CN107436985A - 一种基于bim的卫生间地砖铺设方法 - Google Patents
一种基于bim的卫生间地砖铺设方法 Download PDFInfo
- Publication number
- CN107436985A CN107436985A CN201710631295.6A CN201710631295A CN107436985A CN 107436985 A CN107436985 A CN 107436985A CN 201710631295 A CN201710631295 A CN 201710631295A CN 107436985 A CN107436985 A CN 107436985A
- Authority
- CN
- China
- Prior art keywords
- bim
- gradient
- floor tile
- ground
- tile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Civil Engineering (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Architecture (AREA)
- Road Paving Structures (AREA)
Abstract
本发明公开了一种基于BIM的卫生间地砖铺设方法,包括以下几个步骤:(1)、建立卫生间地面、地漏、地砖三者的三维模型;(2)、利用BIM的动态模拟过程和数据分析,获得地砖的最高处到地漏处的地砖之间的坡度,以及上一坡层和下一坡层之间的坡度差;(3)、将动态模拟过程中的地砖进行坡层分级并排列顺序编号;(4)、铺设时,将地砖按照步骤(3)中的坡层分级和排列顺序编号,并利用获得的上述坡度、坡度差进行次序铺设即可完成的铺设工作。本发明利用BIM,通过对模型的建立和模型建造的动态模拟,为实际施工提供了数据依据,能够适用于贴砖技术不熟练的操作者,降低了错误发生率和返工率,加快了工程进度。
Description
技术领域
本发明涉及建筑领域,具体涉及一种基于BIM的卫生间地砖铺设方法。
背景技术
建筑信息模型是建筑学、工程学及土木工程的新工具。建筑信息模型(BuildingInformation Modeling,简称BIM),被定义成由完全和充足信息构成以支持生命周期管理,并可由计算机应用程序直接解释的建筑或建筑工程信息模型。简言之,即数字技术支撑的对建筑环境的生命周期管理。利用BIM技术对现有建筑施工进行辅助,是建筑施工的一大趋势。
现有的卫生间的坡度都是操作工人在铺砖的时候,同时用水平尺找坡度,这样非常容易造成卫生间坡度较差,有的地方高,有的地方低,造成这个问题的原因在于施工过程并没有数据依据,这个问题在贴砖不高的操作工人上更加突出。若没有预设一个能够模拟真实场景的施工方法,无法构建合适的卫生间坡度,将对屋主的日常生活造成重大的影响。
发明内容
本发明的目的在于提供一种基于BIM的卫生间地砖铺设方法,该方法首先建立卫生间相关建筑构件的三维模型,基于BIM的动态模拟过程和数据分析,获得卫生间的坡度,并获得上一坡层和下一坡层之间的坡度差,为实施铺设时提供数据依据,在铺设时,对地砖进行坡层分级和排列顺序编号,在数据依据的基础上,施工能够顺利无返率的进行。
本发明通过下述技术方案实现:
一种基于BIM的卫生间地砖铺设方法,包括以下几个步骤:
(1)、基于施工图纸,建立卫生间地面、地漏、地砖三者的三维模型;
(2)、利用BIM的动态模拟过程和数据分析,建立地砖铺设在卫生间地面的动态模拟过程,获得地砖的最高处到地漏处的地砖之间的坡度,以及上一坡层和下一坡层之间的坡度差;
(3)、将动态模拟过程中的地砖进行坡层分级并排列顺序编号;
(4)、铺设时,将地砖按照步骤(3)中的坡层分级和排列顺序编号,并利用获得的上述坡度、坡度差进行次序铺设即可完成的铺设工作。
还需要对步骤(2)中的坡度进行判定,若坡度符合施工标准,则继续进行步骤(3);若坡度不符合施工标准,则对地砖的模拟过程进行调整,直至坡度符合施工标准为止。
坡度为卫生间坡水的1%-3%。
坡度差为0.2%-0.3%。
本发明的发明构思在于,本发明首先建立卫生间相关建筑构件的三维模型,基于BIM的动态模拟过程和数据分析,获得卫生间的坡度,并获得上一坡层和下一坡层之间的坡度差,为实施铺设时提供数据依据,在铺设时,对地砖进行坡层分级和排列顺序编号,在数据依据的基础上,施工能够顺利无返率的进行。并且按照这样的数据进行铺设施工,也不会造成局部积水。
本发明与现有技术相比,具有如下的优点和有益效果:
本发明利用BIM,通过对模型的建立和模型建造的动态模拟,为实际施工提供了数据依据,能够适用于贴砖技术不熟练的操作者,降低了错误发生率和返工率,加快了工程进度。
具体实施方式
为使本发明的目的、技术方案和优点更加清楚明白,下面结合实施例,对本发明作进一步的详细说明,本发明的示意性实施方式及其说明仅用于解释本发明,并不作为对本发明的限定。
实施例1
一种基于BIM的卫生间地砖铺设方法,包括以下几个步骤:
(1)、基于施工图纸,建立卫生间地面、地漏、地砖三者的三维模型;
(2)、利用BIM的动态模拟过程和数据分析,建立地砖铺设在卫生间地面的动态模拟过程,获得地砖的最高处到地漏处的地砖之间的坡度,以及上一坡层和下一坡层之间的坡度差;
(3)、将动态模拟过程中的地砖进行坡层分级并排列顺序编号;
(4)、铺设时,将地砖按照步骤(3)中的坡层分级和排列顺序编号,并利用获得的上述坡度、坡度差进行次序铺设即可完成的铺设工作。
实施例2
和实施例1类似,还需要对步骤(2)中的坡度进行判定,若坡度符合施工标准,则继续进行步骤(3);若坡度不符合施工标准,则对地砖的模拟过程进行调整,直至坡度符合施工标准为止。
坡度为卫生间坡水的1%-3%。
坡度差为0.2%-0.3%。
以上所述的具体实施方式,对本发明的目的、技术方案和有益效果进行了进一步详细说明,所应理解的是,以上所述仅为本发明的具体实施方式而已,并不用于限定本发明的保护范围,凡在本发明的精神和原则之内,所做的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (4)
1.一种基于BIM的卫生间地砖铺设方法,其特征在于,包括以下几个步骤:
(1)、基于施工图纸,建立卫生间地面、地漏、地砖三者的三维模型;
(2)、利用BIM的动态模拟过程和数据分析,建立地砖铺设在卫生间地面的动态模拟过程,获得地砖的最高处到地漏处的地砖之间的坡度,以及上一坡层和下一坡层之间的坡度差;
(3)、将动态模拟过程中的地砖进行坡层分级并排列顺序编号;
(4)、铺设时,将地砖按照步骤(3)中的坡层分级和排列顺序编号,并利用获得的上述坡度、坡度差进行次序铺设即可完成的铺设工作。
2.根据权利要求1所述的基于BIM的卫生间地砖铺设方法,其特征在于,还需要对步骤(2)中的坡度进行判定,若坡度符合施工标准,则继续进行步骤(3);若坡度不符合施工标准,则对地砖的模拟过程进行调整,直至坡度符合施工标准为止。
3.根据权利要求1所述的基于BIM的卫生间地砖铺设方法,其特征在于,坡度为卫生间坡水的1%-3%。
4.根据权利要求1所述的基于BIM的卫生间地砖铺设方法,其特征在于,坡度差为0.2%-0.3%。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710631295.6A CN107436985A (zh) | 2017-07-28 | 2017-07-28 | 一种基于bim的卫生间地砖铺设方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710631295.6A CN107436985A (zh) | 2017-07-28 | 2017-07-28 | 一种基于bim的卫生间地砖铺设方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107436985A true CN107436985A (zh) | 2017-12-05 |
Family
ID=60460216
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710631295.6A Pending CN107436985A (zh) | 2017-07-28 | 2017-07-28 | 一种基于bim的卫生间地砖铺设方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107436985A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117610312A (zh) * | 2024-01-04 | 2024-02-27 | 中建三局集团华南有限公司 | 基于bim正向设计地面施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201276803Y (zh) * | 2008-10-07 | 2009-07-22 | 大连九洲建设集团有限公司 | 下沉卫生间防水地面 |
US20110282901A1 (en) * | 2009-09-18 | 2011-11-17 | TEECOM Design Group | Apparatus and Method for Constructing and Utilizing a Beacon Location Database |
CN104712076A (zh) * | 2015-02-06 | 2015-06-17 | 崔新明 | 基于bim技术的蒸压砂加气混凝土砌块墙体施工工法 |
CN104894319A (zh) * | 2015-06-30 | 2015-09-09 | 中国一冶集团有限公司 | 基于bim技术的热风炉格子砖砌块施工方法 |
CN105781064A (zh) * | 2016-03-04 | 2016-07-20 | 上海宝冶集团有限公司 | 基于bim的地砖铺设施工方法 |
CN106088598A (zh) * | 2016-06-12 | 2016-11-09 | 中国十七冶集团有限公司 | 一种运用bim技术进行施工样板引路的方法 |
-
2017
- 2017-07-28 CN CN201710631295.6A patent/CN107436985A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201276803Y (zh) * | 2008-10-07 | 2009-07-22 | 大连九洲建设集团有限公司 | 下沉卫生间防水地面 |
US20110282901A1 (en) * | 2009-09-18 | 2011-11-17 | TEECOM Design Group | Apparatus and Method for Constructing and Utilizing a Beacon Location Database |
CN104712076A (zh) * | 2015-02-06 | 2015-06-17 | 崔新明 | 基于bim技术的蒸压砂加气混凝土砌块墙体施工工法 |
CN104894319A (zh) * | 2015-06-30 | 2015-09-09 | 中国一冶集团有限公司 | 基于bim技术的热风炉格子砖砌块施工方法 |
CN105781064A (zh) * | 2016-03-04 | 2016-07-20 | 上海宝冶集团有限公司 | 基于bim的地砖铺设施工方法 |
CN106088598A (zh) * | 2016-06-12 | 2016-11-09 | 中国十七冶集团有限公司 | 一种运用bim技术进行施工样板引路的方法 |
Non-Patent Citations (3)
Title |
---|
张道真: "《建筑防水》", 31 August 2014 * |
徐勇戈: "《BIM概论》", 31 October 2016 * |
赵永任: "《工程项目管理》", 31 August 2016 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117610312A (zh) * | 2024-01-04 | 2024-02-27 | 中建三局集团华南有限公司 | 基于bim正向设计地面施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107066750B (zh) | 一种解决机电综合管线排布的方法 | |
CN109359351B (zh) | 一种管道三维建模方法及管道设计方法 | |
CN106709660A (zh) | 基于bim的建筑设计方法 | |
CN106599477A (zh) | 一种基于revit三维平台桩基自动生成与三维算量方法 | |
CN105678006A (zh) | 一种基坑开挖图绘制方法 | |
CN111539060B (zh) | 基于bim的建筑砌体施工方法、装置、设备以及介质 | |
CN106500633A (zh) | 一种平整度检测方法 | |
CN109635340B (zh) | 一种基于倾斜摄影和bim的矿山加工系统设计方法 | |
CN110889160A (zh) | 一种基于bim技术的市政管道施工方法 | |
CN107299762A (zh) | 一种基于bim的混凝土浇注方法 | |
CN110502834A (zh) | 基于bim的城市轨道交通车辆基地设计方法 | |
CN107292060A (zh) | 基于bim技术的地下室路面涂覆方法 | |
CN107436985A (zh) | 一种基于bim的卫生间地砖铺设方法 | |
CN107169080A (zh) | 一种基于gis和空间数据库相结合的地理空间分析系统 | |
CN108389229B (zh) | 一种污染场地修复方法及装置 | |
CN111046471B (zh) | 一种帷幕灌浆三维可视化模型构建方法 | |
CN107292058A (zh) | 一种基于bim技术的空心砖砌体方法 | |
CN107491583A (zh) | 一种分级构建电力电缆井参数化模型的方法 | |
CN116776449A (zh) | 一种基于SketchUp软件的核电厂厂区总平面布置方法及系统 | |
CN107436984A (zh) | 一种基于bim的酒窖施工方法 | |
CN109271701B (zh) | 一种基于达索系统的给水排水bim正向设计方法 | |
CN114280259B (zh) | 基于水文地质条件和动力条件的地下水盐分分布分析方法 | |
CN107451356A (zh) | 一种基于bim的外墙砌筑方法 | |
CN109583102A (zh) | 一种钢筋混凝土支撑设计的优化方法、装置及系统 | |
KR101777270B1 (ko) | Bim을 이용한 bipv 설치영역 설정방법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171205 |
|
RJ01 | Rejection of invention patent application after publication |