CN109406907A - High-impedance transformer simulates on-load through-flow test device and test method - Google Patents

High-impedance transformer simulates on-load through-flow test device and test method Download PDF

Info

Publication number
CN109406907A
CN109406907A CN201811499769.7A CN201811499769A CN109406907A CN 109406907 A CN109406907 A CN 109406907A CN 201811499769 A CN201811499769 A CN 201811499769A CN 109406907 A CN109406907 A CN 109406907A
Authority
CN
China
Prior art keywords
phase
frequency
current
wideband
host
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811499769.7A
Other languages
Chinese (zh)
Other versions
CN109406907B (en
Inventor
于游
田景辅
罗钧
李禹�
田鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201811499769.7A priority Critical patent/CN109406907B/en
Publication of CN109406907A publication Critical patent/CN109406907A/en
Application granted granted Critical
Publication of CN109406907B publication Critical patent/CN109406907B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R29/00Arrangements for measuring or indicating electric quantities not covered by groups G01R19/00 - G01R27/00
    • G01R29/20Measuring number of turns; Measuring transformation ratio or coupling factor of windings
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/50Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
    • G01R31/62Testing of transformers

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Testing Relating To Insulation (AREA)

Abstract

A kind of high-impedance transformer simulation on-load through-flow test device and test method, including electronic three-phase wideband power supply and three-phase high-current generator, wideband are without phase of line telemetering equipment;Electronic three-phase wideband power supply output end is connect with three-phase main-frequency high current current lifting device, and the current lifting device three-phase main-frequency high current is made of three consistent isolating transformers of specifications and models;Measurement first does time calibration wideband wireless telemetering phase device host and extension set before starting, and progress power frequency is through-flow, low frequency is through-flow, detects the correctness of differential protection hexagonal figure;No-load voltage ratio is measured, judge no-load voltage ratio, polar correctness and carries out difference stream operation;This invention ensures that the safe and stable operation of system, improves the success rate that once puts into operation.

Description

High-impedance transformer simulates on-load through-flow test device and test method
Technical field
The present invention relates to relay protection fields more particularly to a kind of high-impedance transformer to simulate on-load through-flow test device And test method.
Background technique
2018 editions-State Grid Co., Ltd., the 18 great anti-accident measures of power grid (revised edition) relay protected operation pipes Reason requires: all protection current loops are before putting into operation, except should meet current transformer precision and measurement in load current It is correctly outer that no-load voltage ratio, polarity and electric current and voltage circuit phase relation are measured under conditions of meter precision, it is necessary to measure in each The out-of-balance current (or voltage) of property line, to guarantee the correctness of protective device and second loop return wiring.
With the development of electric system, transformer individual capacity is increasing, self coupling more than 1000MVA/500kV voltage Formula transformer (the boosting change including power plant, Qi Beibian) covers in addition since short-circuit impedance is higher (up to 100 ohm or more) Pipe CT no-load voltage ratio is larger (4000/1).Existing three-phase through-flow test method majority can only be through-flow to bus bar circuit, logical to transformer Stream substantially using stand in maintenance power box 380V directly power or pass through boosting mode (2kV) it is through-flow to high voltage side of transformer, Several amperes may only be added in this way in transformer primary side current, and station interior power capacity limit can be often subject to System, being reflected in CT secondary side current can only be to 0.5~2mA, since the highest of protective device display screen measurement secondary current is differentiated Rate only has 10mA, can not read the secondary current value that the 380V voltage of power frequency application generates at all, be increased using boosting mode and tried The safety and live operability when power supply capacity necessarily affects equipment application are tested, simulation load test differential protection band is given Carry out very big inconvenience.Due to the reason of transformer impedance range wide (1.5~200), transformer belt load polarity test generally can only It can be measured after transformer puts into operation, risk will certainly be brought to putting equipment in service in this way.
Summary of the invention
The present invention is that solve to apply when transformer impedance is excessively high to lead to power frequency through-flow test electric current less than normal, can not normally be measured The problem of secondary loop current phase and amplitude, propose a kind of high-impedance transformer simulation on-load through-flow test experimental rig and Test method can differentiate the protective device quadratic phase relationship for have strict demand to phase and protect the correctness in direction, pass through High-precision frequency-selecting phase meter test transformer high and low pressure side CT secondary singal differentiates the pole of current loop in current differential protection The correctness of sexual intercourse and no-load voltage ratio uses three phase low frequency power supply simulation load test transformer differential protection test method can be with Decades of times reduces experiment power supply capacity, Measurement reliability height and accuracy.
The technical solution of the invention is as follows:
A kind of high-impedance transformer simulates on-load through-flow test device, including electronic three-phase wideband power supply and three-phase it is big Current feedback circuit, wideband are without phase of line telemetering equipment;Electronic three-phase wideband power supply output end and three-phase main-frequency high current flow up Device connection, the current lifting device three-phase main-frequency high current are made of three consistent isolating transformers of specifications and models.
Further, the wideband includes host and extension set without phase of line telemetering equipment, and host and extension set include letter simultaneously Number acquisition module, signal amplification module, analog-to-digital conversion module, data processing module and wireless communication module, the host data Processing module and extension set data processing module are respectively adopted the single-chip microcontroller with Floating-point Computation function and are respectively equipped with time calibration Mouthful;Lubber-line, institute are equipped between host data processing module time calibration mouthful and extension set data processing module time calibration mouthful State host data processing module output time reference pulse, the time that the extension set data processing module is issued by receiving host The calibration of reference pulse deadline, realizes and synchronizes.
Further, the electronic three-phase wideband voltage source includes three-phase alternating current electrical input, hvdc circuit, H Bridge circuit, pwm chip and sine of the third order filter circuit;
The alternating current is three-phase dynamic electricity source, and high voltage direct current, the hvdc circuit width are obtained after rectified filtering Value is 565V, and the busbar voltage after rectifying and wave-filtering is added to the H bridge both ends of pwm chip driving, generates high frequency voltage, H bridge electricity The high frequency voltage of road output exports required voltage through sine of the third order filter circuit;
DC inverter is the alternating current of some frequency or variable frequency by the H-bridge circuit by the folding of switch, Switch is controlled by pwm chip;
The pwm chip is SPWM sinusoidal pulse width modulation chip;
The H-bridge circuit output end connect the host data processing module and extension set data with sine of the third order filter circuit The mode that processing module is all made of DSP digital filtering handles sampled data, realizes frequency-selecting and the measurement of wideband.
A kind of high-impedance transformer simulation on-load through-flow test method, it is characterized in that:
Step 1: measurement first does time calibration to wideband wireless telemetering phase device host and extension set before starting, specific to grasp Make mode are as follows:
1, lubber-line is inserted into host calibration mouth and used extension set calibration mouth respectively;
2, host setting is measured into interface in communication, extension set is set in electric current communication measurement interface;
3, system automatic Verification and make verification complete prompt;
4, lubber-line is pulled out, verification is completed, continues subsequent measurement;
Step 2: it requires to complete patching operations according to wiring;
Step 3: power frequency is through-flow
Bus interval three-phase circuit in three-phase high current current lifting device output end docking station, wideband is without phase of line telemetering equipment master Machine selects any one phase CT secondary current as benchmark, extension set measurement interval circuit threephase switch CT secondary current phase and width Value is sent to host;
Step 4: low frequency is through-flow
By step down side primary circuit by bus grounding switch short circuit, start electronic three-phase wideband power supply to change The pressurization of depressor high-pressure side low frequency, and the cannula C T secondary loop current Adjustment Tests detected according to wideband wireless telemetering phase device Frequency and output voltage make transformer high-low-voltage side cannula C T secondary current amplitude reach measuring accuracy requirement;
Extension set sends transformer high-low-voltage side cannula C T secondary current amplitude respectively and believes with the phase of host reference data Breath detects the correctness of differential protection hexagonal figure to host;
Step 5: the phase and amplitude information sent according to extension set draws hexagonal relational graph, and measures no-load voltage ratio, judges to become Than, polar correctness and carry out difference stream operation.
Further, the electronic three-phase wideband power supply and wideband use its low frequency part, institute without phase of line telemetering equipment It states electronic three-phase wideband power supply output frequency and is respectively less than 5Hz with no phase of line telemetering equipment detection frequency.
Further, using low frequency to pass through transformer realizes simulation on-load through-flow test theoretical foundation for transformer short-circuit resistance Anti- to be rendered as perception, impedance value and test frequency size are proportional.
Further, the 10% of rated current is less than to the electric current that transformer applies using electronic three-phase wideband power supply, root According to automatically controlling after Selection experiment frequency, voltage magnitude output guarantees transformer core and cannula C T is not in low frequency saturation.
Further, the low-frequency current of primary circuit is made to reach 10A or more by adjusting experimental rig voltage in step 4, Two side CT secondary current of bushing shell for transformer is more than 10mA.
A kind of high-impedance transformer a flow-through test method disclosed in this invention and testing equipment, can be in secondary guarantor After protection unit current loop improves, carry out completing each winding current phase and current loop integrality when through-flow test before going into operation Detection, a possibility that avoiding current phase mistake after equipment live, ensure that the safe and stable operation of system, improve one The secondary success rate that puts into operation.Beneficial outcomes are as follows:
1, the power supply capacity of decades of times can be reduced using the present invention, and be convenient for onsite moving;
2, three-phase wideband power supply of the invention, three-phase high-current generator, wideband are without phase of line telemetering equipment using seperated Structured Design further mitigates weight of equipment, improves live operability;
3, electronic three-phase wideband power supply, voltage output end need not increase isolating transformer by the way of the filtering of three ranks, Greatly mitigate weight of equipment;
Wideband can track simultaneously measuring transformer high-low pressure cannula C T secondary current without phase of line telemetering equipment to test frequency The amplitude of each phase with the phase relation of reference data and draws out the hexagonal figure of differential protection;Using wireless transmission, avoid introducing Voltage reference dragging line causes security risk.
Detailed description of the invention
The accompanying drawings constituting a part of this application is used to provide further understanding of the present application, and the application's shows Meaning property embodiment and its explanation do not constitute the restriction to the application for explaining the application.With reference to the accompanying drawing to the present invention It is further elaborated.
Fig. 1 is electronic three-phase wideband voltage source structural schematic diagram;
Fig. 2 is wideband without phase of line telemetering equipment structural schematic diagram;
Fig. 3 is high-impedance transformer a flow-through test device wiring schematic diagram.
Specific embodiment
As shown in figure 3, high-impedance transformer simulation on-load through-flow test device of the invention, including electronic three-phase are wide Frequency power, three-phase high-current generator and wideband are without phase of line telemetering equipment;
As shown in Figure 1, the electronic three-phase wideband voltage source is by three-phase alternating current electrical input, hvdc circuit, H bridge Circuit, pwm chip and sine of the third order filter circuit composition.
The alternating current is three-phase dynamic electricity source, and high voltage direct current, the high voltage direct current amplitude are obtained after rectified filtering For 565V, the busbar voltage after rectifying and wave-filtering is added to the H-bridge circuit both ends of pwm chip driving, generates high frequency voltage, H bridge The high frequency voltage of circuit output exports required voltage through sine of the third order filter circuit.
The H-bridge circuit plays inversion because load or output end both end voltage that it can be made to connect or electric current are reversed herein DC inverter is the alternating current of some frequency or variable frequency, is switched by PWM by the effect of device by the folding of switch Control chip controls.
By pwm chip, specially SPWM SPWM Technique, SPWM passes through not equal to a series of width Pulse is modulated, and comes equivalent sine waveform (amplitude, phase and frequency).Solves contact voltage regulator using such working method The problem of carbon brush rapid wear, while electric drive switch has heat protection function, it being capable of the operation of long-time full load.
The high frequency voltage filtering mode that the electronic three-phase wideband voltage source is exported in the power tube output end of H-bridge circuit For the filtering of three ranks, guarantee that the boundary on filter frequencies curve between passband and stopband is more precipitous, so that the selectivity of filter It is higher, have output impedance low, the characteristics of filter effect, without increasing isolating transformer.It is exported after the filtering of wideband voltage source wide Frequency electric voltage frequency is 0.5Hz-300Hz, output voltage 380V, output electric current 50A.
Electronic three-phase wideband power supply output end connects three-phase main-frequency high current current lifting device, and current lifting device is by three specifications and models Consistent isolating transformer composition, input terminal and output end no-load voltage ratio are 20:1, and current lifting device port input voltage reaches 380V, current lifting device Port output voltage reaches 200A close to 20V, single-phase output electric current, covers existing to the through-flow test of the power frequency of bus bar circuit.
The electric current that the present invention applies transformer using electronic three-phase wideband power supply less than rated current 10% hereinafter, It can guarantee transformer core according to voltage magnitude output is automatically controlled after Selection experiment frequency and cannula C T is not in that low frequency is full With.
The exportable 0.5Hz-300Hz three-phase of electronic three-phase wideband power supply 120 ° of symmetrical alternating current signal each other, output electricity 380V, output-current rating 50A are pressed, use can be met by the three-phase alternating current power supply in maintenance power box in substation and wanted It asks;It is worked by the way of the filtering of three ranks, standard sine wave has output impedance low, the characteristics of good wave filtering effect, without increase Isolating transformer carries out isolation filter;Using the high frequency switch mode work of SPWM control driving, this working method, which solves, to be connect The carbon brush rapid wear problem of touch pressure regulator, electric drive switch itself and have heat protection function, can long-time operation at full load.
As shown in Fig. 2, the wideband includes host and extension set without phase of line telemetering equipment, host and extension set respectively include letter Number acquisition module, signal amplification module, analog-to-digital conversion module, data processing module and wireless communication module, the host data The single-chip microcontroller (STM32F4 series) with Floating-point Computation function is respectively adopted in processing module and extension set data processing module, and divides It She You not time calibration mouthful;Between host data processing module time calibration mouthful and extension set data processing module time calibration mouthful Equipped lubber-line, the host data processing module export time reference pulse, and the extension set data processing module passes through reception The time reference pulse deadline calibration that host issues, hereafter can turn-off time base company's wiring, realize main, extension set time It is synchronous.
By the way of wireless transmission, host selectes voltage or electric current is reference data, and main, extension set automatic tracing is applied Voltage or electric current frequency, realize the measurement of low frequency signal phase and amplitude, host is subjected to extension set multiple groups measurement data, and Color screen shows phase relation, that is, hexagonal figure.
The signal acquisition module includes the acquisition of voltage signal and the acquisition of current signal, and voltage signal passes through partial pressure side Formula obtains voltage signal, and current signal is stuck in induction secondary current signal in CT secondary terminals sub-line by open type current clamp.
It is suitable that the signal amplification module is selected according to the anti-interference ability of signal and the voltage reference of analog-to-digital conversion module Amplification factor and digital filtering processing is done to high-frequency signal.
Host data processing and extension set data processing module be all made of the mode of DSP digital filtering to sampled data into Row processing, refers specifically to discrete sampled point carrying out discrete Fourier transform, converts frequency-region signal for time-domain signal, realizes choosing The measurement of frequency and wideband.
The wireless communication module uses the semiduplex communication modes of low frequency 170MHz, can easily pass through wall, shielding etc. Obstacle realizes Long-range Data Transmission.
The wideband without phase of line telemetering equipment host and extension set can automatic tracing voltage or electric current frequency, realize low frequency The measurement of signal phase and amplitude.
The wideband is shown without phase of line telemetering equipment host using 7 cun of color screens, and multiple groups measurement data is subjected to and handles, And hexagonal phase diagram is drawn according to measurement data.
Electronic three-phase wideband power supply output end connects high voltage side of transformer in field application, and wideband is filled without phase of line telemetering It sets host current clamp and is stuck in high voltage side of transformer cannula C T bis- times with A phase reference data the most, the current clamp of extension set is stuck in Step down side cannula C T bis- times three-phase is tested respectively.
The high-impedance transformer simulates on-load through-flow test method, and its step are as follows:
Step 1: measurement first does time calibration to wideband wireless telemetering phase device host and extension set before starting, specific to grasp Make mode are as follows:
1, lubber-line is inserted into host calibration mouth and used extension set calibration mouth respectively;
2, host setting is measured into interface in communication, extension set is set in electric current communication measurement interface;
3, system automatic Verification and make verification complete prompt;
4, lubber-line is pulled out, verification is completed, continues subsequent measurement.
Step 2: it requires to complete patching operations as shown in Figure 2 according to wiring.
Step 3: power frequency is through-flow
Bus interval three-phase circuit in three-phase high current current lifting device output end docking station, wideband is without phase of line telemetering equipment master Machine selects any one phase CT secondary current as benchmark, extension set measurement interval circuit threephase switch CT secondary current phase and width Value is sent to host;
Step 4: low frequency is through-flow
By step down side primary circuit by bus grounding switch short circuit, start electronic three-phase wideband power supply to change The pressurization of depressor high-pressure side low frequency, and the cannula C T secondary loop current Adjustment Tests detected according to wideband wireless telemetering phase device Frequency and output voltage make transformer high-low-voltage side cannula C T secondary current amplitude reach measuring accuracy requirement;
Extension set sends transformer high-low-voltage side cannula C T secondary current amplitude respectively and believes with the phase of host reference data Breath detects the correctness of differential protection hexagonal figure to host;
Step 5: the phase and amplitude information sent according to extension set draws hexagonal relational graph, and sets no-load voltage ratio, judges to become Than, polar correctness and carry out difference stream operation.
Low frequency through-flow test foundation:
High-power transformer short-circuit impedance is in perception, it is assumed that its perceptual weight is n times of (n of resistive component under the conditions of power frequency Value depends on transformer parameter, even tens times of reachable decades of times under the conditions of power frequency), according to impedance computation formulaAs f=50Hz, induction reactance X0=100 π L are n times of resistance, and impedance value is close to induction reactance at this time Value.When f is low frequency m, induction reactance X1=2m π L, takes m=5Hz, and transformer impedance value reduces close to 10 times, with power frequency at this time Test current of transformer increases 10 times under the threshold voltages such as 50Hz, and with the reduction of frequency, impedance reduces more obvious, note Enter electric current linearly to increase.
The present invention is in perceptual characteristic using Transformer Short Circuit Impedance, through-flow using low-frequency power simulation on-load, mainly Solve the problem of to apply when power frequency through-flow test that electric current is less than normal can not normally measure secondary loop current amplitude and phase.
This device opens standby change in Liaoning Datang world Huludao City 2 × 35MW of Power Co., Ltd. new construction 1# Depressor differential protection wiring carries out the detection of hexagonal vectogram.The three phase mains of device sets 5Hz test frequency from 220kV Line side (high voltage side of transformer) applies, the double entrance bus whole short circuit groundings of the side 6.3kV generator, so that test current passes through Cross transformer and generate low frequency short circuit current in two side of low pressure, by each phase current magnitude of transformer high-low-voltage cannula C T second test and Phase judges the wiring in transformer differential protection circuit by hexagonal vectogram and calculates difference stream.By low frequency measurement data with The comparison of power frequency measurement data, demonstrates the correctness of low frequency three-phase through-flow theory.
The above is only specific embodiments of the present invention, are not intended to restrict the invention, for those skilled in the art For member, the invention may be variously modified and varied.All within the spirits and principles of the present invention, it is made it is any modification, Equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (8)

1. a kind of high-impedance transformer simulates on-load through-flow test device, it is characterized in that: including electronic three-phase wideband power supply With three-phase high-current generator, wideband without phase of line telemetering equipment;Electronic three-phase wideband power supply output end and three-phase main-frequency are big The connection of electric current current lifting device, the current lifting device three-phase main-frequency high current are made of three consistent isolating transformers of specifications and models.
2. the high-impedance transformer according to claim 1 simulates on-load through-flow test device, it is characterized in that: the width Frequency includes host and extension set without phase of line telemetering equipment, host and extension set respectively include signal acquisition module, signal amplification module, Analog-to-digital conversion module, data processing module and wireless communication module, the host data processing module and extension set data processing mould Block is respectively adopted the single-chip microcontroller with Floating-point Computation function and is respectively equipped with time calibration mouthful;In the host data processing module time It calibrates and is equipped with lubber-line between mouth and extension set data processing module time calibration mouthful, the host data processing module exports the time Reference pulse, the extension set data processing module are calibrated by the time reference pulse deadline that receiving host issues, are realized It is synchronous.
3. high-impedance transformer according to claim 1 simulates on-load through-flow test device, it is characterized in that: the electronics Formula three-phase wideband voltage source is by three-phase alternating current electrical input, hvdc circuit, H-bridge circuit, pwm chip and sine of the third order Filter circuit composition;
The alternating current is three-phase dynamic electricity source, high voltage direct current is obtained after rectified filtering, the hvdc circuit amplitude is 565V, the busbar voltage after rectifying and wave-filtering are added to the H bridge both ends of pwm chip driving, generate high frequency voltage, and H-bridge circuit is defeated High frequency voltage out exports required voltage through sine of the third order filter circuit;
DC inverter is the alternating current of some frequency or variable frequency, switch by the H-bridge circuit by the folding of switch It is controlled by pwm chip;
The pwm chip is SPWM sinusoidal pulse width modulation chip;
The H-bridge circuit output end connect the host data processing and extension set data processing module with sine of the third order filter circuit The mode for being all made of DSP digital filtering handles sampled data, realizes frequency-selecting and the measurement of wideband.
4. using the high-impedance transformer mould of high-impedance transformer as described in claim 1 simulation on-load through-flow test device Quasi- on-load through-flow test method, it is characterized in that:
Step 1: measurement first does time calibration, concrete operations side to wideband wireless telemetering phase device host and extension set before starting Formula are as follows:
1) lubber-line is inserted into host calibration mouth and used extension set calibration mouth respectively;
2) host setting is measured into interface in communication, extension set is set in electric current communication measurement interface;
3) system automatic Verification and make verification complete prompt;
4) lubber-line is pulled out, verification is completed, continues subsequent measurement;
Step 2: it requires to complete patching operations according to wiring;
Step 3: power frequency is through-flow
Bus interval three-phase circuit in three-phase high current current lifting device output end docking station, wideband are selected without phase of line telemetering equipment host Any one phase CT secondary current is selected as benchmark, extension set measurement interval circuit threephase switch CT secondary current phase and amplitude are sent To host;
Step 4: low frequency is through-flow
By step down side primary circuit by bus grounding switch short circuit, start electronic three-phase wideband power supply to transformer The pressurization of high-pressure side low frequency, and the cannula C T secondary loop current Adjustment Tests frequency detected according to wideband wireless telemetering phase device And output voltage, so that transformer high-low-voltage side cannula C T secondary current amplitude is reached measuring accuracy requirement;
Extension set send respectively transformer high-low-voltage side cannula C T secondary current amplitude and with the phase information of host reference data extremely Host detects the correctness of differential protection hexagonal figure;
Step 5: the phase and amplitude information sent according to extension set draws hexagonal relational graph, and measures no-load voltage ratio, judges no-load voltage ratio, pole Property correctness and carry out difference stream operation.
5. high-impedance transformer according to claim 4 simulates on-load through-flow test method, it is characterized in that: the electronics Formula three-phase wideband power supply and wideband use its low frequency part, the electronic three-phase wideband power supply output without phase of line telemetering equipment Frequency is respectively less than 5Hz with no phase of line telemetering equipment detection frequency.
6. high-impedance transformer according to claim 4 simulates on-load through-flow test method, it is characterized in that: using low frequency It passes through transformer and realizes that simulation on-load through-flow test theoretical foundation is that Transformer Short Circuit Impedance is rendered as perception, impedance value and examination It is proportional to test frequency size.
7. high-impedance transformer according to claim 4 simulates on-load through-flow test method, it is characterized in that: using electronics The electric current that formula three-phase wideband power supply applies transformer is less than the 10% of rated current, according to automatically controlling after Selection experiment frequency Voltage magnitude output guarantees transformer core and cannula C T is not in low frequency saturation.
8. high-impedance transformer according to claim 4 simulates on-load through-flow test method, it is characterized in that: in step 4 The low-frequency current of primary circuit is set to reach 10A or more, two side CT secondary current of bushing shell for transformer by adjusting experimental rig voltage More than 10mA.
CN201811499769.7A 2018-12-09 2018-12-09 High-impedance transformer simulation loaded through-flow test device and test method Active CN109406907B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811499769.7A CN109406907B (en) 2018-12-09 2018-12-09 High-impedance transformer simulation loaded through-flow test device and test method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811499769.7A CN109406907B (en) 2018-12-09 2018-12-09 High-impedance transformer simulation loaded through-flow test device and test method

Publications (2)

Publication Number Publication Date
CN109406907A true CN109406907A (en) 2019-03-01
CN109406907B CN109406907B (en) 2021-03-02

Family

ID=65458006

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811499769.7A Active CN109406907B (en) 2018-12-09 2018-12-09 High-impedance transformer simulation loaded through-flow test device and test method

Country Status (1)

Country Link
CN (1) CN109406907B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111208373A (en) * 2020-02-20 2020-05-29 中国电力科学研究院有限公司 Mutual load method-based transformer rated operation condition simulation method and system
CN113030620A (en) * 2021-03-16 2021-06-25 马鞍山钢铁股份有限公司 Transformer differential protection phasor test system and method
CN114062875A (en) * 2021-11-18 2022-02-18 株洲时代新材料科技股份有限公司 Device and method for testing impedance characteristics of rail insulation and parts thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006084203A (en) * 2004-09-14 2006-03-30 Mitsubishi Electric Engineering Co Ltd Direct-current grounding warning device
CN201141903Y (en) * 2007-12-14 2008-10-29 浙江省送变电工程公司 Load test instrument of three-phase through-flow simulation belt of transforming station
CN203465372U (en) * 2013-09-30 2014-03-05 福建省电力工程承包公司 Once through-flow three-phase simultaneous measurement detector for transformer station device
CN104730408A (en) * 2015-03-03 2015-06-24 国家电网公司 Method for verifying correctness of differential circuit of transformer with large capacity
CN206208997U (en) * 2016-11-15 2017-05-31 甘肃送变电工程公司 A kind of transforming plant primary flow device
CN207281271U (en) * 2017-10-19 2018-04-27 中国南方电网有限责任公司超高压输电公司柳州局 A kind of secondary through-flow instrument of portable type current transformer
CN210109220U (en) * 2018-12-09 2020-02-21 国网辽宁省电力有限公司锦州供电公司 High-impedance transformer simulation loaded through-flow test device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006084203A (en) * 2004-09-14 2006-03-30 Mitsubishi Electric Engineering Co Ltd Direct-current grounding warning device
CN201141903Y (en) * 2007-12-14 2008-10-29 浙江省送变电工程公司 Load test instrument of three-phase through-flow simulation belt of transforming station
CN203465372U (en) * 2013-09-30 2014-03-05 福建省电力工程承包公司 Once through-flow three-phase simultaneous measurement detector for transformer station device
CN104730408A (en) * 2015-03-03 2015-06-24 国家电网公司 Method for verifying correctness of differential circuit of transformer with large capacity
CN206208997U (en) * 2016-11-15 2017-05-31 甘肃送变电工程公司 A kind of transforming plant primary flow device
CN207281271U (en) * 2017-10-19 2018-04-27 中国南方电网有限责任公司超高压输电公司柳州局 A kind of secondary through-flow instrument of portable type current transformer
CN210109220U (en) * 2018-12-09 2020-02-21 国网辽宁省电力有限公司锦州供电公司 High-impedance transformer simulation loaded through-flow test device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吴炳晨 等: "AP1000核电发_变组短路阻抗法通流试验研究_吴炳晨", 《智能电网》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111208373A (en) * 2020-02-20 2020-05-29 中国电力科学研究院有限公司 Mutual load method-based transformer rated operation condition simulation method and system
CN113030620A (en) * 2021-03-16 2021-06-25 马鞍山钢铁股份有限公司 Transformer differential protection phasor test system and method
CN114062875A (en) * 2021-11-18 2022-02-18 株洲时代新材料科技股份有限公司 Device and method for testing impedance characteristics of rail insulation and parts thereof

Also Published As

Publication number Publication date
CN109406907B (en) 2021-03-02

Similar Documents

Publication Publication Date Title
CN109406907A (en) High-impedance transformer simulates on-load through-flow test device and test method
CN109884439B (en) Black-start test system and method for power system
CN203299270U (en) Device for accurately measuring CVT grid-side voltage harmonic wave
CN108919002A (en) A kind of test macro of direct-current charging post
CN205103361U (en) High voltage electric energy metering device detector of working a telephone switchboard
CN105891606A (en) Device for testing tower grounding resistance through disassembly-free ground lead
CN210051836U (en) Intelligent large-current temperature rise test system
CN204575811U (en) A kind of test macro of high-voltage switch contact
CN102830287B (en) Circuit power frequency parameter measuring device capable of eliminating power frequency interference
Schöttke et al. Transfer characteristic of a MV/LV transformer in the frequency range between 2 kHz and 150 kHz
CN208384025U (en) A kind of test macro of direct-current charging post
CN210109220U (en) High-impedance transformer simulation loaded through-flow test device
CN112415429B (en) Medium voltage grounding fault intelligent diagnostic instrument
CN201281729Y (en) Grounding resistance tester
CN202159123U (en) Portable detection instrument of characteristics of direct-current circuit breaker
CN202748409U (en) Line power frequency parameter measuring apparatus capable of eliminating power frequency interference
CN213302497U (en) Current transformer secondary side loop detection device and circuit
CN206339637U (en) A kind of power detecting system
CN202256525U (en) Device for testing parameters of high-voltage circuit
CN213398738U (en) Transformer direct resistance transformation ratio comprehensive test system
CN212808479U (en) Electrified fault diagnosis device of low-voltage transformer area zero line
CN103954869A (en) Cable power frequency parameter testing device based on PXI system
CN201177647Y (en) Multiple waveform aging test apparatus of lightning arrester
CN204633468U (en) A kind of area user identification zone device of multimode manner
CN209878904U (en) Black start test system of power system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant