CN107448043A - There are top cover steel feed bin top frame platform formwork, release method - Google Patents

There are top cover steel feed bin top frame platform formwork, release method Download PDF

Info

Publication number
CN107448043A
CN107448043A CN201610372038.0A CN201610372038A CN107448043A CN 107448043 A CN107448043 A CN 107448043A CN 201610372038 A CN201610372038 A CN 201610372038A CN 107448043 A CN107448043 A CN 107448043A
Authority
CN
China
Prior art keywords
feed bin
steel feed
top cover
frame platform
release method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610372038.0A
Other languages
Chinese (zh)
Other versions
CN107448043B (en
Inventor
何勇
谢麟
王吉勤
刘九朝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201610372038.0A priority Critical patent/CN107448043B/en
Publication of CN107448043A publication Critical patent/CN107448043A/en
Application granted granted Critical
Publication of CN107448043B publication Critical patent/CN107448043B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H7/00Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
    • E04H7/22Containers for fluent solids, e.g. silos, bunkers; Supports therefor
    • E04H7/24Constructions, with or without perforated walls, depending on the use of specified materials
    • E04H7/26Constructions, with or without perforated walls, depending on the use of specified materials mainly of concrete, e.g. reinforced concrete or other stone-like materials

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

One kind has top cover steel feed bin top frame platform formwork, release method, it is characterised in that comprises the following steps:A, there is top cover steel feed bin top frame platform formwork, one group of 200 × 110mm inclined sizing block is used on each limiter bearing, former design gaps 25mm increases 8mm is reached into 33mm in advance, b, there are the demoulding of top cover steel feed bin top frame platform, form removal, with the whole steel feed bin of some jack stands, the inclined sizing block group pre-set is taken out.The apparatus structure for having top cover steel feed bin top frame platform formwork, release method that there is steel feed bin integrally to jack in advance of the invention is simple, sets up conveniently, the construction quality that steel feed bin integrally jacks in advance is safe and reliable, solves the advantages of problem that template support system can not be stripped dismounting, speed up the work and reduce engineering cost.

Description

There are top cover steel feed bin top frame platform formwork, release method
Technical field
The present invention relates to a kind of framework platform formwork, release method, is that one kind has top cover steel feed bin top frame platform formwork, release method specifically.
Background technology
More main proportioning room steel feed bin divides storehouse of returning mine, mixes ore storage bin, fuel ore storage bin, serpentine ore storage bin, 5 kinds of lime stone ore storage bin in South Platform modeling quiet steel works sintering first stage of the project in river, and totally 36, steel feed bin is by circular cylinder body, annular base, bearing, cone and top cover(Blending ore steel feed bin is without top cover)Composition.Bearing is arranged on+16.3m concrete platforms, and annular base is installed on bearing, and lower half and centrum portion are hung on below 16.3m concretes platform, flange in the bottom absolute altitude 3.5m.Steel feed bin top barrel diameter, top cover absolute altitude+21.0m, steel feed bin top is+21.8m concrete platforms.Steel feed bin minimum weight 90t, maximum 130t, common about 3725t.
Steel feed bin is arranged in concrete frame structure in platform modeling quiet steel works sintering first stage of the project in river, and integral layout is compact, and steel feed bin physical dimension is big, steel feed bin top cover and top concrete platform only 100mm gaps.Proportioning room, which shares 20, has top cover steel feed bin and 16 without top cover steel feed bin.
Fig. 1 is the schematic diagram that the crossbeam beam bottom distance steel feed bin top cover gap of the embodiment of the present invention is 100mm.For there is the frame superstructure of top cover steel feed bin, in construction steel feed bin, it is 100mm to have calculated crossbeam beam bottom distance steel feed bin top cover gap.If constructed with conventionally following the prescribed order, have top cover steel feed bin after installing, its top framework platform structure of constructing when, template support system can only frame on the top cover for having top cover steel feed bin.And direct working measure of the frame on the top cover of steel feed bin, wait after top concrete frame platform structure conserves, template support system by it is concrete structure pressed inflexibly, will be unable to the demoulding and remove.
Therefore it is known have top cover steel feed bin top frame platform formwork, the demoulding there are problems that above-mentioned a variety of inconvenience and.
The content of the invention
The purpose of the present invention, it is to propose a kind of have top cover steel feed bin top frame platform formwork, release method by what steel feed bin integrally jacked in advance.
To achieve the above object, technical solution of the invention is:
One kind has top cover steel feed bin top frame platform formwork, release method, it is characterised in that comprises the following steps:
A, there is top cover steel feed bin top frame platform formwork
Every group of bearing is installed on 16.3m absolute altitude platforms as requested, one group of 200 × 110mm inclined sizing block is used on each limiter bearing, former design gaps 25mm increases 8mm is reached into 33mm in advance;By pre-adjusting every group of bearing absolute altitude, steel feed bin is improved into 8mm, makes steel feed bin top cover to the real space size 92mm of top concrete girder bottom space;It is 12mm thick, flitch 80 × 50mm of specification from template specification, template has been placed directly in up to 92mm thickness on the steel feed bin top cover of top and complete template support, help steel feed bin and the 21.8m absolute altitudes platform construction of top to complete;
B, there are the demoulding of top cover steel feed bin top frame platform, form removal
After the completion of having the maintenance of the concrete frame platform construction at the top of top cover steel feed bin, with the whole steel feed bin of some jack stands, take out the inclined sizing block group pre-set, plus the 25mm gaps of design itself, after steel feed bin is put down above the spacing bearing, top crossbeam is with forming 33mm spaces at the top of steel feed bin, to take off the template under concrete girder;Operating personnel enters form removal from maintenance hole;After form removable, be covered in using removable cover on hole, then again with jack by steel feed bin top to design elevation of top+21000, install gravity sensor.
The present invention's has top cover steel feed bin top frame platform formwork, release method to be further achieved by the following technical measures.
Foregoing method, wherein every group of bearing includes very heavy Top bearings, sensor support base and limiter bearing.
Foregoing method, wherein the 21.8m absolute altitudes platform construction increases by 600 × 600mm maintenance holes on 21.8m platforms in advance before completing, so that operating personnel enters from maintenance hole treats form removal job space.
Foregoing method, wherein the jack is 4.
Foregoing method, wherein every lifting capacity of the jack is 30t~50t.
After adopting the above technical scheme, the present invention's has top cover steel feed bin top frame platform formwork, release method to have advantages below:
1st, the apparatus structure that steel feed bin integrally jacks in advance is simple, sets up conveniently;
2nd, the construction quality that steel feed bin integrally jacks in advance is safe and reliable, solves the problem that template support system can not be stripped dismounting;
3rd, speed up the work, reduce engineering cost.
Brief description of the drawings
Fig. 1 is the schematic diagram that the concrete girder bottom distance steel feed bin top cover gap of the embodiment of the present invention is 100mm;
Fig. 2 is the A-A sectional views in Fig. 1;
Fig. 3 is the enlarged drawing at P positions in Fig. 2, and it is 25mm to illustrate former design gaps;
Fig. 4 is another enlarged drawing at P positions in Fig. 2, is illustrated by making former design gaps increase to 33mm from 25mm using inclined sizing block group;
Fig. 5 is the enlarged drawing at Q positions in Fig. 2, illustrates steel feed bin top frame platform formwork schematic diagram;
Fig. 6 is another enlarged drawing at Q positions in Fig. 2, illustrates the demoulding of steel feed bin top frame platform, form removal schematic diagram.
In figure:1 maintenance hole, 2 steel feed bins, 3 concrete girders, 4 floors, 5 cat ladders, 6 steel feed bin annular ledges, 7 very heavy Top bearings, 8 sensor support bases, 9 limiter bearings, 10 inclined sizing block groups, 11 steel feed bin top covers, 12 templates, 13 scaffold support systems, 14 flitches.
Embodiment
With reference to embodiments and its accompanying drawing illustrates further to the present invention.
Embodiment 1
1. there is top cover steel feed bin top frame platform formwork measure
For there is the frame superstructure of top cover steel feed bin, in construction steel feed bin, it is 100mm to have calculated crossbeam beam bottom distance steel feed bin top cover gap.
According to original design top cover steel feed bin after installing, its top framework platform structure of constructing when, template support system includes very heavy Top bearings 7, sensor support base 8, limiter bearing 9 can only frame on the top cover for having top cover steel feed bin.If direct frame on the top cover of steel feed bin, is waited after top concrete frame platform structure conserves, template support system by it is concrete structure pressed inflexibly, will be unable to the demoulding and remove.
Referring now to Fig. 2-4, Fig. 2 is the A-A sectional views in Fig. 1, and Fig. 3 is the enlarged drawing at P positions in Fig. 1, and it is 25mm to illustrate former design gaps, and Fig. 4 is another enlarged drawing at P positions in Fig. 1, is illustrated through making former design gaps increase to 33mm from 25mm using inclined sizing block group.
The demoulding is difficult after the method integrally jacked in advance using steel feed bin is solved the problems, such as.Every group of bearing is first included into very heavy Top bearings 7, sensor support base 8 as requested, limiter bearing 9 is installed on 16.3m platforms, and one group of 200 × 110 inclined sizing block group 10 is used on each limiter bearing, and former design gaps 25mm increases 8mm is reached into 33mm in advance.
By pre-adjusting bearing absolute altitude, steel feed bin is improved into 8mm, then the real space size of steel feed bin top cover to top concrete crossbeam bottom space is 100-8=92mm.It is 12mm thick, flitch 80 × 50mm of specification from the specification of template 12, and is just 92mm, so template can be placed directly on the steel feed bin top cover of top completely.
Supporting is completed as stated above, after+21.8m the platform constructions of steel feed bin and top are complete, steel feed bin top cover, middle concrete crossbeam, concrete platform will form the space of a closing, personnel, which cannot be introduced into this closing space, to complete to tear frame operation open, and the template of the landing slab bottom in this space and support will be unable to remove.Therefore, before concrete platform of constructing, linked up with design, increase by 600 × 600mm maintenance holes 1 on 21.8m platforms, operating personnel enters from newly-increased maintenance hole treats form removal job space.
2. there are the demoulding of top cover steel feed bin top frame platform, form removal measure
Fig. 5 is the enlarged drawing at Q positions in Fig. 1, illustrates steel feed bin top frame platform formwork schematic diagram, and Fig. 6 is another enlarged drawing at Q positions in Fig. 1, illustrates the demoulding of steel feed bin top frame platform, form removal schematic diagram.
After the completion of having the maintenance of the concrete frame platform construction at the top of top cover steel feed bin, with the whole steel feed bin of 4 30t~50t jack stands, take out the inclined sizing block group that steel feed bin is improved to 8mm in advance, plus the 25mm gaps of design itself, after steel feed bin is put down above the spacing bearing, for top crossbeam with forming 33mm spaces at the top of steel feed bin, the space is a little although narrow and small, and operation is more difficult but is enough to take off the template under concrete crossbeam.
Operating personnel enters from newly-increased maintenance hole treats form removal job space.After form removable, it is covered in using removable cover on hole.Then again with jack by steel feed bin top to design elevation of top+21000, install gravity sensor.
The present invention has substantive distinguishing features and significant technological progress, the present invention's has top cover steel feed bin top frame platform formwork, release method, the arrangement and method for construction integrally jacked in advance using steel feed bin, use device is simple in construction, sets up conveniently, the construction quality that steel feed bin integrally jacks in advance is safe and reliable, solve the problem that template support system can not be stripped dismounting, also accelerate project progress, reduce engineering cost.
Above example is used for illustrative purposes only, rather than limitation of the present invention, person skilled in the relevant technique, without departing from the spirit and scope of the present invention, can also make various conversion or change.Therefore, all equivalent technical schemes should also belong to scope of the invention, should be limited by each claim.

Claims (5)

1. one kind has top cover steel feed bin top frame platform formwork, release method, it is characterised in that comprises the following steps:
A, there is top cover steel feed bin top frame platform formwork
Every group of bearing is installed on 16.3m absolute altitude platforms as requested, one group of 200 × 110mm inclined sizing block is used on each limiter bearing, former design gaps 25mm increases 8mm is reached into 33mm in advance;By pre-adjusting every group of bearing absolute altitude, steel feed bin is improved into 8mm, makes steel feed bin top cover to the real space size 92mm of top concrete girder bottom space;It is 12mm thick, flitch 80 × 50mm of specification from template specification, template has been placed directly in up to 92mm thickness on the steel feed bin top cover of top and complete template support, help steel feed bin and the 21.8m absolute altitudes platform construction of top to complete;
B, there are the demoulding of top cover steel feed bin top frame platform, form removal
After the completion of having the maintenance of the concrete frame platform construction at the top of top cover steel feed bin, with the whole steel feed bin of some jack stands, take out the inclined sizing block group pre-set, plus the 25mm gaps of design itself, after steel feed bin is put down above the spacing bearing, top crossbeam is with forming 33mm spaces at the top of steel feed bin, to take off the template under concrete girder;Operating personnel enters form removal from maintenance hole;After form removable, be covered in using removable cover on hole, then again with jack by steel feed bin top to design elevation of top+21000, install gravity sensor.
2. there are top cover steel feed bin top frame platform formwork, release method as claimed in claim 1, it is characterised in that every group of bearing includes very heavy Top bearings, sensor support base and limiter bearing.
3. there are top cover steel feed bin top frame platform formwork, release method as claimed in claim 1, it is characterized in that, the 21.8m absolute altitudes platform construction increases by 600 × 600mm maintenance holes on 21.8m platforms in advance before completing, so that operating personnel enters from maintenance hole treats form removal job space.
4. there are top cover steel feed bin top frame platform formwork, release method as claimed in claim 1, it is characterised in that the jack is 4.
5. there are top cover steel feed bin top frame platform formwork, release method as described in claim 1 or 4, it is characterised in that every lifting capacity of the jack is 30t~50t.
CN201610372038.0A 2016-05-31 2016-05-31 There are top cover steel feed bin top frame platform formwork, release method Active CN107448043B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610372038.0A CN107448043B (en) 2016-05-31 2016-05-31 There are top cover steel feed bin top frame platform formwork, release method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610372038.0A CN107448043B (en) 2016-05-31 2016-05-31 There are top cover steel feed bin top frame platform formwork, release method

Publications (2)

Publication Number Publication Date
CN107448043A true CN107448043A (en) 2017-12-08
CN107448043B CN107448043B (en) 2019-06-14

Family

ID=60485705

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610372038.0A Active CN107448043B (en) 2016-05-31 2016-05-31 There are top cover steel feed bin top frame platform formwork, release method

Country Status (1)

Country Link
CN (1) CN107448043B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201176726Y (en) * 2008-04-16 2009-01-07 中冶天工建设有限公司 Deviated gravity center thick wall super large reinforced concrete structures formwork sectional steel support system
CN101435276A (en) * 2008-12-18 2009-05-20 中建二局第三建筑工程有限公司 Cabin top steel beam hydraulic hoisting and positioning apparatus of cylinder cabin structure building and construction method thereof
CN101476410A (en) * 2009-01-13 2009-07-08 杭州萧宏建设集团有限公司 Mounting and demounting method roof plate formwork support platform of concrete silo
CN101831978A (en) * 2010-03-16 2010-09-15 南通华荣建设集团有限公司 In-situ cast-in-place construction method for pre-tensioned pre-stressed arch-bar barn roof
CN103938908A (en) * 2013-09-29 2014-07-23 天津大学 Silo top slip-form lifting construction method adopting spatial horizontal supporting system
CN105484549A (en) * 2016-01-25 2016-04-13 五矿二十三冶建设集团第一工程有限公司 Installation and construction method of large steel material bin

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201176726Y (en) * 2008-04-16 2009-01-07 中冶天工建设有限公司 Deviated gravity center thick wall super large reinforced concrete structures formwork sectional steel support system
CN101435276A (en) * 2008-12-18 2009-05-20 中建二局第三建筑工程有限公司 Cabin top steel beam hydraulic hoisting and positioning apparatus of cylinder cabin structure building and construction method thereof
CN101476410A (en) * 2009-01-13 2009-07-08 杭州萧宏建设集团有限公司 Mounting and demounting method roof plate formwork support platform of concrete silo
CN101831978A (en) * 2010-03-16 2010-09-15 南通华荣建设集团有限公司 In-situ cast-in-place construction method for pre-tensioned pre-stressed arch-bar barn roof
CN103938908A (en) * 2013-09-29 2014-07-23 天津大学 Silo top slip-form lifting construction method adopting spatial horizontal supporting system
CN105484549A (en) * 2016-01-25 2016-04-13 五矿二十三冶建设集团第一工程有限公司 Installation and construction method of large steel material bin

Also Published As

Publication number Publication date
CN107448043B (en) 2019-06-14

Similar Documents

Publication Publication Date Title
CN108019076B (en) Construction method of large-diameter reinforced concrete silo and device for conical shell construction
CN104141383B (en) A kind of Bailey beam pendent form support system and construction thereof
CN201411900Y (en) Hydraulic die lifter for chimneys
CN103628680A (en) Construction method for large-area steel structure hanging layer
CN108035594A (en) The prefabricated decompression cone construction method of concrete silo structure
CN104975719A (en) Novel material distribution device and floor concrete casting construction method of novel material distribution device
CN109025291A (en) A kind of construction method of separate type precast stair
CN103790390A (en) Glass plate hoisting system for large-span dome glass curtain wall construction and construction method thereof
CN104594655A (en) Application method for dismantling temporary supports in brick-concrete structure wall
JP2011047111A (en) Method for constructing concrete wall formed on inner wall surface of vertical shaft
CN109055637B (en) Hydraulic lifting process for mounting furnace shell in blast furnace overhaul
CN106223354B (en) The construction method of shallow foundation stay in place form
RU2476653C1 (en) Method of erecting high-rise reinforced concrete structures, for example, industrial chimney-stacks and towers
CN101709829B (en) Dismantling method of coal gas storage cabinet
CN102561392A (en) Structure for supporting construction elevator foundation on basement top plate and construction method thereof
CN104531931B (en) Blast furnace discharge yard bottom cleaning shaft installation method
CN107448043A (en) There are top cover steel feed bin top frame platform formwork, release method
CN111021269A (en) Bailey beam dismantling construction method in bridge engineering
CN204850435U (en) Case roof beam of using top die body system promotes anti -falling device
CN102515030A (en) Construction process for replacement for steam pocket in narrow condition
CN106758845B (en) Concrete structure falls beam joist device and falls beam construction method using it
CN202440851U (en) Structure for supporting construction elevator foundation on basement top plate
CN113833259A (en) Limestone warehouse engineering slip form structure and special construction scheme thereof
Zhang et al. Significant progress in construction equipment of super high-rise building
CN106121254A (en) Heavy component transportation system and construction method after a kind of contrary sequence method dismounting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant