CN107449987B - Based on the test method of transferring the files for not tearing 750 kv transformer high pressure lead technologies open - Google Patents

Based on the test method of transferring the files for not tearing 750 kv transformer high pressure lead technologies open Download PDF

Info

Publication number
CN107449987B
CN107449987B CN201710769923.7A CN201710769923A CN107449987B CN 107449987 B CN107449987 B CN 107449987B CN 201710769923 A CN201710769923 A CN 201710769923A CN 107449987 B CN107449987 B CN 107449987B
Authority
CN
China
Prior art keywords
winding
transformer
pressure
resistance
phase
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710769923.7A
Other languages
Chinese (zh)
Other versions
CN107449987A (en
Inventor
王金铜
俞璐
周欢
赵海鹏
谷倩倩
蒋向荣
田发英
张晗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MAINTENANCE Co OF STATE GRID XINJIANG ELECTRIC POWER Co
State Grid Corp of China SGCC
Original Assignee
MAINTENANCE Co OF STATE GRID XINJIANG ELECTRIC POWER Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MAINTENANCE Co OF STATE GRID XINJIANG ELECTRIC POWER Co, State Grid Corp of China SGCC filed Critical MAINTENANCE Co OF STATE GRID XINJIANG ELECTRIC POWER Co
Priority to CN201710769923.7A priority Critical patent/CN107449987B/en
Publication of CN107449987A publication Critical patent/CN107449987A/en
Application granted granted Critical
Publication of CN107449987B publication Critical patent/CN107449987B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R27/00Arrangements for measuring resistance, reactance, impedance, or electric characteristics derived therefrom
    • G01R27/02Measuring real or complex resistance, reactance, impedance, or other two-pole characteristics derived therefrom, e.g. time constant

Abstract

The invention discloses a kind of based on the test method of transferring the files for not tearing 750 kv transformer high pressure lead technologies open, and it includes middle pressure-low pressure no-load voltage ratio testing procedures to be depressed into neutral point winding D.C. resistance testing procedure in;Medium pressure-low pressure no-load voltage ratio testing procedure are as follows: remove lead at three-phase neutral bushing, remove the earth mat circuit of first winding parallel connection;Temporary changes low-pressure side safety measure simultaneously pulls open main transformer low-pressure side three-phase ground disconnecting link or removes ground line, disconnects ground connection, remove the earth mat circuit of secondary winding parallel connection;Any one phase low pressure winding wiring is removed simultaneously, opens Angle connection, removes other two-phase winding loops of secondary winding parallel connection;No-load voltage ratio test is carried out finally by no-load voltage ratio tester.

Description

Based on the test method of transferring the files for not tearing 750 kv transformer high pressure lead technologies open
Technical field
The present invention relates to transformer high-voltages to test field, specifically, in particular to 750 kv transformers transfer the files and transfer the files Experiment work afterwards.
Background technique
Power transformer is one of the capital equipment of transmission distribution electric energy in electric system, is undertaken a certain voltage change phase The effect of the different voltage of same another or several numerical value.In order to meet the variation of network load and voltage, transformer need to be fitted The adjustment of Shi Jinhang operational taps.Since 750 kv transformer voltages are high, capacity is big, select single-phase self-coupling formula without excitation Structure.The gear adjustment of off circuit tap changing transfor mer needs to carry out under power failure.The variation of gear means winding connection Changed, since off circuit tap changing transfor mer gear can only be judged by the mechanical instruction of equipment pressure regulating device itself, because There are actual-gears and instruction gear not to be inconsistent for this, the risk of winding joint poor contact;If actual-gear is not inconsistent with instruction gear, After electrification can not matching system voltage and load, serious person will cause power grid paralysis;And winding joint poor contact can make to contact Resistance increases, and fever is generated under the action of electric current, causes insulation dissolved gas in oil content constantly to increase, dielectric strength declines most It causes to puncture eventually, cause damages to equipment and the stabilization of power grids.For the generation for avoiding such accident, need after gear adjusts to it Carry out the test of electric property verifying.According to the requirement of " 18 great anti-accident measures of power grid of State Grid Corporation of China " 9.4.1: Off circuit tap changer is after changing tap position, it is necessary to which measurement uses the D.C. resistance and no-load voltage ratio tapped.
For exclusive PCR, the accuracy of guarantee electrical test data, previous electrical test needs are being torn open in tested device Except being carried out under conditions of a lead.750 kv transformer volumes are big, sleeve position is high, and about 13 meters of bushing distance away the ground, Lead is the bis- division aluminum conductors of 1600mm2;About 7 meters of medium voltage side distance away the ground, lead is the bis- division aluminum conductors of 1440mm2;It is high, in Lead dismounting in side is pressed to need to configure crane and high altitude vehicle cooperation dismounting, the average phase transformer lead dismounting time is about 3 hours. Transformer work power off time of transferring the files is typically only 1-2 days, in the nervous activity duration, when removing fixture wire and occupying a large amount of Between, prolonged high altitude operation means high operating risk, meanwhile, frequent detaching equipment also can will cause lead to fitting Abrasion even deforms.
By us specifically the study found that 750 kv transformers are YNd11, neutral-point solid ground connection type, change After depressor has a power failure, safety measure need to be arranged, cloth postpones high, medium and low three side of transformer and passes through ground line or grounding switch ground connection (Fig. 1).Overwhelming majority no-load voltage ratio tester measuring principle is bridge method (Fig. 2) at present, that is, passes through the primary side in subject transformer Making alive U1 adjusts resistance R1, refers to galvanometer then in Circuit Fault on Secondary Transformer since electromagnetic induction principle induces voltage U2 Zero, voltage ratio K is obtained by series loop voltage divider principle simple computation, is can be found that by above-mentioned measuring principle figure accurately to survey Voltage ratio K is measured, cannot and there are other circuits in first and second side of transformer, and pressure-low pressure no-load voltage ratio is tested in actually carrying out When, first winding be in be depressed into neutral point winding, secondary winding is low pressure winding.It is not removing a lead and is not changing safety In the case where measure, since middle pressure, neutral point are grounded, first winding parallel connection earth mat;Low-pressure side is Angle connection and connects simultaneously Ground, secondary winding parallel connection earth mat and other two-phase low pressure windings, other circuits in parallel cause the voltage and current signal for being tested winding It changes, test data is caused deviation occur.
The test of overwhelming majority D.C. resistance is all made of digital direct current resistance meter (Fig. 3) at present, successively passes through pressure stabilizing Power supply EN and constant-current supply IN gives tested winding charging, after test loop transient process, transformer winding and circuit string The measuring resistance of connection all passes through the same electric current IN, and at this time according to the characteristic of series loop, voltage is than being resistance ratio, known The resistance value and precise measurement measuring resistance and transformer of measuring resistance be tested after the voltage at winding both ends can calculate it is tested around The D.C. resistance of group is can be found that when being depressed into the test of neutral point winding D.C. resistance in progress by above-mentioned measuring principle figure as energy Accurately measure the D.C. resistance of winding, it is to be ensured that in measurement circuit cannot other in parallel circuits, otherwise will lead to measured value is The parallel value of the two;It is simultaneously guarantee test safety, non-tested winding will guarantee to open a way.And pressure-neutral point in actually carrying out When D.C. resistance is tested, in the case where not removing a lead and not changing safety measure, since middle pressure, neutral point connect Earth mat can be coupled in parallel in measurement circuit by ground, first winding parallel connection earth mat if directly measuring, the direct current measured Resistance value is the parallel value of the D.C. resistance of winding actual DC resistance value and earth mat, and the result measured and true value is caused to occur Deviation;Low-pressure side is Angle connection and ground connection simultaneously, is not also able to satisfy the requirement of open circuit
Summary of the invention
It is based on not tearing open in view of the above-mentioned deficiencies in the prior art, the technical problem to be solved by the present invention is that providing one kind The test method of transferring the files of 750 kv transformer high pressure lead technologies, by not removing 750 kv transformers height, medium voltage side draws Line is completed to test after transferring the files in the case where removing low-pressure side lead less.This method greatly shortens test period, reduces existing The operating risk of field, has saved a large amount of human and material resources, financial resources cost input.
In order to achieve the above object, the present invention is achieved by the following scheme:
Based on the test method of transferring the files for not tearing 750 kv transformer high pressure lead technologies open, surveyed comprising middle pressure-low pressure no-load voltage ratio Try is depressed into neutral point winding D.C. resistance testing procedure in suddenly;
Medium pressure-low pressure no-load voltage ratio testing procedure are as follows: remove lead at three-phase neutral bushing, it is in parallel to remove first winding Earth mat circuit;Temporary changes low-pressure side safety measure simultaneously pulls open main transformer low-pressure side three-phase ground disconnecting link or removes ground line, Ground connection is disconnected, the earth mat circuit of secondary winding parallel connection is removed;Any one phase low pressure winding wiring is removed simultaneously, opens angular company It connects, removes other two-phase winding loops of secondary winding parallel connection;No-load voltage ratio test is carried out finally by no-load voltage ratio tester;
Medium pressure is to neutral point winding D.C. resistance testing procedure are as follows: removes lead at three-phase neutral bushing, removes The earth mat circuit of first winding parallel connection;Temporary changes low-pressure side safety measure simultaneously, pulls open main transformer low-pressure side three-phase ground disconnecting link Or ground line is removed, ground connection is disconnected, the earth mat circuit of secondary winding parallel connection is removed;Any one phase low pressure winding is removed simultaneously to connect Line opens Angle connection, it is ensured that low-pressure side winding is in open-circuit condition;It is carried out finally by digital direct current resistance meter straight Leakage resistance test.
As a kind of preferred embodiment of the invention: passing through change in medium pressure-low pressure transformation no-load voltage ratio testing procedure Than tester carry out no-load voltage ratio test refer to: by subject transformer primary side making alive U1, then Circuit Fault on Secondary Transformer by Voltage U2 is induced in electromagnetic induction principle, resistance R1 is adjusted, makes galvanometer nulling, simply counted by series loop voltage divider principle Calculation obtains voltage ratio K, is can be found that by above-mentioned measuring principle figure as that can accurately measure voltage ratio K;
Medium pressure is carried out into neutral point winding D.C. resistance testing procedure by digital direct current resistance meter D.C. resistance test refers to: successively by regulated power supply EN and constant-current supply IN to tested winding charging, when test loop transition After process, the measuring resistance of transformer winding and circuit in series all passes through the same electric current IN, at this time according to series loop Characteristic, voltage than being resistance ratio, the resistance value and precise measurement measuring resistance and transformer of known measuring resistance it is tested around The D.C. resistance of tested winding can be calculated after the voltage at group both ends, and the test of neutral point winding D.C. resistance is depressed into progress.
As a kind of preferred embodiment of the invention: 750 kv transformer is single-phase self-coupling formula without excitation transformation Device.
As a kind of preferred embodiment of the invention: 750 kv transformer is YNd11, neutral-point solid ground Connection type.
As a kind of preferred embodiment of the invention: also comprising pressure-low pressure no-load voltage ratio testing procedure and middle pressure in commission Transformer is had a power failure before to neutral point winding D.C. resistance testing procedure, safety measure is arranged after power failure, cloth postpones transformer High, medium and low three side passes through the step of ground line or grounding switch ground connection.
The medicine have the advantages that
1, test of transferring the files is carried out using method of the invention, it is only necessary to remove main transformer three-phase neutral bushing lead and a phase master It is lower and presses winding casing tube lead that can carry out correlation test work, and previous experiment work needs to remove main transformer three-phase high-low pressure Three sides amount to 15 leads, at least need to configure the people an of crane, a high altitude vehicle and 3 times of new type test methods every time Member, new type test method has saved a large amount of time, human and material resources cost in contrast, effectively reduces high altitude operation wind Danger, while reducing to the unnecessary abrasion of fitting.
2, by theoretical research and date comprision, single-phase self-coupling formula is being carried out using test method of transferring the files of the invention Transformer is transferred the files in experiment work, it is only necessary to pressure-low pressure no-load voltage ratio in measurement, in be depressed into neutral point winding D.C. resistance and can have effect The good tap switch physical location simultaneously of card off circuit tap changer contact is consistent with indicating positions, it is compared with the past it is reasonable, have Effect reduces test number (TN).
Detailed description of the invention
Fig. 1 is the transformer connection schematic diagram of the prior art, is had a power failure it illustrates main transformer and after arrangement safety measure Wiring effect;
Fig. 2-1 is the no-load voltage ratio tester schematic diagram of the prior art;
Fig. 2-2 is the no-load voltage ratio test schematic of the prior art (before taking out stitches);
Fig. 2-3 is no-load voltage ratio test schematic of the invention (after taking out stitches);
Fig. 2-4 is that no-load voltage ratio of the invention tests wiring diagram;
Fig. 3-1 is the instrument for measuring DC resistance schematic diagram of the prior art;
Fig. 3-2 is the D.C. resistance test schematic of the prior art (before taking out stitches);
Fig. 3-3 is D.C. resistance test schematic of the invention (after taking out stitches);
Fig. 3-4 is that D.C. resistance of the invention tests wiring diagram;
Fig. 4 is the schematic diagram removed using the lead that the present invention transfer the files when testing.
Description of symbols:
LA: A phase;LB: B phase;LC: C phase;
A:A phase high-voltage winding;X:A phase neutral point winding;A:A phase low pressure winding head end;X:A phase low pressure winding tail end;Am: Winding head end is pressed in A phase;
B:B phase high-voltage winding;Y:B phase neutral point winding;B:B phase low pressure winding head end;Y:B phase low pressure winding tail end;Bm: Winding head end is pressed in B phase;
C:C phase high-voltage winding;Z:C phase neutral point winding;C:C phase low pressure winding head end;Z:C phase low pressure winding tail end;Cm: Winding head end is pressed in C phase.
Specific embodiment
The specific embodiment of the invention is described with reference to the accompanying drawings and embodiments:
As shown, it illustrates a specific embodiment of the invention, as shown, disclosed by the invention be based on not tearing open The test method of transferring the files of 750 kv transformer high pressure lead technologies, by not removing 750 kv transformers height, medium voltage side Lead is completed to test after transferring the files in the case where removing low-pressure side lead less.This method greatly shortens test period, reduces The operating risk at scene, has saved a large amount of human and material resources, financial resources cost input.
We are according to the research to single-phase self-coupling formula without exciting transformer structure note that the adjustment of gear only changes Medium voltage side winding connection, other winding connections do not change, therefore we need to only verify the related electric of medium voltage side winding Parameter, the i.e. correctness of verifying gear ensure that tap switch contact is good simultaneously, therefore can carry out the middle pressure of high pressure-or middle pressure- Low pressure no-load voltage ratio test, high pressure to it is middle pressure winding or in be depressed into neutral point winding D.C. resistance test.From safety and implementation Comprehensively consider in complexity, actual test Scheme Choice of the invention: 1, middle pressure-low pressure no-load voltage ratio test.2, neutrality is depressed into Point winding D.C. resistance test.
In order to realize no-load voltage ratio test more properly and securely, the present invention removes lead at three-phase neutral bushing, removes The earth mat circuit of first winding parallel connection;Temporary changes low-pressure side safety measure simultaneously, pulls open main transformer low-pressure side three-phase ground disconnecting link Or ground line is removed, ground connection is disconnected, the earth mat circuit of secondary winding parallel connection is removed;Any one phase low pressure winding is removed simultaneously to connect Line opens Angle connection, removes other two-phase winding loops of secondary winding parallel connection, test connection such as Fig. 2-4.
In order to realize D.C. resistance test more properly and securely, the present invention removes lead at three-phase neutral bushing, Remove the earth mat circuit of first winding parallel connection;Temporary changes low-pressure side safety measure simultaneously, pulls open main transformer low-pressure side three-phase ground Disconnecting link removes ground line, disconnects ground connection, removes the earth mat circuit of secondary winding parallel connection;Any one phase low pressure winding is removed simultaneously Angle connection is opened in wiring, it is ensured that low-pressure side winding is in open-circuit condition, and the accurate and reliable of test data is effectively ensured, test Wiring diagram such as Fig. 3-4.
In summary the test principle and requirement of no-load voltage ratio and D.C. resistance, scene of the invention take dismounting main transformer The lead of three-phase neutral bushing, remove any one phase main transformer low pressure winding low-tension bushing lead, while temporarily pulling open master Low pressure side three-phase ground disconnecting link or dismounting ground line (as shown in Figure 4) are met under the premise of guaranteeing operating personnel's safety Test request.Scene has carried out relevant test job by this method, and with the test data of conventional dismounting lead into Go comparison, test data no significant difference, and safety and steady is run after putting equipment in service electrification, and it is novel to further demonstrate the set The reliability and accuracy of test method.Specific experiment data are as shown in the table;We carry out three substations under administration Test, every group of test passes through conventional test methodologies and test method of the invention carries out test of transferring the files, experimental result respectively It is as follows:
As seen from the above table, the mistake between the test result and precision and conventional test methodologies of test method of transferring the files of the invention Difference is very small;Meet the regulation of electric system;But three times of working efficiency of the invention really conventional test methodologies;It saves significantly Manpower and time have been saved, power off time and security risk are reduced.
Compared with the prior art, the present invention has the following advantages:
1, only need dismounting main transformer three-phase neutral bushing lead and a phase main transformer low pressure winding casing lead that can carry out phase Experiment work is closed, and previous experiment work needs to remove three side of main transformer three-phase high-low pressure and amounts to 15 leads, at least needs every time The personnel an of crane, a high altitude vehicle and 3 times of new type test methods are configured, new type test method is saved in contrast A large amount of time, human and material resources cost, high altitude operation risk is effectively reduced, while reducing to the unnecessary mill of fitting Damage.
2, it by theoretical research and date comprision, transfers the files in experiment work carrying out single-phase self-coupling formula transformer, only Pressure-low pressure no-load voltage ratio in need to measuring, in be depressed into neutral point winding D.C. resistance can effectively to verify off circuit tap changer contact good Good tap switch physical location simultaneously is consistent with indicating positions, it is compared with the past it is reasonable, be effectively reduced test number (TN).
To sum up, the mentality of designing in specific embodiments of the present invention is as follows:
(1) 750 kv transformer is that YNd11, neutral-point solid ground connection type need to arrange peace after transformer has a power failure Full measure, cloth postpone high, medium and low three side of transformer and pass through ground line or grounding switch ground connection, as shown in Figure 1;
(2) most no-load voltage ratio tester measuring principles are bridge method at present, as shown in Fig. 2-1, by subject transformation The primary side making alive U1 of device adjusts resistance R1, makes then in Circuit Fault on Secondary Transformer since electromagnetic induction principle induces voltage U2 Galvanometer nulling obtains voltage ratio K by series loop voltage divider principle simple computation.
It is can be found that by above-mentioned measuring principle figure as voltage ratio K can be accurately measured, it cannot in first and second side of transformer And there are other circuits.And if pressure-low pressure no-load voltage ratio test (Fig. 2-in being carried out in the case where not changing safety measure and removing lead 2, by taking A phase as an example), since middle pressure, neutral point are grounded, first winding parallel connection earth mat circuit;Low-pressure side is Angle connection simultaneously And be grounded, secondary winding other two-phase low pressure windings of parallel connection and earth mat circuit cause the voltage and current signal for being tested winding to occur Variation, causes test data deviation occur.It realizes correct test, interference circuit (Fig. 2-2 dotted portion) should be disconnected.
In conjunction with actual conditions, neutral point lead is removed, removes the earth mat circuit of first winding parallel connection;Secondly, temporary changes Low-pressure side safety measure pulls open step down side three-phase ground disconnecting link or removes ground line, disconnects ground connection, remove secondary winding Earth mat circuit in parallel;Any one phase low pressure winding wiring is removed simultaneously, opens Angle connection, removes secondary winding parallel connection its His two-phase winding loop, principle signal such as Fig. 2-3, tests wiring such as Fig. 2-4;
Remaining two-phase no-load voltage ratio test similarly, therefore, to realize in the correct test of pressure-low pressure no-load voltage ratio, transformer need to be pulled open In the case where low-pressure side three-phase ground disconnecting link or dismounting ground line, removes three-phase neutral point lead and any one phase low pressure winding is drawn Line.
(3) most D.C. resistance tests are all made of digital direct current resistance meter (3-1) at present, and instrument successively leads to Regulated power supply EN and constant-current supply IN is crossed to tested winding charging, after test loop transient process, transformer winding and The measuring resistance of circuit in series all passes through the same electric current IN, and at this time according to the characteristic of series loop, voltage ratio is resistance ratio, It can be calculated after the resistance value and precise measurement measuring resistance and transformer of known measuring resistance are tested the voltage at winding both ends The D.C. resistance RX of tested winding.
It is can be found that by the measuring principle figure of Fig. 3-1 to be depressed into the D.C. resistance of neutral point winding in capable of accurately measuring, Need to ensure to measure in circuit cannot other in parallel circuits, otherwise will lead to the parallel value that measured value both is;It is simultaneously guarantee examination Safety is tested, non-tested winding will guarantee to open a way.And if (Fig. 3-2, with A in the case where not changing safety measure and removing lead For phase), since middle pressure, neutral point are grounded, first winding parallel connection earth mat causes the result measured and true value to occur inclined Difference;Low-pressure side is that Angle connection constitutes circuit simultaneously.It realizes correct security measurement, tested winding interference circuit (figure should be disconnected At 3-2 dotted line), and guarantee that low-pressure side is opened a way.
In conjunction with actual conditions, lead at dismountable three-phase neutral bushing removes the earth mat circuit of first winding parallel connection;Together When temporary changes low-pressure side safety measure, pull open main transformer low-pressure side three-phase ground disconnecting link or remove ground line, disconnect ground connection, simultaneously Any one phase low pressure winding wiring is removed, opens Angle connection, it is ensured that low-pressure side winding is in open-circuit condition, and test is effectively ensured Accurate and reliable, the test wiring of data
Remaining two-phase D.C. resistance is tested similarly, therefore, to realize in be depressed into the D.C. resistance of neutral point winding and correctly survey Examination in the case where need to pulling open step down side three-phase ground disconnecting link or removing ground line, is removed three-phase neutral point lead and is appointed It anticipates a phase low pressure winding lead.
(4) therefore, to meet the test request of no-load voltage ratio and D.C. resistance in testing program, step down side need to pulled open In the case where three-phase ground disconnecting link or dismounting ground line, three-phase neutral point lead and any one phase low pressure winding (totally four) are removed Lead (Fig. 4)
Smoothly 17, Xinjiang, 750 kv substations complete transformer tune to test method through the invention at present Whole gear and experiment work, test data is accurate and reliable, equal safe and stable operation after putting equipment in service.
By this new type test method, primary work at least 6000 yuan/time of save the cost of transferring the files that have a power failure, Xinjiang has altogether now 28 groups of transformers will save 33.6 ten thousand yuan if every group of transformer is transferred the files 2 times every year every year;In addition, new type test method also contracts Short power off time, while avoiding potential various vehicle drivings, high altitude operation risk.And such new type test method Using any economic input is not necessarily to, it is truly realized cost efficiency.
The preferred embodiment for the present invention is explained in detail above in conjunction with attached drawing, but the present invention is not limited to above-mentioned implementations Mode within the knowledge of a person skilled in the art can also be without departing from the purpose of the present invention It makes a variety of changes, these variations are related to the relevant technologies well-known to those skilled in the art, these both fall within the invention patent Protection scope.
Many other changes and remodeling can be made by not departing from the spirit and scope of the present invention.It should be appreciated that the present invention is not It is limited to specific embodiment, the scope of the present invention is defined by the following claims.

Claims (5)

1. based on the test method of transferring the files for not tearing 750 kv transformer high pressure lead technologies open, it is characterised in that: include middle pressure- Low pressure no-load voltage ratio testing procedure is depressed into neutral point winding D.C. resistance testing procedure in;
Medium pressure-low pressure no-load voltage ratio testing procedure are as follows: remove lead at three-phase neutral bushing, remove the ground of first winding parallel connection Net circuit;Temporary changes low-pressure side safety measure simultaneously pulls open main transformer low-pressure side three-phase ground disconnecting link or removes ground line, disconnects Ground connection removes the earth mat circuit of secondary winding parallel connection;Any one phase low pressure winding wiring is removed simultaneously, opens Angle connection, is moved Except other two-phase winding loops of secondary winding parallel connection;No-load voltage ratio test is carried out finally by no-load voltage ratio tester;
Medium pressure is to neutral point winding D.C. resistance testing procedure are as follows: removes lead at three-phase neutral bushing, removes primary The earth mat circuit of winding parallel;Temporary changes low-pressure side safety measure simultaneously, pulls open main transformer low-pressure side three-phase ground disconnecting link or tears open Except ground line, ground connection is disconnected, removes the earth mat circuit of secondary winding parallel connection;Any one phase low pressure winding wiring is removed simultaneously, is beaten Open Angle connection, it is ensured that low-pressure side winding is in open-circuit condition;Direct current is carried out finally by digital direct current resistance meter Resistance test.
2. special as described in claim 1 based on the test method of transferring the files for not tearing 750 kv transformer high pressure lead technologies open Sign is: in medium pressure-low pressure transformation no-load voltage ratio testing procedure by no-load voltage ratio tester carry out no-load voltage ratio test referring to: by Be tested the primary side making alive U1 of transformer, then in Circuit Fault on Secondary Transformer since electromagnetic induction principle induces voltage U2, adjustment Resistance R1 makes galvanometer nulling, obtains voltage ratio K by series loop voltage divider principle simple computation;
Medium pressure carries out direct current by digital direct current resistance meter into neutral point winding D.C. resistance testing procedure Resistance test refers to: successively tested winding charging is given by regulated power supply EN and constant-current supply IN, when test loop transient process After, the measuring resistance of transformer winding and circuit in series all passes through the same electric current, at this time according to the characteristic of series loop, Voltage is tested winding both ends than being resistance ratio, in the resistance value and precise measurement measuring resistance and transformer of known measuring resistance The D.C. resistance of tested winding can be calculated after voltage, and the test of neutral point winding D.C. resistance is depressed into progress.
3. special as described in claim 1 based on the test method of transferring the files for not tearing 750 kv transformer high pressure lead technologies open Sign is: 750 kv transformer is single-phase self-coupling formula without exciting transformer.
4. special as described in claim 1 based on the test method of transferring the files for not tearing 750 kv transformer high pressure lead technologies open Sign is: 750 kv transformer is YNd11, neutral-point solid ground connection type.
5. special as described in claim 1 based on the test method of transferring the files for not tearing 750 kv transformer high pressure lead technologies open Sign is: also comprising pressure-low pressure no-load voltage ratio testing procedure in commission and in be depressed into neutral point winding D.C. resistance testing procedure it It is preceding that transformer has a power failure, safety measure is arranged after power failure, cloth postpones high, medium and low three side of transformer and passes through ground line or ground connection The step of disconnecting link is grounded.
CN201710769923.7A 2017-08-31 2017-08-31 Based on the test method of transferring the files for not tearing 750 kv transformer high pressure lead technologies open Active CN107449987B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710769923.7A CN107449987B (en) 2017-08-31 2017-08-31 Based on the test method of transferring the files for not tearing 750 kv transformer high pressure lead technologies open

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710769923.7A CN107449987B (en) 2017-08-31 2017-08-31 Based on the test method of transferring the files for not tearing 750 kv transformer high pressure lead technologies open

Publications (2)

Publication Number Publication Date
CN107449987A CN107449987A (en) 2017-12-08
CN107449987B true CN107449987B (en) 2019-09-10

Family

ID=60494734

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710769923.7A Active CN107449987B (en) 2017-08-31 2017-08-31 Based on the test method of transferring the files for not tearing 750 kv transformer high pressure lead technologies open

Country Status (1)

Country Link
CN (1) CN107449987B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111337750B (en) * 2020-02-11 2021-12-21 深圳供电局有限公司 Method and device for synchronously testing direct resistance of three-phase winding of cable outgoing type transformer
CN112433105B (en) * 2020-10-27 2024-02-09 吴江变压器有限公司 Transformer semi-finished product transformation ratio measuring method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101354418A (en) * 2008-09-22 2009-01-28 河南省电力公司商丘供电公司 Power transformer test method without disconnecting wire
CN101769961A (en) * 2008-12-30 2010-07-07 上海金炫建设工程有限公司 Method for testing direct current resistance of large transformer without disconnecting lead
CN102095954A (en) * 2010-12-17 2011-06-15 青海电力科学试验研究院 Preventive test method for capacitance voltage transformer free from dismounting lead
CN103336186A (en) * 2012-12-18 2013-10-02 辽宁省电力有限公司检修分公司 Method for testing transformer equipment without disassembling lead
CN105974229A (en) * 2016-05-06 2016-09-28 国网山东省电力公司青州市供电公司 Disconnection-free testing method for high voltage electric equipment in transformer substation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101354418A (en) * 2008-09-22 2009-01-28 河南省电力公司商丘供电公司 Power transformer test method without disconnecting wire
CN101769961A (en) * 2008-12-30 2010-07-07 上海金炫建设工程有限公司 Method for testing direct current resistance of large transformer without disconnecting lead
CN102095954A (en) * 2010-12-17 2011-06-15 青海电力科学试验研究院 Preventive test method for capacitance voltage transformer free from dismounting lead
CN103336186A (en) * 2012-12-18 2013-10-02 辽宁省电力有限公司检修分公司 Method for testing transformer equipment without disassembling lead
CN105974229A (en) * 2016-05-06 2016-09-28 国网山东省电力公司青州市供电公司 Disconnection-free testing method for high voltage electric equipment in transformer substation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
不拆引线测量500KV自耦变压器套管电容量及介质损耗的方法;张振兴 等;《中国电力》;20140831;第47卷(第8期);21-26

Also Published As

Publication number Publication date
CN107449987A (en) 2017-12-08

Similar Documents

Publication Publication Date Title
CN101833043B (en) Method for measuring electric capacity and dielectric loss of capacitance type voltage transformer
CN110031718B (en) Method for verifying integrity of alternating current circuit by pressurizing low-voltage side of railway traction station
CN102565618A (en) Method for detecting zero-sequence voltage circuit of transformer substation
CN102608485B (en) Detection method for zero-sequence current loops of transformer substations
CN104345245B (en) Method for checking voltage transformer wiring correctness by using transformer turn ratio & group tester
CN101539616A (en) Method for detecting accuracy of optical current transformer for measuring
CN106771647A (en) A kind of low current neutral grounding electric network capacitance current measurement method
CN108254658A (en) A kind of distribution earth fault searches instrument and lookup method
CN107807282A (en) The method of tested media loss factor and capacitance under transformer non-dismantle high voltages fuse
CN107449987B (en) Based on the test method of transferring the files for not tearing 750 kv transformer high pressure lead technologies open
CN103424627B (en) The method of double-end measurement parallel grid line zero-sequence impedance
CN101614798A (en) Polarity detection system of electronic transformer
CN105606951A (en) Method and device for measuring polarity of capacitor voltage transformer by using self-excitation method
CN109283421B (en) Low-voltage power-on detection test method and device for railway traction substation
CN107340490A (en) Voltage transformer verification platform and boosting compensation method in GIS
CN203849294U (en) Overhead line parameter measuring line connecting device
CN109557494A (en) A kind of harmonic measuring device and system based on capacitance type potential transformer
CN103487617B (en) Three-phase once logical pressure and the most through-flow device
CN209373017U (en) A kind of rail traction substation low-voltage energization detection experimental rig
CN105699781B (en) A kind of transformer leakage inductance and Measuring DC Resistance
CN103698596B (en) A kind of power system high voltage meter and method
CN113156276B (en) Method for checking and debugging secondary voltage loop of bus alternating-current withstand voltage test of switching equipment
CN209878904U (en) Black start test system of power system
CN109406907A (en) High-impedance transformer simulates on-load through-flow test device and test method
CN213302497U (en) Current transformer secondary side loop detection device and circuit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant