow velocity, reduce to the erosion of channel and wash away, while avoiding soil erosion.Exempt from power from silt process, saves a large amount of people Power material resources.
3. siphon drainage has dredging effect, can remove into the silt shunted in pond, to avoid silting causes to shunt Lose effect of catchmenting in pond, it is ensured that effective work of system.
Detailed description of the invention
Fig. 1 is overall structure diagram of the invention;
Fig. 2 is the sectional view of A-A section in Fig. 1 of the present invention;
In figure: silt carrying flow 1, plastic blind-ditch 31, geotextiles 32, groove 33, the soft dam 4 that becomes silted up certainly, shunts pond 51, lid at channel 2 Plate 52, discharge siphon 53.
Specific embodiment
Present invention will be further explained below with reference to specific examples.It should be understood that these embodiments are merely to illustrate this hair It is bright rather than limit the scope of the invention.In addition, it should also be understood that, after reading the content taught by the present invention, art technology Personnel can make various changes or modifications the present invention, and such equivalent forms equally fall within the application the appended claims and limited Fixed range.
Embodiment 1
As shown in Figure 1, a kind of be from soft dam system of becoming silted up, including permeable siltation for prevent and treat Canal in Loess Area groove channel erosion System, siphon drainge system, permeable siltation system includes plastic blind-ditch 31, geotextiles 32.As shown in Fig. 2, the bottom of trench in channel 2 is opened Digging groove 33 places plastic blind-ditch 31 in groove 33, and geotextiles 32, the silt carrying flow 1 in channel 2 are wrapped up outside plastic blind-ditch 31 Water sand separates after flowing through permeable siltation system, and in the base slope of channel 2, erosion and deposition is formed from the soft dam 4 that becomes silted up silt repeatedly;Siphon drainage system System includes shunting pond 51, cover board 52, discharge siphon 53, and the water outlet of plastic blind-ditch 31 is connected to pond 51 is shunted, and shunts pond 51 Four walls and bottom surface concrete lining, with a thickness of 30cm, the depth for shunting pond 51 is 3m, and the length and width for shunting pond 51 are 1m, the top for shunting pond 51 are equipped with cover board 52, and the side wall for shunting pond 51 is equipped with aperture, and the height of aperture is lower than the top for shunting pond 51 The diameter of portion 30cm, aperture are identical as the caliber of discharge siphon 53, the caliber of the discharge siphon 53 in siphon drainge system For 300mm, the water inlet of discharge siphon 53, which is extend into, to be shunted in pond 51, and the water outlet of discharge siphon 53, which passes through, shunts pond 51 Downstream security region is placed on after the aperture of side wall.The present invention is used to prevent and treat the soft dam system of becoming silted up certainly of Canal in Loess Area groove channel erosion, Can be arranged in the ditch section of channel difference elevation multiple, be distributed in ladder-type, the quantity of step according to the length of channel, ratio of slope, The factors such as rainfall determine.
Above-described is only presently preferred embodiments of the present invention, is not intended to limit the invention, all in the scope of the present invention Within, any modification, equivalence replacement for being made etc. should all be included in the protection scope of the present invention.

Claims (3)

1. a kind of for preventing and treating the soft dam system of becoming silted up certainly of Canal in Loess Area groove channel erosion, including permeable siltation system, siphon drainage system System;Permeable siltation system includes plastic blind-ditch, geotextiles, excavates groove in the bottom of trench of channel, multiple plastics are placed in groove French drain, the cross section of plastic blind-ditch are rectangle, wrap up geotextiles outside plastic blind-ditch, the silt carrying flow in channel flows through permeable siltation Water sand separates after system, and in the base slope of channel, erosion and deposition is formed from the soft dam that becomes silted up silt repeatedly;Siphon drainge system includes shunting pond, lid Plate, discharge siphon, the water outlet of plastic blind-ditch are connected to pond is shunted, and the top for shunting pond is equipped with cover board, shunt the side wall in pond Equipped with aperture, for the height of aperture lower than the top 30cm or more for shunting pond, the diameter of aperture and the caliber of discharge siphon are identical, The water inlet of discharge siphon, which is extend into, to be shunted in pond, and the water outlet of discharge siphon is placed after passing through the aperture for shunting pond side wall In downstream security region.
2. according to claim 1 a kind of for preventing and treating the soft dam system of becoming silted up certainly of Canal in Loess Area groove channel erosion, feature exists In the depth in the shunting pond is 2m~4m, and the length and width for shunting pond are 0.8m~1m.
3. according to claim 1 a kind of for preventing and treating the soft dam system of becoming silted up certainly of Canal in Loess Area groove channel erosion, feature exists In the discharge siphon in the siphon drainge system is 1 or more, and caliber is 200~500mm.
CN201710576787.XA 2017-07-14 2017-07-14 It is a kind of for prevent and treat Canal in Loess Area groove channel erosion from the soft dam system of becoming silted up Active CN107460846B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201710576787.XA CN107460846B (en) 2017-07-14 2017-07-14 It is a kind of for prevent and treat Canal in Loess Area groove channel erosion from the soft dam system of becoming silted up
PCT/CN2017/109458 WO2019010876A1 (en) 2017-07-14 2017-11-06 Self-silting soft dam system for preventing and controlling gully erosion in loess area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710576787.XA CN107460846B (en) 2017-07-14 2017-07-14 It is a kind of for prevent and treat Canal in Loess Area groove channel erosion from the soft dam system of becoming silted up

Publications (2)

Publication Number Publication Date
CN107460846A CN107460846A (en) 2017-12-12
CN107460846B true CN107460846B (en) 2019-09-03

Family

ID=60544319

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710576787.XA Active CN107460846B (en) 2017-07-14 2017-07-14 It is a kind of for prevent and treat Canal in Loess Area groove channel erosion from the soft dam system of becoming silted up

Country Status (2)

Country Link
CN (1) CN107460846B (en)
WO (1) WO2019010876A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589751A (en) * 2018-06-25 2018-09-28 长安大学 A kind of radial drainage arrangement and method for protecting plateau engineering based on Gu Gou
CN110777909B (en) * 2019-11-22 2021-03-23 嘉兴金喜莱科技有限公司 Debris flow prevention and control system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4100881A1 (en) * 1991-01-14 1992-07-16 Cronau Heinrich Gmbh Permanent way for railway high speed trains - consists of precast concrete trough sections laid end on end and filled with ballast bed
CN1281924A (en) * 1999-07-22 2001-01-31 陈启星 Method for preventing and controlling reservoir sediment accumulation by using siphon principle
CN202227458U (en) * 2011-09-26 2012-05-23 周慧 Draining and silt-discharging system
CN204039863U (en) * 2014-08-13 2014-12-24 江苏中设工程咨询集团有限公司 Road soil curb edge waterproof/drainage structure
CN106192937A (en) * 2016-06-29 2016-12-07 云南农业大学 A kind of construction method of accumulated water farmland row's control water system
CN106638629A (en) * 2016-12-01 2017-05-10 浙江大学 Device for greening slope of loess slope

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6733209B2 (en) * 2000-01-07 2004-05-11 Kristar Enterprises, Inc. Chitosan enhanced erosion control rolls
ES2272160B1 (en) * 2005-05-16 2008-03-16 Dalton Internacional S.A. SYSTEM OF TRANSFER AND USE OF FLUVIAL WATERS IN THEIR EXIT TO THE SEA.
CN101270570B (en) * 2008-04-09 2010-06-09 中国科学院水利部成都山地灾害与环境研究所 Mud silt blocking method for dilute debris flow and high-sandiness floods and uses thereof
CN102535384B (en) * 2012-02-21 2014-06-04 浙江大学 In-trench water-stone separation siphoning-drainage debris flow control method
CN102758417B (en) * 2012-07-30 2016-01-13 黄海宽 A kind of water and soil is separated the method for environmental protection and the water and soil isolating construction thereof of building up fields of harnessing the river

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4100881A1 (en) * 1991-01-14 1992-07-16 Cronau Heinrich Gmbh Permanent way for railway high speed trains - consists of precast concrete trough sections laid end on end and filled with ballast bed
CN1281924A (en) * 1999-07-22 2001-01-31 陈启星 Method for preventing and controlling reservoir sediment accumulation by using siphon principle
CN202227458U (en) * 2011-09-26 2012-05-23 周慧 Draining and silt-discharging system
CN204039863U (en) * 2014-08-13 2014-12-24 江苏中设工程咨询集团有限公司 Road soil curb edge waterproof/drainage structure
CN106192937A (en) * 2016-06-29 2016-12-07 云南农业大学 A kind of construction method of accumulated water farmland row's control water system
CN106638629A (en) * 2016-12-01 2017-05-10 浙江大学 Device for greening slope of loess slope

Also Published As

Publication number Publication date
CN107460846A (en) 2017-12-12
WO2019010876A1 (en) 2019-01-17

Similar Documents

Publication Publication Date Title
KR100952192B1 (en) Water pocket well for infiltrating a rainwater
CN106087953B (en) A kind of drainage and construction method for preventing and treating mountain area large size spoil ground mud-rock flow
KR100948551B1 (en) System for improving water quality of river
CN104452656A (en) River channel segmental desilting construction method
CN210827513U (en) Self-adaptation side slope drainage seepage prevention structure
CN107460846B (en) It is a kind of for prevent and treat Canal in Loess Area groove channel erosion from the soft dam system of becoming silted up
WO2018036317A1 (en) Water collecting and draining system, and construction method thereof
CN102535384B (en) In-trench water-stone separation siphoning-drainage debris flow control method
CN203782664U (en) Anti-scour structure of sandy foundation water gate
CN110145007A (en) The drainage system of Dumping Sites
CN202214710U (en) Overflowing-drainage integrated brake weir
CN208039303U (en) A kind of Construction of Civil Engineering retaining wall
CN206752629U (en) A kind of municipal works rainwater inspection well
CN208039174U (en) Flume steep slope section energy dissipater
CN215562326U (en) Prevention and control system for blocking, shunting and water-stone separation of debris flow
CN206308771U (en) The complementary sewerage system of bilateral
CN102383401A (en) Overflow water drainage integral type sluice weir
CN109914568A (en) A kind of structure that Cut-off ditch is connected with inspection shaft
CN104963379A (en) Water taking structure for mountainous area river course
CN210917448U (en) Novel retaining wall structure
CN212335694U (en) Integrated kerbstone double-filtration drainage device
JP2022075302A (en) Scouring prevention structure
KR20110083935A (en) Complex debris barrier of eco-friendly
CN212358351U (en) Foundation ditch is backfilled with falling drainage system
CN211773292U (en) Retaining wall for hydraulic engineering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant