CN107439269A - A kind of Fast Installation formula agricultural greenhouse combining structure - Google Patents
A kind of Fast Installation formula agricultural greenhouse combining structure Download PDFInfo
- Publication number
- CN107439269A CN107439269A CN201710900237.9A CN201710900237A CN107439269A CN 107439269 A CN107439269 A CN 107439269A CN 201710900237 A CN201710900237 A CN 201710900237A CN 107439269 A CN107439269 A CN 107439269A
- Authority
- CN
- China
- Prior art keywords
- veneer
- stopper slot
- integrative
- bolt
- sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G9/00—Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
- A01G9/14—Greenhouses
- A01G9/16—Dismountable or portable greenhouses ; Greenhouses with sliding roofs
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A40/00—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
- Y02A40/10—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
- Y02A40/25—Greenhouse technology, e.g. cooling systems therefor
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Environmental Sciences (AREA)
- Greenhouses (AREA)
Abstract
Invention provides a kind of Fast Installation formula agricultural greenhouse combining structure, including fixed base seat board, fixed base seat board is made up of multigroup veneer, veneer upper surface two side ends are fixedly installed the protrusion post plate of integrative-structure, transverse slat is fixedly mounted in the first stopper slot by bolt II, connecting rod is movably hinged with by bearing pin in second stopper slot, arch tube is fixedly connected by the bolt III of sleeve basal surface medial extremity with sleeve.Fixed base seat board is fixed on ground surface by the present invention by anchor pole, the bearing capacity and intensity of whole greenhouse can be greatly improved, then transverse slat is fixedly mounted in the first stopper slot of the first limited block by bolt II, the endwise tensile strength of greenhouse bracket can be improved, improve the wind resistance of greenhouse bracket, arch tube is fixed in sleeve by bolt III, it can solve the problem that arch tube produces situation about significantly rocking under strong wind weather, this structure Stability Analysis of Structures, it is easy for installation, without welding, the speed of installation is improved.
Description
Technical field
Invention is related to agricultural greenhouse technical field, specially a kind of Fast Installation formula agricultural greenhouse combining structure.
Background technology
In the Agricultural Activities such as vegetable cultivation, flower culture and the seed breeding of agricultural greenhouse frame worldwide
Substantial amounts of application is arrived, its basic structure is all aided with insulating plastic film composition using steelframe main body, in order to adjust illumination, also sets
External sunshade canopy is equipped with, and is equipped with that rain-proof, windproof, gear be cold and the auxiliary facility such as modern agriculture science and technology facility, it is in office so as to realize
Vegetable cultivation, flower culture and the seed breeding in what season, so that transition of the traditional agriculture to modern science and technology agricultural is able to
Smoothly realize.Traditional big-canopy framework is typically made up of several arch tubes and column, and the arch tube is bent to form necessarily using metal tube
Span curved arc arch tube is that the bottom of each column first is fixed on into ground during installation, is spaced between each column as ceiling
Greenhouse framework body is formed, then adjacent two arch tube is threaded together by iron wire, is then again fixed on each arch tube by steel strand wires
On column, finally greenhouse framework laterally and longitudinally between built and be connected with longeron using crossbeam, the adjacent arch of the big-canopy framework
Connection is tightened using iron wire by hand between pipe, is fixedly connected by hand using longitudinal and transverse steel strand wires between each arch tube and column, should
Kind builds connected mode, wastes time and energy, cost of labor height, efficiency is low, and arch tube easily shakes in strong wind weather, fastness
Bad, column is directly anchored on ground, makes intensity deficiency of the greenhouse frame in carrying, wind resistance, resistance to compression, during use unsightly,
Easy avalanche.And greenhouse framework body laterally and longitudinally between built and be connected with tubing such as longerons using crossbeam, material wave when building
Fei great, cost is high, and crossbeam is typically fixed on column or arch tube with longeron using welding manner, and welding job common people will not
Operation further increases cost of labor, it is necessary to professional welder completion;In addition, using this mounting means, once install, just
It is difficult to dismantle, it is proposed that a kind of Fast Installation formula agricultural greenhouse combining structure.
The content of the invention
The purpose of invention is to provide a kind of Fast Installation formula agricultural greenhouse combining structure, to solve in above-mentioned background technology
The problem of proposition.
To achieve the above object, invention provides following technical scheme:A kind of Fast Installation formula agricultural greenhouse combining structure, bag
Fixed base seat board is included, the fixed base seat board is made up of multigroup veneer, and the veneer end surface is fixedly installed integrative-structure
Grafting block, and another end surfaces of veneer offer inserting groove, and veneer is plugged in described in another group by grafting block described in one group
In the inserting groove of veneer, and veneer described in one group is fixedly connected by the first fastening bolt with veneer described in another group, the list
Plate upper surface two side ends are fixedly installed the protrusion post plate of integrative-structure, and the protrusion post plate two side ends are provided with integral knot
First protrusion side plate of structure, the protrusion post plate top are provided with pillar panel, and the pillar panel rear surface both side surface is equal
The second protrusion side plate of integrative-structure is provided with, the pillar panel lower end passes through the bolt I and protrusion post on the second protrusion side plate
First protrusion side plate of plate is fixedly connected, and outer surface is provided with the first limited block of integrative-structure in the middle part of pillar panel, and first
Limited block upper surface middle part offers the first stopper slot, horizontal positioned in the first stopper slot to have transverse slat, first limited block
Front side surface is provided with bolt II, and the transverse slat is fixedly mounted in the first stopper slot by bolt II, in the middle part of the pillar panel
Inner surface is provided with the second limited block of integrative-structure, and the second limited block upper surface middle part offers the second stopper slot,
Connecting rod is movably hinged with by bearing pin in second stopper slot, the small end is provided with sleeve, sleeve lower surface
Outboard end is provided with the 3rd limited block of integrative-structure, offers the 3rd stopper slot in the middle part of the 3rd limited block basal surface, institute
State small end and be movably hinged and be arranged in the 3rd stopper slot, the 4th is offered in the middle part of the inner surface of the pillar panel upper end
Stopper slot, arch tube is installed with by the second fastening bolt in the 4th stopper slot, the equal activity in arch tube upper end is plugged in
In sleeve, and arch tube is fixedly connected by the bolt III of sleeve basal surface medial extremity with sleeve.
Preferably, the veneer outer surface two side ends are fixedly installed the casting lug thereon of integrative-structure, the casting lug thereon
Middle part surface is inserted with anchor pole, and the veneer is fixedly mounted on ground by anchor pole.
Preferably, the veneer length is 1.6m, and distance of the pillar panel between veneer surface described in two groups is 1m.
Compared with prior art, the beneficial effect of invention is:Invent easy to operate, improve the installation rate of greenhouse, together
When improve the intensity of greenhouse, it is specific as follows:
1st, before carrying out greenhouse installation exercise, calculate the length of greenhouse, by by multigroup veneer splicing into appropriate length
Fixed base seat board, fixed base seat board is fixed on ground surface by anchor pole, by by the integral structure of veneer splicing,
The stability on greenhouse basis can be substantially increased, the bearing capacity and intensity of whole greenhouse can be improved;
2nd, pillar panel is fixedly mounted on protrusion post plate surface by bolt I, transverse slat is then fixed into peace by bolt II
In the first stopper slot of the first limited block, it is possible to increase the endwise tensile strength of greenhouse bracket, improve greenhouse bracket
Wind resistance;
3rd, connecting rod is pulled out, arch tube activity is plugged in the sleeve of pull bar upper end, it is then that arch tube one end is tight by second
Fixing bolt is fixedly mounted in the 4th stopper slot, after arch tube installation, arch tube is fixed in sleeve by bolt III, energy
The bearing strength of arch tube is enough greatly improved, also can solve the problem that arch tube produces the situation for significantly rocking loosening under strong wind weather.
Brief description of the drawings
Fig. 1 is inventive structure schematic diagram;
Fig. 2 is invention middle sleeve sectional view;
Fig. 3 is veneer sectional view in the present invention.
In figure:1 veneer, 2 grafting blocks, 3 inserting grooves, 4 first fastening bolts, 5 casting lug thereons, 6 anchor poles, 7 protrusion post plates, 8
One protrusion side plate, 9 pillar panels, 10 second protrusion side plates, 11 first limited blocks, 12 first stopper slots, 13 transverse slats, 14 second limits
Position block, 15 second stopper slots, 16 connecting rods, 17 sleeves, 18 the 3rd limited blocks, 19 the 3rd stopper slots, 20 arch tubes, 21, it is the 4th spacing
Groove, 22 second fastening bolts.
Embodiment
Below in conjunction with the accompanying drawing in inventive embodiments, the technical scheme in inventive embodiments is carried out clearly and completely
Description, it is clear that described embodiment is only invention part of the embodiment, rather than whole embodiments.Based in invention
Embodiment, the every other embodiment that those of ordinary skill in the art are obtained under the premise of creative work is not made,
Belong to the scope of invention protection.
Fig. 1-3 are referred to, invention provides a kind of technical scheme:A kind of Fast Installation formula agricultural greenhouse combining structure, including
Fixed base seat board, fixed base seat board are made up of multigroup veneer 1, and the length of veneer 1 is 1.6m, and the outer surface two side ends of veneer 1 are solid
Surely the casting lug thereon 5 of integrative-structure is provided with, the middle part surface of casting lug thereon 5 is inserted with anchor pole 6, and the veneer 1 is fixedly mounted by anchor pole 6
On ground, the end surface of veneer 1 is fixedly installed the grafting block 2 of integrative-structure, and 1 another end surfaces of veneer offer grafting
Groove 3, one group of veneer 1 are plugged in the inserting groove 3 of another group of veneer 1 by grafting block 2, and one group of veneer 1 passes through the first fastening
Bolt 4 is fixedly connected with another group of veneer 1, and the upper surface two side ends of veneer 1 are fixedly installed the protrusion post plate 7 of integrative-structure,
The two side ends of protrusion post plate 7 are provided with the first protrusion side plate 8 of integrative-structure.
The top of protrusion post plate 7 is provided with pillar panel 9, and distance of two groups of pillar panels 9 between the surface of veneer 1 is 1m, stands
The rear surface both side surface of post plate 9 is provided with the second protrusion side plate 10 of integrative-structure, and the lower end of pillar panel 9 passes through second
Bolt I on protrusion side plate 10 is fixedly connected with the first protrusion side plate 8 of protrusion post plate 7, and the middle part outer surface of pillar panel 9 is all provided with
The first limited block 11 of integrative-structure is equipped with, the upper surface middle part of the first limited block 11 offers the first stopper slot 12, the first limit
Horizontal positioned in the groove 12 of position to have transverse slat 13, the front side surface of the first limited block 11 is provided with bolt II, and transverse slat 13 is solid by bolt II
Dingan County is in the first stopper slot 12.
The inside middle portion surface of pillar panel 9 is provided with the second limited block 14 of integrative-structure, the upper surface of the second limited block 14
Middle part offers the second stopper slot 15, and connecting rod 16, the upper end of connecting rod 16 are movably hinged with by bearing pin in the second stopper slot 15
Sleeve 17 is provided with, the lower surface outboard end of sleeve 17 is provided with the 3rd limited block 18 of integrative-structure, the 3rd limited block 18
The 3rd stopper slot 19 is offered in the middle part of basal surface, the upper end of connecting rod 16, which is movably hinged, to be arranged in the 3rd stopper slot 19, column
The 4th stopper slot 21 is offered in the middle part of the upper end inner surface of plate 9, is consolidated in the 4th stopper slot 21 by the second fastening bolt 22
Dingan County is equipped with arch tube 20, and the equal activity in the upper end of arch tube 20 is plugged in sleeve 17, and arch tube 20 passes through the basal surface medial extremity of sleeve 17
Bolt III be fixedly connected with sleeve 17, whole greenhouse structure without welding, it is easy for installation, substantially increase greenhouse installation speed
Degree.
Operation principle:Before carrying out greenhouse installation exercise, the length of greenhouse is calculated, by the way that multigroup veneer 1 is spliced into
The fixed base seat board of appropriate length, fixed base seat board is fixed on ground surface by anchor pole, by improving greenhouse base
The stability of plinth, the bearing capacity and intensity of whole greenhouse can be greatly improved, pillar panel 9 is fixedly mounted by bolt I
On the surface of protrusion post plate 7, then transverse slat 13 is fixedly mounted in the first stopper slot 12 of the first limited block 11 by bolt II,
The endwise tensile strength of greenhouse bracket can be improved, improves the wind resistance of greenhouse bracket, connecting rod 16 is pulled out, arch tube 20 is lived
It is dynamic to be plugged in the sleeve 17 of the upper end of pull bar 16, the one end of arch tube 20 is then fixedly mounted on the 4th limit by the second fastening bolt
In the groove 21 of position, after 20 installation of arch tube, arch tube 20 is fixed in sleeve 17 by bolt III, arch tube can be greatly improved
20 bearing strength, it also can solve the problem that arch tube 20 produces situation about significantly rocking under strong wind weather.
While there has been shown and described that the embodiment invented, for the ordinary skill in the art, Ke Yili
Solution can carry out a variety of changes, modification to these embodiments in the case where not departing from the principle of invention and spirit, replace and become
Type, the scope of invention are defined by the appended claims and the equivalents thereof.
Claims (3)
1. a kind of Fast Installation formula agricultural greenhouse combining structure, including fixed base seat board, the fixed base seat board is by multigroup veneer
(1) form, it is characterised in that:Veneer (1) end surface is fixedly installed the grafting block (2) of integrative-structure, and veneer (1)
Another end surfaces offer inserting groove (3), and veneer (1) is plugged in veneer (1) described in another group by grafting block (2) described in one group
Inserting groove (3) in, and veneer (1) described in one group passes through the first fastening bolt (4) and veneer (1) described in another group is fixed connects
Connect, veneer (1) upper surface two side ends are fixedly installed the protrusion post plate (7) of integrative-structure, the protrusion post plate (7) two
Side is provided with the first protrusion side plate (8) of integrative-structure, and pillar panel (9), institute are provided with above the protrusion post plate (7)
State the second protrusion side plate (10) that pillar panel (9) rear surface both side surface is provided with integrative-structure, pillar panel (9) lower end
It is fixedly connected by the bolt I on the second protrusion side plate (10) with the first protrusion side plate (8) of protrusion post plate (7), pillar panel
(9) middle part outer surface is provided with the first limited block (11) of integrative-structure, and the first limited block (11) upper surface middle part is opened
It is horizontal positioned in the first stopper slot (12) to have transverse slat (13), the first limited block (11) front side provided with the first stopper slot (12)
Surface is provided with bolt II, and the transverse slat (13) is fixedly mounted in the first stopper slot (12) by bolt II, the pillar panel
(9) inside middle portion surface is provided with the second limited block (14) of integrative-structure, and the second limited block (14) upper surface middle part is opened
Provided with the second stopper slot (15), connecting rod (16), the connecting rod are movably hinged with by bearing pin in second stopper slot (15)
(16) upper end is provided with sleeve (17), and sleeve (17) lower surface outboard end is provided with the 3rd limited block of integrative-structure
(18) the 3rd stopper slot (19), the equal moveable hinge in connecting rod (16) upper end, are offered in the middle part of the 3rd limited block (18) basal surface
Connect and be arranged in the 3rd stopper slot (19), the 4th stopper slot (21) is offered in the middle part of the inner surface of pillar panel (9) upper end,
Arch tube (20) is installed with by the second fastening bolt (22) in 4th stopper slot (21), arch tube (20) upper end is living
It is dynamic to be plugged in sleeve (17), and bolt III and sleeve (17) fixed company of the arch tube (20) by sleeve (17) basal surface medial extremity
Connect.
A kind of 2. Fast Installation formula agricultural greenhouse combining structure according to claim 1, it is characterised in that:The veneer
(1) outer surface two side ends are fixedly installed the casting lug thereon (5) of integrative-structure, and casting lug thereon (5) middle part surface is inserted with
Anchor pole (6), the veneer (1) are fixedly mounted on ground by anchor pole (6).
A kind of 3. Fast Installation formula agricultural greenhouse combining structure according to claim 1, it is characterised in that:The veneer
(1) length is 1.6m, and pillar panel (9) described in two groups is 1m on the distance between veneer (1) surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710900237.9A CN107439269A (en) | 2017-09-28 | 2017-09-28 | A kind of Fast Installation formula agricultural greenhouse combining structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710900237.9A CN107439269A (en) | 2017-09-28 | 2017-09-28 | A kind of Fast Installation formula agricultural greenhouse combining structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107439269A true CN107439269A (en) | 2017-12-08 |
Family
ID=60498494
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710900237.9A Withdrawn CN107439269A (en) | 2017-09-28 | 2017-09-28 | A kind of Fast Installation formula agricultural greenhouse combining structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107439269A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112075265A (en) * | 2020-09-24 | 2020-12-15 | 高彦军 | Detachable and fast-assembled reinforced greenhouse framework structure and assembling method thereof |
CN112075266A (en) * | 2020-09-24 | 2020-12-15 | 高彦军 | Cable membrane greenhouse structure with rapid building process |
CN112160421A (en) * | 2020-09-24 | 2021-01-01 | 高彦军 | Agricultural greenhouse capable of being quickly connected and connecting method thereof |
-
2017
- 2017-09-28 CN CN201710900237.9A patent/CN107439269A/en not_active Withdrawn
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112075265A (en) * | 2020-09-24 | 2020-12-15 | 高彦军 | Detachable and fast-assembled reinforced greenhouse framework structure and assembling method thereof |
CN112075266A (en) * | 2020-09-24 | 2020-12-15 | 高彦军 | Cable membrane greenhouse structure with rapid building process |
CN112160421A (en) * | 2020-09-24 | 2021-01-01 | 高彦军 | Agricultural greenhouse capable of being quickly connected and connecting method thereof |
CN112075266B (en) * | 2020-09-24 | 2022-07-12 | 山西清露金华节能科技有限公司 | Cable membrane greenhouse structure with rapid building process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202663885U (en) | Grape steel frame rainproof shed | |
CN107439269A (en) | A kind of Fast Installation formula agricultural greenhouse combining structure | |
CN205357443U (en) | Movable steel wire grape trellis | |
CN201135056Y (en) | Green vegetables, fruits shed | |
CN104885868A (en) | Independent Y-shaped pergola building method applicable to mountain halfpace pear garden | |
CN214546019U (en) | Large-scale double-arch greenhouse of northwest area all-steel frame | |
CN206251687U (en) | A kind of solar photovoltaic green-house | |
CN205305570U (en) | Simple and easy big -arch shelter | |
CN103782843A (en) | Vegetable greenhouse with labor and materials saved | |
CN208597439U (en) | Pear tree composite frame | |
CN204168835U (en) | Green house moulded by a kind of wood | |
CN206237934U (en) | A kind of seedling raising greenhouse | |
CN208739718U (en) | A kind of greenhouse frame | |
CN211207903U (en) | Outdoor advertising device convenient to dismouting | |
CN204948923U (en) | Hasp is fixed exempts from to tie up tectorial membrane for green house | |
CN205574216U (en) | Many portable wind and rain canopies of point type | |
CN203788826U (en) | Grape trellis for wide- and narrow-row planting | |
CN103688792A (en) | Multi-span bilayer-film greenhouse | |
CN207063689U (en) | A kind of sunshade | |
CN110402723A (en) | A kind of long-span solar greenhouse and its building method | |
CN204090647U (en) | Connect a plastic tunnel | |
CN207201486U (en) | A kind of large span inserts ground canopy | |
CN205962122U (en) | Grape support column | |
CN202068784U (en) | Economic, practical and multi-purpose greenhouse shed | |
CN205813025U (en) | The Fructus Vitis viniferae of a kind of umbrella-shaped structure is taken shelter from rain frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20171208 |