CN107448043B - There are top cover steel feed bin top frame platform formwork, release method - Google Patents

There are top cover steel feed bin top frame platform formwork, release method Download PDF

Info

Publication number
CN107448043B
CN107448043B CN201610372038.0A CN201610372038A CN107448043B CN 107448043 B CN107448043 B CN 107448043B CN 201610372038 A CN201610372038 A CN 201610372038A CN 107448043 B CN107448043 B CN 107448043B
Authority
CN
China
Prior art keywords
feed bin
steel feed
top cover
frame platform
release method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610372038.0A
Other languages
Chinese (zh)
Other versions
CN107448043A (en
Inventor
何勇
谢麟
王吉勤
刘九朝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201610372038.0A priority Critical patent/CN107448043B/en
Publication of CN107448043A publication Critical patent/CN107448043A/en
Application granted granted Critical
Publication of CN107448043B publication Critical patent/CN107448043B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H7/00Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
    • E04H7/22Containers for fluent solids, e.g. silos, bunkers; Supports therefor
    • E04H7/24Constructions, with or without perforated walls, depending on the use of specified materials
    • E04H7/26Constructions, with or without perforated walls, depending on the use of specified materials mainly of concrete, e.g. reinforced concrete or other stone-like materials

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

One kind having top cover steel feed bin top frame platform formwork, release method, characterized by the following steps: a, there is top cover steel feed bin top frame platform formwork, one group of 200 × 110mm inclined sizing block is used on each limiter support, former design gaps 25mm increase 8mm is reached into 33mm in advance, b, there are the demoulding of top cover steel feed bin top frame platform, demoulding, with the entire steel feed bin of several jack stands, pre-set inclined sizing block group is taken out.The apparatus structure for having top cover steel feed bin top frame platform formwork, release method that there is steel feed bin integrally to jack in advance of the invention is simple, sets up conveniently, the construction quality that steel feed bin integrally jacks in advance is safe and reliable, solves the problems, such as the advantages of template support system can not demould dismounting, speed up the work and reduce engineering cost.

Description

There are top cover steel feed bin top frame platform formwork, release method
Technical field
The present invention relates to a kind of framework platform formworks, release method, specifically, being that one kind has top cover steel feed bin top frame Body panel formwork, release method.
Background technique
More main proportioning room steel feed bin divides storehouse of returning mine, mixes ore storage bin, fuel in South Platform modeling quiet steel works sintering first stage of the project in river Ore storage bin, serpentine ore storage bin, 5 kinds of lime stone ore storage bin, totally 36, steel feed bin is by circular cylinder body, annular base, support, cone and top Cover (blending ore steel feed bin is without top cover) composition.Support is mounted on+16.3m concrete platform, and annular base is installed on support, lower half Portion and centrum portion are hung below 16.3m concrete platform, flange in the bottom absolute altitude 3.5m.Steel feed bin top barrel diameter 8.2m, top cover Absolute altitude+21.0m, steel feed bin top is+21.8m concrete platform.Steel feed bin minimum weight 90t, maximum 130t, total about 3725t.
Steel feed bin is arranged in concrete frame structure in platform modeling quiet steel works sintering first stage of the project in river, and integral layout is tight It gathers, steel feed bin geometric dimension is big, steel feed bin top cover and top concrete the platform only gap 100mm.Proportioning room, which shares 20, top Lid steel feed bin and 16 are without top cover steel feed bin.
Fig. 1 is the schematic diagram that the crossbeam beam bottom distance steel feed bin top cover gap of the embodiment of the present invention is 100mm.For there is top The frame superstructure of lid steel feed bin, in construction steel feed bin, having calculated crossbeam beam bottom distance steel feed bin top cover gap is 100mm.If constructed with conventionally following the prescribed order, have top cover steel feed bin after installing, construction upper part frame When body panel structure, template support system can only frame on the top cover for having top cover steel feed bin.And direct frame is in the top cover of steel feed bin On working measure, after waiting tops concrete frame platform structure to conserve, template support system is by concrete structure pressed Inflexibly, it will be unable to demoulding to remove.
Therefore it is known have top cover steel feed bin top frame platform formwork, demoulding there are problems that it is above-mentioned various inconvenient and.
Summary of the invention
The purpose of the present invention is to propose a kind of have top cover steel feed bin top frame platform for what steel feed bin integrally jacked in advance Formwork, release method.
To achieve the above object, the technical solution of the invention is as follows:
One kind having top cover steel feed bin top frame platform formwork, release method, it is characterised in that the following steps are included:
A, there is top cover steel feed bin top frame platform formwork
Every group of support is installed on 16.3m absolute altitude platform as requested, one group 200 is used on each limiter support Former design gaps 25mm increase 8mm is reached 33mm in advance by × 110mm inclined sizing block;It, will by pre-adjusting every group of support absolute altitude Steel feed bin improves 8mm, makes steel feed bin top cover to the real space size 92mm of top concrete girder bottom space;Select template specification For 12mm thickness, flitch 80 × 50mm of specification has been placed directly in template on the steel feed bin top cover of top up to 92mm thickness and completes template Supporting helps steel feed bin and the 21.8m absolute altitude platform construction of top to complete;
B, there are the demoulding of top cover steel feed bin top frame platform, demoulding
After the completion of having the concrete frame platform construction maintenance at the top of top cover steel feed bin, with several entire steel of jack stand Feed bin takes out pre-set inclined sizing block group, in addition the gap 25mm of design itself, puts down steel feed bin above limit support Afterwards, the space 33mm is formed at the top of top crossbeam and steel feed bin, to take off the template under concrete girder;Operating personnel from maintenance hole into Enter demoulding;After form removable, be covered on hole using removable cover, then again with jack by steel feed bin top to setting The elevation of top+21000 of meter installs gravity sensor.
Of the invention has top cover steel feed bin top frame platform formwork, release method that can also use technical measures below To further realize.
Method above-mentioned, wherein every group of support includes jacking bracket, sensor support base and limiter support.
Method above-mentioned, wherein the 21.8m absolute altitude platform construction complete before in advance on 21.8m platform increase by 600 × 600mm overhauls hole, so that operating personnel enters from maintenance hole to demoulding job space.
Method above-mentioned, wherein the jack is 4.
Method above-mentioned, wherein every lifting capacity of the jack is 30t~50t.
After adopting the above technical scheme, of the invention has top cover steel feed bin top frame platform formwork, release method to have Following advantages:
1, the apparatus structure that steel feed bin integrally jacks in advance is simple, sets up conveniently;
2, the construction quality that steel feed bin integrally jacks in advance is safe and reliable, and dismounting can not be demoulded by solving template support system Problem;
3, it speeds up the work, reduce engineering cost.
Detailed description of the invention
Fig. 1 is the schematic diagram that the concrete girder bottom distance steel feed bin top cover gap of the embodiment of the present invention is 100mm;
Fig. 2 is the A-A cross-sectional view in Fig. 1;
Fig. 3 is the enlarged drawing at the position P in Fig. 2, illustrates that former design gaps are 25mm;
Fig. 4 is another enlarged drawing at the position P in Fig. 2, is illustrated by increasing former design gaps from 25mm using inclined sizing block group It is added to 33mm;
Fig. 5 is the enlarged drawing at the position Q in Fig. 2, illustrates steel feed bin top frame platform formwork schematic diagram;
Fig. 6 is another enlarged drawing at the position Q in Fig. 2, illustrates the demoulding of steel feed bin top frame platform, demoulding schematic diagram.
In figure: 1 maintenance hole, 2 steel feed bins, 3 concrete girders, 4 floors, 5 ladders, 6 steel feed bin annular ledges, 7 very heavy topmasts Seat, 8 sensor support bases, 9 limiter supports, 10 inclined sizing block groups, 11 steel feed bin top covers, 12 templates, 13 scaffold support systems, 14 Flitch.
Specific embodiment
With reference to embodiments and its attached drawing further explains the present invention.
Embodiment 1
1. there is top cover steel feed bin top frame platform formwork measure
For there is the frame superstructure of top cover steel feed bin, in construction steel feed bin, crossbeam beam bottom distance steel material has been calculated Silo roof lid gap is 100mm.
According to original design top cover steel feed bin after installing, construction upper part framework platform structure when, template support system System include jacking bracket 7, sensor support base 8, limiter support 9 can only frame on the top cover for having top cover steel feed bin.If straight Frame is connect on the top cover of steel feed bin, after waiting tops concrete frame platform structure to conserve, template support system is by concrete What structure was pressed inflexibly, it will be unable to demoulding and remove.
It is the A-A cross-sectional view in Fig. 1 referring now to Fig. 2-4, Fig. 2, Fig. 3 is the enlarged drawing at the position P in Fig. 2, illustrates that original is set Meter gap is 25mm, and Fig. 4 is another enlarged drawing at the position P in Fig. 2, illustrates that inclined sizing block group is used to make former design gaps from 25mm Increase to 33mm.
It is difficult to demould after being solved the problems, such as using the method that steel feed bin integrally jacks in advance.First as requested by every group of support packet Jacking bracket 7, sensor support base 8 are included, limiter support 9 is installed on 16.3m platform, is used on each limiter support Former design gaps 25mm increase 8mm is reached 33mm in advance by one group of 200 × 110 inclined sizing block group 10.
By pre-adjusting support absolute altitude, steel feed bin is improved into 8mm, then steel feed bin top cover to top concrete crossbeam bottom The real space in space is having a size of 100-8=92mm.Select 12 specification of template thick for 12mm, flitch 80 × 50mm of specification, and just For 92mm, pushed up on steel feed bin top cover so template can be placed directly in completely.
According to the above method supporting complete, after+21.8m the platform construction of steel feed bin and top is complete, steel feed bin top cover, in Between concrete crossbeam, concrete platform will form a closed space, personnel, which cannot be introduced into, to complete to tear frame operation open in this enclosure space, this is empty Between platform board bottom template and support will be unable to remove.Therefore, it before concrete platform of constructing, is linked up with design, it is flat in 21.8m Increase by 600 × 600mm on platform and overhaul hole 1, operating personnel enters from newly-increased maintenance hole to demoulding job space.
2. having the demoulding of top cover steel feed bin top frame platform, demoulding measure
Fig. 5 is the enlarged drawing at the position Q in Fig. 2, illustrates that steel feed bin top frame platform formwork schematic diagram, Fig. 6 are Q in Fig. 2 Another enlarged drawing at position illustrates the demoulding of steel feed bin top frame platform, demoulding schematic diagram.
After the completion of having the concrete frame platform construction maintenance at the top of top cover steel feed bin, with 4 30t~50t jack stands Entire steel feed bin takes out the inclined sizing block group that steel feed bin is improved to 8mm in advance, in addition the gap 25mm of design itself, puts down steel material Storehouse forms the space 33mm after limiting above support at the top of top crossbeam and steel feed bin, the space is a little although narrow, operates It is more difficult but be enough to take off the template under concrete crossbeam.
Operating personnel enters from newly-increased maintenance hole to demoulding job space.After form removable, using removable cover It is covered on hole.Then again with jack by steel feed bin top to the elevation of top+21000 of design, gravity sensor is installed.
The present invention has substantive distinguishing features and significant technological progress, and of the invention has top cover steel feed bin top frame platform Formwork, release method, the arrangement and method for construction integrally jacked in advance using steel feed bin, use device structure is simple, sets up conveniently, steel feed bin The whole construction quality jacked in advance is safe and reliable, solves the problems, such as that template support system can not demould dismounting, also accelerates work Cheng Jindu, engineering cost is reduced.
Above embodiments are used for illustrative purposes only, rather than limitation of the present invention, the technology people in relation to technical field Member, without departing from the spirit and scope of the present invention, can also make various transformation or variation.Therefore, all equivalent Technical solution also should belong to scope of the invention, should be limited by each claim.

Claims (5)

1. one kind has top cover steel feed bin top frame platform formwork, release method, it is characterised in that the following steps are included:
A, there is top cover steel feed bin top frame platform formwork
Every group of support is installed on 16.3m absolute altitude platform as requested, on each limiter support using one group 200 × Former design gaps 25mm increase 8mm is reached 33mm in advance by 110mm inclined sizing block;By pre-adjusting every group of support absolute altitude, by steel Feed bin improves 8mm, makes steel feed bin top cover to the real space size 92mm of top concrete girder bottom space;Select template specification be 12mm is thick, flitch 80 × 50mm of specification, has been placed directly in template on the steel feed bin top cover of top up to 92mm thickness and completes template branch Shield helps steel feed bin and the 21.8m absolute altitude platform construction of top to complete;
B, there are the demoulding of top cover steel feed bin top frame platform, demoulding
After the completion of having the concrete frame platform construction maintenance at the top of top cover steel feed bin, with the entire steel material of several jack stands Pre-set inclined sizing block group is taken out in storehouse, in addition the gap 25mm of design itself, puts down steel feed bin after limiting above support, The space 33mm is formed at the top of top crossbeam and steel feed bin, to take off the template under concrete girder;Operating personnel enters from maintenance hole Demoulding;After form removable, be covered on hole using removable cover, then again with jack by steel feed bin top to design Elevation of top+21000, install gravity sensor.
2. having top cover steel feed bin top frame platform formwork, release method as described in claim 1, which is characterized in that described Every group of support includes jacking bracket, sensor support base and limiter support.
3. having top cover steel feed bin top frame platform formwork, release method as described in claim 1, which is characterized in that described 21.8m absolute altitude platform construction complete before in advance on 21.8m platform increase by 600 × 600mm overhaul hole so that operating personnel from Hole is overhauled to enter to demoulding job space.
4. having top cover steel feed bin top frame platform formwork, release method as described in claim 1, which is characterized in that described Jack is 4.
5. as described in claim 1 or 4 have top cover steel feed bin top frame platform formwork, release method, which is characterized in that institute Every lifting capacity for stating jack is 30t~50t.
CN201610372038.0A 2016-05-31 2016-05-31 There are top cover steel feed bin top frame platform formwork, release method Active CN107448043B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610372038.0A CN107448043B (en) 2016-05-31 2016-05-31 There are top cover steel feed bin top frame platform formwork, release method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610372038.0A CN107448043B (en) 2016-05-31 2016-05-31 There are top cover steel feed bin top frame platform formwork, release method

Publications (2)

Publication Number Publication Date
CN107448043A CN107448043A (en) 2017-12-08
CN107448043B true CN107448043B (en) 2019-06-14

Family

ID=60485705

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610372038.0A Active CN107448043B (en) 2016-05-31 2016-05-31 There are top cover steel feed bin top frame platform formwork, release method

Country Status (1)

Country Link
CN (1) CN107448043B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201176726Y (en) * 2008-04-16 2009-01-07 中冶天工建设有限公司 Deviated gravity center thick wall super large reinforced concrete structures formwork sectional steel support system
CN101435276A (en) * 2008-12-18 2009-05-20 中建二局第三建筑工程有限公司 Hydraulic lifting and positioning device for steel beam at top of silo structure and construction method thereof
CN101476410A (en) * 2009-01-13 2009-07-08 杭州萧宏建设集团有限公司 Mounting and demounting method roof plate formwork support platform of concrete silo
CN101831978A (en) * 2010-03-16 2010-09-15 南通华荣建设集团有限公司 In-situ cast-in-place construction method for pre-tensioned pre-stressed arch-bar barn roof
CN103938908A (en) * 2013-09-29 2014-07-23 天津大学 Silo top slip-form lifting construction method adopting spatial horizontal supporting system
CN105484549A (en) * 2016-01-25 2016-04-13 五矿二十三冶建设集团第一工程有限公司 Installation and construction method of large steel material bin

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201176726Y (en) * 2008-04-16 2009-01-07 中冶天工建设有限公司 Deviated gravity center thick wall super large reinforced concrete structures formwork sectional steel support system
CN101435276A (en) * 2008-12-18 2009-05-20 中建二局第三建筑工程有限公司 Hydraulic lifting and positioning device for steel beam at top of silo structure and construction method thereof
CN101476410A (en) * 2009-01-13 2009-07-08 杭州萧宏建设集团有限公司 Mounting and demounting method roof plate formwork support platform of concrete silo
CN101831978A (en) * 2010-03-16 2010-09-15 南通华荣建设集团有限公司 In-situ cast-in-place construction method for pre-tensioned pre-stressed arch-bar barn roof
CN103938908A (en) * 2013-09-29 2014-07-23 天津大学 Silo top slip-form lifting construction method adopting spatial horizontal supporting system
CN105484549A (en) * 2016-01-25 2016-04-13 五矿二十三冶建设集团第一工程有限公司 Installation and construction method of large steel material bin

Also Published As

Publication number Publication date
CN107448043A (en) 2017-12-08

Similar Documents

Publication Publication Date Title
CN108019076B (en) Construction method of large-diameter reinforced concrete silo and device for conical shell construction
CN104141383B (en) A kind of Bailey beam pendent form support system and construction thereof
CN104018514B (en) Large Towers kind equipment basis pre-embedded anchoring bolts inversion construction method
CN101619630B (en) Mounting method of steel chimney and implementary jacking device
CN103758348B (en) Profile steel framework structure concrete floor slab suspension mould pouring construction method
CN104895314A (en) Truss platform for high and large space top plate concrete construction
CN103468850A (en) Advance integrated installing method of converter
CN109055637B (en) Hydraulic lifting process for mounting furnace shell in blast furnace overhaul
RU2476653C1 (en) Method of erecting high-rise reinforced concrete structures, for example, industrial chimney-stacks and towers
CN107502690A (en) A kind of point of device and replacing options with integral replacing last furnace shell
CN107448043B (en) There are top cover steel feed bin top frame platform formwork, release method
CN101709829B (en) Dismantling method of coal gas storage cabinet
CN204325609U (en) The motor handling instrument of rotor spinning machine
CN102296959B (en) Electric walking shaft formwork supporting system
CN210947710U (en) Synchronous sliding mode system for multiple special-shaped cabin bodies of underground shaft
CN210508326U (en) Liftable well operation platform
CN208617174U (en) Construction elevator foundation support formula reinforcing apparatus
CN204299144U (en) Elevator internal mold operating platform
CN113833259A (en) Limestone warehouse engineering slip form structure and special construction scheme thereof
CN102409120A (en) Blast Furnace Bottom Replacement Method
CN102320525A (en) Single-beam cantilever crane
CN106758845B (en) Concrete structure falls beam joist device and falls beam construction method using it
CN105671245B (en) A kind of method of utilization hoist engine flip-over type installing converter
CN102704694A (en) Method for hoisting silo top steel beam by using sliding form platform
CN204549893U (en) A kind of tackling system of auxiliary hoist jib hinged-support bearing replacing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant