CN107448043B - There are top cover steel feed bin top frame platform formwork, release method - Google Patents
There are top cover steel feed bin top frame platform formwork, release method Download PDFInfo
- Publication number
- CN107448043B CN107448043B CN201610372038.0A CN201610372038A CN107448043B CN 107448043 B CN107448043 B CN 107448043B CN 201610372038 A CN201610372038 A CN 201610372038A CN 107448043 B CN107448043 B CN 107448043B
- Authority
- CN
- China
- Prior art keywords
- feed bin
- steel feed
- top cover
- frame platform
- release method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H7/00—Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
- E04H7/22—Containers for fluent solids, e.g. silos, bunkers; Supports therefor
- E04H7/24—Constructions, with or without perforated walls, depending on the use of specified materials
- E04H7/26—Constructions, with or without perforated walls, depending on the use of specified materials mainly of concrete, e.g. reinforced concrete or other stone-like materials
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
One kind having top cover steel feed bin top frame platform formwork, release method, characterized by the following steps: a, there is top cover steel feed bin top frame platform formwork, one group of 200 × 110mm inclined sizing block is used on each limiter support, former design gaps 25mm increase 8mm is reached into 33mm in advance, b, there are the demoulding of top cover steel feed bin top frame platform, demoulding, with the entire steel feed bin of several jack stands, pre-set inclined sizing block group is taken out.The apparatus structure for having top cover steel feed bin top frame platform formwork, release method that there is steel feed bin integrally to jack in advance of the invention is simple, sets up conveniently, the construction quality that steel feed bin integrally jacks in advance is safe and reliable, solves the problems, such as the advantages of template support system can not demould dismounting, speed up the work and reduce engineering cost.
Description
Technical field
The present invention relates to a kind of framework platform formworks, release method, specifically, being that one kind has top cover steel feed bin top frame
Body panel formwork, release method.
Background technique
More main proportioning room steel feed bin divides storehouse of returning mine, mixes ore storage bin, fuel in South Platform modeling quiet steel works sintering first stage of the project in river
Ore storage bin, serpentine ore storage bin, 5 kinds of lime stone ore storage bin, totally 36, steel feed bin is by circular cylinder body, annular base, support, cone and top
Cover (blending ore steel feed bin is without top cover) composition.Support is mounted on+16.3m concrete platform, and annular base is installed on support, lower half
Portion and centrum portion are hung below 16.3m concrete platform, flange in the bottom absolute altitude 3.5m.Steel feed bin top barrel diameter 8.2m, top cover
Absolute altitude+21.0m, steel feed bin top is+21.8m concrete platform.Steel feed bin minimum weight 90t, maximum 130t, total about 3725t.
Steel feed bin is arranged in concrete frame structure in platform modeling quiet steel works sintering first stage of the project in river, and integral layout is tight
It gathers, steel feed bin geometric dimension is big, steel feed bin top cover and top concrete the platform only gap 100mm.Proportioning room, which shares 20, top
Lid steel feed bin and 16 are without top cover steel feed bin.
Fig. 1 is the schematic diagram that the crossbeam beam bottom distance steel feed bin top cover gap of the embodiment of the present invention is 100mm.For there is top
The frame superstructure of lid steel feed bin, in construction steel feed bin, having calculated crossbeam beam bottom distance steel feed bin top cover gap is
100mm.If constructed with conventionally following the prescribed order, have top cover steel feed bin after installing, construction upper part frame
When body panel structure, template support system can only frame on the top cover for having top cover steel feed bin.And direct frame is in the top cover of steel feed bin
On working measure, after waiting tops concrete frame platform structure to conserve, template support system is by concrete structure pressed
Inflexibly, it will be unable to demoulding to remove.
Therefore it is known have top cover steel feed bin top frame platform formwork, demoulding there are problems that it is above-mentioned various inconvenient and.
Summary of the invention
The purpose of the present invention is to propose a kind of have top cover steel feed bin top frame platform for what steel feed bin integrally jacked in advance
Formwork, release method.
To achieve the above object, the technical solution of the invention is as follows:
One kind having top cover steel feed bin top frame platform formwork, release method, it is characterised in that the following steps are included:
A, there is top cover steel feed bin top frame platform formwork
Every group of support is installed on 16.3m absolute altitude platform as requested, one group 200 is used on each limiter support
Former design gaps 25mm increase 8mm is reached 33mm in advance by × 110mm inclined sizing block;It, will by pre-adjusting every group of support absolute altitude
Steel feed bin improves 8mm, makes steel feed bin top cover to the real space size 92mm of top concrete girder bottom space;Select template specification
For 12mm thickness, flitch 80 × 50mm of specification has been placed directly in template on the steel feed bin top cover of top up to 92mm thickness and completes template
Supporting helps steel feed bin and the 21.8m absolute altitude platform construction of top to complete;
B, there are the demoulding of top cover steel feed bin top frame platform, demoulding
After the completion of having the concrete frame platform construction maintenance at the top of top cover steel feed bin, with several entire steel of jack stand
Feed bin takes out pre-set inclined sizing block group, in addition the gap 25mm of design itself, puts down steel feed bin above limit support
Afterwards, the space 33mm is formed at the top of top crossbeam and steel feed bin, to take off the template under concrete girder;Operating personnel from maintenance hole into
Enter demoulding;After form removable, be covered on hole using removable cover, then again with jack by steel feed bin top to setting
The elevation of top+21000 of meter installs gravity sensor.
Of the invention has top cover steel feed bin top frame platform formwork, release method that can also use technical measures below
To further realize.
Method above-mentioned, wherein every group of support includes jacking bracket, sensor support base and limiter support.
Method above-mentioned, wherein the 21.8m absolute altitude platform construction complete before in advance on 21.8m platform increase by 600 ×
600mm overhauls hole, so that operating personnel enters from maintenance hole to demoulding job space.
Method above-mentioned, wherein the jack is 4.
Method above-mentioned, wherein every lifting capacity of the jack is 30t~50t.
After adopting the above technical scheme, of the invention has top cover steel feed bin top frame platform formwork, release method to have
Following advantages:
1, the apparatus structure that steel feed bin integrally jacks in advance is simple, sets up conveniently;
2, the construction quality that steel feed bin integrally jacks in advance is safe and reliable, and dismounting can not be demoulded by solving template support system
Problem;
3, it speeds up the work, reduce engineering cost.
Detailed description of the invention
Fig. 1 is the schematic diagram that the concrete girder bottom distance steel feed bin top cover gap of the embodiment of the present invention is 100mm;
Fig. 2 is the A-A cross-sectional view in Fig. 1;
Fig. 3 is the enlarged drawing at the position P in Fig. 2, illustrates that former design gaps are 25mm;
Fig. 4 is another enlarged drawing at the position P in Fig. 2, is illustrated by increasing former design gaps from 25mm using inclined sizing block group
It is added to 33mm;
Fig. 5 is the enlarged drawing at the position Q in Fig. 2, illustrates steel feed bin top frame platform formwork schematic diagram;
Fig. 6 is another enlarged drawing at the position Q in Fig. 2, illustrates the demoulding of steel feed bin top frame platform, demoulding schematic diagram.
In figure: 1 maintenance hole, 2 steel feed bins, 3 concrete girders, 4 floors, 5 ladders, 6 steel feed bin annular ledges, 7 very heavy topmasts
Seat, 8 sensor support bases, 9 limiter supports, 10 inclined sizing block groups, 11 steel feed bin top covers, 12 templates, 13 scaffold support systems, 14
Flitch.
Specific embodiment
With reference to embodiments and its attached drawing further explains the present invention.
Embodiment 1
1. there is top cover steel feed bin top frame platform formwork measure
For there is the frame superstructure of top cover steel feed bin, in construction steel feed bin, crossbeam beam bottom distance steel material has been calculated
Silo roof lid gap is 100mm.
According to original design top cover steel feed bin after installing, construction upper part framework platform structure when, template support system
System include jacking bracket 7, sensor support base 8, limiter support 9 can only frame on the top cover for having top cover steel feed bin.If straight
Frame is connect on the top cover of steel feed bin, after waiting tops concrete frame platform structure to conserve, template support system is by concrete
What structure was pressed inflexibly, it will be unable to demoulding and remove.
It is the A-A cross-sectional view in Fig. 1 referring now to Fig. 2-4, Fig. 2, Fig. 3 is the enlarged drawing at the position P in Fig. 2, illustrates that original is set
Meter gap is 25mm, and Fig. 4 is another enlarged drawing at the position P in Fig. 2, illustrates that inclined sizing block group is used to make former design gaps from 25mm
Increase to 33mm.
It is difficult to demould after being solved the problems, such as using the method that steel feed bin integrally jacks in advance.First as requested by every group of support packet
Jacking bracket 7, sensor support base 8 are included, limiter support 9 is installed on 16.3m platform, is used on each limiter support
Former design gaps 25mm increase 8mm is reached 33mm in advance by one group of 200 × 110 inclined sizing block group 10.
By pre-adjusting support absolute altitude, steel feed bin is improved into 8mm, then steel feed bin top cover to top concrete crossbeam bottom
The real space in space is having a size of 100-8=92mm.Select 12 specification of template thick for 12mm, flitch 80 × 50mm of specification, and just
For 92mm, pushed up on steel feed bin top cover so template can be placed directly in completely.
According to the above method supporting complete, after+21.8m the platform construction of steel feed bin and top is complete, steel feed bin top cover, in
Between concrete crossbeam, concrete platform will form a closed space, personnel, which cannot be introduced into, to complete to tear frame operation open in this enclosure space, this is empty
Between platform board bottom template and support will be unable to remove.Therefore, it before concrete platform of constructing, is linked up with design, it is flat in 21.8m
Increase by 600 × 600mm on platform and overhaul hole 1, operating personnel enters from newly-increased maintenance hole to demoulding job space.
2. having the demoulding of top cover steel feed bin top frame platform, demoulding measure
Fig. 5 is the enlarged drawing at the position Q in Fig. 2, illustrates that steel feed bin top frame platform formwork schematic diagram, Fig. 6 are Q in Fig. 2
Another enlarged drawing at position illustrates the demoulding of steel feed bin top frame platform, demoulding schematic diagram.
After the completion of having the concrete frame platform construction maintenance at the top of top cover steel feed bin, with 4 30t~50t jack stands
Entire steel feed bin takes out the inclined sizing block group that steel feed bin is improved to 8mm in advance, in addition the gap 25mm of design itself, puts down steel material
Storehouse forms the space 33mm after limiting above support at the top of top crossbeam and steel feed bin, the space is a little although narrow, operates
It is more difficult but be enough to take off the template under concrete crossbeam.
Operating personnel enters from newly-increased maintenance hole to demoulding job space.After form removable, using removable cover
It is covered on hole.Then again with jack by steel feed bin top to the elevation of top+21000 of design, gravity sensor is installed.
The present invention has substantive distinguishing features and significant technological progress, and of the invention has top cover steel feed bin top frame platform
Formwork, release method, the arrangement and method for construction integrally jacked in advance using steel feed bin, use device structure is simple, sets up conveniently, steel feed bin
The whole construction quality jacked in advance is safe and reliable, solves the problems, such as that template support system can not demould dismounting, also accelerates work
Cheng Jindu, engineering cost is reduced.
Above embodiments are used for illustrative purposes only, rather than limitation of the present invention, the technology people in relation to technical field
Member, without departing from the spirit and scope of the present invention, can also make various transformation or variation.Therefore, all equivalent
Technical solution also should belong to scope of the invention, should be limited by each claim.
Claims (5)
1. one kind has top cover steel feed bin top frame platform formwork, release method, it is characterised in that the following steps are included:
A, there is top cover steel feed bin top frame platform formwork
Every group of support is installed on 16.3m absolute altitude platform as requested, on each limiter support using one group 200 ×
Former design gaps 25mm increase 8mm is reached 33mm in advance by 110mm inclined sizing block;By pre-adjusting every group of support absolute altitude, by steel
Feed bin improves 8mm, makes steel feed bin top cover to the real space size 92mm of top concrete girder bottom space;Select template specification be
12mm is thick, flitch 80 × 50mm of specification, has been placed directly in template on the steel feed bin top cover of top up to 92mm thickness and completes template branch
Shield helps steel feed bin and the 21.8m absolute altitude platform construction of top to complete;
B, there are the demoulding of top cover steel feed bin top frame platform, demoulding
After the completion of having the concrete frame platform construction maintenance at the top of top cover steel feed bin, with the entire steel material of several jack stands
Pre-set inclined sizing block group is taken out in storehouse, in addition the gap 25mm of design itself, puts down steel feed bin after limiting above support,
The space 33mm is formed at the top of top crossbeam and steel feed bin, to take off the template under concrete girder;Operating personnel enters from maintenance hole
Demoulding;After form removable, be covered on hole using removable cover, then again with jack by steel feed bin top to design
Elevation of top+21000, install gravity sensor.
2. having top cover steel feed bin top frame platform formwork, release method as described in claim 1, which is characterized in that described
Every group of support includes jacking bracket, sensor support base and limiter support.
3. having top cover steel feed bin top frame platform formwork, release method as described in claim 1, which is characterized in that described
21.8m absolute altitude platform construction complete before in advance on 21.8m platform increase by 600 × 600mm overhaul hole so that operating personnel from
Hole is overhauled to enter to demoulding job space.
4. having top cover steel feed bin top frame platform formwork, release method as described in claim 1, which is characterized in that described
Jack is 4.
5. as described in claim 1 or 4 have top cover steel feed bin top frame platform formwork, release method, which is characterized in that institute
Every lifting capacity for stating jack is 30t~50t.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610372038.0A CN107448043B (en) | 2016-05-31 | 2016-05-31 | There are top cover steel feed bin top frame platform formwork, release method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610372038.0A CN107448043B (en) | 2016-05-31 | 2016-05-31 | There are top cover steel feed bin top frame platform formwork, release method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107448043A CN107448043A (en) | 2017-12-08 |
CN107448043B true CN107448043B (en) | 2019-06-14 |
Family
ID=60485705
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610372038.0A Active CN107448043B (en) | 2016-05-31 | 2016-05-31 | There are top cover steel feed bin top frame platform formwork, release method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107448043B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201176726Y (en) * | 2008-04-16 | 2009-01-07 | 中冶天工建设有限公司 | Deviated gravity center thick wall super large reinforced concrete structures formwork sectional steel support system |
CN101435276A (en) * | 2008-12-18 | 2009-05-20 | 中建二局第三建筑工程有限公司 | Hydraulic lifting and positioning device for steel beam at top of silo structure and construction method thereof |
CN101476410A (en) * | 2009-01-13 | 2009-07-08 | 杭州萧宏建设集团有限公司 | Mounting and demounting method roof plate formwork support platform of concrete silo |
CN101831978A (en) * | 2010-03-16 | 2010-09-15 | 南通华荣建设集团有限公司 | In-situ cast-in-place construction method for pre-tensioned pre-stressed arch-bar barn roof |
CN103938908A (en) * | 2013-09-29 | 2014-07-23 | 天津大学 | Silo top slip-form lifting construction method adopting spatial horizontal supporting system |
CN105484549A (en) * | 2016-01-25 | 2016-04-13 | 五矿二十三冶建设集团第一工程有限公司 | Installation and construction method of large steel material bin |
-
2016
- 2016-05-31 CN CN201610372038.0A patent/CN107448043B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201176726Y (en) * | 2008-04-16 | 2009-01-07 | 中冶天工建设有限公司 | Deviated gravity center thick wall super large reinforced concrete structures formwork sectional steel support system |
CN101435276A (en) * | 2008-12-18 | 2009-05-20 | 中建二局第三建筑工程有限公司 | Hydraulic lifting and positioning device for steel beam at top of silo structure and construction method thereof |
CN101476410A (en) * | 2009-01-13 | 2009-07-08 | 杭州萧宏建设集团有限公司 | Mounting and demounting method roof plate formwork support platform of concrete silo |
CN101831978A (en) * | 2010-03-16 | 2010-09-15 | 南通华荣建设集团有限公司 | In-situ cast-in-place construction method for pre-tensioned pre-stressed arch-bar barn roof |
CN103938908A (en) * | 2013-09-29 | 2014-07-23 | 天津大学 | Silo top slip-form lifting construction method adopting spatial horizontal supporting system |
CN105484549A (en) * | 2016-01-25 | 2016-04-13 | 五矿二十三冶建设集团第一工程有限公司 | Installation and construction method of large steel material bin |
Also Published As
Publication number | Publication date |
---|---|
CN107448043A (en) | 2017-12-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108019076B (en) | Construction method of large-diameter reinforced concrete silo and device for conical shell construction | |
CN104141383B (en) | A kind of Bailey beam pendent form support system and construction thereof | |
CN104018514B (en) | Large Towers kind equipment basis pre-embedded anchoring bolts inversion construction method | |
CN101619630B (en) | Mounting method of steel chimney and implementary jacking device | |
CN103758348B (en) | Profile steel framework structure concrete floor slab suspension mould pouring construction method | |
CN104895314A (en) | Truss platform for high and large space top plate concrete construction | |
CN103468850A (en) | Advance integrated installing method of converter | |
CN109055637B (en) | Hydraulic lifting process for mounting furnace shell in blast furnace overhaul | |
RU2476653C1 (en) | Method of erecting high-rise reinforced concrete structures, for example, industrial chimney-stacks and towers | |
CN107502690A (en) | A kind of point of device and replacing options with integral replacing last furnace shell | |
CN107448043B (en) | There are top cover steel feed bin top frame platform formwork, release method | |
CN101709829B (en) | Dismantling method of coal gas storage cabinet | |
CN204325609U (en) | The motor handling instrument of rotor spinning machine | |
CN102296959B (en) | Electric walking shaft formwork supporting system | |
CN210947710U (en) | Synchronous sliding mode system for multiple special-shaped cabin bodies of underground shaft | |
CN210508326U (en) | Liftable well operation platform | |
CN208617174U (en) | Construction elevator foundation support formula reinforcing apparatus | |
CN204299144U (en) | Elevator internal mold operating platform | |
CN113833259A (en) | Limestone warehouse engineering slip form structure and special construction scheme thereof | |
CN102409120A (en) | Blast Furnace Bottom Replacement Method | |
CN102320525A (en) | Single-beam cantilever crane | |
CN106758845B (en) | Concrete structure falls beam joist device and falls beam construction method using it | |
CN105671245B (en) | A kind of method of utilization hoist engine flip-over type installing converter | |
CN102704694A (en) | Method for hoisting silo top steel beam by using sliding form platform | |
CN204549893U (en) | A kind of tackling system of auxiliary hoist jib hinged-support bearing replacing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |